This federal contract opportunity is for the construction of a prosthetics facility for the Department of Veterans Affairs. The solicitation number is 36C77623R0166_1 for the project named "Y1DA--590-210 Construct Prosthetics Facility (VA-23-00044335)." The agency listed is the Department of Veterans Affairs Technology Acquisition Center located in Austin. The opportunity type is a solicitation. No other key details are provided in the limited information given.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B
E
G
F
H
D
3 4 6 8 10 11 12 13 14 15 17 18165 972
FD
MB
WC
LAV
LAV
2"SAN
"S
A N
WC
LAV
4" SAN FROM
ABOVE
WC
LAV
4"SAN
WC
LAV
CONNECT TO EXISTING CAST-IRON 5"
SAN OUTSIDE BUILDING. REFER TO
CIVIL DRAWINGS FOR CONTINUATION.
SK
SK
SK
2"SAN
"S
A N
SK
2"SAN
SK
SK
SK/SK
2"SAN
4"SAN
45-SP1
EWC
2"SAN
SK SK
SK
SK
SK SK
2" V UP
6" W UP
"S
A N
FS
CONNECT VENT TO TOP OF
SANITARY LINE AND ROUTE AT
45° TO VERTICAL IN WALL ABOVE.
6" STORM DRAINAGE TO 5'
OUTSIDE BUILDING. REFER TO
CIVIL DRAWINGS FOR
CONTINUATION.
PROVIDE VALVE AND CHECK
VALVE IN VERTICAL OF 2"
PUMP DISCHARGE.
EW
4"SAN
FCO
FCO
FCO
SK
FCO
FCO
4"SAN
FCO
4"SAN
1/2" CW UP
2" V UP
6" W
COORDINATE LOCATION OF
POST INDICATOR VALVE WITH
CIVIL CONTRACTOR
2"SAN
0.00' (100.00')
FINISH FLOOR
4"SAN
1/2"CW
FROM TP-2
3"SAN
4"SAN
ROUTE THROUGH CENTRAL
MIDDLE THIRD OF FOOTING AT
THIS LOCAITON. COORDINATE
WITH STRUCTURAL ENGINEER
FOR SLEEVES REQUIREMENTS
ROUTE THROUGH CENTER MIDDLE THIRD
OF FOOTING AT THIS LOCAITON.
COORDINATE WITH STRUCTURAL
ENGINEER FOR SLEEVE REQUIREMENTS
I.E.= -7' - 6 1/2"
1/2"CW UP FROM TRAP PRIMER
"S
A N
4"SAN
FD
2" V UP
4"SAN
4"SAN
2"SAN
2"SAN
FCO
4" ST
6" ST
REFER TO 8/P301
FOR ADDITIONAL
INFORMATION.
I.E.= -2' - 0"
ROLL FITTING INTO TOP OF
DRAIN TILE MAIN OR CONNECT
DIRECTLY INTO THE TOP OF THE
EXTERIOR DRAIN TILE LINE.
4"DT
6" STORM DRAINAGE TO 5'
OUTSIDE BUILDING. REFER TO
CIVIL DRAWINGS FOR
CONTINUATION.
CRITICAL INVERT ELEVATION.
COORDINATE SLEEVE WITH
STRUCTURAL ENGINEER.
I.E.= -2' - 0"
I.E.= -2' - 6"
CRITICAL INVERT ELEVATION.
COORDINATE SLEEVE WITH
STRUCTURAL ENGINEER.
45-SP2
COORDINATE LOCATION OF
ELEVATOR BASINS WITH STRUCTURAL
AND ELEVATOR MANUFACTURER.
REFER TO 11/P301 FOR
ADDITIONAL INFORMATION
I.E.= -1' - 1"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:0
:3
P
M
P100-B45
UNDERFLOOR PLAN - PLUMBING CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149
N O R
HT
1/8" = 1'-0"
UNDERFLOOR PLAN - PLUMBING
Revisions: Date:
B
E
G
F
H
D
3 4 6 8 10 11 12 13 14 15 17 18165 972
STAIR 1
S100-45
RECEPTION
101-45
CORRIDOR
C102-45
CORRIDOR
C100-45
CORRIDOR
C103-45
ORTHO SUPERVISOR OFFICE
126-45
STAIR 2
S102-45
STAFF TOILET
122-45
TELECOM
151-45
TEAM EVALUATION
120-45
TRASH
130E-45
ELECTRICAL
150-45
FITTING / EXAM SOFT GOODS
108-45
HAC
110-45
EQUIPMENT STORAGE
115-45
DYNAMIC ALIGNMENT
113-45
CAST
114-45
FACIAL/ BODY FITTING STUDIO
109-45
FITTING / EXAM SOFT GOODS
116-45
SOILED HOLDING
112-45
FITTING / EXAM SOFT GOODS
107-45
FITTING / EXAM CUSTOM FAB
117-45
FITTING / EXAM SOFT GOODS
106-45
FITTING / EXAM SOFT GOODS
105-45
FITTING / EXAM SOFT GOODS
104-45
FITTING / EXAM SOFT GOODS
103-45
PATIENT TOILET
102-45
PROSTHETICS LAB
130-45
MECHANICAL FIRE/H20
125-45 ELECTRICAL
124-45
PATIENT / PUBLIC TOILET
119-45
PATIENT / PUBLIC TOILET
118-45
LOBBY
100-45
OPEN OFFICE
123-45
STAFF TOILET
111-45
CAD/ CAM
130D-45
LAB RESTORATION
130A-45
PROSTHETICS/ ORTHOTICS FUME
130C-45
LAB DUST ROOM
130B-45
ELEVATOR
E-1-45
CORRIDOR
C101-45
P-408 P-528
P-408
FD-C
P-502
LAV
WC
P-528
P-103
P-408
P-103
P-103
1 1/2"V DN
P-408 P-408
2"V
2" V UP
2"SAN DN, 1 1/2"V
P-103
P-408
2"SAN DN,
1 1/2"V
P-528
P-507
P-103
P-528
P-528 P-414
P-528
2"V
2"V
2" V
3"CW
3/4"HWC
3/4"CW
3/4"HWC
1 1/2"HW
0.5
1 1/2"CW
PROVIDE
SECONDARY STORM
OUTLET.
PROVIDE SECONDARY STORM
OUTLET. PROVIDE BIRD SCREEN OR
INTEGRAL PERFORATED COVER ON
OUTLET. CONFIRM FINAL COLOR
SELECTION WITH ARCHITECT.
P-609
P-708 P-528
P-408
P-528
1 1/2"V
P-528 P-528
P-528
1 1/2"V
1 1/2"V
P-528 P-528
2"V UP
12.10' (100.00')
FINISH FLOOR
1 1/2"V
2"V
P111-B45
3" SAN DN
FD
2"V UP
3"SAN
FCO
3/4"CW
1 1/4"CW
6"STS
1 1/2"V
2 1/2"CW
4"STS
FS-S
2" SAN
2" SAN DN
P-801
P-801
P-801P-801
1 1/2"CW UP
3/4"HWC
1"HW UP
TP-2
FCO-1
FCO-1
FCO-1
1/2"CW DN
1/2"CW UP
2"SAN DN, 1 1/2"V
2"V
2"SAN DN, 1 1/2"V
2"SAN DN, 1 1/2"V
2"SAN DN, 1 1/2"V
2"SAN DN,
1 1/2"V
2"SAN DN, 1 1/2"V
WHA-1
2"V2
"V
4"SAN DN, 2"V
2"SAN DN, 1 1/2"V
WHA-1
2"SAN DN, 1 1/2"V
4"SAN DN, 2"V
2"V
2"SAN DN, 1 1/2"V 2"SAN DN, 1 1/2"V 2"SAN DN, 1 1/2"V
2"SAN DN, 1 1/2"V
2"SAN DN,
1 1/2"V
2"SAN DN,
1 1/2"V
2"SAN DN, 1 1/2"V
SK
CO
3"SAN DN
3/4"CW
PROVIDE FLOW SPLITTER VALVE
AT THIS LOCATION ON HW SIDE
FCO-1
2"HW
2"CW
1 1/2"HW
1 1/2"V
"V
1 1/4"CW
3/4"HW
2" PD DN
2" SAN DN,
1 1/2"V
2"SAN DN,
1 1/2"V
RD RD
RD
RD
3"CW
2"HW
2 1/2"CW
2"HW
1 1/2"CW
2 1/2"CW
2"CW
1 1/2"CW
2"CW
1 1/2"HW
2" SAN DN
1/2"CW DN
1/2"CW
2"V
3/4"HWC
2"HW
3"CW
2 1/2"CW
2"CW
1 1/2"CW
WHA-1
0.5
1 1/2"HW
1 1/2"HW
3/4"CW
1 1/2"HW
1 1/2"HW
3/4"CW
FCO-1
COORDINATE PIPE ROUTING AT THIS
LOCATION WITH ARCHITECTURAL
DRAWINGS. NO PIPING SHALL BE
ROUTED IN RATED WALL.
FD
1/2"CW UP
FROM TP-1
3"SAN
3/4"HWC
1 1/2"HW
FCO-1
WCO-1 WCO-1
4"ST
6"ST
1 1/2"HW
FD-C
2"V
2" V
1/2"CW DN TO
FLOOR SINK TRAP
/2 "V
2"V
1 1/2"V
PROVIDE FLOW SPLITTER VALVE
AT THIS LOCATION ON HW SIDE
WHA-1
B
MECHANICAL FIRE/H20
125-45
6" W UP AND DN
45-WH-1
"H
W
BACKFLOW PREVENTER DRAIN
REDUCED PRESSURE BACKFLOW
PREVENTER
45-PP1
/4
"H W
C
DISCHARGE DRAIN ONTO
SPLASH BLOCK AT GRADE
LEVEL.
REFER TO 6/P301 FOR
WATER HEATER
INSTALLATION DETAIL.
45-ET-1
PROVIDE HOUSEKEEPING
PAD UNDER EQUIPMENT
FD-E
TP-1
1P-801
6" SERVICE ENTRANCE IN THIS
CORNER OF ROOM 125. TAP IN
VERTICAL FOR CW, 6" W UP TO
FIRE PROTECTION BACKFLOW
PREVENTER. REFER TO FP101.
3" CW
2"CW
3"CW
VALVE IN VERTICAL
2"PD
VALVE IN VERTICAL
TERMINATE PUMP DISCHARGE
18" ABOVE THE GRADE ON
CONRETE SPLASHBLOCK
2" V
2"PD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:0
:3
P
M
P111-B45
FIRST LEVEL PLAN - PLUMBING CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149
N O R
HT
1/8" = 1'-0"
FIRST LEVEL PLAN - PLUMBING
KEYNOTES:
1. PROVIDE 4" DRAIN FROM BACKFLOW
PREVENTER DISCHARGE THROUGH BUILDING
WALL. DRAIN ON TO SPLASH BLOCK ON
GRADE. PROVIDE WIRE MESH TO PROTECT
FROM INSECT/ANIMAL INTRUSION.
2. MOUNT THERMOSTATIC MIXING VALVE,PART
OF FIXTURE P-708 (REFER TO SECTION 224000
ABOVE CEILING. ROUTE EYEWASH DRAIN INTO
WALL AND CONNECT TO SANITARY/VENT.
N O R
HT
1/2" = 1'-0"
ENLARGED PLAN OF MECHANICAL FIRE/H20
B
E
G
F
H
D
3 4 6 8 10 11 12 13 14 15 17 18165 972
OPEN OFFICE
201-45
CONFERENCE
202-45
STAIR 1
S200-45
LOCKERS
203A-45
STAFF LOUNGE
203-45CHIEF OFFICE
204-45
ASSIST CHIEF OFFICE
205-45
PROSTHETICS REP OFFICE
206-45
COPY/ WORK/MAILING
207-45
ELECTRICAL
227-45
STAFF TOILET
208-45
CORRIDOR
C200-45
DME ACTIVE STORAGE
226-45
ELEVATOR EQUIP
222-45
MECHANICAL
220-45
TELECOM
221-45
WHEELCHAIR PARTS STORAGE
225-45
STAIR 2
S202-45
PROSTHETICS/ ORTHOTICS
MAINTENANCE
228-45
SHOE MODIFICATION STORAGE
224-45
PARTS STORAGE
223-45
CORRIDOR
C200-45
P-528
2" SAN DN
1 1/2" V UP
2" V UP TO
4" VTR
P-408
P-103
3"V UP, 4"VTR
1"HW DN
1 1/2"CW DN
3/4" HW & CW
1 1/4" CW DN
TO P-103
2" V UP
3/4" HWC DN
0.5
FD-C
FCO-1
TP-1
1/2" CW DN
4"SAN DN, 2"V
2"SAN DN,
1 1/2"V
2" V DN
FD-C
TP-1
SHUTOFF VALVE IN
VERTICAL. 1/2" CW DN TO
FLOOR DRAIN TRAP
1 1/2"CW
3/4"HW
1"HW
1"CW
1"HW
3/4"HW
6/3668
RD-1
6/3668
RD-2
4/2457
RD-1
4/2457
RD-2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:0
:4
P
M
P121-B45
SECOND LEVEL PLAN - PLUMBING CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149
N O R
HT
1/8" = 1'-0"
SECOND LEVEL PLAN - PLUMBING
ET WORKSHOP
B246-110
TECH OFFICE
B247-110
TECH OFFICE
B245-110
BIOMED PARTS
B243-110HAC
B244-110
BIOMED
B242-110
CORRIDOR
C2B-5-110
CORRIDOR
C2B-1-110
WORKSTATION
B227-110
TOILET
B216-110
BREAK
B227A-110
OFFICE
B229-110
FILES
B227B-110
CORRIDOR
C2B-4-110
TELECOM
B214-110
COPY
B226-110
OFFICE
B228-110
OFFICE
B230-110
STORAGE
B230A-110
OFFICE
B232-110
OFFICE
B234-110
OFFICE
B236-110
CONFERENCE
B238-110
WORKSTATION
B239-110
WORKSTATION
B235-110
WORKSTATION
B231-110
STAIR
S2B-5-110
ELEC
B212-110
STAIR-2
S2B-2-110
WOMEN'S TOILET
B219
BIO ENGINEERING
B220
ELEVATOR 10
E2B-10
CHASE
B209A
STORAGE
B209
Room
E2B-11
EXISTING MEDICAL
VACUUM, MEDICAL
AIR AND OXYGEN
PIPING TO MAINS TO
REMAIN.
EXISTING MEDICAL
GAS OUTLETS TO
REMAIN.
MV
MA
O
MV
MA
O
PROVIDE NEW
OXYGEN MEDICAL
GAS OUTLET.
3/4"O1/2"O
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:0
:4
P
M
P121-B110
SECOND LEVEL PLAN - PLUMBING
- 110
CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149
1/8" = 1'-0"
SECOND LEVEL PLAN - PLUMBING - 110
N
O R HT
UNDER DEDUCT ALTERNATE 1, ALL WORK ON
THIS SHEET IS REMOVED FROM PROJECT SCOPE.
B
E
G
F
H
D
3 4 6 8 10 11 12 13 14 15 17 18165 972
4" VTR
4"VTR
4" VTR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:0
:4
P
M
P131-B45
ROOF PLAN - PLUMBING CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149
N O R
HT
1/8" = 1'-0"
ROOF PLAN - PLUMBING
BACKFLOW PREVENTER PIPING DETAIL
NTS
[3 m m
WALL LINE
REDUCED PRESSURE
PRINCIPLE BACKFLOW
PREVENTER WITH GATE
VALVES
PLAN
AIR GAP
FITTINGWATER LINE
FROM METER
PIPE TO DRAIN
(TYPICAL)
FINISHED FLOOR
COLD WATER TO
SYSTEM
PIPE SUPPORT
ELEVATION
[3 m m
T O
B O
T T
O M
O F
R E
L
IE
F O
P E
N
IN
G S
TYPE "C" FLOOR DRAIN DETAIL
NTS
NICKLE BRONZE
ADJUSTABLE STRAINER
(FLUSH WITH FINISHED
FLOOR)
CEMENT BED
TILE FLOOR
CONCRETE FILL
STRUCTURAL SLAB
FLASHING
CLAMP WITH
WEEP HOLES
THREADED, CAULKED OR
NO-HUB CONNECTION
WATERPROOF
MEMBRANE
PROVIDE A METAL SUPPORT
PLATE WHEN DRAIN IS INSTALLED
IN AN EXISTING FLOOR - CAULK
AROUND DRAIN PRIOR TO
RE-GROUTING
CLAMP WATERPROOF
MEMBRANE INSIDE OF DRAIN
BODY TO DRAIN TO WEEP
HOLES
NOTE:
SLOPE MEMBRANE LINER 2% TO DRAIN.
LOOSE GRAVEL AT
WEEP HOLES
3mm to 6mm SIZE
P-103 WATER CLOSET DETAIL
NTS
FINISHED FLOOR
FINISHED WALL
3/4" [19mm]
CONDUIT
TWO GANG
ELECTRICAL BOX
W/STAINLESS STEEL
COVER PLATE
LOCATION
OF PUSH
BUTTON
SPLIT GRAB BAR
SEE ARCH. DWGS
C WATER CLOSET
PLAN
ELEVATION
L
[250mm]
[450mm]
F O
R F
IX
T
U R
E H
E
IG
H T
S E
E A
R C
H
IT
E C
T U
R A
L D
R A
W
IN
G S
TYPICAL WHEELCHAIR LAVATORY DETAIL
NTS
FAUCET SEE
SPECIFICATIONS
LAMINAR FLOW
CONTROL DEVICE
OFFSET
WASTE
TRAP
PARALLEL
TO WALL
LOOSE KEY
STOP
ESCUTCHEON
FINISHED
FLOOR
[8 m m
[200mm]
[2 m m
F O
R F
IX
T
U R
E H
E
IG
H T
S S
E E
A R
C H
IT
E
C T
U R
A L D
R A
W
IN
G S
PROVIDE COVER FOR EXPOSED PIPING
NOTE:
LAVATORY MOUNTING DETAIL
NTS
MINIMUM 16 GAGE GALVANIZED STEEL
PLATE 12"x48" [300x1200mm] MIN.
SECURED TO A MIN. 4 STUDS PER
LAVATORY
1/4" [6mm]∅ MOLLY BOLT HOLLOW WALL
ANCHOR (1 EA. SIDE OF LAV)
MIN. (3) 1/4" [6mm]
MACHINE BOLTS
W/DOUBLE LOCK NUTS
ON BACK SIDE
MIN. 5 1/4" [131mm]∅
GALV. MACHINE BOLTS
WELDED TO PLATE
1/4" [6mm]
TYP. 1/8"
TYP. [3mm]
A A
PLAN
SECTION A
NOTE:
1.
2.
AT LAVS WITH FOOT PEDAL CONTROLS PROVIDE
AN ADDITIONAL 16 GAGE GALVANIZED STEEL
PLATE 12"x16" [300x600mm] SECURED TO A
MINIMUM OF 2 STUDS PER FOOT PEDAL.
PROVIDE 20 GAGE STUDS WHEN HEIGHT
EXCEEDS 12'-0" [3600mm]
STEEL HANGER BY LAV MFGR
STEEL WALL PLATE
WALL ANCHOR
STUDS
FOR FIXTURE
HEIGHT SEE
ARCHITECTURAL
DRAWINGS
SEE FP DRAWINGS
FOR CONTINUATION
BY F.P.C.
BY P.C.
PROVIDE INSULATION ON
PIPING
M
IN
10"
18"
8"
/4
V A
R
IE
S
[9 m m
T
O F
L O
O R
CW
C W
H W
VACUUM RELIEF VALVE.
WATTS N36 OR EQUAL.
EXPANSION
TANK 45-ET-1
CIRCULATING
PUMP 45-PP1
UNION (TYP.)
DRAIN
A.S.M.E. PRESSURE AND
TEMPERATURE RELIEF VALVE
THERMOMETER IN WELL (0-200˚F)
PIPE DIRECTLY OVER
FLOOR DRAIN
HOUSEKEEPING
PAD
HWC
BYPASS FOR HOT WATER CIRC.
45-WH-1
NORMALLY CLOSED
CLAMPING RING
WATER CUTOFF MASTIC
ADJUSTABLE EXTENSION
ROOF DECK
ROOF INSULATION
DOME STRAINER
BEARING PAN
UNDERDECK CLAMP
OUTLET SIZE AS
SHOWN ON DRAWINGS
PRIMARY ROOF DRAINSECONDARY ROOF DRAIN
INTERNAL
WATER DAM ROOF MEMBRANE
BASIN WITH
PERFORATED
COVER PLATE
ON/OFF INTEGRAL OR
PIGGY BACK FLOAT SWITCH
DISCHARGE PIPE.
SHUTOFF VALVE
CHECK VALVE.
UNION
BACKFILL AROUND BASIN
WITH 6" OF CONCRETE.
SUMP PUMP
FLANGED COUPLING
OR UNION.
ANCHOR FLANGE
12" DEEP CONCRETE
ALARM WHEN WATER
LEVEL IS 3" BELOW INVERT
OF LOWEST INLET.
CONTROL PANEL WITH HIGH
WATER AND OIL PRESENT ALARMS.
OIL SENSOR
NOTES:
1. INSTALL CONTROL PANEL PER MANUFACTURER INSTRUCTIONS. COMPONENTS
AND WIRING ARRANGEMENT MAY DIFFER FROM THAT SHOWN.
2. SUMP PUMPS THAT DISCHARGE TO STORM SHALL BE INSTALLED WITH THE TOP OF
THE SUMP BASIN 2" ABOVE FLOOR LEVEL A 2" HIGH X4" WIDE CONCRETE CURB
AROUND THE PERIMETER OF THE BASIN LID MAY BE USED IN LIEU OF RAISING THE
ENTIRE SUMP BASIN.
CLEANOUT
CONNECT TO TOP OF
HORIZONTAL GRAVITY PIPE
FLOOR
NONCORROSIVE, HEAVY DUTY SLEEVE (E.G.
CAST IRON, CONCRETE PIPE). PROVIDE A
MINIMUM OF 2" CLEAR FROM TOP OF
CARRIER PIPE TO INSIDE OF SLEEVE.
CARRIER PIPE. NO JOINTS
INSIDE SLEEVE.
ENCASE SLEEVE WITH CONCRETE
A MINIMUM OF 9" ALL AROUND. IF
TOP OF SLEEVE IS WITHIN 18" OF
BOTTOM OF FOOTING CONCRETE
SHALL EXTEND TO UNDERSIDE OF
FOOTING.
[NTS:
NTS: COORDINATE THIS NOTE (#1) WITH STRUCTURAL ENGINEER PRIOR TO ADDING TO
DRAWINGS. THE GENERAL CONTRACTOR WON'T SEE THIS DRAWING AND WON'T VOLUNTARILY
STEP THE FOOTING WITHOUT CLARIFICATION FROM STRUCTURAL ENGINEER. THIS DETAIL IS NOT INTENDED AS A GENERIC-SHOW-ON-EVERY-PROJECT DETAIL. ROUTING PIPE BENEATH A BUILDING
FOOTING OR FOUNDATION WALL SHOULD ONLY BE DONE AS A LAST RESORT WHEN ALL OTHER
OPTIONS ARE IMPOSSIBLE OR FINANCIALLY NOT FEASABLE.]
NOTES:
1. STEP FOOTING DOWN AS REQUIRED TO MAINTAIN 8" MINIMUM
DIMENSION.
6" MIN.
9" MIN.
6" (TYP.)
2" MIN
8" MIN
(NOTE 1)
9" MIN. NO SLEEVES PERMITTED.
GRADE
2" MIN
[NTS: ONLY USE THIS PORTION OF
THE DETAIL AS A LAST RESORT
WHEN ALL OTHER OPTIONS ARE
IMPOSSIBLE OR FINANCIALLY NOT
FEASABLE.]. ERASE HATCHING IF
YOU PLAN TO USE IT.
(ERASE THIS ONLY AFTER READING NOTES TO SPECIFIER)
THREADED ROD. (TYP.)
OVERSIZE HANGER TO ALLOW
LONGITUDINAL PIPE EXPANSION
AND PIPE INSULATION TO PASS
THROUGH UNBROKEN. (TYP.)
UNI-STRUT OR EQUIVALENT
HIGH DENSITY INSULATION INSERT
OR, FOR APPLICATIONS PERMITTED
IN SPEC SECTION (SECTION 22 05 11-
PLUMBING), STEEL SADDLE FILLED
WITH INSULATION. (TYP.)
THREADED ROD. (TYP.)
PIPE INSULATION (TYP.)
INSULATION SHIELD (TYP.)
INSULATION SHIELD
INSTALL CLAMP ON ALL
PIPES LESS THAN 4"Ø
THREADED ROD
INSULATION
CLEVIS HANGER
HIGH DENSITY INSULATION INSERT
OR, FOR APPLICATIONS PERMITTED
IN SPEC SECTION (SECTION 22 05 11-
PLUMBING), STEEL SADDLE FILLED
WITH INSULATION.
NOTES:
1. REFER TO SPECIFICATION SECTIONS SECTION 22 05 11 - PLUMBING.
BASIN WITH SOLID
COVER PLATE
REFER TO DRAWINGS
FOR NUMBER AND
LOCATION OF INLET.
ON/OFF INTEGRAL OR
PIGGY BACK FLOAT SWITCH
DISCHARGE PIPE.
SHUTOFF VALVE
CHECK VALVE.
UNION
BACKFILL AROUND BASIN
WITH 6" OF CONCRETE.
SUMP PUMP
FLANGED COUPLING
OR UNION.
ANCHOR FLANGE
12" DEEP CONCRETE
ALARM WHEN WATER
LEVEL IS 3" BELOW INVERT
OF LOWEST INLET.
CONTROL PANEL WITH
HIGH WATER ALARMS.
NOTES:
1. INSTALL CONTROL PANEL PER MANUFACTURER INSTRUCTIONS.
COMPONENTS AND WIRING ARRANGEMENT MAY DIFFER FROM THAT
SHOWN.
ROUTE TO THE EXTERIOR OF
THE BUILDING AND TERMINATE
MANUFACTURER
RECOMMENDED BACKFILL
AROUND THE BASIN.
FINISH FLOOR
I.E. = SEE PLAN.
SMOOTH AND LEVEL
PAD SURFACE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:0
:4
P
M
P301
PLUMBING DETAILS CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149
NO SCALE
WATER HEATER DETAIL
NO SCALE
ROOF DRAIN DETAIL
NO SCALE
SUMP PUMP DETAIL
(OIL SENSOR - CONTROL PANEL)
NO SCALE
PIPE FOUNDATION AND SLEEVE DETAIL
NO SCALE
PIPE SUPPORT DETAIL
Revisions: Date:
NO SCALE
DRAIN TILE SUMP PUMP DETAIL
P-408
P-103
P-528
P-528
P-408
P-408
P-103
P-103
P-609
P-708
P-408
P-103
P-414
P-528
P-103
P-408
P-528
P-528
P-528
P-528
P-528
P-528
P-528 P-408
P-528
P-528
P-408
P-408
P-103
P-502
P-528
P-507
P-528
TO 4" VTR
2"SAN
4"SAN
2"V
1 1/2"V
2"V
2"V
FD-C
FCO-1
2"V
4"SAN
45-SP1
4"SAN
1 1/2"V
2"SAN
2"V
4"SAN
2"SAN
2"V
1 1/2"V
4"SAN
4"SAN
4"SAN
2"SAN FS-S
1 1/2"V
1 1/2"V
2"V
2"SAN
4"SAN
2"SAN
1 1/2"V
4" VTR
4"SAN
2"SAN
1 1/2"V
2"SAN
1 1/2"V
3"V
4"SAN
3"V
4"SAN
2"SAN
1 1/2"V
4"SAN
2"V
2"SAN
1 1/2"V
2"SAN
2"V
2"SAN
2"SAN
2"V
2"SAN
1 1/2"V
2"V
2"SAN
1 1/2"V
2"SAN
2"SAN
1 1/2"V
2"SAN
1 1/2"V
2"SAN
4"SAN
FD-C
2"V
2"V
1 1/2"V
2"SAN
1 1/2"V
3" VTR
2"V
2"SAN
1 1/2"V
2"SAN
1 1/2"V
FCO-1
FCO-1
FCO-1
4"SAN
2"V
2"V
REFER TO CIVIL
DRAWINGS FOR
CONTINUATION
2"SAN
6/3668
RD-2
6/3668
RD-1
2"SAN
1 1/2"V
4"SAN
2"V
4/2457
RD-1
4/2457
RD-2
2"V
4"SAN
2"V
4"SAN
4"SAN
2"V
FCO-1
2"PD
TERMINATE PUMP DISCHARGE
18" ABOVE THE GRADE ON
CONCRETE SPLASHBLOCK
FD-E
1 1/2"V
CO
6"STS (3,668)
4"STS (2,457)
4"SAN
2"V
FD-C
4"ST (2,457)
WCO-1
FD-C
2"V
2"V
WCO-1
6"ST (3,668)
2"SAN
FCO-1
4"SAN
45-SP2
2"PD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:0
:5
P
M
P401
PLUMBING DIAGRAMS CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149
NO SCALE
PLUMBING RISER SANITARY/VENT
GENERAL NOTES:
1. RISER DIAGRAM SHOWN FOR REFERENCE
PURPOSES ONLY. REFER TO DRAWINGS FOR
ADDITIONAL INFORMATION.
P-408
P-103
P-528
P-528
P-408
P-408
P-103
P-103
P-609
P-708
P-408
P-103
P-414
P-528
P-103
P-408
P-528
P-528
P-528
P-528
P-528
P-528
P-528
P-408
P-528
P-528
P-408
P-408
P-103
P-502
P-528
P-507
P-528
1 1/2"HW
1 1/2"CW
3/4"CW
3/4"HW
1 1/2"CW
3/4"HW
1 1/4"CW
3"CW
2"CW
2"HW
3"CW
6"CW
3"CW
1 1/2"CW
P-801
P-801
P-801
P-801
P-801
45-WH-1
3/4"HWC
BFP-1
45-PP1
3/4"HW
3/4"HW
1"HW
1"CW
1 1/2"HW
BALANCING ASSEMBLY.
REFER TO DRAWINGS FOR
BALANCING INFORMATION.
PROVIDE 45-ET-1
AT THIS LOCATION
1"HW
45-ET-1
TP-1
BALANCING ASSEMBLY.
REFER TO DRAWINGS FOR
BALANCING INFORMATION.
BALANCING ASSEMBLY.
REFER TO DRAWINGS FOR
BALANCING INFORMATION.
2"HW
3/4"HWC
WHA-1
2"HW
2 1/2"CW
WHA-1
1 1/2"CW
3/4"HW
1"HW
TP-2
1 1/2"CW
3/4"HWC
2 1/2"CW
2"CW
2"HW
3/4"HWC
1 1/2"CW
1 1/2"HW
3/4"HW
2"CW
1 1/2"CW
2"CW
WHA-1
3/4"CW
1 1/4"CW
1 1/2"HW
1 1/2"HW
3/4"CW
3/4"CW
3/4"CW
TP-1
1 1/2"CW
1 1/2"HW
1"HW
1 1/2"CW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:0
:5
P
M
P402
PLUMBING DIAGRAMS CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149
NO SCALE
PLUMBING RISER DOMESTIC
GENERAL NOTES:
1. RISER DIAGRAM SHOWN FOR REFERENCE
PURPOSES ONLY. REFER TO DRAWINGS FOR
ADDITIONAL INFORMATION.
BY F.P.C.
BY P.C.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:0
:5
P
M
P501
PLUMBING SCHEDULES CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149
45-SP2 ELEV E-1-45 DRAIN TILE SUMP SUMP PUMP CENT WATER 20 [ 1 ] 27 [ 430 ] 1 NA 70 [ 21 ] 1 0.50 [0.4] 1 120 1750 CONSTANT
45-SP1 ELEV E-1-45 ELEVATOR SUMP SUMP PUMP CENT WATER 50 [ 3 ] 27 [ 430 ] 1 NA 70 [ 21 ] 1 0.50 [0.4] 1 120 1750 CONSTANT
45-PP1 MECH 125-45 BLDG 45 HOT WATER RECIR CENT DOMESTIC WATER 2 [ ] 10 [ 160 ] 0 NA 140 [ 60 ] 1 0.166666667 [ ] 1 120 1750 CONSTANT ----
GPM [L/s] FT [kPa] FT [kPa] °F [°C] HP [kW]
FLUID
FLOW HEAD NPSH AVAILABLE TEMPERATURE
SP. GR. MIN. %
EFF
NOMINAL POWER
PHASE VOLT MAX RPM SPEED
CONTROL REMARKS
MARK LOCATION AREA AND/OR
BLDG SERVED
SYSTEM AND/OR
SERVICE TYPE
CIRCULATING FLUID ELECTRICAL MOTOR
PLUMBING PUMP SCHEDULE
45-WH-1 MECH 125-45 BLDG 45 DOMESTIC HOT WATER ELECTRIC 80 [ 300 ] 176 [ 670 ] 39 50 [ 350 ] 6 30 5 3 208 -----
GAL [L] GAL/HR [L/HR] PSIG [kPa] TOTAL kW kW PER
ELEMENT PHASE VOLT
MARK LOCATION AREA AND/OR BLDG
SERVED
SYSTEM AND/OR
SERVICE TYPE
STORAGE CAPACITY RECOVERY @ 70 °F [21°C]
RISE
TIME TO
RECOVER
CONTENTS,
MINUTES
RELIEF VALVE SETTING
NO OF
ELEMENTS
ELECTRICAL INPUT
REMARKS
ELECTRIC WATER HEATER SCHEDULE
45-ET-1 BLDG 45 POTABLE THERMAL
EXPANSION TANK 40 [ 4 ] 140 [ 60 ] 30 [ 210 ] 125 [ 860 ] 50 [ 350 ] 3 [ 11 ] 5 [ 19 ] 0.75 [ 19 ] -----
°F [°C] °F [°C] PSIG [kPa] PSIG [kPa] PSIG [kPa] GAL [L] GAL [L] IN [mm]
MIN MAXMARK LOCATION TYPE
SYSTEM TEMPERATURE RANGE
INITIAL PRESSURE IN TANK MAX OPERATING PRESSURE RELIEF VALVE PSIG [kPA] MIN TANK VOLUME MIN ACCEPT VOLUME PIPE SIZE TO TANK
REMARKS
DOMESTIC WATER THERMAL EXPANSION TANK SCHEDULE
FD-S FLOOR SINK 3 [ 75 ] 1.5 [ 38 ] N/A N/A N/A N/A NO
FD-E FLOOR DRAIN 4 [ 100 ] 2 [ 50 ] N/A N/A N/A N/A NO
FD-C FLOOR DRAIN 3 [ 75 ] 1.5 [ 38 ] N/A N/A N/A N/A NO
P-801 WALL HYDRANT N/A N/A .75 [ 19 ] N/A N/A 5 N/A NO
P-710 SWING-DOWN EYE WASH N/A N/A .75 [ 19 ] .75 [ 19 ] NA 3 N/A NO MOUNTED ON P-414 AND P-528 FIXTURES, REFER TO THOSE FIXTURES FOR WASTE
FIXTURE UNITS.
P-708 WALL MOUNTED EYE/FACE
WASH 2 [ 50 ] 1.5 [ 38 ] .75 [ 19 ] .75 [ 19 ] 2 3 N/A NO
P-609 ELECTRIC WATER COOLER 2 [ 50 ] 1.5 [ 38 ] .5 [ 13 ] N/A 1 1 N/A NO
P-528 SINK COUNTER MOUNTED 2 [ 50 ] 2 [ 50 ] .75 [ 19 ] .75 [ 19 ] 2 4 N/A NO PROVIDE MIXING VALVE RATED FOR 0.5 GPM AT 5 PSI OF PRESSURE DROP
P-507 PLASTER SINK 2 [ 50 ] 1.5 [ 38 ] .5 [ 13 ] .5 [ 13 ] 1 1 N/A NO PROVIDE MIXING VALVE RATED FOR 0.5 GPM AT 5 PSI OF PRESSURE DROP
P-502 SINK SERVICE 3 [ 75 ] 2 [ 50 ] .75 [ 19 ] .75 [ 19 ] 2 3 N/A NO PROVIDE MIXING VALVE RATED FOR 0.5 GPM AT 5 PSI OF PRESSURE DROP
P-414 LAVATORY 2 [ 50 ] 1.5 [ 38 ] .5 [ 13 ] .5 [ 13 ] 1 1 N/A NO PROVIDE MIXING VALVE RATED FOR 0.5 GPM AT 5 PSI OF PRESSURE DROP
P-408 LAVATORY 2 [ 50 ] 1.5 [ 38 ] .5 [ 13 ] .5 [ 13 ] 1 1 N/A NO PROVIDE MIXING VALVE RATED FOR 0.5 GPM AT 5 PSI OF PRESSURE DROP
P-103 WATER CLOSET, WALL HUNG 3 [ 75 ] 2 [ 50 ] 1.25 [ 31 ] N/A 4 6 N/A NO
IN [mm] IN [mm] IN [mm] IN [mm]
MARK DESCRIPTION
WASTE PIPE VENT PIPE COLD WATER HOT WATER WASTE
FIXTURE
UNITS
WATER
FIXTURE
UNITS
WRIST BLADE
HANDLES
ELECTRIC
SENSOR REMARKS
PLUMBING FIXTURE SCHEDULE
ELECTRICAL ABBREVIATION KEY
AFF ABOVE FINISHED FLOOR
N.C. NORMALLY CLOSED
NIC NOT IN CONTRACT
N.O. NORMALLY OPEN
SV SOLENOID VALVE
ABBR: DESCRIPTION:
TYP TYPICAL
C CONDUIT
UON UNLESS OTHERWISE NOTES
GFI GROUND FAULT INTERRUPTER
NORMAL BRANCH LUMINAIRE
EMERGENCY BRANCH LUMINAIRE
LUMINAIRE SYMBOL KEY
SYMBOL: DESCRIPTION:
ATS-# AUTOMATIC TRANSFER SWITCH, REFER TO
TRANSFER SWITCH SCHEDULE
26 36 00
BAT-# BATTERY RACK 26 32 13
CGA-# FIRE ALARM - GRAPHIC ANNUNCIATOR 28 31 00
CR-# CORD REEL 26 27 26
CT-# CABLE TRAY 26 05 36
DIM-# DC DIMMING PANEL 26 09 33
DP-# DISTRIBUTION PANEL 26 24 16
DR-# DIMMING RACK 26 09 33
DT-# GENERATOR DAY TANK 26 32 13
DTR-# TRANSFORMER - DISTRIBUTION TYPE
REFER TO TRANSFORMER SCHEDULE
26 12 19
28 31 00FAA-# FIRE ALARM - ANNUNCIATOR
26 32 13GAP-# GENERATOR ANNUNCIATOR PANEL
26 32 13GCC-# TEMP. GENERATOR/LOAD BANK CONNECTION CABINET
26 32 13GCP-# GENERATOR CONTROL PANEL
26 32 13GEN-# GENERATOR
26 32 13GRR-# GENERATOR REMOTE RADIATOR
26 05 33HH-# HANDHOLE
26 05 17HT-# HEAT TAPE
26 52 00INV-# LIGHTING INVERTER
26 28 31LC-# LIGHTING CONTACTOR, REFER TO CONTACTOR SCHEDULE
26 20 00M-# METER DISTRIBUTION CENTER
26 20 00EXTERIOR MOUNTED METERING CABINETMC-#
26 14 19MCC-# MOTOR CONTROL CENTER, REFER TO MOTOR CONTROL SCHEDULE
26 05 37MH-# MANHOLE
26 36 00MTS-# MANUAL TRANSFER SWITCH, REFER TO TRANSFER SWITCH SCHEDULE
26 24 19MX-# MANUAL SWITCH, REFER TO DISCONNECT AND STARTER SCHEDULE
NEP-# FIRE ALARM - EXTENDER PANEL 28 31 00
PDU-# POWER DISTRIBUTION UNIT 26 26 00
PS-# PAD-MOUNT MEDIUM VOLTAGE SWITCH 26 13 15
R-# RELAY 26 09 39
RA-ATS-# REMOTE ANNUNCIATOR FOR ATS 26 36 00
SB-# SWITCHBOARD 26 24 13
SC-# SECTIONALIZING CABINET 26 13 14
SG-# SWITCHGEAR 26 23 00
SMP-# SNOW MELT CONTROL PANEL 26 05 17
SPD-# SURGE PROTECTION DEVICE 26 43 00
UD-# UNDERFLOOR DUCT - TRENCH DUCT - CELLULAR FLOOR DUCT 26 05 38
US-# UNIT SUBSTATION 26 11 00
VCC-# FIRE ALARM - VOICE COMMAND CENTER 28 31 00
VFD-# VARIABLE FREQUENCY DRIVE - REFER TO VFD SCHEDULE 26 29 23
ACU-# AUTONOMOUS CONTROL UNIT
LOC-# LOCAL OPERATING CONSOLE 28 31 00
28 31 00
CMD# EMERGENCY COMMUNICATION MESSAGE DISPLAY 28 31 00
26 24 14GPS-# GENERATOR PARALLELING AND DISTRIBUTION SWITCHBOARD
26 24 23MPC-# PACKAGED POWER CENTER
SCP-# FIREFIGHTERS SMOKE CONTROL PANEL 28 31 00
TVA-# TEXTURAL VISIBLE APPLIANCE 28 31 00
WD-# WALL DUCT 26 05 38
SMS-# PAVEMENT MOUNTED DEICING CONTROLLER 26 05 17
26 13 35
26 13 13MVSG-# MEDIUM VOLTAGE SWITCHGEAR
UPS-# UNINTERRUPTIBLE POWER SUPPLY 26 33 53
26 12 13
26 12 21
C-# GENERAL PURPOSE CONTACTOR 26 28 21
26 13 34
ELECTRICAL EQUIPMENT TAGS
TAG: DESCRIPTION:
RELATED
SPECIFICATION
FAP-# 28 31 00 FIRE ALARM CONTROL PANEL
FA-200 28 31 00 FIRE ALARM VISUAL NOTIFICATION
DEVICE - WALL MOUNTED
V1 V3
V7 VH
FA-211 28 31 00 FIRE ALARM AUDIO/VISUAL NOTIFICATION
DEVICE - WALL MOUNTED
A1 A3
A7 AH
AS
FA-210 28 31 00 FIRE ALARM AUDIO NOTIFICATION DEVICE -
WALL MOUNTED
A
FA-201 28 31 00 FIRE ALARM VISUAL NOTIFICATION
DEVICE - CEILING MOUNTED
V1 V3
V7 VH
FA-231 28 31 00 FIRE ALARM AUDIO/VISUAL NOTIFICATION
DEVICE - CEILING MOUNTED
A1 A3
A7 AH
FA-203 28 31 00 FIRE ALARM VISUAL NOTIFICATION DEVICE -
WALL MOUNTED - WEATHERPROOF
V W
FA-212 28 31 00 FIRE ALARM AUDIO/VISUAL NOTIFICATION
DEVICE - WALL MOUNTED - WEATHERPROOF
A
FA-233 28 31 00 FIRE ALARM AUDIO NOTIFICATION DEVICE -
WALL MOUNTED - MINI-HORN
MH
FA-230 28 31 00 FIRE ALARM AUDIO NOTIFICATION
DEVICE - CEILING MOUNTED
A
SD FA-120 28 31 00 FIRE ALARM SMOKE DETECTOR - CEILING
MOUNTED
SD FA-122 28 31 00 FIRE ALARM DUCT SMOKE DETECTOR
SD FA-123 28 31 00 FIRE ALARM IN DUCT SMOKE DETECTOR
FA-140 28 31 00 FIRE ALARM HEAT DETECTOR H
FA-141 28 31 00 HEAT DETECTOR - 200 DEGREEHF
FA-142 28 31 00 HEAT DETECTOR - EXPLOSION PROOFHX
FA-121 28 31 00 FIRE ALARM PROJECTED BEAM SMOKE
DETECTOR
SD BRSD
BT
FA-151 28 31 00 FIRE ALARM FLAME DETECTORFD
FA-130 28 31 00 FIRE ALARM MANUAL PULL STATIONF
FA-131 28 31 00 FIRE ALARM MANUAL PULL STATION W/ COVERFT
FA-161 28 31 00 FIRE ALARM RELAYAR
FA-160 28 31 00 FIRE ALARM ADDRESSABLE MONITOR MODULEMM
FA-250 28 31 00 FIRE ALARM SMOKE DAMPERSD
FA-251 28 31 00 SMOKE OR FIRE DAMPER CONTROLLERARD
FA-260 28 31 00 FIRE ALARM FLOW SWITCH TO MONITOR FIRE
PROTECTION SYSTEM
FS
FA-261 28 31 00 FIRE ALARM MONITOR SWITCH TO
MONITOR FIRE PROTECTION SYSTEM
MS
FA-262 28 31 00 FIRE ALARM POST INDICATOR VALVE
CONNECTION
PIV
FA-263 28 31 00 FIRE ALARM ELECTRONIC BELL FOR
SPRINKLER SYSTEM
EB
FA-252 28 31 00 FIRE ALARM HOISTWAY DAMPERHD
FA-253 28 31 00 FIRE ALARM HOISTWAY DAMPER SWITCHHDS
FA-272 28 31 00 FIRE ALARM HOLD OPEN OVERRIDE
CONNECTION
DH
PD
FA-270 28 31 00 FIRE ALARM ELECTROMAGNETIC DOOR
HOLD DEVICE
DH
FA-110 28 31 00 FIRE FIGHTERS PHONEP
FA-170 28 31 00 SMOKE DETECTOR - STAND ALONESD
B
FA-171 28 31 00 SMOKE DETECTOR - STAND ALONE 177
CANDELA
SD
V
FA-241 28 31 00 FIRE ALARM REMOTE INDICATORRI
FA-242 28 31 00 FIRE ALARM REMOTE INDICATOR
AND TEST SWITCH
RTS/I
CO FA-150 FIRE ALARM CARBON
MONOXIDE/HEAT/SMOKE DETECTOR
FA-232 FIRE ALARM CM LOUD SPEAKERS
28 31 00
28 31 00
VS
VS
SW-1P 26 09 33 SWITCH - SINGLE POLE
SW-1P-EM 26 09 33 SWITCH - EMERGENCYE
SW-2P 26 09 33 SWITCH - TWO POLE2
SW-3W 26 09 33 SWITCH - THREE WAY3
SW-3W-EM 26 09 33 SWITCH - THREE WAY - EMERGENCY3E
SW-4W 26 09 33 SWITCH - FOUR WAY4
SW-4W-EM 26 09 33 SWITCH - FOUR WAY - EMERGENCY4E
SW-1P-WP 26 09 33 SWITCH - WEATHERPROOFW
SW-1P-EX 26 09 33 SWITCH - EXPLOSION PROOFX
SW-1P-PL 26 09 33 SWITCH - PILOT LIGHTP
SW-1P-LH 26 09 33 SWITCH - LIGHTED HANDLEL
SW-1P-ADJ 26 09 33 SWITCH - LOCAL TIMER - USER ADJUSTABLET
SW-1P-060 26 09 33 SWITCH - LOCAL TIMER - SPRING WOUND60
SW-1P-M 26 09 33 SWITCH - MOMENTARY CONTACTM
SW-OC-P-O SWITCH - OCCUPANCY SENSOR
WALL SWITCH
O
SW-OC-P-O2 SWITCH - OCCUPANCY SENSOR AND
DUAL SWITCH
O2
OC SW-OC-P-P OCCUPANCY SENSOR - PASSIVE INFRARED
360 DEGREE COVERAGEP
OC SW-OC-P-P2 OCCUPANCY SENSOR - PASSIVE INFRARED
100 DEGREE COVERAGEP2
OC SW-OC-U OCCUPANCY SENSOR - ULTRASONIC 360
DEGREE COVERAGEU
OC SW-OC-U2 OCCUPANCY SENSOR - ULTRASONIC 35'X30'
HAND MOTION COVERAGEU2
OC SW-OC-U-A OCCUPANCY SENSOR - ULTRASONIC TWO
SIDED CORRIDOR COVERAGEA
OC SW-OC-D OCCUPANCY SENSOR - DUAL TECHNOLOGY
D
OC SW-OC-P-HB OCCUPANCY SENSOR - HIGH BAY
HB
OC SW-OC-P-HA OCCUPANCY SENSOR - HIGH BAY AISLE
COVERAGE
HA
ALCR ALCR20 AUTOMATIC LOAD CONTROL RELAY
BCELTS BCELTS BRANCH CIRCUIT EMERGENCY LIGHTING
TRANSFER SWITCH 20A
LS SW-LS DAYLIGHT LEVEL SENSOR
LS SW-LS-3Z DAYLIGHT LEVEL SENSOR - 3 ZONE
LS SW-LS-D DAYLIGHT LEVEL SENSOR - 1 ZONE DIMMING
D
LS SW-LS-D-3Z DAYLIGHT LEVEL SENSOR - 3 ZONE DIMMING
3D
26 09 33
26 09 33
26 09 33
26 09 33
26 09 33
26 09 33
26 09 33
26 09 33
26 09 33
26 09 33
26 09 33
26 09 33
SW-1P-K SWITCH - SINGLE POLE - KEY LOCK 26 09 33
K
SW-2P-K SWITCH - TWO POLE - KEY LOCK
K2
SW-3W-K SWITCH - THREE WAY - KEY LOCK
K3
SW-4W-K SWITCH - FOUR WAY - KEY LOCK
K4
SW-LS-PC PHOTOCELL26 09 33PC
26 09 33
26 09 33
26 09 33
MD-SD-# 26 28 16 MOBILE DIAGNOSTICS SERVICE DISCONNECT.
REFER TO DISC/STA SCHEDULE
CB-# 26 28 16 CIRCUIT BREAKER - SURFACE MOUNTED.
REFER TO DISC/STA SCHEDULE
CB-# 26 28 16 CIRCUIT BREAKER - FLUSH MOUNTED.
REFER TO DISC/STA SCHEDULE
DS-#/FDS-#/DSS-# 26 28 16 DISCONNECT. REFER TO DISC/STA SCHEDULE
SW-OC-D-W OCCUPANCY SENSOR - DUAL
TECHNOLOGY - WALL MOUNTED
D
26 09 33OC
SW-OC-P-W OCCUPANCY SENSOR - PASSIVE INFRARED -
WALL MOUNTED
P
26 09 33OC
SW-OC-U-W OCCUPANCY SENSOR - ULTRASONIC - WALL
MOUNTED
U
26 09 33OC
26 09 33
26 09 33
26 09 33
26 09 33
AS
SW-D-LED DIMMER - LED
D
26 09 33
SW-D3-LED DIMMER - LED - 3-WAY
D3
26 09 33
ELECTRICAL SYMBOL LIST
SYMBOL: TAG:
SPEC
SECTION:
DESCRIPTION:
ELECTRICAL SYMBOL LIST
SYMBOL: TAG:
SPEC
SECTION:
DESCRIPTION:
FA-254 28 31 00 FIRE ALARM SMOKE DAMPER WITH DUCT
DETECTOR AND ADDRESSABLE RELAY
SD
SW-DCS DIMMER CONTROL STATION26 09 33#B
SW-LCS DIMMER CONTROL STATION WITH FADERS26 09 33
TC-# TIME SWITCH 26 09 33TC
RI-TV 26 05 33 TV ANTENNA OUTLET ROUGH-INTV
FB-# or PT-# 26 27 26 FLOOR BOX or POKE THROUGH
JB 26 05 33 JUNCTION BOX
J
J
ECONN 26 05 33 ELECTRICAL CONNECTION
E
E
WW-# 26 05 35 ELECTRICAL WIREWAY w/ DEVICES SHOWN
WM-# 26 05 35 MULTI OUTLET SYSTEM
RI-TECH-C 26 05 33 TECHNOLOGY ROUGH-IN, CEILING
RI
RI-TECH-W 26 05 33 TECHNOLOGY ROUGH-IN, WALL PHONE
DPM 26 09 13/
26 24 13
DIGITAL POWER METERDPM
PANEL '###' 26 24 16 PANELBOARD - SURFACE MOUNT
PANEL '###' 26 24 16 PANELBOARD - RECESS MOUNT
IPP-# 26 24 21 ISOLATED POWER PANEL
MG 26 24 21 MASTER GROUND STATION MODULEMG
GB 26 05 26 GROUND BUSGB
IBT 26 05 26 INTERSYSTEM BONDING TERMINATIONIBT
ES ES 26 09 16 EMERGENCY STOP, N.C. CONTACT
EPO 26 09 16 EMERGENCY STOP, N.O. CONTACTEPO
CPC 26 09 16 CONTROL POWER CABINETCPC
MX-#/MS-#
/CB-#/CS-#
26 24 19 MANUAL SWITCH / STARTER / COMBINATION
STARTER/ CIRCUIT BREAKER. REFER TO
DISC/STA SCHEDULE
LCS-# 26 09 33 LIGHTING CONTROL STATION
#B#F
ELECTRICAL SYMBOL LIST
SYMBOL: TAG:
SPEC
SECTION:
DESCRIPTION:
DEM DEM ENERGY METER26 09 13
EEM EEM EXTERNAL ENERGY METER26 09 13
PQM PQM POWER QUALITY METER26 09 13
TR-#/DTR-# 26 22 00 TRANSFORMER. REFER TO
TRANSFORMER SCHEDULE
SW-1P-DJ 26 09 33 SWITCH - DOOR JAMBJ
SW-OD DIMMER - WALL DIMMER
OCCUPANCY SENSORO
26 09 33
SW WALL CONTROL STATION26 09 33SW
SW-LV 26 09 33 CENTRAL CONTROL - STATIONLV
LCD SW-LCD LIGHTING CONTROL LCD STATION26 09 33
NLC SW-NLC NURSE CALL LIGHTING CONTOLLER26 09 33
ASSD-# AIR SAMPLING SMOKE DETECTION 28 31 50
CUP-# CUSTOM UTILITY PEDESTAL 26 27 16
26 12 16
EVCS-# ELECTRICAL VEHICLE CHARGING STATION 26 27 29
W
26 32 13
LINEAR LUMINAIRES
TROFFER
WALL SCONCE LUMINAIRE
DOWNLIGHT LUMINAIRE
AIMABLE OR WALL WASH LUMINAIRE
INDUSTRIAL LUMINAIRE
POLE MOUNTED LUMINAIRE
SINGLE FACE EXIT SIGN
DOUBLE FACE EXIT SIGN
EMERGENCY UNIT
WALL BRACKET LUMINAIRE
ELECTRICAL SYMBOL LIST
SYMBOL: TAG:
SPEC
SECTION:
DESCRIPTION:
WALL/CEILING EMERGENCY EXIT SIGN
REC-DUP-GFI-R 26 27 26 GROUND FAULT DEVICEG
REC-TAMP 26 27 26 DUPLEX RECEPTACLE, TAMPER RESISTANT, 125V
REC-TAMP-GFI 26 27 26 GFI DUPLEX RECEPTACLE,
TAMPER RESISTANT, 125V
REC-TAMP-QUAD 26 27 26 QUAD RECEPTACLE, TAMPER RESISTANT, 125V
REC-ISO-
SUR-QUAD
26 27 26 ISOLATED GROUND QUAD RECEPTACLE WITH
SURGE SUPPRESSION, 125V
REC-DUP 26 27 26 DUPLEX RECEPTACLE, 125V
REC-DUP-XP 26 27 26 DUPLEX RECEPTACLE, EXPLOSION PROOF, 125V
REC-DUP-GFI 26 27 26 DUPLEX GFI RECEPTACLE, 125V
REC-DUP-WP 26 27 26 DUPLEX GFI WEATHERPROOF RECEPTACLE 125V
W
REC-ISO 26 27 26 ISOLATED GROUND RECEPTACLE, 125V
REC-ISO-SUR 26 27 26 ISOLATED GROUND RECEPTACLE WITH SURGE
SUPPRESSION, 125V
REC-QUAD 26 27 26 QUAD RECEPTACLE, 125V
REC-QUAD-GFI 26 27 26 QUAD GFI RECEPTACLE, 125V
REC-SIM-XP 26 27 26 RECEPTACLE, EXPLOSION PROOF, 125V
ELECTRICAL SYMBOL LIST
SYMBOL: TAG:
SPEC
SECTION:
DESCRIPTION:
REC-USB 26 27 26 DUPLEX RECEPTACLE, USB CHARGING
X
S
S
U
X
DUPLEX RECEPTACLE CONTROLLED BY
OCCUPANCY
O REC-DUP-O 26 27 26
REC-PED-QUAD 26 05 33 RECEPTACLE - PEDESTAL STYLE
REC-DUP-PED 26 05 33 RECEPTACLE - PEDESTAL STYLE
REC-ARC 26 27 26 ARC FAULT CIRCUIT INTERRUPTER RECEPT 125V
REC-QUAD-USB 26 27 26 QUAD RECEPTACLE, USB 125V
U
REC-QUAD-WP 26 27 26 QUAD GFI WEATHERPROOF RECEPTACLE, 125V
W
REC-Z# 26 27 26 IEC PIN AND SLEEVE RECEPTACLE, 600V
PP# 26 27 23 POWER POLE
QUAD RECEPTACLE CONTROLLED BY
OCCUPANCY
O REC-QUAD-O 26 27 26
P
REFER TO LUMINAIRE
SCHEDULE
W/RI
RI
RI-TECH 26 05 33 TECHNOLOGY OUTLET ROUGH-IN
FA-220 28 31 00 EMERGENCY NOTIFICATION -
AUDIO/VISUAL - WALL MOUNTED
A11 A33
A77 AHH
AS#
FA-202 28 31 00 EMERGENCY NOTIFICATION - VISUAL -
WALL MOUNTED
V11 V33
V77 VHH
FA-221 28 31 00 EMERGENCY NOTIFICATION -
AUDIO/VISUAL - CEILING MOUNTED
A11 A33
A99AHH
A77
AS#
FA-222 28 31 00 EMERGENCY NOTIFICATION - VISUAL
ONLY - CEILING MOUNTED
V11 V33
V99
V77
VS#
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
VIEW NAME
1/8" = 1'-0"
M101
SIMSIM
INDICATES SIMILAR DETAIL REFERENCED
IN MULTIPLE LOCATIONS
LEVEL NAME
10' - 0" HEIGHT ABOVE
PROJECT 0' - 0"
1 INDICATES NOTE USED TO DESCRIBE
ADDITIONAL INFORMATION ABOUT
WORK REQUIRED, SPECIFIC TO THE
SHEET AND/OR DETAIL
N O R
HT
INDICATES DIRECTION OF TRUE NORTH
VIEW KEY
LINE TYPE AND TAG KEY:
NEW WORK BY THIS CONTRACTOR (WIDE LINE)
NEW
EXISTING TO BE REMOVED (SHORT DASHED PATTERN)
NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)
EXISTING
EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)
EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
HALFTONING DOES NOT MODIFY SCOPE.
'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING
TAG-1 UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL
INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST
INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL
T101
TEMPERATURE CONTROLS CONTRACTORT.C.C.
SECURITY CONTRACTORS.C.
AUDIO/VISUAL CONTRACTORA.V.C.
NURSE CALL CONTRACTORN.C.C.
CIVIL CONTRACTORC.C.
ASBESTOS ABATEMENT CONTRACTOR
FIRE PROTECTION CONTRACTORF.P.C.
HEATING CONTRACTORH.C.
PLUMBING CONTRACTORP.C.
GENERAL CONTRACTORG.C.
MECHANICAL CONTRACTORM.C.
VENTILATION CONTRACTORV.C.
ELECTRICAL CONTRACTORE.C.
A.C.
CONTRACTOR ABBREVIATION KEY
ABBR: DESCRIPTION:
TECHNOLOGY CONTRACTORT.C.
CONSTRUCTION MANAGERC.M.
FOOD SERVICE CONTRACTORF.S.C.
BUILDING CODE: IBC 2015 EDITION
ELECTRICAL CODE: NFPA 70 (NEC) 2020 EDITION
LIFE SAFETY CODE: NFPA 101 2021 EDITION
ENERGY CONSERVATION CODE: IECC 2018
LOCAL BUILDING CODE: VA STANDARARDS
APPLICABLE CODES
CONTRACTOR SHALL COMPLY WITH APPLICABLE CODES AND LOCAL AMENDMENTS.
ELECTRICAL SHEET INDEX
E003 SITE LIGHTING
E001 ELECTRICAL COVERSHEET
E002 ELECTRICAL NOTES
E301 ELECTRICAL DETAILS
E401-B45 ELECTRICAL RISER DIAGRAMS
E501-B45 ELECTRICAL SCHEDULES - BUILDING 45
E502-B45 ELECTRICAL SCHEDULES - BUILDING 45
E503-B110 ELECTRICAL SCHEDULES - BUILDING 110
E600-B45 ENLARGED PLANS
ED111-B50 FIRST LEVEL PLAN - ELECTRICAL DEMOLITION
ED121-B50 SECOND LEVEL PLAN - ELECTRICAL DEMOLITION
ED122-B110 SECOND LEVEL PLAN - ELECTRICAL DEMOLITION - 110
EL111-B45 FIRST LEVEL PLAN - ELECTRICAL LIGHTING
EL121-B45 SECOND LEVEL PLAN - ELECTRICAL LIGHTING
EL122-B110 SECOND LEVEL PLAN - ELECTRICAL LIGHTING - 110
EP111-B45 FIRST LEVEL PLAN - ELECTRICAL POWER
EP121-B45 SECOND LEVEL PLAN - ELECTRICAL POWER
EP122-B110 SECOND LEVEL PLAN - ELECTRICAL POWER - 110
ES111-B45 FIRST LEVEL PLAN - ELECTRICAL SYSTEMS
ES121-B45 SECOND LEVEL PLAN - ELECTRICAL SYSTEMS
ES122-B110 SECOND LEVEL PLAN - ELECTRICAL SYSTEMS - 110
ES500-B45 FIRE ALARM DETAILS
ET101-B45 SITE PLAN - ELECTRICAL & TECHNOLOGY
GRAND TOTAL: 23
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \E
.0
V A
H a m p to n P ro s th e ti c s C
J o h n .A
.M a rs a c .r v t
/9
/2
:1
:1
A
M
E001
ELECTRICAL COVERSHEET CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG JOHMAR16149Revisions: Date:
FEEDERS: SWITCHBOARDS, DISTRIBUTION PANELS,
PANELBOARDS, MOTOR CONTROL CENTERS, ETC.
BRANCH CIRCUITS: LIGHTING, RECEPTACLES,
CONTROLS, ETC.
MECHANICAL EQUIPMENT FEEDERS: PUMPS, CHILLERS,
AIR HANDLING UNITS, ETC.
FLOOR MOUNTED EQUIPMENT FEEDERS: PUMPS, ETC.
(INCLUDE NO MORE THAN 6 FEET OF LFMC TO PUMP)
CONTROLS (LIGHTING, POWER, BUILDING AUTOMATION, ETC.)
WET AND DAMP LOCATIONS: (CONDUIT, BOXES, FITTINGS,
INSTALLED AND EQUIPPED TO PREVENT WATER ENTRY)
FINISHED SPACES / CONCEALED
CONDUIT INSTALLATION SCHEDULE
THE FOLLOWING SCHEDULE SHALL BE ADHERED TO UNLESS THEY CONSTITUTE A VIOLATION OF APPLICABLE CODES OR ARE NOTED OTHERWISE ON THE DRAWINGS. THE INSTALLATION OF RMC CONDUIT WILL BE PERMITTED IN PLACE OF ALL CONDUIT SPECIFIED IN THIS SCHEDULE. REFER TO CONDUIT AND BOXES SPECIFICATION 25 05 33 FOR ADDITIONAL INFORMATION.
INSTALLATION TYPE RMC IMC EMT RTRC PVC
COATED
RMC
PVC PVC
CONCRETE
ENCASED
HDPE ASR
X X
X X
X X
X X
X X
X
X X
CORROSIVE LOCATIONS
X X
ELEVATED CONCRETE SLABS (ABOVE GRADE)
XX
INTERIOR LOCATIONS: CONCEALED
INTERIOR LOCATIONS: EXPOSED
WITHIN 5’ FROM THE PERIMETER OF THE BUILDING WHEN PASSING
THROUGH THE PERIMETER OF THE BUILDING FOUNDATION:
UNDERGROUND SITE CONDUITS:
INTERIOR LOCATIONS: EXISTING WALLS AND EXPOSED
INSTALLATION (FINISHED SPACES)
WITHIN 5’ FROM THE PERIMETER OF THE BUILDING
UNDERGROUND / SLABS ON GRADE
(IN OR UNDER SLABS ON GRADE)
5' OR GREATER FROM THE PERIMETER OF A BUILDING FOUNDATION
WITHIN 5' FROM THE PERIMETER OF A BUILDING FOUNDATION
UNDER ROADS, DRIVES, AND VEHICLE TRAVELED WAYS.WHEN HDPE
DIRECTIONAL BORING IS ALLOWED: PROVIDE PRESSURIZED GROUT
DUCTBANKS
(REFER TO DUCTBANK DETAILS WHEN APPLICABLE)
BARS SHALL OVERLAP 40 DIAMETERS AND SHALL EXTEND 5' BEYOND
ROADS, DRIVES, TRAVELED WAYS, ETC.
REINFORCING SHALL CONSIST OF ONE-HALF INCH DEFORMED BARS
SPACED 12 INCHES ON CENTER, PARALLELING THE DUCTS ON
BOTTOM, WITH ONE-HALF INCH DEFORMED TIE BARS SPACED
TWELVE INCHES ON CENTERS.
PROVIDE MINIMUM 3" CONCRETE COVER ON ALL SIDES OF
REINFORCING.
ENTIRE DUCTBANK SHALL BE INSTALLED ON PRECAST CONCRETE
PAVERS ON 3’ CENTERS.
HAZARDOUS (CLASSIFIED LOCATIONS AS DEFIED BY THE NATIONAL
ELECTRICAL CODE:
COMPLETE WITH SCREWED FITTINGS AND CONDUIT SEALS
FIRE RATED ASSEMBLIES:
FIRE RATED ASSEMBLIES LISTED WITH PHENOLIC RTRC RACEWAY
DEFINITIONS:
CONCRETE ENCASEMENT: CONDUIT WITH A MINIMUM OF 3"
THICKNESS BETWEEN THE SURFACE OF THE CONCRETE AND THE
NEAREST CONDUIT. CONCRETE TO BE DOWELED INTO THE
FOUNDATION.
X
XX
X X
X X
XXX
X X X
XXX
X X X
X
X
X
X
X
X
ELECTRICAL PHASING NOTES:
THESE NOTES APPLY TO ALL ELECTRICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, LIGHTING, POWER, AND SYSTEMS.
1. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF PHASES. REFER TO
COR INSTRUCTIONS FOR MORE DETAILS AND PHASING SCHEDULES AND FOR CONCURRENT
WORK. MECHANICAL, ELECTRICAL AND TECHNOLOGY DRAWINGS DEPICT THE INTENT OF
THE FINAL DESIGN. THE MECHANICAL, ELECTRICAL, AND TECHNOLOGY DRAWINGS DO NOT
DEPICT THE MEANS AND METHODS TO MEET THE REQUIREMENTS OF THE PHASING
CRITERIA.
2. REVIEW PROJECT PHASING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES, ETC.
WITH AFFECTED ADJACENT AREAS.
3. PROVIDE TEMPORARY LIGHTING, POWER, SYSTEMS, ETC. AS NEEDED TO MAINTAIN
SERVICE TO ALL AREAS DURING ALL PHASES OF PROJECT.
4. INSTALL TEMPORARY LIGHTING, CIRCUITS, ETC. AS NECESSARY TO KEEP ALL OCCUPIED
SPACES OPERATIONAL THROUGHOUT ALL PHASES OF THE PROJECT
5. PHASE DEMOLITION WORK TO MINIMIZE DOWNTIME.
1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD
SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND
REPORT ANY CONFLICTS BEFORE PROCEEDING.
2. NOT ALL EXISTING EQUIPMENT, LUMINAIRES, AND CONDUIT ARE SHOWN. VERIFY EXISTING
CONDITIONS AND REPORT ANY CONFLICTS WITH NEW WORK BEFORE STARTING WORK.
3. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF
ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.
CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.
4. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF
CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL
CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO
BIDDING.
5. WHERE EXISTING ELECTRICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH NEW
EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL EITHER
ARRANGE NEW EQUIPMENT, CONDUIT, OR DUCTWORK IN SUCH A FASHION THAT IT DOES
NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING ELECTRICAL SYSTEMS TO
ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.
ELECTRICAL RENOVATION NOTES:
THESE NOTES APPLY TO ALL ELECTRICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, LIGHTING, POWER, AND SYSTEMS.
1. ##-### INDICATES ELECTRICAL EQUIPMENT DEFINED IN ELECTRICAL SCHEDULES OR
SPECIFICATION. REFER TO DRAWINGS CONTAINING ELECTRICAL SCHEDULES. PERMANENT
NAMEPLATE SHALL MATCH FINAL EQUIPMENT NOMENCLATURE, NOT ELECTRICAL
EQUIPMENT TAG NAME, REFER TO SPECIFICATIONS.
2. {L###} INDICATES THE LIGHTING SEQUENCE OF OPERATION FOR THE SPACE. REFER TO THE
LIGHTING SEQUENCE OF OPERATION MATRIX ON SHEET E501-B45.
3. "NL" INDICATES LUMINAIRE IS UNSWITCHED FOR NIGHT LIGHT.
4. "SE" INDICATES LUMINAIRE IS SWITCHED/CONTROLLED DURING NORMAL OPERATION AND
OPERATES FROM EMERGENCY CIRCUIT UPON LOSS OF POWER.
5. SHADED LUMINAIRE OR DEVICE INDICATES LUMINAIRE OR DEVICE IS CONNECTED TO AN
EMERGENCY CIRCUIT.
6. REFER TO SHEET E501-B45 FOR LUMINAIRE SCHEDULE.
7. { Z###} INDICATES THE LIGHTING ZONES FOR THE SPACE. PROVIDE SEPARATE CONTROL OF
EACH CONTROLLED ZONE. LUMINAIRES ASSOCIATED WITH THE SAME ZONE SHALL OPERATE
TOGETHER WITHIN THE SAME PROGRAMMED SCENE. REFER TO SHEET E-XXX.
8. VACANCY/OCCUPANCY SENSOR LAYOUT: SENSORS ARE SHOWN ON THE PLANS FOR
DESIGN INTENT AND MAY NOT REPRESENT EVERY DEVICE. PROVIDE MANUFACTURER
SPECIFIC FLOOR PLAN LAYOUTS SHOWING LOCATION, ORIENTATION, AND COVERAGE AREA
OF EACH CONTROL DEVICE, SENSOR, AND CONTROLLER/INTERFACE. AREAS REQUIRING
MULTIPLE SENSOR DEVICES FOR APPROPRIATE COVERAGE, SUBMIT SPECIFIC
MANUFACTURER-APPROVED SENSOR LAYOUT AS AN OVERLAY DIRECTLY ON THE PROJECT
DRAWINGS, EITHER IN PRINT OR APPROVED ELECTRONIC FORM.
ELECTRICAL MOUNTING SUBSCRIPT KEY:
A MOUNT AT +6" TO CENTERLINE ABOVE COUNTER OR BACKSPLASH
C MOUNT AT CEILING
H MOUNT ORIENTED HORIZONTALLY
L MOUNT IN CASEWORK
M MOUNT IN MODULAR FURNITURE
R MOUNT IN SURFACE RACEWAY
EWC ELECTRIC WATER COOLER
ELECTRICAL GENERAL NOTES:
LUMINAIRE
F1 = FIXTURE TAG
1 = CIRCUIT NUMBER
a = SWITCH DESIGNATION
NL = SUBSCRIPT (IF APPLICABLE)
Z = ZONE DESIGNATION
*IF LABEL IS ORIENTED HORIZONTALLY A SLASH WILL SEPARATE THIS
INFORMATION. EX: F1 / 1 / a / NL
DEVICE
A = MOUNTING (IF APPLICABLE)
1 = CIRCUIT NUMBER
*IF LABEL IS ORIENTED HORIZONTALLY A SLASH WILL SEPARATE THIS
INFORMATION. EX: A / 1
LUMINAIRE KEY:
DEVICE KEY:
1. THE ELECTRICAL LIGHTING DRAWINGS INDICATE EXISTING ELECTRICAL ITEMS TO BE
REMOVED. THE DRAWINGS ARE INTENDED TO INDICATE THE SCOPE OF WORK REQUIRED
AND DO NOT INDICATE EVERY BOX, CONDUIT, OR WIRE THAT MUST BE REMOVED. THE
CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTING A BID AND VERIFY EXISTING
CONDITIONS.
2. EQUIPMENT REMOVAL IN CERTAIN LOCATIONS MAY REQUIRE THE INSTALLATION OF A
JUNCTION BOX TO RECONNECT CIRCUITS THAT REMAIN IN OPERATION. EXTEND CONDUIT
AND WIRING AS REQUIRED TO MAINTAIN POWER TO REMAINING EQUIPMENT.
3. BALLASTS MANUFACTURED PRIOR TO 1980 CONTAIN PCBs AND SHALL BE DISPOSED OF BY
A FEDERAL OR STATE E.P.A. APPROVED METHOD AND IN ACCORDANCE WITH
SPECIFICATIONS.
4. HID AND FLUORESCENT LAMPS CONTAIN MERCURY AND SHALL BE DISPOSED OF BY A
FEDERAL OR STATE E.P.A. APPROVED METHOD AND IN ACCORDANCE WITH
SPECIFICATIONS.
5. REUSE EXISTING CONDUIT, CIRCUITS AND LIGHTING CONTROL WHERE POSSIBLE. PROVIDE
NEW CONDUIT AND WIRE WHERE SHOWN, MISSING OR REQUIRED TO INSTALL THE NEW
LIGHT FIXTURES.
6. WHERE REMOVED EXTERIOR LIGHT FIXTURE IS NOT BEING REPLACED. PROVIDE
WATERPROOF GROMMETS, SEALS OR PLUGS TO COVER EXISTING HOLES IN POLES.
7. VERIFY MANUFACTURERS INSTALLATION GUIDELINES WITH EXISTING FIELD CONDITIONS
PRIOR TO BIDDING AND ORDERING NEW LIGHT FIXTURES AND INSTALLATION MATERIAL.
8. MATCH EXISTING PAINTED SURFACES. WHERE REPLACED LUMINAIRE DOES NOT FULLY
COVER EXISTING JUNCTION BOX OR PAINTED SURFACE. PROVIDE CUSTOM BACK PLATE
WHERE NECESSARY TO COVER ANY FIELD CONDITIONS THAT WOULD ALLOW INTRUSION
OF WATER AND CAULK WHERE NECESSARY.
9. REFER TO 26.51.00 SPECIFICATIONS FOR COMMISSIONING OF FIXTURES.
10. COORDINATE EXISTING LIGHTING CONTROL AND REPROGRAM PHOTOCELLS AS
NECESSARY TO MEET EXISTING CONTROL SEQUENCES. VERIFY WITH OWNER ANY
CHANGES.
11. VERIFY WITH EXISTING CONDITIONS PRIOR TO REMOVING ALL FIXTURES WITH A QUARTZ
RESTRIKE. IF THE QUARTZ RESTRIKE IS A SEPARATE CIRCUIT, NOTIFY THE ENGINEERING
IMMEDIATELY.
ELECTRICAL LIGHTING DEMOLITION NOTES:
1. COORDINATE LUMINAIRE IN MECHANICAL ROOMS WITH DUCTWORK, PIPING AND ANY
MECHANICAL EQUIPMENT. PROVIDE LUMINAIRE WITH CHAINS OR HANGAR KIT WHERE
REQUIRED. BOTTOM OF FIXTURE TO BE 9’ AFF. COORDINATE MOUNTING PRIOR TO
ORDERING LUMINAIRES.
2. COORDINATE ALL LUMINAIRE LOCATIONS WITH STRUCTURAL TRUSS AND BEAMS PRIOR TO
ROUGH-IN.
3. PROVIDE SEPARATE BRANCH CIRCUIT TO SUPPLY POWER TO THE HOIST WAY PIT
LIGHTING. LIGHTING SHALL NOT BE CONNECTED TO THE LOAD SIDE OF ANY GFCI DEVICE.
MOUNT PIT LUMINAIRES VERTICALLY 48” FROM TOP OF PIT OR BELOW PIT CEILING. REFER
TO ELEVATOR MANUFACTURER FOR EXACT LOCATION.
4. LUMINAIRES SHALL BE TARGETED AND ADJUSTED BY THE CONTRACTOR UNDER THE
OBSERVATION AND IN COMPLIANCE WITH RECOMMENDATIONS OF THE ENGINEER. ALL
LABOR AND MATERIAL COSTS MADE NECESSARY BY THIS REQUIREMENT SHALL BE
INCLUDED.
TYPICAL NEW CONSTRUCTION:
1. HALF SHADED FIXTURE INDICATE UNSWITCHED LUMINAIRES FOR NIGHT LIGHTING
CONNECTED TO PANEL AS NOTE.
2. FULLY SHADED FIXTURES INDICATE EMERGENCY LUMINAIRES THAT ARE TO BE
CONNECTED VIA AN EMERGENCY TRANSFER DEVICE (ETD) TO TURN LIGHTS ON UPON
LOSS OF POWER. THE THIRD LEG OF THE ETD IS CONNECTED TO THE EMERGENCY
LIGHTING PANEL.
3. SITE HAS UNDERGROUND UTILITIES, STEAM, WATER, ELECTRIC AND VAULTS. POLE
LOCATIONS HAVE BEEN COORDINATED WITH CIVIL PLANS. CONTRACTOR SHALL FIELD
VERIFY ALL UNDERGROUND UTILITIES PRIOR TO INSTALLING ALL LIGHT POLES. HAND
EXCAVATE IF NECESSARY, TO ASCERTAIN EXACT LOCATION OF UNDERGROUND UTILITIES
PRIOR TO INSTALLING 'ANY' POLE.
4. WHERE LUMINAIRE QUANTITIES OR LAYOUT DIFFER BETWEEN ELECTRICAL LIGHTING
PLANS AND ARCHITECTURAL REFLECTED CEILING PLANS, HIGHER QUANTITY SHALL TAKE
PRECEDENCE. CONTRACTOR SHALL CONFIRM QUANTITY AND LAYOUT WITH DESIGN TEAM.
5. #B PUSH BUTTON REFERS TO SCENE QUANTITY. COORDINATE NUMBER OF BUTTONS FOR
CONTROL STATIONS WITH LIGHTING CONTROL MANUFACTURER. CONTROL SHALL BE
CAPABLE OF DIMMING UP/DOWN AND SWITCHING ON/OFF FOR MULTIPLE ZONES AS
INDICATED AND PER LIGHTING SEQUENCE OF OPERATIONS.
6. Z## INDICATES ZONING AND REFLECTS A LIGHTING CONTROL GROUP. PROVIDE RELAYS AS
REQUIRED TO ALLOW LUMINAIRES WITHIN THE DEFINED ZONE TO FUNCTION TOGETHER
DURING NORMAL POWER.
TYPICAL NEW CONSTRUCTION:
1. ALL LUMINAIRES SHOWN TO BE DEMOLISHED SHALL BE DISPOSED OF IF NOT REQUIRED BY
OWNER FOR ATTIC STOCK. CONFIRM WITH OWNER PRIOR TO DISPOSAL IF THE LAMPS,
LENS OR SUBSET OF LUMINAIRES SHOULD BE TURNED OVER FOR ATTIC STOCK.
2. REMOVE EXISTING LUMINAIRES AND WALL SWITCHES WHERE SHOWN. LOCATE AND
IDENTIFY ELECTRICAL CIRCUIT SERVING REMOVED LUMINAIRES FOR REUSE WITH NEW
DEVICES.
3. COORDINATE HOURS OF ACCESS WITH OWNER.
4. EXISTING EMERGENCY LIGHTING AND EXIT SIGNAGE SHALL REMAIN.
5. REMOVE EXISTING LUMINAIRE AND PREPARE FOR INSTALLATION OF NEW LUMINAIRE IN
SAME LOCATION OR NEW LOCATION.
6. MATCH EXISTING FACEPLATE FINISH AND TYPE FOR ALL LOCATIONS WHERE NEW WALL
CONTROL DEVICE IS BEING INSTALLED.
7. WHERE WALL SWITCH DEVICE IS REMOVED AND NOT REPLACED. PROVIDE WITH BLANK
SWITCH PLATE.
8. EXPOSED 3/4" CONDUIT TO NEW OR EXISTING FIXTURES OR DEVICES IS ACCEPTABLE AS
LONG AS IT IS INSTALLED IN A NEAT AND ORDERLY METHOD AND MEETS ADOPTED CODES.
COORDINATE NEW RUNS WITH OWNER PRIOR TO INSTALLATIONS.
9. REUSE EXISTING CONDUIT, WIRE, CONTROL AND JUNCTION BOXES. PROVIDE NEW IF
REQUIRED TO INSTALL THE NEW LUMINAIRE.
10. PROVIDE (1) UNSWITCHED LEG FROM PANEL SERVING THE EMERGENCY FIXTURES TO THE
SENSOR LEG SERVING THE NEW BATTERY BACK UP IN NEW LUMINAIRES.
11. CONNECT NEW LUMINAIRES TO CIRCUIT THAT SERVED PREVIOUSLY REMOVED LUMINAIRE
USING 2#12 &1#12 GND IN 3/4" C. EXTEND CONDUIT AND CONDUCTORS AS REQUIRED TO
MAKE CONNECTION. CONDUIT IN GOOD CONDITION SHALL BE REUSED IN PLACE.
12. NEW OCCUPANCY SENSORS TO BE INSTALLED IN A MANUAL ON/AUTO OFF'
CONFIGURATION.
13. REPLACE CEILING TILES WITH LIKE IN AREAS WITH A REDUCTION IN LUMINAIRE. REUSE
EXISTING CEILING TILES WHERE APPLICABLE. PROVIDE NEW TO MATCH EXISTING IF
REQUIRED. ADJUST AND MOVE AIR RETURN GRILLS AS REQUIRED TO COORDINATE WITH
REVISED LUMINAIRE LAYOUT IN AREAS WITH A LAYIN CEILING.
14. COORDINATE LOCATIONS OF NEW LUMINAIRES WITH EXISTING DUCT, PIPING, STRUCTURAL
AND CEILING…