Att 3 eCAS Reports and Plans~1.docx
DOCX document 72 KB Posted
- Attached to
- 22EHSLCe-CASRFR: Request for Responses for the EHS Comprehensive Assessment System Vendor
- Solicitation number
- BD-22-1039-EHS01-EHS01-70914
- Issued by
- Suffolk County, Massachusetts
About this file
This document is an Attachment to a Request for Responses (RFR) issued by the Executive Office of Health and Human Services (EOHHS) in Massachusetts. The RFR is for the procurement of a qualified vendor to implement, maintain, and support a software solution for digitized clinical assessments and workflows for certain MassHealth long-term services and supports and behavioral health programs, with potential expansion to other MassHealth programs. The RFR outlines the required project deliverables, reports, and plans that the selected vendor must provide, including functional specification documents, test plans, training materials, deployment and acceptance plans, and various maintenance and operations support deliverables.
The RFR requires the vendor to develop a comprehensive solution to support assessment workflows, operations, and quality monitoring, as well as generate CMS reports and project deliverables to allow EOHHS to monitor progress. The vendor will also be required to establish data exchanges with Health Plans and Providers, develop a robust training program, and provide ongoing maintenance and support for the solution. The contract will be awarded for an initial term, with potential renewal options.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 3: E-CAS REPORTS AND PLANS
Contents
| ATTACHMENT 3: E-CAS REPORTS AND PLANS | 1 |
| User Reports | 3 |
| CMS Reports | 8 |
| Project Deliverables/Reports | 8 |
| Project Initiation Completion Milestone | 8 |
| Requirement Elaboration and Specification Definition Milestone | 8 |
| Production Deployment Certification Milestone | 9 |
| Termination of Warranty Period Milestone | 9 |
| Project Kickoff Protocol and Materials Package | 9 |
| Implementation Plan | 9 |
| Project Risk Management Plan | 11 |
| Project Progress and Status Report | 13 |
| Issue Log | 13 |
| Change Log Templates | 13 |
| Requirement Elaboration and Specification Definition Protocol and Materials Package | 13 |
| Functional Specification Documents | 13 |
| Requirements Traceability Matrix | 14 |
| Product Requirement Document | 14 |
| User Interface Design Document | 15 |
| Software Architecture Design Document | 16 |
| Data Integration/Interface Specifications Documents | 16 |
| EOHHS Data Exchange Plan | 17 |
| Trading Partner Data Exchange Plan | 17 |
| Project Progress and Status Reports | 17 |
| Test Plan including Test Scenarios, Test Cases and Test Scripts | 18 |
| Solution Test Results and Certification | 19 |
| Pilot Plan | 19 |
| Pilot Outreach and Training Materials | 19 |
| Pilot Results Report | 19 |
| Knowledge Transfer and Training Plan | 19 |
| Training Materials Package | 21 |
| End-User Manuals and Quick Reference Guides | 21 |
| Solution Technical Documentation | 21 |
| Data Conversion and Migration Plan | 21 |
| Deployment and Acceptance Plan | 22 |
| Incident and Defect Resolution Log and Report | 23 |
| Production Deployment Certification | 24 |
| Solution Maintenance and Support (M&S) Plan | 24 |
| Maintenance and Support Activity Reports | 25 |
| Incident Reports – Solution Maintenance | 25 |
| Continuity of Operations and Disaster Recovery Plan | 25 |
| Data Security Plan | 26 |
| System Security Risk Management Plan | 26 |
| Solution Operations and Hosting Plan | 26 |
| Incident Reports – Operations and Hosting | 27 |
| System Performance Reports | 27 |
| Availability and Performance Reports | 28 |
Attachment 3, UCA System Reports and Plans 2 The Bidder will provide reports including:
· User reports will support assessment operations and program management, including monitoring of assessment workflows, operations and quality, Assessor performance, provider performance, and assessed individuals’ clinical needs for use in program integrity initiatives, population health analytics and policy development. Reports will be available as part of each user’s dashboard and will include standard programmatic reports and the capacity for users to customize reports based on a set of predetermined parameters, as well as selected data sets for download. Reports will be populated with data available based on each user’s authorized access (i.e. based on user role, Provider organization, Assessment Team, and Release of Information). See the User Reports section below for the types of standard reports and proposed elements the Selected Bidder will develop for users.
· CMS reports to support EOHHS performance reporting to the Centers for Medicare and Medicaid Services (CMS). CMS reports will be available in a form and format and on a cadence to be specified by EOHHS.
· Project Deliverables/reports will allow EOHHS to monitor Selected Bidder project progress. The Project Deliverables Table below includes the Deliverables/Reports/Plans from Section 3.2 Implementation Tasks and Deliverables and Section 3.4 Maintenance and Operations Support Services Tasks and Deliverables. Plans are identified in bold font.
· System performance reports will support EOHHS with monitoring ongoing system performance. See the System Performance Reports Table below for details.
User Reports User reports will be developed for each Assessment Tool according to the implementation process outlined in RFR Section 3.2 and will meet requirements described in RFR Section 1.4.1.1.10.
The table below outlines report example users and potential use cases:
| Example Report User |
| Proposed Report Elements |
| Example Reporting Use Case |
| Individual Assessor |
| Individual or summary information about an assessed individual. Reports may include: |
· Information about behavioral health needs, functional needs, program eligibility, demographics, MassHealth coverage type, number of assessments per year, assessment Outputs, no-show rates, etc.
· Data from a single assessment or information from multiple assessments to show trends over time.
Help clinicians gather information, prioritize needs for intervention and examine improvement or challenges over time.
Facilitate options counseling and referrals to specific services that the individual has been determined eligible for. For example, the UCA may indicate that a Member is eligible for several LTSS programs, and the report may be used to facilitate discussion of how best to meet the Member’s needs.
| Supervisor or Team Lead |
| Individual or summary information about assessed individuals. Reports may include: |
· Information about behavioral health needs, functional needs, program eligibility, demographics, MassHealth coverage type, number of assessments per year, assessment Outputs, no-show rates, etc.
· Data from a single assessment or information from multiple assessments to show trends over time.
· Data from a single assessed individual or groups of assessed individuals (i.e. Assessor’s entire caseload).
Individual or summary information about Assessors and their work. Reports may include:
· Assessment Outputs, answers to high priority assessment questions, excerpts from narrative sections, etc.
· Assessor productivity (e.g., timeliness to schedule and complete assessments, number of assessments completed) and performance (e.g., outcome of quality reviews, Appeals).
· Data from a single assessment or information from multiple assessments to show trends over time.
Help supervisors examine case mix of caseloads for equity of case assignment.
Help supervisors examine accuracy of CANS ratings to inform supervision.
Help supervisors provide quality supervision around assessment and case conceptualization as well as intervention choices.
Monitor interrater reliability (IRR) and provide opportunities for coaching and training of individual Assessors.
| Provider Organization |
| Summary information about assessed individuals. Reports may include: |
· Information about behavioral health needs, functional needs, program eligibility, demographics, MassHealth coverage type, number of assessments per year, assessment Outputs, no-show rates, etc.
· Data from multiple assessments to show trends over time.
· Data from groups of assessed individuals (e.g., all individuals at an outpatient clinic).
· Combined assessment data with claims, Prior Authorization, or other service utilization data.
Monitor population characteristics including acuity, presenting problems and demographic information.
Support new program development, grant writing, or quality improvement initiatives.
Monitor population health trends over time, including outcomes of services.
Provide information about case mix by program type (for instance in-home therapy vs. outpatient).
Calculate performance metrics or quality measures.
| EOHHS State Agency Level |
| Summary information about assessed individuals. Reports may include: |
· Information about behavioral health needs, functional needs, program eligibility, demographics, MassHealth coverage type, number of assessments per year, assessment Outputs, no-show rates, etc.
· Data from multiple assessments to show trends over time.
· Data from groups of assessed individuals (e.g., all individuals at an outpatient clinic).
· Combined assessment data with claims, Prior Authorization, or other service utilization data.
Information about specific Assessment Tool workflow steps. Reports may include:
· Quality review statistics, including productivity and performance (e.g., number of assessments selected for quality review, outcomes of quality review such as changes made to assessments).
· Appeals statistics, including productivity and performance (e.g., withdrawals prior to Appeal, BOH decisions (upheld, partially upheld, overturned, new information provided during hearing).
· Data from a single assessment or information from multiple assessments to show trends over time.
· Data from a single assessed individual or groups of assessed individuals (i.e. Assessor’s entire caseload).
· Data associated with a single or multiple Assessors, Assessment Teams, Providers, programs, services, or state agencies.
Examine population health trends, such as changes in functional and clinical needs over time. For example, CANS data can be linked to service utilization data to analyze the relationship between population characteristics, clinical needs, service utilization, and outcomes.
Assess availability of needed service providers by geographic region.
Examine predictors and outcomes of service utilization.
Monitor Provider and Health Plan compliance and performance, including calculating performance metrics or quality measures.
Support new program or policy development.
Support contract management, program integrity initiatives, and process improvement efforts (e.g., improving the way Appeals are managed).
| Training Team |
| Individual or summary information about Assessors and their work. Reports may include: |
· Assessment Outputs, answers to high priority assessment questions, excerpts from narrative sections, etc.
· Assessor productivity (e.g., timeliness to schedule and complete assessments, number of assessments completed) and performance (e.g., outcome of quality reviews, Appeals).
· Data from a single assessment or information from multiple assessments to show trends over time.
Monitor interrater reliability (IRR) and provide opportunities for coaching and training of individual Assessors.
Examine trends in quality of Assessors’ practice in order to identify continued training needs and develop future trainings.
Examine data quality.
| Health Plans |
| Summary information about assessed individuals. Reports may include: |
· Information about behavioral health needs, functional needs, program eligibility, demographics, MassHealth coverage type, number of assessments per year, assessment Outputs, no-show rates, etc.
· Data from multiple assessments to show trends over time.
· Data from groups of assessed individuals (e.g., all individuals at an outpatient clinic).
· Combined assessment data with claims, Prior Authorization, or other service utilization data.
Summary information about Providers. Reports may include:
· Assessor, Assessment Team, or Provider productivity (e.g., timeliness to schedule and complete assessments, number of assessments completed) and performance (e.g., outcome of quality reviews, Appeals).
Examine population health trends, such as changes in functional and clinical needs over time. For example, CANS data can be linked to service utilization data to analyze the relationship between population characteristics, clinical needs, service utilization, and outcomes.
Assess availability of needed service providers by geographic region.
Examine predictors and outcomes of service utilization.
Monitor Provider compliance and performance, including calculating performance metrics or quality measures.
CMS Reports
| REPORT CATEGORY |
| PROPOSED REPORT ELEMENTS |
| Outcomes Reports |
| Includes specific outcome measures agreed upon by EOHHS and CMS. Includes establishing baseline performance and tracking performance over time. Anticipated measures include, but are not limited to: |
· e-CAS usage/access by EOHHS staff users
· Number of assessments for the same member for different programs or services
· Spend on assessments for the same member for different programs or services
· Number of members receiving services who have e-CAS assessment data
· Program Integrity analyses conducted using e-CAS data
Project Deliverables/Reports
| DELIVERABLE |
| DESCRIPTION |
| RFR SECTION/ TASK |
| Description and Metrics of Acceptance |
| Payment Schedule (Due Date) |
| Project Initiation Completion Milestone |
| The Selected Bidder will have a repeatable, tested approach for initiating implementation of the e-CAS. The aim of Project Initiation is to ensure that EOHHS and relevant stakeholders understand and approve the Selected Bidder’s approach to implementation, communications, documentation review and progress tracking throughout the lifespan of the project. |
There are a number of Tasks and Deliverables specified in the RFR and listed in this Attachment.
| Section 3.2, Implementation Tasks and Deliverables; Section 1.9, Payment |
| To be determined |
| Payment will be made according to agreed upon project timeline |
| Requirement Elaboration and Specification Definition Milestone |
| After Project Initiation, the Selected Bidder will undertake requirement elaboration and specification definition activities, including but not limited to design sessions/workshops with select EOHHS personnel. The aim of Requirement Elaboration and Specification Definition is to clearly outline the detailed design and configuration of the e-CAS platform and identify any required customization. This will require the discovery and documentation of current business practices, where appropriate, clarification of RFR requirements and defining more detailed specifications. This work will include eliciting and documenting input from stakeholders to gain an understanding of user requirements and needs, work across teams to identify new workflows, and determine the user priorities of the system. The Selected Bidder must be familiar with the business environment of clinical assessments and preferably LTSS and BH to address potential roadblocks, challenges, and risks. |
| Section 3.2, Implementation Tasks and Deliverables; Section 1.9, Payment |
| To be determined |
| Payment will be made according to agreed upon project timeline |
| Production Deployment Certification Milestone |
| The Selected Bidder will manage the deployment and acceptance process, including facilitating tasks and milestones according to schedule, ensuring effective communications between stakeholders, and recording and resolving incidents and Defects. |
There are a number of Tasks and Deliverables specified in the RFR and listed in this Attachment.
| Section 3.2, Implementation Tasks and Deliverables; Section 1.9, Payment |
| To be determined |
| Payment will be made according to agreed upon project timeline |
| Termination of Warranty Period Milestone |
| Termination of Warranty Period as defined in Attachment 1, Statement of Work, Section 10.2. |
There are a number of Tasks and Deliverables specified in the RFR and listed in this Attachment.
| RFR Section 1.9, Payment; Attachment 1, Statement of Work, Section 10.2 |
| To be determined |
| Payment will be made according to agreed upon project timeline |
| Project Kickoff Protocol and Materials Package |
| Project Kickoff Protocol and Materials Package – By a mutually agreed upon date, the Selected Bidder will provide a documented protocol for project initiation and a package of materials that, once customized, may be used in meetings, presentations, and other project kickoff activities. |
There are a number of Tasks and Deliverables specified in the RFR and listed in this Attachment.
| Section 3.2.1, Project Initiation |
| To be determined |
| Due at Project Initiation Completion Milestone; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Implementation Plan |
| Implementation Plan – By a mutually agreed upon date, the Selected Bidder will produce a baseline Implementation Plan. The Selected Bidder’s Implementation Plan will demonstrate that the Selected Bidder has a thorough understanding of the project scope and Tasks and what must be done to satisfy the project requirements. The Implementation Plan must include detail sufficient for EOHHS to understand how the Selected Bidder intends to manage the project throughout the full system development lifecycle. The Implementation Plan must include the following: |
· Scope: High-level definition of the scope of functionality that the e-CAS will have, including the timing of Phases 1-2 of the e-CAS implementation and which programs, services, and functional Modules will be included in each implementation stage.
· Project timeline and overview: A three-level work breakdown structure; project timeline; project Milestones; and Deliverables. For each milestone and Deliverable, the Selected Bidder will describe exactly what will be provided to meet the Milestone or Deliverable, metrics used to determine when the Milestone or Deliverable has been met, and project schedule associated with the Milestone or Deliverable. If applicable, Milestones and Deliverables should be included for the implementation of each stage of the project.
· Project stages: Describes the Selected Bidder’s process to complete each major project stage (i.e., Project Initiation; Requirements, Development, Testing, and Pilot; Knowledge Transfer and Training; Data Conversion and Migration; Deployment and Acceptance).
· Work management and execution guidance: Includes description of how the Selected Bidder will ensure the project team is completing work according to project timelines and at a high level of quality. Must include proposed meetings and meeting cadence, a description of the environment that the Selected Bidder will set up to manage the project and project information and to facilitate collaboration among project team members (this environment can take the form of an online “project portal”), and any other specifics related to work completion and work processes that the Selected Bidder deems important.
· Division of project tasks: Describes how Selected Bidder will utilize its resources for certain project activities and when the team will rely on EOHHS resources for certain project activities. Includes high-level roles and responsibilities, Selected Bidder staffing plan and organizational chart, and any other important information related to division of labor. Additionally, the Selected Bidder must clearly specify deliverables and dates that require EOHHS’s involvement for technical setup and project environments and the involvement of EOHHS staff in implementation activities.
· Documentation of key project information and management of project documentation: Describes how the Selected Bidder will record assumptions, decisions, risks, and other key pieces of project information. Describes how documents will be maintained, including document owners and update protocols. Must also detail how the “project portal” will manage the flow of project-related documents.
· Stakeholder management: Describes how the Selected Bidder will engage various project stakeholders throughout the life of the project to ensure all impacted parties are aware of project progress and are consulted as needed. The Selected Bidder will address EOHHS stakeholders as well as Providers and Health Plans.
· Project controls: Describes how the Selected Bidder will facilitate key management review as to project content, scope, and schedule.
· Any other sections that the Selected Bidder deems necessary and are approved by EOHHS.
The Selected Bidder’s Implementation Plan shall be constructed in accordance with industry standards, accepted project management principles outlined in the Project Management Body of Knowledge (PMBOK) from the Project Management Institute, or acceptable equivalent. The Selected Bidder must build, produce and maintain the Implementation Plan in Microsoft Project or comparable project management system approved by EOHHS.
| Section 3.2.1, Project Initiation |
| To be determined |
| Due at Project Initiation Completion Milestone; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Project Risk Management Plan |
| Project Risk Management Plan – By a mutually agreed upon date, the Selected Bidder will produce a Risk Management Plan. The Risk Management Plan must be a forward-looking plan that describes: |
· How the Selected Bidder has already identified (based on prior experience and organizational experience) and will, during the course of the implementation, identify issues that could affect the achievement of project objectives;
· How the Selected Bidder will systematically assess and rank the risk associated with these issues;
· How the Selected Bidder is already pursuing or would rapidly develop and implement mitigation strategies that effectively address the risks associated with the aforementioned issues; and
· The tools the Selected Bidder will use for tracking internal (Selected Bidder) and external (EOHHS, Provider, Health Plan) issues and related risks, including both technical and non-technical issues that could affect the Deliverables, schedule and/or budget.
EOHHS expects that, at a minimum, the plan will contain the following sections:
· Risk Management Approach – This section of the Risk Management Plan must provide a general description for the approach the Selected Bidder will take to identify and manage the risks associated with the project.
· Risk Identification – This section of the Risk Management Plan must explain the process by which the risks associated with the e-CAS will be identified. It must describe the method(s) for how the Selected Bidder identifies the risks, the format in which risks are recorded, and the forum in which this process will be conducted.
· Risk Qualification and Prioritization – This section of the Risk Management Plan must describe the Selected Bidder’s approach to determining the probability and impact of each risk to allow the Project Manager to prioritize the risk avoidance and mitigation strategy. This is usually done with a risk matrix. This section must also explain how risks will be qualified and prioritized for this project.
· Risk Monitoring – This section of the Risk Management Plan must discuss how the risks in the project will be actively monitored, ensuring that risks are identified and monitored throughout the life of the project and that each risk has trigger conditions identified. There must be thorough documentation of the risk monitoring process.
· Risk Mitigation and Avoidance – Once risks have been qualified, determination must be made on how to address those risks which have the greatest potential probability and impact on the e-CAS project. This section of the Risk Management Plan must explain the considerations which must be made and the options available to the Project Manager in managing these risks.
| Section 3.2.1, Project Initiation |
| To be determined |
| Due at Project Initiation Completion Milestone; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Project Progress and Status Report |
| Report should include current, valid information about the implementation’s status by task. |
| Section 3.2.1, Project Initiation |
| To be determined |
| Due at Project Initiation Completion Milestone; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Issue Log |
| A comprehensive compendium of triaged, prioritized implementation issues for discussion with EOHHS. |
| Section 3.2.1, Project Initiation |
| To be determined |
| Due at Project Initiation Completion Milestone; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Change Log Templates |
| A comprehensive record of changes to solution design, functionality, development, and configuration which have been agreed to by the Selected Bidder and EOHHS. |
| Section 3.2.1, Project Initiation |
| To be determined |
| Due at Project Initiation Completion Milestone; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Requirement Elaboration and Specification Definition Protocol and Materials Package |
| Requirement Elaboration and Specification Definition Protocol and Materials Package – The Selected Bidder will conduct requirement elaboration and specification definition activities in accordance with its proposed protocol. The protocol will be outlined in the Requirement Elaboration and Specification Definition Protocol and Materials Package, to be completed in accordance with the dates set forth in the approved implementation plan. The protocol must simultaneously account for a phased implementation and the need to engage stakeholders in certain requirement elaboration and specification definition activities. The Requirement Elaboration and Specification Definition Protocol and Materials Package will also include templates and standardized forms or documents that the Selected Bidder intends to use throughout requirements gathering (e.g., BRD template). |
| Section 3.2.2, |
Requirement Elaboration and Specification Definition
| To be determined |
| Final draft due at Requirement Elaboration and Specification Completion; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Functional Specification Documents |
| Functional Specification Documents – In accordance with the dates set forth in the approved Implementation Plan, the Selected Bidder will develop Functional Specification Documents that it will submit to EOHHS for review in a manner prior approved by EOHHS. Functional Specification Documents must provide a detailed description of what the solution will look like, how it will behave, and how it meets business needs. Functional Specification Documents will serve multiple purposes, including: |
· Documenting business requirements;
· Providing configuration and, if applicable, customization instructions to developers;
· Providing a basis for estimating configuration/customization level of effort and work duration;
· Establishing agreement with EOHHS on exactly what will be built; and
· Providing a point of synchronization for the whole project team.
The Functional Specification Documents will also be inputs to the Implementation and Deployment and Acceptance Plans. After functional specifications are reviewed and approved, changes to the specifications will require EOHHS’ prior written approval.
Section 3.2.2, Requirement Elaboration and Specification Definition
| To be determined |
| Final draft due at Requirement Elaboration and Specification Completion; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Requirements Traceability Matrix |
| Requirements Traceability Matrix – EOHHS expects that a major Deliverable of this Task is a detailed functional Requirements Traceability Matrix. The matrix will be completed in accordance with the dates set forth in the approved Implementation Plan. This matrix will reflect the actual configuration and/or customization required to implement the system. This matrix will be used throughout the life of the project, including acceptance testing. |
| Section 3.2.2, |
| To be determined |
| Final draft due at Requirement Elaboration and Specification Completion; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Product Requirement Document |
| Product Requirements Document – Throughout requirements gathering, design, development, and testing/piloting, the Selected Bidder will record information about system functionality. The Product Requirements Document will describe the e-CAS’s purpose, features, functionality, maintenance, and behavior. It will include requirements such as business rules, user stories and/or use cases, and clarification to questions, which will be updated as the team moves through each of the product development cycles (“sprints”). An updated Product Requirements Document will be submitted to EOHHS at the conclusion of each sprint, and a final Product Requirements Document will be submitted prior to e-CAS Go Live. The Product Requirements Document should follow a consistent format, be easy to understand, and be available to EOHHS staff. EOHHS prefers a web-based tool or format. The Product Requirements Document should include: |
· Goals and business objectives;
· Background information, including relevant as-is documentation;
· Assumptions;
· User Stories and/or Use Cases;
· Acceptance criteria;
· User interaction and user design;
· Questions and answers tracking; and
· Future work planned, including work that has been identified for future e-CAS phases.
Section 3.2.2,
| To be determined |
| Final draft due at Requirement Elaboration and Specification Completion; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| User Interface Design Document |
| User Interface (UI) Design Experience – EOHHS expects the baseline UI design to be implemented early in the development process and evolve through constant feedback/demonstration loops with end users. The Selected Bidder will ensure that the e-CAS’s user interface and user experience is as simple and easy-to-use as possible. In order to achieve this, EOHHS expects the Selected Bidder to be planful and incorporate best practices for user experience and user interface, including researching users, prototyping designs, and engaging in usability testing. The Selected Bidder will develop documentation that clearly outlines the expected user experience and allows EOHHS staff and other stakeholders to give input into user experience design. The Selected Bidder will propose a final format for the UI Design Experience subject to EOHHS review and approval. Documentation shall include, at a minimum, user personas, user scenarios, wireframes, mock-ups, user journeys, and usability testing reports. |
| Section 3.2.2, |
| To be determined |
| Draft due at Requirement Elaboration and Specification Completion; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Software Architecture Design Document |
| Software Architecture Design Document – The Selected Bidder will be responsible for ensuring that the e-CAS design meets the current needs of EOHHS and can be easily updated for the future. The goal of the Software Architecture Design Document is to record how the e-CAS will be built. It gives an overview of the product architecture, determines full scope of work, and sets milestones. It should include, at a minimum: |
· Overview and background;
· Architecture and design principles;
· Connection to User Stories and/or Use Cases;
· Solution details; and
· Diagrams of the solution.
Section 3.2.2,
| To be determined |
| Draft due at Requirement Elaboration and Specification Completion; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Data Integration/Interface Specifications Documents |
| Data Integration/Interface Specifications Document – The Selected Bidder will specify and document the need to exchange or accept data from other information systems and how said data will be transmitted. For each interface for which EOHHS determines the Selected Bidder needs to implement, the Selected Bidder will define the interface in terms of format, content and transmission method. At a minimum, this document will include: |
· The concept of operations for each interface;
· Definitions of the message structure and protocols that govern the interchange of data;
· Identification of the communication paths along which the project team expects data to flow;
· A description of the data exchange format and protocol for exchange;
· Documentation of exception/error handling process, including detailed definition of Bad Data and how it will be corrected;
· A general description of each interface;
· Data dictionaries;
· Assumptions where appropriate; and
· Estimated size and frequency of data exchange.
The Data Integration/Interface Specifications Document will be completed in accordance with the dates set forth in the approved Implementation Plan.
Section 3.2.2,
| To be determined |
| Final draft due at Requirement Elaboration and Specification Completion; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| EOHHS Data Exchange Plan |
| EOHHS Data Exchange Plan – The Selected Bidder will submit an EOHHS Data Exchange Plan to EOHHS in accordance with the dates set forth in the approved Implementation Plan. The EOHHS Data Exchange Plan will be developed with EOHHS staff input and include sections covering the EOHHS systems with which the Selected Bidder will exchange data. The plan will include, at a minimum: project timeline, key EOHHS and authorized vendor staff, roles and responsibilities, and critical information about the EOHHS system’s functioning, development processes, and release schedules. |
| Section 3.2.2, |
| To be determined |
| Final draft due at Requirement Elaboration and Specification Completion; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Trading Partner Data Exchange Plan |
| Trading Partner Data Exchange Plan – The Selected Bidder will submit a Trading Partner Data Exchange Plan to EOHHS in accordance with the dates set forth in the approved Implementation Plan. Developed collaboratively with EOHHS staff, the Trading Partner Data Exchange Plan will describe the Selected Bidder’s strategy for establishing data exchanges with Health Plans and Providers via TPT or an equivalent process. The plan will include, at a minimum: project timeline, engagement strategy for different Health Plan and Provider types, proposed meeting cadence, and a plan for any supplementary documentation. |
| Section 3.2.2, |
| To be determined |
| Final draft due at Requirement Elaboration and Specification Completion; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Project Progress and Status Reports |
| Progress Reports and Status Reports – The Selected Bidder will provide regular updates on project status to the EOHHS Project Manager and team. Such updates shall include, but not be limited to: all completed or pending actions, status of deliverables, variances from the Implementation Plan, updates on project risks, and planned versus actual delivery dates. EOHHS reserves the right to specify the mode and frequency of these updates after project initiation and to request updates and modifications to the mode and frequency at any time during the project. |
Along with EOHHS’s Project Manager, and in accordance with the Implementation Plan, the Selected Bidder will participate in project briefings and supply content for communications materials that convey project status and progress to executive sponsors and key stakeholders.
Section 3.2.3, Build: Configuration, Customization and Integration
| To be determined |
| Final drafts due at Production Deployment Certification Milestone; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Test Plan including Test Scenarios, Test Cases and Test Scripts |
| Test Plan including Test Scenarios, Test Cases and Test Scripts – The Selected Bidder will submit a comprehensive Test Plan to EOHHS in accordance with the dates set forth in the approved Implementation Plan. Testing will include all software components in accordance with published functions and features, based on business scenarios and user friendliness. Interfaces will be tested based on design and business scenarios. At a minimum, the Test Plan must incorporate unit, integration, usability, performance, interface, load, failover, security, and user acceptance tests. For each of the various types of tests that will need to be performed, the Testing Plan must outline the following: |
· Scope;
· Objective;
· Roles and Responsibilities;
· Test Schedule;
· Test Execution Protocol/Workflow;
· Assumptions for Test Execution;
· Constraints for Test Execution;
· Test Scripts – these must be tied to functional requirements;
· Test Data Requirements;
· Test Resource Requirements;
· Expected Results;
· Acceptance Criteria (including item pass/fail criteria);
· Issue Tracking;
· Issue Reporting;
· Testing Status Reports;
· Stage Completion Reports;
· Test Final Report Sign-Off;
· Risk Mitigation;
· Testing Facilities;
· Testing Tools;
· Issue Tracking Tools;
· Issue Severity and Priority Definition;
· Issue Reporting; and
· Remediation Process 3.2.4, Testing
| To be determined |
| Final drafts due at Production Deployment Certification Milestone; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Solution Test Results and Certification |
| Solution Test Results and Certification – The final acceptance test must adequately represent the live system and include report generation. The Selected Bidder must test back-up/recover and failover features successfully. The failure of any specific portion of the test will require that the entire test be rerun, not just the failed portion of the test. The E-CAS is accepted only when the EOHHS Project Manager has reviewed documented Solution Test Results and certified in writing of final acceptance of the product for production deployment. No Warranty Period shall begin until after such certification of successful acceptance testing is issued from EOHHS. |
| 3.2.4, Testing |
| To be determined |
| Final drafts due at Production Deployment Certification Milestone; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Pilot Plan |
| Pilot Plan – The Selected Bidder will develop a Pilot Plan that articulates the overall pilot approach, including pilot users, a communication plan with timeline, pilot scenarios, pilot support approach (i.e., what do users do when they have issues and how feedback will be collected), pilot set up, functionality included/excluded from the pilot, and pilot success criteria. |
| 3.2.5, Pilot |
| To be determined |
| Final drafts due at Production Deployment Certification Milestone; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Pilot Outreach and Training Materials |
| Pilot Outreach and Training Materials – The Selected Bidder will develop a set of outreach communications and training materials for the pilot users. |
| 3.2.5, Pilot |
| To be determined |
| Final drafts due at Production Deployment Certification Milestone; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Pilot Results Report |
| Pilot Results Report – The Selected Bidder will develop a report summarizing the results from executing the pilot scenarios, prioritized plans for issue remediation, and any implications for the Go Live schedule or approach. |
| 3.2.5, Pilot |
| To be determined |
| Final draft due at Production Deployment Certification Milestone; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Knowledge Transfer and Training Plan |
| Knowledge Transfer and Training Plans - The Selected Bidder will develop and execute, in collaboration with EOHHS, a Knowledge Transfer and Training Plan that will be approved by the EOHHS Project Manager. The plan should be completed in accordance with the dates set forth in the approved Implementation Plan and shall outline separate, detailed approaches for two distinct audiences: system administrators and end users. |
For each audience (system administrators and end users), the Knowledge Transfer and Training Plan shall include at a minimum:
· A recommended approach or approaches to knowledge transfer (system administrators) or training (end users); the approaches should be designed for adult learners possessing a variety of backgrounds, experiences, and learning styles;
· The population size and types of roles that need training;
· A recommended approach to acquired skills assessment;
· An inventory of tasks, deliverables, and resources necessary to complete the knowledge transfer or training effort, including tools and documentation necessary to support the proposed effort; and
· For each method or course:
· A course description;
· The target audience (system administrator, end user or other);
· Proposed training goals;
· Proposed training standards;
· The specific plan for training relevant personnel, including EOHHS input;
· The delivery timeframe (by phase, implementation step) with a strategy for providing training early in the project to allow the training goals to be implemented throughout the project life cycle;
· A description of training deliverables and format (i.e., online, written documentation, course materials); and
· A description of skill sets achieved at the end of training and how training effectiveness will be measured and addressed.
The Selected Bidder’s EOHHS-approved training schedule must be closely coordinated with EOHHS staff. Upon acceptance by the EOHHS Project Manager, the Selected Bidder shall implement the approved Plan.
| 3.2.6, Knowledge Transfer and Training |
| To be determined |
| Final draft due at Production Deployment Certification Milestone; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Training Materials Package |
| Training Materials Package – The Selected Bidder will organize and develop materials for use in training activities. Materials should include training guides with sufficient detail to be employed by trainers in a “train the trainer” model (i.e. trainers not part of Selected Bidder organization) to conduct training for users within a particular organization (e.g., trainers from the LTSS Provider Service Center who may train staff within their organization or provide support to users) in addition to materials for Selected Bidder trainers to use directly with training participants. EOHHS will review and approve these materials prior to their use and expects to receive final versions of training materials in hardcopy and electronic formats. EOHHS will have full authority to edit/customize all Selected Bidder-provided end user and system administrator training documentation. |
| 3.2.6, Knowledge Transfer and Training |
| To be determined |
| Final draft due at Production Deployment Certification Milestone; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| End-User Manuals and Quick Reference Guides |
| End-User Manuals and Quick Reference Guides – The Selected Bidder shall be responsible for providing sufficient reference materials and takeaway documents, such as user manuals, user guides, video tutorials, or “cheat sheets” to complement initial knowledge transfer and training activities and to provide follow-up reference material for trainees and users. EOHHS will review and approve these materials prior to their use. |
| 3.2.6, Knowledge Transfer and Training |
| To be determined |
| Final draft due at Production Deployment Certification Milestone; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Solution Technical Documentation |
| Solution Technical Documentation – EOHHS requires that the Selected Bidder maintain and make available full documentation of the solution, including any data interfaces within the Selected Bidder’s span of control, throughout the life of the contract. |
| 3.2.6, Knowledge Transfer and Training |
| To be determined |
| Final draft due at Production Deployment Certification Milestone; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Data Conversion and Migration Plan |
| Data Conversion and Migration Plan – The Selected Bidder will be required to develop a Data Conversion and Migration Plan. The Plan will be produced in accordance with the dates set forth in the approved Implementation Plan. The plan must outline: |
· The scope of data conversion/migration activities;
· An inventory/catalog and profile of data to be converted, if applicable;
· The approach to be followed for all data conversion and migration activities for the e-CAS functional areas, including a detailing of specific activities, their durations and applicable dependencies;
· A list of applications impacted;
· A list of conversion and reconciliation tools to be employed;
· An outline of conversion roles and responsibilities;
· A description of conversion resource requirements;
· The approach and methodology to data transformations;
· The approach to be followed for data cleanup;
· The approach and methodology for data classification (i.e., organization and/or tagging);
· The approach to be followed for methodology for conversion testing/validation; and
· An outline of acceptance criteria.
It is expected that the Selected Bidder’s approach to the completion of the following tasks will be addressed in the Data Conversion and Migration Plan:
· Ensure database backups are in place;
· Execute data conversion routines/packages;
· Validate converted data to confirm success;
· Revert to backup if conversion fails;
· Provide EOHHS with the results of the conversion and any exceptions;
· Work with EOHHS to resolve nulls and non-converted data; and
· Provide post conversion support through requested ad-hoc reporting and provision of access to the pre-and post- converted data for EOHHS confirmation analysis.
| 3.2.7, Data Conversion and Migration |
| To be determined |
| Final draft due at Production Deployment Certification Milestone; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Deployment and Acceptance Plan |
| Deployment and Acceptance Plan – The Selected Bidder is required to provide an e-CAS Deployment and Acceptance Plan that details the process whereby the Selected Bidder will move the fully configured and as-needed customized products that make up the e-CAS into production and Go Live over two (2) implementation Phases. The Deployment and Acceptance Plan must be produced in accordance with the dates set forth in the approved Implementation Plan. |
The Deployment and Acceptance Plan must address, at a minimum:
· Deployment activities, including deployment of user documentation and online help;
· Sequencing of all deployment events;
· Deployment schedule;
· Go/No-Go Decision Points;
· Incident and Defect Resolution documentation and tracking, including Defect classification as described in Attachment 5, EOHHS Key Performance Indicators;
· Cut-off schedule for legacy applications; and
· Each item listed above should be provided for each deployment phase (i.e., Phases 1-2).
| 3.2.8, Deployment and Acceptance |
| To be determined |
| Final draft due at Production Deployment Certification Milestone; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Incident and Defect Resolution Log and Report |
| Incident and Defect Resolution Log and Report – During the course of deployment, and through final solution acceptance, the Selected Bidder shall maintain a document that serves as a combined log/report in which the following information is maintained: |
· Recording and codification of incidents and/or problems with the solution that compromise its availability or performance: At a minimum the following information shall be captured for each incident: incident’s reporting origin, a description of the incident including the incident’s impact, and the codification of the incident based on potential cause(s), magnitude and resolution priority.
· Recording and codification of Defects and/or problems with the solution that limit or otherwise adversely impact its functionality: At a minimum the following information shall be captured for each Defect: Defect’s reporting origin, a description of the Defect including the Defect’s scope and functionality affected, and the classification of the Defect based on potential cause(s), magnitude and resolution priority.
· Resolution of incidents and Defects: At a minimum, the log/report shall capture, irrespective of reporting origin, interim and final measures taken by the Selected Bidder (and, if applicable, EOHHS) to resolve incidents and Defects.
· Date/time stamps for events associated with all the above.
| 3.2.8, Deployment and Acceptance |
| To be determined |
| Final draft due at Termination of Warranty Period Milestone; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Production Deployment Certification |
| Production Deployment Certification – The Selected Bidder shall demonstrate full production deployment as articulated in the Deployment and Acceptance Plan. The e-CAS is accepted only when the EOHHS Project Manager has reviewed documentation and certified in writing of final acceptance. Acceptance will be provided separately for each phase of deployment. |
| 3.2.8, Deployment and Acceptance |
| To be determined |
| Final draft due at Termination of Warranty Period Milestone; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
| Solution Maintenance and Support (M&S) Plan |
| Solution Maintenance and Support (M&S) Plan – The Selected Bidder shall develop a comprehensive Solution M&S Plan, which will be updated on an annual basis and approved by EOHHS. At a minimum the M&S Plan shall address: |
· Ensuring the Selected Bidder's solution continually meets EOHHS requirements and is updated with new or revised functionality (i.e., via development and configuration) to support new requirements as a result of programmatic, operational, organizational, legal or regulatory changes that are agreed upon via the Change Management process;
· Accommodating changes to regulations, standards, and EOHHS organizational processes through operational and system changes that do not require significant system functional changes (i.e., development or configuration);
· Making improvements or changes in response to feedback collected from e-CAS users via regular surveys;
· Ensuring data interfaces are adequately supported and maintained to support EOHHS and Provider and plan data exchange partners;
· Ensuring e-CAS data is high quality, including a plan for correcting Bad Data;
· Ensuring that solution maintenance windows do not interfere with EOHHS business or occur during business hours;
· Providing regular and periodic maintenance to the solution on a schedule agreed upon by the Selected Bidder and EOHHS; and
· Ensuring that solution training materials, manuals and reference guides, and technical documentation are kept up to date throughout the life of the contract.
The M&S plan shall incorporate the following elements:
· Scope;
· Resource Roles and Responsibilities;
· Configuration Management Protocol;
· Change Management Protocol, including Change Request Form as defined in Section 7 of Attachment 1, Statement of Work;
· Levels of Support;
· Key Performance Indicators; and
· Reporting and Management Protocols.
| 3.4.1, Solution Maintenance and Operations Support (M&S) |
| To be determined |
| Final draft due at Production Deployment Certification Milestone; payment tied to Milestone inclusive of all Tasks and Deliverables within the Milestone |
Annual updates due at cadence agreed upon by the Parties; payment incorporated into monthly invoices billed by Vendor
| Maintenance and Support Activity Reports |