The document is an addendum to a Request for Proposal (RFP) issued by the Maryland Department of Transportation Motor Vehicle Administration (MDOT MVA) for the Vehicle Emissions Inspection Program (VEIP) Operations. The RFP seeks to manage and operate the Maryland VEIP, including pricing for centralized tests, external kiosk tests, and FIS tests. The pricing must be provided as all-inclusive, fixed-price unit rates and include an allowance for new external kiosk installations. The RFP also requires the offeror to provide an itemized transition cost and pricing information for fleet inspection station equipment.

The pricing sheet outlines the estimated number of vehicle emission tests by test location based on a six-year vehicle emission inspection program exemption. The price per test is set at $14.00 for emissions tests and $10.00 for kiosk tests. The offeror must provide numerical data for the various test types and kiosk installations, as well as itemize the transition costs. The contract term is 10 years, with the possibility of renewal.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions FINANCIAL PROPOSAL FORM - ATTACHMENT B - RFP V-HQ-24019-S - VEHICLE EMISSIONS INSPECTION PROGRAM (VEIP) OPERATIONS

MARYLAND DEPARTMENT OF TRANSPORTATION MOTOR VEHICLE ADMINISTRATION

Purpose:
MDOT MVA requires that you price out the work presented in your Technical Proposal, and submit it on this Financial (Cost) Proposal Form, per RFP Section 5.4. This pricing encompasses both the Base Period (Years 1-5) and the Option Period (Years 6-10). MDOT MVA has provided an extra work allowance for MVA equipment requests to be enacted upon MVA approval. Extra Work Allowance data is not to be altered by Offerors.
General Financial Proposal Instructions
a) Offerors may only use this form and must use the data provided by MDOT MVA as the basis for their pricing.
b) Quantities in the charts are estimates and may not represent the actual quantities experienced once the contract is awarded.
c) A vehicle emission inspection/ test shall mean both the initial and all paid re-tests.
d) The transition costs shall be itemized in Pricing Sheet - Section 2.
e) The price to the motorist per each vehicle emission inspection/test, regardless of whether the test takes place in a centralized lane, hybrid station or remote-OBD, is $14.00; Kiosk cost is $10.00.
f) The price per test shall be proposed as an all-inclusive fixed-price unit rate cost which shall include all costs to the State.
g) Offeror to insert numerical data into cells shaded as: All other cells are fixed or self-calculating and not to be altered by Offeror.
Line by Line Instructions:
Pricing Sheet, Section 1
Pricing for Base and Option Period. Reference RFP Section 2
a) Row 1 - Insert the all-inclusive, fixed price per centralized test in cell C37. This includes any kiosks the Offeror proposes to install IN the centralized lanes.
b) Row 2 - Insert the all-inclusive, fixed price per external kiosk test in cell C38.
c) Row 3 - Insert the all-inclusive, fixed price per FIS test in cell C39.
d) This section is no longer applicable
e) This section is no longer applicable
f) Row 4 - New External Kiosk Installations beyond Existing 10: Insert the total cost per external kiosk installation, per Section 2.5.2, in cell C42. MDOT MVA reserves the right to direct some or all of these activities, at MDOT MVA's sole discretion, over the course of the contract. MVA has built in a multiplier of the maximum quantity of 15 kiosks.
g) Total VEIP transition cost is a sum of the milestone costs in Pricing Sheet Section 2.
Pricing Sheet, Section 2: Itemization of Transition Milestones and Costs
a) Enter cost data in cells D52 through D61 corresponding to the Offeror's proposed milestones to be entered in Columns B/C. Total milestone costs will be reflected in cell D44.
Do not include any external kiosk costs beyond the replacement of the existing 10 kiosks.
Pricing Sheet, Section 3: Required Pricing Information for Fleet Inspection Station Equipment
a) Enter data in cells D67 through D69 and D72 through D74 corresponding to the labeling in Columns B/C. Offerors must enter data in all indicated cells.
Pricing Sheet, Section 4: Equipment Replacement/Rehabilitation
a) Complete columns B through D for each deliverable and capital item to be rehabilitated or replaced during both the Base and Option Period. Add additional pages if necessary.

&G

Pricing Sheet-6MY

FINANCIAL PROPOSAL FORM - ATTACHMENT B - RFP V-HQ-24019-S
VEHICLE EMISSIONS INSPECTION PROGRAM OPERATIONS FOR THE MARYLAND DEPARTMENT OF TRANSPORTATION MOTOR VEHICLE ADMINISTRATION

This form is to be completed in its entirety, is not to be altered in any way and is to contain only the data stipulated on the form.

Firm Name: Date:

Printed Name of Offeror: Signature of Offeror:

Pricing Sheet Six (6) Model Year Vehicle Emission Inspection Program Exemption

DRAFT
Pricing Sheet, Section 1: Unit Costs for Inspections and Transition
Estimated Number of Vehicle Emission Tests by Test Location based on Six (6) Model Year Vehicle Emission Inspection Program Exemption
Estimated quantities for each type of test are included in proposal sheet solely for the proposal purposes. The estimates listed in the proposal sheet are not a guarantee.
NOTE: Emissions test fees are identified below, an average 76% of all Transactions were paid by Credit Card in June 2023 (Inspection and Late Fees)
10-Year Contract Period
Row #Customer Test FeesContract Years 1-10
Number of Subject Vehicles- 0
Senior / Disabled <5k Mile Exemptions15,342,100
Number of Initial Inspections(997,200)
Initial Failures14,344,800
Free Inspections (first retest and readiness rejects)2,582,000
Paid Retests932,400
Total Number of Inspections9,337,900
Total Number of Paid Inspections:16,625,700
1Centralized Lane Inspections$146,798,900
2Kiosk Inspections$1015,572,700
3Fleet Inspection Tests (FIS)$144,951,200
4This section is no longer applicable
5This section is no longer applicable
Vendor InputsBelow cells are self calculating
Total Contract Period - Years 1 - 10Base Period - Years 1-5Option Period - Years 6-10
Type of InspectionVendor All Inclusive Fixed Cost Per TestTotal Costs per Inspection Type (Cost X Inspections)Total Costs per Inspection Type (Cost X Inspections)Total Costs per Inspection Type (Cost X Inspections)
Centralized Lanes
(Row 1)$ - 0$ - 0$ - 0$ - 0
Kiosk Tests
(Row 2)$ - 0$ - 0$ - 0$ - 0
Fleet Inspection Tests (FIS)
(Row 3)$ - 0$ - 0$ - 0$ - 0
This section is no longer applicable$ - 0
This section is no longer applicable$ - 0
New External Kiosk Installation Costs beyond Existing 10
(Row 4)$ - 0$ -$ -$ -
Extra Work AllowanceState Provided Number$ 500,000$ 250,000.00$ 250,000
Transition PhaseTotal Price for activities proposed in Transition Plan
(Total of Pricing Sheet, Section 2)$ - 0$ - 0
TotalsTotal Cost Price Years 1-10, w/ Transition$ 500,000
Total Period Prices$ 250,000$ 250,000
Pricing Sheet, Section 2: Itemization of Transition Milestones and Costs
Offeror to itemize all milestones identified in their Transition Plan
No.MilestoneCost
1$ - 0
2$ - 0
3$ - 0
4$ - 0
5$ - 0
6$ - 0
7$ - 0
8$ - 0
9$ - 0
10$ - 0
Total Transition Phase Cost$ - 0
Pricing Sheet, Section 3: Required Pricing Information for Fleet Inspection Station Equipment
Offeror to enter data for applicable Equipment Costs
Traditional OBD Inspection Equipment for Fleet Inspection Station
Purchase OBD Equipment$ - 0
Lease (annual cost)$ - 0
Equipment Maintenance (annual cost)$ - 0
Idle Test Inspection Equipment for Fleet Inspection Station
Purchase Remote OBD Equipment$ - 0
Lease (annual cost)$ - 0
Equipment Maintenance (annual cost)$ - 0
Pricing Sheet, Section 4: Equipment Replacement/Rehabilitation
Offeror to itemize all costs for deliverables and capital items (defined as a durable item expected to be in service at least one (1) year and having a value of $5,000.00 or greater), that are not itemized in the Pricing Sheet Sections 2 or 3, and will be included in any VEIP operations. List items by type and indicate quantities. Add additional pages as necessary.
No.Item NameNumber of UnitsUnit CostTotal Cost
1$ - 0
2$ - 0
3$ - 0
4$ - 0
5$ - 0
6$ - 0
7$ - 0
8$ - 0
9$ - 0
10$ - 0
11$ - 0
12$ - 0
13$ - 0
14$ - 0
15$ - 0
16$ - 0
17$ - 0
18$ - 0
19$ - 0
20$ - 0
21$ - 0
22$ - 0
23$ - 0
24$ - 0
25$ - 0
26$ - 0
27$ - 0
28$ - 0
29$ - 0
30$ - 0
31$ - 0
32$ - 0
33$ - 0
34$ - 0
35$ - 0
36$ - 0
37$ - 0
38$ - 0
39$ - 0
40$ - 0
Total$ - 0

&G

6 MY Exemption Page &P

Insp.Summary 6MY Exemp.

Model Year ExemptionsContract YearContract YearContract YearContract YearContract YearContract YearContract YearContract YearContract YearContract Year
12345678910
1Number of Subject Vehicles1,500,0001,507,5001,515,0371,522,6131,530,2261,537,8771,545,5661,553,2941,561,0611,568,86615,342,040
2Senior / Disabled <5k mile exempt(97,500)(97,987)(98,477)(98,970)(99,465)(99,962)(100,462)(100,964)(101,469)(101,976)
3Number of Initial Inspections1,402,5001,409,5121,416,5601,423,6431,430,7611,437,9151,445,1041,452,3301,459,5921,466,890
4Initial Failures140,250140,951141,656142,364143,076143,791144,510145,233145,959146,689
5First Retests (Free)112,200112,761113,325113,891114,461115,033115,608116,186116,767117,351
6Readiness Rejects (Not Counted as Fail) (Free)91,16391,61892,07692,53792,99993,46493,93294,40194,87395,348
7Paid Retests120,054120,654121,258121,864122,473123,086123,701124,319124,941125,566
8Total Number of Inspections1,725,9171,734,5461,743,2191,751,9351,760,6951,769,4981,778,3461,787,2371,796,1731,805,154
9Total Number of Paid Inspections (Total Inspections-1st Retest-Rejects)1,522,5541,530,1671,537,8181,545,5071,553,2341,561,0001,568,8051,576,6491,584,5331,592,455
10Kiosk Tests310,665341,731375,905413,495454,845500,329550,362605,398665,938732,532
11Fleet Inspections (FIS)4,1604,1604,1604,1604,1604,1604,1604,1604,1604,160
12This section is no longer applicable
13This section is no longer applicable
14Total Centralized Lanes Inspections (Total Insp - Alternative Tests)1,411,0921,388,6551,363,1541,334,2801,301,6901,265,0091,223,8241,177,6791,126,0761,068,463
Contract Years 1-5 Totals (Rounded)1,244,334Contract 10 Year Totals (Rounded)
1Number of Subject Vehicles- 0- 0- 0
2Senior / Disabled <5k mile exempt (% of SV)7,575,4007,766,70015,342,100
3Number of Initial Inspections(492,400)(504,800)(997,200)
4Initial Failures (% of # of Inspections)7,083,0007,261,80014,344,800
5Free Retests (% of # of Inspections)708,300726,2001,434,500
6Readiness Rejects (Not Counted as Fail)(% of # of Inspections)566,600580,9001,147,500
7Paid Retests (% of # of Inspections)460,400472,000932,400
8Total Number of Inspections (total inspections-exemptions)8,716,300621,6009,337,900
9Total Number of Paid Inspections(Total Inspections-Free retests&rejects)7,689,3008,936,40016,625,700
10Kiosk Tests (# Tests/Kiosk)(Discount to cost of inspection)7,689,3007,883,40015,572,700
11Fleet Inspections (FIS) (# Test/FIS)31,896,6003,054,6004,951,200
12This section is no longer applicable20,80020,80041,600
13This section is no longer applicable- 0- 0- 0
14Total Centralized Lanes Inspections (Total Insp - Alternative Tests)6,798,900- 06,798,900