Construction Document Section 5.pdf

PDF 18 MB Posted

Attached to
Y1DA--590-210 Construct Prosthetics Facility (VA-23-00044335)
Solicitation number
36C77623R0166_1
Issued by

About this file

This federal contract opportunity is for the construction of a prosthetics facility for the Department of Veterans Affairs. The solicitation number is 36C77623R0166_1 for the project named "Y1DA--590-210 Construct Prosthetics Facility (VA-23-00044335)." The agency listed is the Department of Veterans Affairs Technology Acquisition Center located in Austin. The opportunity type is a solicitation. No other key details are provided in the limited information given.

View the file

Other files

File Type Posted
Amendment 0008 Attachment 1 - Hampton VA RFIs All.docx DOCX document
36C77623R0166 0008.docx DOCX document
Amendment 0008 Attachment 3 - 081113 Hollow Metal Doors and Frames.pdf PDF
Amendment 0008 Attachment 2 - 329000.pdf PDF
36C77623R0166 0007.docx DOCX document
36C77623R0166 0006.docx DOCX document
Amendment 0006 Attachment 2 - 117300 ceiling mounted patient lift system.pdf PDF
Amendment 0006 Attachment 3 - 087113-11 LE Power Assist Door Operators.pdf PDF
Amendment 0006 Attachment 4 - 019100 General Commissioning Rev 1.pdf PDF
Amendment 0006 Attachment 5 - 000110 TOC Rev 1.pdf PDF
Amendment 0006 Attachment 1 - Hampton VA RFIs 1-97.docx DOCX document
36C77623R0166 0005.docx DOCX document
36C77623R0166 0004.docx DOCX document
S06 - 36C77623R0166 0003.docx DOCX document
36C77623R0166 0002.docx DOCX document
wage rates.pdf PDF
36C77623R0166-0001.docx DOCX document
S04 - Site Visit Sign-in Sheet Completed.pdf PDF
36C77623R0166 0001.docx DOCX document
Wage Determination.pdf PDF
Construction Documents Section 3.pdf PDF
Bid Documents Part 1.pdf PDF
Bid Documents Part 7.pdf PDF
SPEC VOL I - A.pdf PDF
S02 - RFP - 36C77623R0166_1.docx DOCX document
Construction Documents Section 2.pdf PDF
Bid Documents Part 2.pdf PDF
Construction Documents Section 1.pdf PDF
Bid Documents Part 6.pdf PDF
Bid Documents Part 4.pdf PDF
Hampton VAMC Site Plan.pdf PDF
Site Visit Instructions.docx DOCX document
Construction Document Section 4.pdf PDF
Bid Documents Part 5.pdf PDF
Bid Documents Part 3.pdf PDF
SPEC VOL I - B.pdf PDF
SPEC VOL II -.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B

E

G

F

H

D

3 4 6 8 10 11 12 13 14 15 17 18165 972

FD

MB

WC

LAV

LAV

2"SAN

"S

A N

WC

LAV

4" SAN FROM

ABOVE

WC

LAV

4"SAN

WC

LAV

CONNECT TO EXISTING CAST-IRON 5"

SAN OUTSIDE BUILDING. REFER TO

CIVIL DRAWINGS FOR CONTINUATION.

SK

SK

SK

2"SAN

"S

A N

SK

2"SAN

SK

SK

SK/SK

2"SAN

4"SAN

45-SP1

EWC

2"SAN

SK SK

SK

SK

SK SK

2" V UP

6" W UP

"S

A N

FS

CONNECT VENT TO TOP OF

SANITARY LINE AND ROUTE AT

45° TO VERTICAL IN WALL ABOVE.

6" STORM DRAINAGE TO 5'

OUTSIDE BUILDING. REFER TO

CIVIL DRAWINGS FOR

CONTINUATION.

PROVIDE VALVE AND CHECK

VALVE IN VERTICAL OF 2"

PUMP DISCHARGE.

EW

4"SAN

FCO

FCO

FCO

SK

FCO

FCO

4"SAN

FCO

4"SAN

1/2" CW UP

2" V UP

6" W

COORDINATE LOCATION OF

POST INDICATOR VALVE WITH

CIVIL CONTRACTOR

2"SAN

0.00' (100.00')

FINISH FLOOR

4"SAN

1/2"CW

FROM TP-2

3"SAN

4"SAN

ROUTE THROUGH CENTRAL

MIDDLE THIRD OF FOOTING AT

THIS LOCAITON. COORDINATE

WITH STRUCTURAL ENGINEER

FOR SLEEVES REQUIREMENTS

ROUTE THROUGH CENTER MIDDLE THIRD

OF FOOTING AT THIS LOCAITON.

COORDINATE WITH STRUCTURAL

ENGINEER FOR SLEEVE REQUIREMENTS

I.E.= -7' - 6 1/2"

1/2"CW UP FROM TRAP PRIMER

"S

A N

4"SAN

FD

2" V UP

4"SAN

4"SAN

2"SAN

2"SAN

FCO

4" ST

6" ST

REFER TO 8/P301

FOR ADDITIONAL

INFORMATION.

I.E.= -2' - 0"

ROLL FITTING INTO TOP OF

DRAIN TILE MAIN OR CONNECT

DIRECTLY INTO THE TOP OF THE

EXTERIOR DRAIN TILE LINE.

4"DT

6" STORM DRAINAGE TO 5'

OUTSIDE BUILDING. REFER TO

CIVIL DRAWINGS FOR

CONTINUATION.

CRITICAL INVERT ELEVATION.

COORDINATE SLEEVE WITH

STRUCTURAL ENGINEER.

I.E.= -2' - 0"

I.E.= -2' - 6"

CRITICAL INVERT ELEVATION.

COORDINATE SLEEVE WITH

STRUCTURAL ENGINEER.

45-SP2

COORDINATE LOCATION OF

ELEVATOR BASINS WITH STRUCTURAL

AND ELEVATOR MANUFACTURER.

REFER TO 11/P301 FOR

ADDITIONAL INFORMATION

I.E.= -1' - 1"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:0

:3

P

M

P100-B45

UNDERFLOOR PLAN - PLUMBING CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149

N O R

HT

1/8" = 1'-0"

UNDERFLOOR PLAN - PLUMBING

Revisions: Date:

B

E

G

F

H

D

3 4 6 8 10 11 12 13 14 15 17 18165 972

STAIR 1

S100-45

RECEPTION

101-45

CORRIDOR

C102-45

CORRIDOR

C100-45

CORRIDOR

C103-45

ORTHO SUPERVISOR OFFICE

126-45

STAIR 2

S102-45

STAFF TOILET

122-45

TELECOM

151-45

TEAM EVALUATION

120-45

TRASH

130E-45

ELECTRICAL

150-45

FITTING / EXAM SOFT GOODS

108-45

HAC

110-45

EQUIPMENT STORAGE

115-45

DYNAMIC ALIGNMENT

113-45

CAST

114-45

FACIAL/ BODY FITTING STUDIO

109-45

FITTING / EXAM SOFT GOODS

116-45

SOILED HOLDING

112-45

FITTING / EXAM SOFT GOODS

107-45

FITTING / EXAM CUSTOM FAB

117-45

FITTING / EXAM SOFT GOODS

106-45

FITTING / EXAM SOFT GOODS

105-45

FITTING / EXAM SOFT GOODS

104-45

FITTING / EXAM SOFT GOODS

103-45

PATIENT TOILET

102-45

PROSTHETICS LAB

130-45

MECHANICAL FIRE/H20

125-45 ELECTRICAL

124-45

PATIENT / PUBLIC TOILET

119-45

PATIENT / PUBLIC TOILET

118-45

LOBBY

100-45

OPEN OFFICE

123-45

STAFF TOILET

111-45

CAD/ CAM

130D-45

LAB RESTORATION

130A-45

PROSTHETICS/ ORTHOTICS FUME

130C-45

LAB DUST ROOM

130B-45

ELEVATOR

E-1-45

CORRIDOR

C101-45

P-408 P-528

P-408

FD-C

P-502

LAV

WC

P-528

P-103

P-408

P-103

P-103

1 1/2"V DN

P-408 P-408

2"V

2" V UP

2"SAN DN, 1 1/2"V

P-103

P-408

2"SAN DN,

1 1/2"V

P-528

P-507

P-103

P-528

P-528 P-414

P-528

2"V

2"V

2" V

3"CW

3/4"HWC

3/4"CW

3/4"HWC

1 1/2"HW

0.5

1 1/2"CW

PROVIDE

SECONDARY STORM

OUTLET.

PROVIDE SECONDARY STORM

OUTLET. PROVIDE BIRD SCREEN OR

INTEGRAL PERFORATED COVER ON

OUTLET. CONFIRM FINAL COLOR

SELECTION WITH ARCHITECT.

P-609

P-708 P-528

P-408

P-528

1 1/2"V

P-528 P-528

P-528

1 1/2"V

1 1/2"V

P-528 P-528

2"V UP

12.10' (100.00')

FINISH FLOOR

1 1/2"V

2"V

P111-B45

3" SAN DN

FD

2"V UP

3"SAN

FCO

3/4"CW

1 1/4"CW

6"STS

1 1/2"V

2 1/2"CW

4"STS

FS-S

2" SAN

2" SAN DN

P-801

P-801

P-801P-801

1 1/2"CW UP

3/4"HWC

1"HW UP

TP-2

FCO-1

FCO-1

FCO-1

1/2"CW DN

1/2"CW UP

2"SAN DN, 1 1/2"V

2"V

2"SAN DN, 1 1/2"V

2"SAN DN, 1 1/2"V

2"SAN DN, 1 1/2"V

2"SAN DN,

1 1/2"V

2"SAN DN, 1 1/2"V

WHA-1

2"V2

"V

4"SAN DN, 2"V

2"SAN DN, 1 1/2"V

WHA-1

2"SAN DN, 1 1/2"V

4"SAN DN, 2"V

2"V

2"SAN DN, 1 1/2"V 2"SAN DN, 1 1/2"V 2"SAN DN, 1 1/2"V

2"SAN DN, 1 1/2"V

2"SAN DN,

1 1/2"V

2"SAN DN,

1 1/2"V

2"SAN DN, 1 1/2"V

SK

CO

3"SAN DN

3/4"CW

PROVIDE FLOW SPLITTER VALVE

AT THIS LOCATION ON HW SIDE

FCO-1

2"HW

2"CW

1 1/2"HW

1 1/2"V

"V

1 1/4"CW

3/4"HW

2" PD DN

2" SAN DN,

1 1/2"V

2"SAN DN,

1 1/2"V

RD RD

RD

RD

3"CW

2"HW

2 1/2"CW

2"HW

1 1/2"CW

2 1/2"CW

2"CW

1 1/2"CW

2"CW

1 1/2"HW

2" SAN DN

1/2"CW DN

1/2"CW

2"V

3/4"HWC

2"HW

3"CW

2 1/2"CW

2"CW

1 1/2"CW

WHA-1

0.5

1 1/2"HW

1 1/2"HW

3/4"CW

1 1/2"HW

1 1/2"HW

3/4"CW

FCO-1

COORDINATE PIPE ROUTING AT THIS

LOCATION WITH ARCHITECTURAL

DRAWINGS. NO PIPING SHALL BE

ROUTED IN RATED WALL.

FD

1/2"CW UP

FROM TP-1

3"SAN

3/4"HWC

1 1/2"HW

FCO-1

WCO-1 WCO-1

4"ST

6"ST

1 1/2"HW

FD-C

2"V

2" V

1/2"CW DN TO

FLOOR SINK TRAP

/2 "V

2"V

1 1/2"V

PROVIDE FLOW SPLITTER VALVE

AT THIS LOCATION ON HW SIDE

WHA-1

B

MECHANICAL FIRE/H20

125-45

6" W UP AND DN

45-WH-1

"H

W

BACKFLOW PREVENTER DRAIN

REDUCED PRESSURE BACKFLOW

PREVENTER

45-PP1

/4

"H W

C

DISCHARGE DRAIN ONTO

SPLASH BLOCK AT GRADE

LEVEL.

REFER TO 6/P301 FOR

WATER HEATER

INSTALLATION DETAIL.

45-ET-1

PROVIDE HOUSEKEEPING

PAD UNDER EQUIPMENT

FD-E

TP-1

1P-801

6" SERVICE ENTRANCE IN THIS

CORNER OF ROOM 125. TAP IN

VERTICAL FOR CW, 6" W UP TO

FIRE PROTECTION BACKFLOW

PREVENTER. REFER TO FP101.

3" CW

2"CW

3"CW

VALVE IN VERTICAL

2"PD

VALVE IN VERTICAL

TERMINATE PUMP DISCHARGE

18" ABOVE THE GRADE ON

CONRETE SPLASHBLOCK

2" V

2"PD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:0

:3

P

M

P111-B45

FIRST LEVEL PLAN - PLUMBING CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149

N O R

HT

1/8" = 1'-0"

FIRST LEVEL PLAN - PLUMBING

KEYNOTES:

1. PROVIDE 4" DRAIN FROM BACKFLOW

PREVENTER DISCHARGE THROUGH BUILDING

WALL. DRAIN ON TO SPLASH BLOCK ON

GRADE. PROVIDE WIRE MESH TO PROTECT

FROM INSECT/ANIMAL INTRUSION.

2. MOUNT THERMOSTATIC MIXING VALVE,PART

OF FIXTURE P-708 (REFER TO SECTION 224000

ABOVE CEILING. ROUTE EYEWASH DRAIN INTO

WALL AND CONNECT TO SANITARY/VENT.

N O R

HT

1/2" = 1'-0"

ENLARGED PLAN OF MECHANICAL FIRE/H20

B

E

G

F

H

D

3 4 6 8 10 11 12 13 14 15 17 18165 972

OPEN OFFICE

201-45

CONFERENCE

202-45

STAIR 1

S200-45

LOCKERS

203A-45

STAFF LOUNGE

203-45CHIEF OFFICE

204-45

ASSIST CHIEF OFFICE

205-45

PROSTHETICS REP OFFICE

206-45

COPY/ WORK/MAILING

207-45

ELECTRICAL

227-45

STAFF TOILET

208-45

CORRIDOR

C200-45

DME ACTIVE STORAGE

226-45

ELEVATOR EQUIP

222-45

MECHANICAL

220-45

TELECOM

221-45

WHEELCHAIR PARTS STORAGE

225-45

STAIR 2

S202-45

PROSTHETICS/ ORTHOTICS

MAINTENANCE

228-45

SHOE MODIFICATION STORAGE

224-45

PARTS STORAGE

223-45

CORRIDOR

C200-45

P-528

2" SAN DN

1 1/2" V UP

2" V UP TO

4" VTR

P-408

P-103

3"V UP, 4"VTR

1"HW DN

1 1/2"CW DN

3/4" HW & CW

1 1/4" CW DN

TO P-103

2" V UP

3/4" HWC DN

0.5

FD-C

FCO-1

TP-1

1/2" CW DN

4"SAN DN, 2"V

2"SAN DN,

1 1/2"V

2" V DN

FD-C

TP-1

SHUTOFF VALVE IN

VERTICAL. 1/2" CW DN TO

FLOOR DRAIN TRAP

1 1/2"CW

3/4"HW

1"HW

1"CW

1"HW

3/4"HW

6/3668

RD-1

6/3668

RD-2

4/2457

RD-1

4/2457

RD-2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:0

:4

P

M

P121-B45

SECOND LEVEL PLAN - PLUMBING CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149

N O R

HT

1/8" = 1'-0"

SECOND LEVEL PLAN - PLUMBING

ET WORKSHOP

B246-110

TECH OFFICE

B247-110

TECH OFFICE

B245-110

BIOMED PARTS

B243-110HAC

B244-110

BIOMED

B242-110

CORRIDOR

C2B-5-110

CORRIDOR

C2B-1-110

WORKSTATION

B227-110

TOILET

B216-110

BREAK

B227A-110

OFFICE

B229-110

FILES

B227B-110

CORRIDOR

C2B-4-110

TELECOM

B214-110

COPY

B226-110

OFFICE

B228-110

OFFICE

B230-110

STORAGE

B230A-110

OFFICE

B232-110

OFFICE

B234-110

OFFICE

B236-110

CONFERENCE

B238-110

WORKSTATION

B239-110

WORKSTATION

B235-110

WORKSTATION

B231-110

STAIR

S2B-5-110

ELEC

B212-110

STAIR-2

S2B-2-110

WOMEN'S TOILET

B219

BIO ENGINEERING

B220

ELEVATOR 10

E2B-10

CHASE

B209A

STORAGE

B209

Room

E2B-11

EXISTING MEDICAL

VACUUM, MEDICAL

AIR AND OXYGEN

PIPING TO MAINS TO

REMAIN.

EXISTING MEDICAL

GAS OUTLETS TO

REMAIN.

MV

MA

O

MV

MA

O

PROVIDE NEW

OXYGEN MEDICAL

GAS OUTLET.

3/4"O1/2"O

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:0

:4

P

M

P121-B110

SECOND LEVEL PLAN - PLUMBING

- 110

CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149

1/8" = 1'-0"

SECOND LEVEL PLAN - PLUMBING - 110

N

O R HT

UNDER DEDUCT ALTERNATE 1, ALL WORK ON

THIS SHEET IS REMOVED FROM PROJECT SCOPE.

B

E

G

F

H

D

3 4 6 8 10 11 12 13 14 15 17 18165 972

4" VTR

4"VTR

4" VTR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:0

:4

P

M

P131-B45

ROOF PLAN - PLUMBING CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149

N O R

HT

1/8" = 1'-0"

ROOF PLAN - PLUMBING

BACKFLOW PREVENTER PIPING DETAIL

NTS

[3 m m

WALL LINE

REDUCED PRESSURE

PRINCIPLE BACKFLOW

PREVENTER WITH GATE

VALVES

PLAN

AIR GAP

FITTINGWATER LINE

FROM METER

PIPE TO DRAIN

(TYPICAL)

FINISHED FLOOR

COLD WATER TO

SYSTEM

PIPE SUPPORT

ELEVATION

[3 m m

T O

B O

T T

O M

O F

R E

L

IE

F O

P E

N

IN

G S

TYPE "C" FLOOR DRAIN DETAIL

NTS

NICKLE BRONZE

ADJUSTABLE STRAINER

(FLUSH WITH FINISHED

FLOOR)

CEMENT BED

TILE FLOOR

CONCRETE FILL

STRUCTURAL SLAB

FLASHING

CLAMP WITH

WEEP HOLES

THREADED, CAULKED OR

NO-HUB CONNECTION

WATERPROOF

MEMBRANE

PROVIDE A METAL SUPPORT

PLATE WHEN DRAIN IS INSTALLED

IN AN EXISTING FLOOR - CAULK

AROUND DRAIN PRIOR TO

RE-GROUTING

CLAMP WATERPROOF

MEMBRANE INSIDE OF DRAIN

BODY TO DRAIN TO WEEP

HOLES

NOTE:

SLOPE MEMBRANE LINER 2% TO DRAIN.

LOOSE GRAVEL AT

WEEP HOLES

3mm to 6mm SIZE

P-103 WATER CLOSET DETAIL

NTS

FINISHED FLOOR

FINISHED WALL

3/4" [19mm]

CONDUIT

TWO GANG

ELECTRICAL BOX

W/STAINLESS STEEL

COVER PLATE

LOCATION

OF PUSH

BUTTON

SPLIT GRAB BAR

SEE ARCH. DWGS

C WATER CLOSET

PLAN

ELEVATION

L

[250mm]

[450mm]

F O

R F

IX

T

U R

E H

E

IG

H T

S E

E A

R C

H

IT

E C

T U

R A

L D

R A

W

IN

G S

TYPICAL WHEELCHAIR LAVATORY DETAIL

NTS

FAUCET SEE

SPECIFICATIONS

LAMINAR FLOW

CONTROL DEVICE

OFFSET

WASTE

TRAP

PARALLEL

TO WALL

LOOSE KEY

STOP

ESCUTCHEON

FINISHED

FLOOR

[8 m m

[200mm]

[2 m m

F O

R F

IX

T

U R

E H

E

IG

H T

S S

E E

A R

C H

IT

E

C T

U R

A L D

R A

W

IN

G S

PROVIDE COVER FOR EXPOSED PIPING

NOTE:

LAVATORY MOUNTING DETAIL

NTS

MINIMUM 16 GAGE GALVANIZED STEEL

PLATE 12"x48" [300x1200mm] MIN.

SECURED TO A MIN. 4 STUDS PER

LAVATORY

1/4" [6mm]∅ MOLLY BOLT HOLLOW WALL

ANCHOR (1 EA. SIDE OF LAV)

MIN. (3) 1/4" [6mm]

MACHINE BOLTS

W/DOUBLE LOCK NUTS

ON BACK SIDE

MIN. 5 1/4" [131mm]∅

GALV. MACHINE BOLTS

WELDED TO PLATE

1/4" [6mm]

TYP. 1/8"

TYP. [3mm]

A A

PLAN

SECTION A

NOTE:

1.

2.

AT LAVS WITH FOOT PEDAL CONTROLS PROVIDE

AN ADDITIONAL 16 GAGE GALVANIZED STEEL

PLATE 12"x16" [300x600mm] SECURED TO A

MINIMUM OF 2 STUDS PER FOOT PEDAL.

PROVIDE 20 GAGE STUDS WHEN HEIGHT

EXCEEDS 12'-0" [3600mm]

STEEL HANGER BY LAV MFGR

STEEL WALL PLATE

WALL ANCHOR

STUDS

FOR FIXTURE

HEIGHT SEE

ARCHITECTURAL

DRAWINGS

SEE FP DRAWINGS

FOR CONTINUATION

BY F.P.C.

BY P.C.

PROVIDE INSULATION ON

PIPING

M

IN

10"

18"

8"

/4

V A

R

IE

S

[9 m m

T

O F

L O

O R

CW

C W

H W

VACUUM RELIEF VALVE.

WATTS N36 OR EQUAL.

EXPANSION

TANK 45-ET-1

CIRCULATING

PUMP 45-PP1

UNION (TYP.)

DRAIN

A.S.M.E. PRESSURE AND

TEMPERATURE RELIEF VALVE

THERMOMETER IN WELL (0-200˚F)

PIPE DIRECTLY OVER

FLOOR DRAIN

HOUSEKEEPING

PAD

HWC

BYPASS FOR HOT WATER CIRC.

45-WH-1

NORMALLY CLOSED

CLAMPING RING

WATER CUTOFF MASTIC

ADJUSTABLE EXTENSION

ROOF DECK

ROOF INSULATION

DOME STRAINER

BEARING PAN

UNDERDECK CLAMP

OUTLET SIZE AS

SHOWN ON DRAWINGS

PRIMARY ROOF DRAINSECONDARY ROOF DRAIN

INTERNAL

WATER DAM ROOF MEMBRANE

BASIN WITH

PERFORATED

COVER PLATE

ON/OFF INTEGRAL OR

PIGGY BACK FLOAT SWITCH

DISCHARGE PIPE.

SHUTOFF VALVE

CHECK VALVE.

UNION

BACKFILL AROUND BASIN

WITH 6" OF CONCRETE.

SUMP PUMP

FLANGED COUPLING

OR UNION.

ANCHOR FLANGE

12" DEEP CONCRETE

ALARM WHEN WATER

LEVEL IS 3" BELOW INVERT

OF LOWEST INLET.

CONTROL PANEL WITH HIGH

WATER AND OIL PRESENT ALARMS.

OIL SENSOR

NOTES:

1. INSTALL CONTROL PANEL PER MANUFACTURER INSTRUCTIONS. COMPONENTS

AND WIRING ARRANGEMENT MAY DIFFER FROM THAT SHOWN.

2. SUMP PUMPS THAT DISCHARGE TO STORM SHALL BE INSTALLED WITH THE TOP OF

THE SUMP BASIN 2" ABOVE FLOOR LEVEL A 2" HIGH X4" WIDE CONCRETE CURB

AROUND THE PERIMETER OF THE BASIN LID MAY BE USED IN LIEU OF RAISING THE

ENTIRE SUMP BASIN.

CLEANOUT

CONNECT TO TOP OF

HORIZONTAL GRAVITY PIPE

FLOOR

NONCORROSIVE, HEAVY DUTY SLEEVE (E.G.

CAST IRON, CONCRETE PIPE). PROVIDE A

MINIMUM OF 2" CLEAR FROM TOP OF

CARRIER PIPE TO INSIDE OF SLEEVE.

CARRIER PIPE. NO JOINTS

INSIDE SLEEVE.

ENCASE SLEEVE WITH CONCRETE

A MINIMUM OF 9" ALL AROUND. IF

TOP OF SLEEVE IS WITHIN 18" OF

BOTTOM OF FOOTING CONCRETE

SHALL EXTEND TO UNDERSIDE OF

FOOTING.

[NTS:

NTS: COORDINATE THIS NOTE (#1) WITH STRUCTURAL ENGINEER PRIOR TO ADDING TO

DRAWINGS. THE GENERAL CONTRACTOR WON'T SEE THIS DRAWING AND WON'T VOLUNTARILY

STEP THE FOOTING WITHOUT CLARIFICATION FROM STRUCTURAL ENGINEER. THIS DETAIL IS NOT INTENDED AS A GENERIC-SHOW-ON-EVERY-PROJECT DETAIL. ROUTING PIPE BENEATH A BUILDING

FOOTING OR FOUNDATION WALL SHOULD ONLY BE DONE AS A LAST RESORT WHEN ALL OTHER

OPTIONS ARE IMPOSSIBLE OR FINANCIALLY NOT FEASABLE.]

NOTES:

1. STEP FOOTING DOWN AS REQUIRED TO MAINTAIN 8" MINIMUM

DIMENSION.

6" MIN.

9" MIN.

6" (TYP.)

2" MIN

8" MIN

(NOTE 1)

9" MIN. NO SLEEVES PERMITTED.

GRADE

2" MIN

[NTS: ONLY USE THIS PORTION OF

THE DETAIL AS A LAST RESORT

WHEN ALL OTHER OPTIONS ARE

IMPOSSIBLE OR FINANCIALLY NOT

FEASABLE.]. ERASE HATCHING IF

YOU PLAN TO USE IT.

(ERASE THIS ONLY AFTER READING NOTES TO SPECIFIER)

THREADED ROD. (TYP.)

OVERSIZE HANGER TO ALLOW

LONGITUDINAL PIPE EXPANSION

AND PIPE INSULATION TO PASS

THROUGH UNBROKEN. (TYP.)

UNI-STRUT OR EQUIVALENT

HIGH DENSITY INSULATION INSERT

OR, FOR APPLICATIONS PERMITTED

IN SPEC SECTION (SECTION 22 05 11-

PLUMBING), STEEL SADDLE FILLED

WITH INSULATION. (TYP.)

THREADED ROD. (TYP.)

PIPE INSULATION (TYP.)

INSULATION SHIELD (TYP.)

INSULATION SHIELD

INSTALL CLAMP ON ALL

PIPES LESS THAN 4"Ø

THREADED ROD

INSULATION

CLEVIS HANGER

HIGH DENSITY INSULATION INSERT

OR, FOR APPLICATIONS PERMITTED

IN SPEC SECTION (SECTION 22 05 11-

PLUMBING), STEEL SADDLE FILLED

WITH INSULATION.

NOTES:

1. REFER TO SPECIFICATION SECTIONS SECTION 22 05 11 - PLUMBING.

BASIN WITH SOLID

COVER PLATE

REFER TO DRAWINGS

FOR NUMBER AND

LOCATION OF INLET.

ON/OFF INTEGRAL OR

PIGGY BACK FLOAT SWITCH

DISCHARGE PIPE.

SHUTOFF VALVE

CHECK VALVE.

UNION

BACKFILL AROUND BASIN

WITH 6" OF CONCRETE.

SUMP PUMP

FLANGED COUPLING

OR UNION.

ANCHOR FLANGE

12" DEEP CONCRETE

ALARM WHEN WATER

LEVEL IS 3" BELOW INVERT

OF LOWEST INLET.

CONTROL PANEL WITH

HIGH WATER ALARMS.

NOTES:

1. INSTALL CONTROL PANEL PER MANUFACTURER INSTRUCTIONS.

COMPONENTS AND WIRING ARRANGEMENT MAY DIFFER FROM THAT

SHOWN.

ROUTE TO THE EXTERIOR OF

THE BUILDING AND TERMINATE

MANUFACTURER

RECOMMENDED BACKFILL

AROUND THE BASIN.

FINISH FLOOR

I.E. = SEE PLAN.

SMOOTH AND LEVEL

PAD SURFACE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:0

:4

P

M

P301

PLUMBING DETAILS CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149

NO SCALE

WATER HEATER DETAIL

NO SCALE

ROOF DRAIN DETAIL

NO SCALE

SUMP PUMP DETAIL

(OIL SENSOR - CONTROL PANEL)

NO SCALE

PIPE FOUNDATION AND SLEEVE DETAIL

NO SCALE

PIPE SUPPORT DETAIL

Revisions: Date:

NO SCALE

DRAIN TILE SUMP PUMP DETAIL

P-408

P-103

P-528

P-528

P-408

P-408

P-103

P-103

P-609

P-708

P-408

P-103

P-414

P-528

P-103

P-408

P-528

P-528

P-528

P-528

P-528

P-528

P-528 P-408

P-528

P-528

P-408

P-408

P-103

P-502

P-528

P-507

P-528

TO 4" VTR

2"SAN

4"SAN

2"V

1 1/2"V

2"V

2"V

FD-C

FCO-1

2"V

4"SAN

45-SP1

4"SAN

1 1/2"V

2"SAN

2"V

4"SAN

2"SAN

2"V

1 1/2"V

4"SAN

4"SAN

4"SAN

2"SAN FS-S

1 1/2"V

1 1/2"V

2"V

2"SAN

4"SAN

2"SAN

1 1/2"V

4" VTR

4"SAN

2"SAN

1 1/2"V

2"SAN

1 1/2"V

3"V

4"SAN

3"V

4"SAN

2"SAN

1 1/2"V

4"SAN

2"V

2"SAN

1 1/2"V

2"SAN

2"V

2"SAN

2"SAN

2"V

2"SAN

1 1/2"V

2"V

2"SAN

1 1/2"V

2"SAN

2"SAN

1 1/2"V

2"SAN

1 1/2"V

2"SAN

4"SAN

FD-C

2"V

2"V

1 1/2"V

2"SAN

1 1/2"V

3" VTR

2"V

2"SAN

1 1/2"V

2"SAN

1 1/2"V

FCO-1

FCO-1

FCO-1

4"SAN

2"V

2"V

REFER TO CIVIL

DRAWINGS FOR

CONTINUATION

2"SAN

6/3668

RD-2

6/3668

RD-1

2"SAN

1 1/2"V

4"SAN

2"V

4/2457

RD-1

4/2457

RD-2

2"V

4"SAN

2"V

4"SAN

4"SAN

2"V

FCO-1

2"PD

TERMINATE PUMP DISCHARGE

18" ABOVE THE GRADE ON

CONCRETE SPLASHBLOCK

FD-E

1 1/2"V

CO

6"STS (3,668)

4"STS (2,457)

4"SAN

2"V

FD-C

4"ST (2,457)

WCO-1

FD-C

2"V

2"V

WCO-1

6"ST (3,668)

2"SAN

FCO-1

4"SAN

45-SP2

2"PD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:0

:5

P

M

P401

PLUMBING DIAGRAMS CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149

NO SCALE

PLUMBING RISER SANITARY/VENT

GENERAL NOTES:

1. RISER DIAGRAM SHOWN FOR REFERENCE

PURPOSES ONLY. REFER TO DRAWINGS FOR

ADDITIONAL INFORMATION.

P-408

P-103

P-528

P-528

P-408

P-408

P-103

P-103

P-609

P-708

P-408

P-103

P-414

P-528

P-103

P-408

P-528

P-528

P-528

P-528

P-528

P-528

P-528

P-408

P-528

P-528

P-408

P-408

P-103

P-502

P-528

P-507

P-528

1 1/2"HW

1 1/2"CW

3/4"CW

3/4"HW

1 1/2"CW

3/4"HW

1 1/4"CW

3"CW

2"CW

2"HW

3"CW

6"CW

3"CW

1 1/2"CW

P-801

P-801

P-801

P-801

P-801

45-WH-1

3/4"HWC

BFP-1

45-PP1

3/4"HW

3/4"HW

1"HW

1"CW

1 1/2"HW

BALANCING ASSEMBLY.

REFER TO DRAWINGS FOR

BALANCING INFORMATION.

PROVIDE 45-ET-1

AT THIS LOCATION

1"HW

45-ET-1

TP-1

BALANCING ASSEMBLY.

REFER TO DRAWINGS FOR

BALANCING INFORMATION.

BALANCING ASSEMBLY.

REFER TO DRAWINGS FOR

BALANCING INFORMATION.

2"HW

3/4"HWC

WHA-1

2"HW

2 1/2"CW

WHA-1

1 1/2"CW

3/4"HW

1"HW

TP-2

1 1/2"CW

3/4"HWC

2 1/2"CW

2"CW

2"HW

3/4"HWC

1 1/2"CW

1 1/2"HW

3/4"HW

2"CW

1 1/2"CW

2"CW

WHA-1

3/4"CW

1 1/4"CW

1 1/2"HW

1 1/2"HW

3/4"CW

3/4"CW

3/4"CW

TP-1

1 1/2"CW

1 1/2"HW

1"HW

1 1/2"CW

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:0

:5

P

M

P402

PLUMBING DIAGRAMS CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149

NO SCALE

PLUMBING RISER DOMESTIC

GENERAL NOTES:

1. RISER DIAGRAM SHOWN FOR REFERENCE

PURPOSES ONLY. REFER TO DRAWINGS FOR

ADDITIONAL INFORMATION.

BY F.P.C.

BY P.C.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:0

:5

P

M

P501

PLUMBING SCHEDULES CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149

45-SP2 ELEV E-1-45 DRAIN TILE SUMP SUMP PUMP CENT WATER 20 [ 1 ] 27 [ 430 ] 1 NA 70 [ 21 ] 1 0.50 [0.4] 1 120 1750 CONSTANT

45-SP1 ELEV E-1-45 ELEVATOR SUMP SUMP PUMP CENT WATER 50 [ 3 ] 27 [ 430 ] 1 NA 70 [ 21 ] 1 0.50 [0.4] 1 120 1750 CONSTANT

45-PP1 MECH 125-45 BLDG 45 HOT WATER RECIR CENT DOMESTIC WATER 2 [ ] 10 [ 160 ] 0 NA 140 [ 60 ] 1 0.166666667 [ ] 1 120 1750 CONSTANT ----

GPM [L/s] FT [kPa] FT [kPa] °F [°C] HP [kW]

FLUID

FLOW HEAD NPSH AVAILABLE TEMPERATURE

SP. GR. MIN. %

EFF

NOMINAL POWER

PHASE VOLT MAX RPM SPEED

CONTROL REMARKS

MARK LOCATION AREA AND/OR

BLDG SERVED

SYSTEM AND/OR

SERVICE TYPE

CIRCULATING FLUID ELECTRICAL MOTOR

PLUMBING PUMP SCHEDULE

45-WH-1 MECH 125-45 BLDG 45 DOMESTIC HOT WATER ELECTRIC 80 [ 300 ] 176 [ 670 ] 39 50 [ 350 ] 6 30 5 3 208 -----

GAL [L] GAL/HR [L/HR] PSIG [kPa] TOTAL kW kW PER

ELEMENT PHASE VOLT

MARK LOCATION AREA AND/OR BLDG

SERVED

SYSTEM AND/OR

SERVICE TYPE

STORAGE CAPACITY RECOVERY @ 70 °F [21°C]

RISE

TIME TO

RECOVER

CONTENTS,

MINUTES

RELIEF VALVE SETTING

NO OF

ELEMENTS

ELECTRICAL INPUT

REMARKS

ELECTRIC WATER HEATER SCHEDULE

45-ET-1 BLDG 45 POTABLE THERMAL

EXPANSION TANK 40 [ 4 ] 140 [ 60 ] 30 [ 210 ] 125 [ 860 ] 50 [ 350 ] 3 [ 11 ] 5 [ 19 ] 0.75 [ 19 ] -----

°F [°C] °F [°C] PSIG [kPa] PSIG [kPa] PSIG [kPa] GAL [L] GAL [L] IN [mm]

MIN MAXMARK LOCATION TYPE

SYSTEM TEMPERATURE RANGE

INITIAL PRESSURE IN TANK MAX OPERATING PRESSURE RELIEF VALVE PSIG [kPA] MIN TANK VOLUME MIN ACCEPT VOLUME PIPE SIZE TO TANK

REMARKS

DOMESTIC WATER THERMAL EXPANSION TANK SCHEDULE

FD-S FLOOR SINK 3 [ 75 ] 1.5 [ 38 ] N/A N/A N/A N/A NO

FD-E FLOOR DRAIN 4 [ 100 ] 2 [ 50 ] N/A N/A N/A N/A NO

FD-C FLOOR DRAIN 3 [ 75 ] 1.5 [ 38 ] N/A N/A N/A N/A NO

P-801 WALL HYDRANT N/A N/A .75 [ 19 ] N/A N/A 5 N/A NO

P-710 SWING-DOWN EYE WASH N/A N/A .75 [ 19 ] .75 [ 19 ] NA 3 N/A NO MOUNTED ON P-414 AND P-528 FIXTURES, REFER TO THOSE FIXTURES FOR WASTE

FIXTURE UNITS.

P-708 WALL MOUNTED EYE/FACE

WASH 2 [ 50 ] 1.5 [ 38 ] .75 [ 19 ] .75 [ 19 ] 2 3 N/A NO

P-609 ELECTRIC WATER COOLER 2 [ 50 ] 1.5 [ 38 ] .5 [ 13 ] N/A 1 1 N/A NO

P-528 SINK COUNTER MOUNTED 2 [ 50 ] 2 [ 50 ] .75 [ 19 ] .75 [ 19 ] 2 4 N/A NO PROVIDE MIXING VALVE RATED FOR 0.5 GPM AT 5 PSI OF PRESSURE DROP

P-507 PLASTER SINK 2 [ 50 ] 1.5 [ 38 ] .5 [ 13 ] .5 [ 13 ] 1 1 N/A NO PROVIDE MIXING VALVE RATED FOR 0.5 GPM AT 5 PSI OF PRESSURE DROP

P-502 SINK SERVICE 3 [ 75 ] 2 [ 50 ] .75 [ 19 ] .75 [ 19 ] 2 3 N/A NO PROVIDE MIXING VALVE RATED FOR 0.5 GPM AT 5 PSI OF PRESSURE DROP

P-414 LAVATORY 2 [ 50 ] 1.5 [ 38 ] .5 [ 13 ] .5 [ 13 ] 1 1 N/A NO PROVIDE MIXING VALVE RATED FOR 0.5 GPM AT 5 PSI OF PRESSURE DROP

P-408 LAVATORY 2 [ 50 ] 1.5 [ 38 ] .5 [ 13 ] .5 [ 13 ] 1 1 N/A NO PROVIDE MIXING VALVE RATED FOR 0.5 GPM AT 5 PSI OF PRESSURE DROP

P-103 WATER CLOSET, WALL HUNG 3 [ 75 ] 2 [ 50 ] 1.25 [ 31 ] N/A 4 6 N/A NO

IN [mm] IN [mm] IN [mm] IN [mm]

MARK DESCRIPTION

WASTE PIPE VENT PIPE COLD WATER HOT WATER WASTE

FIXTURE

UNITS

WATER

FIXTURE

UNITS

WRIST BLADE

HANDLES

ELECTRIC

SENSOR REMARKS

PLUMBING FIXTURE SCHEDULE

ELECTRICAL ABBREVIATION KEY

AFF ABOVE FINISHED FLOOR

N.C. NORMALLY CLOSED

NIC NOT IN CONTRACT

N.O. NORMALLY OPEN

SV SOLENOID VALVE

ABBR: DESCRIPTION:

TYP TYPICAL

C CONDUIT

UON UNLESS OTHERWISE NOTES

GFI GROUND FAULT INTERRUPTER

NORMAL BRANCH LUMINAIRE

EMERGENCY BRANCH LUMINAIRE

LUMINAIRE SYMBOL KEY

SYMBOL: DESCRIPTION:

ATS-# AUTOMATIC TRANSFER SWITCH, REFER TO

TRANSFER SWITCH SCHEDULE

26 36 00

BAT-# BATTERY RACK 26 32 13

CGA-# FIRE ALARM - GRAPHIC ANNUNCIATOR 28 31 00

CR-# CORD REEL 26 27 26

CT-# CABLE TRAY 26 05 36

DIM-# DC DIMMING PANEL 26 09 33

DP-# DISTRIBUTION PANEL 26 24 16

DR-# DIMMING RACK 26 09 33

DT-# GENERATOR DAY TANK 26 32 13

DTR-# TRANSFORMER - DISTRIBUTION TYPE

REFER TO TRANSFORMER SCHEDULE

26 12 19

28 31 00FAA-# FIRE ALARM - ANNUNCIATOR

26 32 13GAP-# GENERATOR ANNUNCIATOR PANEL

26 32 13GCC-# TEMP. GENERATOR/LOAD BANK CONNECTION CABINET

26 32 13GCP-# GENERATOR CONTROL PANEL

26 32 13GEN-# GENERATOR

26 32 13GRR-# GENERATOR REMOTE RADIATOR

26 05 33HH-# HANDHOLE

26 05 17HT-# HEAT TAPE

26 52 00INV-# LIGHTING INVERTER

26 28 31LC-# LIGHTING CONTACTOR, REFER TO CONTACTOR SCHEDULE

26 20 00M-# METER DISTRIBUTION CENTER

26 20 00EXTERIOR MOUNTED METERING CABINETMC-#

26 14 19MCC-# MOTOR CONTROL CENTER, REFER TO MOTOR CONTROL SCHEDULE

26 05 37MH-# MANHOLE

26 36 00MTS-# MANUAL TRANSFER SWITCH, REFER TO TRANSFER SWITCH SCHEDULE

26 24 19MX-# MANUAL SWITCH, REFER TO DISCONNECT AND STARTER SCHEDULE

NEP-# FIRE ALARM - EXTENDER PANEL 28 31 00

PDU-# POWER DISTRIBUTION UNIT 26 26 00

PS-# PAD-MOUNT MEDIUM VOLTAGE SWITCH 26 13 15

R-# RELAY 26 09 39

RA-ATS-# REMOTE ANNUNCIATOR FOR ATS 26 36 00

SB-# SWITCHBOARD 26 24 13

SC-# SECTIONALIZING CABINET 26 13 14

SG-# SWITCHGEAR 26 23 00

SMP-# SNOW MELT CONTROL PANEL 26 05 17

SPD-# SURGE PROTECTION DEVICE 26 43 00

UD-# UNDERFLOOR DUCT - TRENCH DUCT - CELLULAR FLOOR DUCT 26 05 38

US-# UNIT SUBSTATION 26 11 00

VCC-# FIRE ALARM - VOICE COMMAND CENTER 28 31 00

VFD-# VARIABLE FREQUENCY DRIVE - REFER TO VFD SCHEDULE 26 29 23

ACU-# AUTONOMOUS CONTROL UNIT

LOC-# LOCAL OPERATING CONSOLE 28 31 00

28 31 00

CMD# EMERGENCY COMMUNICATION MESSAGE DISPLAY 28 31 00

26 24 14GPS-# GENERATOR PARALLELING AND DISTRIBUTION SWITCHBOARD

26 24 23MPC-# PACKAGED POWER CENTER

SCP-# FIREFIGHTERS SMOKE CONTROL PANEL 28 31 00

TVA-# TEXTURAL VISIBLE APPLIANCE 28 31 00

WD-# WALL DUCT 26 05 38

SMS-# PAVEMENT MOUNTED DEICING CONTROLLER 26 05 17

26 13 35

26 13 13MVSG-# MEDIUM VOLTAGE SWITCHGEAR

UPS-# UNINTERRUPTIBLE POWER SUPPLY 26 33 53

26 12 13

26 12 21

C-# GENERAL PURPOSE CONTACTOR 26 28 21

26 13 34

ELECTRICAL EQUIPMENT TAGS

TAG: DESCRIPTION:

RELATED

SPECIFICATION

FAP-# 28 31 00 FIRE ALARM CONTROL PANEL

FA-200 28 31 00 FIRE ALARM VISUAL NOTIFICATION

DEVICE - WALL MOUNTED

V1 V3

V7 VH

FA-211 28 31 00 FIRE ALARM AUDIO/VISUAL NOTIFICATION

DEVICE - WALL MOUNTED

A1 A3

A7 AH

AS

FA-210 28 31 00 FIRE ALARM AUDIO NOTIFICATION DEVICE -

WALL MOUNTED

A

FA-201 28 31 00 FIRE ALARM VISUAL NOTIFICATION

DEVICE - CEILING MOUNTED

V1 V3

V7 VH

FA-231 28 31 00 FIRE ALARM AUDIO/VISUAL NOTIFICATION

DEVICE - CEILING MOUNTED

A1 A3

A7 AH

FA-203 28 31 00 FIRE ALARM VISUAL NOTIFICATION DEVICE -

WALL MOUNTED - WEATHERPROOF

V W

FA-212 28 31 00 FIRE ALARM AUDIO/VISUAL NOTIFICATION

DEVICE - WALL MOUNTED - WEATHERPROOF

A

FA-233 28 31 00 FIRE ALARM AUDIO NOTIFICATION DEVICE -

WALL MOUNTED - MINI-HORN

MH

FA-230 28 31 00 FIRE ALARM AUDIO NOTIFICATION

DEVICE - CEILING MOUNTED

A

SD FA-120 28 31 00 FIRE ALARM SMOKE DETECTOR - CEILING

MOUNTED

SD FA-122 28 31 00 FIRE ALARM DUCT SMOKE DETECTOR

SD FA-123 28 31 00 FIRE ALARM IN DUCT SMOKE DETECTOR

FA-140 28 31 00 FIRE ALARM HEAT DETECTOR H

FA-141 28 31 00 HEAT DETECTOR - 200 DEGREEHF

FA-142 28 31 00 HEAT DETECTOR - EXPLOSION PROOFHX

FA-121 28 31 00 FIRE ALARM PROJECTED BEAM SMOKE

DETECTOR

SD BRSD

BT

FA-151 28 31 00 FIRE ALARM FLAME DETECTORFD

FA-130 28 31 00 FIRE ALARM MANUAL PULL STATIONF

FA-131 28 31 00 FIRE ALARM MANUAL PULL STATION W/ COVERFT

FA-161 28 31 00 FIRE ALARM RELAYAR

FA-160 28 31 00 FIRE ALARM ADDRESSABLE MONITOR MODULEMM

FA-250 28 31 00 FIRE ALARM SMOKE DAMPERSD

FA-251 28 31 00 SMOKE OR FIRE DAMPER CONTROLLERARD

FA-260 28 31 00 FIRE ALARM FLOW SWITCH TO MONITOR FIRE

PROTECTION SYSTEM

FS

FA-261 28 31 00 FIRE ALARM MONITOR SWITCH TO

MONITOR FIRE PROTECTION SYSTEM

MS

FA-262 28 31 00 FIRE ALARM POST INDICATOR VALVE

CONNECTION

PIV

FA-263 28 31 00 FIRE ALARM ELECTRONIC BELL FOR

SPRINKLER SYSTEM

EB

FA-252 28 31 00 FIRE ALARM HOISTWAY DAMPERHD

FA-253 28 31 00 FIRE ALARM HOISTWAY DAMPER SWITCHHDS

FA-272 28 31 00 FIRE ALARM HOLD OPEN OVERRIDE

CONNECTION

DH

PD

FA-270 28 31 00 FIRE ALARM ELECTROMAGNETIC DOOR

HOLD DEVICE

DH

FA-110 28 31 00 FIRE FIGHTERS PHONEP

FA-170 28 31 00 SMOKE DETECTOR - STAND ALONESD

B

FA-171 28 31 00 SMOKE DETECTOR - STAND ALONE 177

CANDELA

SD

V

FA-241 28 31 00 FIRE ALARM REMOTE INDICATORRI

FA-242 28 31 00 FIRE ALARM REMOTE INDICATOR

AND TEST SWITCH

RTS/I

CO FA-150 FIRE ALARM CARBON

MONOXIDE/HEAT/SMOKE DETECTOR

FA-232 FIRE ALARM CM LOUD SPEAKERS

28 31 00

28 31 00

VS

VS

SW-1P 26 09 33 SWITCH - SINGLE POLE

SW-1P-EM 26 09 33 SWITCH - EMERGENCYE

SW-2P 26 09 33 SWITCH - TWO POLE2

SW-3W 26 09 33 SWITCH - THREE WAY3

SW-3W-EM 26 09 33 SWITCH - THREE WAY - EMERGENCY3E

SW-4W 26 09 33 SWITCH - FOUR WAY4

SW-4W-EM 26 09 33 SWITCH - FOUR WAY - EMERGENCY4E

SW-1P-WP 26 09 33 SWITCH - WEATHERPROOFW

SW-1P-EX 26 09 33 SWITCH - EXPLOSION PROOFX

SW-1P-PL 26 09 33 SWITCH - PILOT LIGHTP

SW-1P-LH 26 09 33 SWITCH - LIGHTED HANDLEL

SW-1P-ADJ 26 09 33 SWITCH - LOCAL TIMER - USER ADJUSTABLET

SW-1P-060 26 09 33 SWITCH - LOCAL TIMER - SPRING WOUND60

SW-1P-M 26 09 33 SWITCH - MOMENTARY CONTACTM

SW-OC-P-O SWITCH - OCCUPANCY SENSOR

WALL SWITCH

O

SW-OC-P-O2 SWITCH - OCCUPANCY SENSOR AND

DUAL SWITCH

O2

OC SW-OC-P-P OCCUPANCY SENSOR - PASSIVE INFRARED

360 DEGREE COVERAGEP

OC SW-OC-P-P2 OCCUPANCY SENSOR - PASSIVE INFRARED

100 DEGREE COVERAGEP2

OC SW-OC-U OCCUPANCY SENSOR - ULTRASONIC 360

DEGREE COVERAGEU

OC SW-OC-U2 OCCUPANCY SENSOR - ULTRASONIC 35'X30'

HAND MOTION COVERAGEU2

OC SW-OC-U-A OCCUPANCY SENSOR - ULTRASONIC TWO

SIDED CORRIDOR COVERAGEA

OC SW-OC-D OCCUPANCY SENSOR - DUAL TECHNOLOGY

D

OC SW-OC-P-HB OCCUPANCY SENSOR - HIGH BAY

HB

OC SW-OC-P-HA OCCUPANCY SENSOR - HIGH BAY AISLE

COVERAGE

HA

ALCR ALCR20 AUTOMATIC LOAD CONTROL RELAY

BCELTS BCELTS BRANCH CIRCUIT EMERGENCY LIGHTING

TRANSFER SWITCH 20A

LS SW-LS DAYLIGHT LEVEL SENSOR

LS SW-LS-3Z DAYLIGHT LEVEL SENSOR - 3 ZONE

LS SW-LS-D DAYLIGHT LEVEL SENSOR - 1 ZONE DIMMING

D

LS SW-LS-D-3Z DAYLIGHT LEVEL SENSOR - 3 ZONE DIMMING

3D

26 09 33

26 09 33

26 09 33

26 09 33

26 09 33

26 09 33

26 09 33

26 09 33

26 09 33

26 09 33

26 09 33

26 09 33

SW-1P-K SWITCH - SINGLE POLE - KEY LOCK 26 09 33

K

SW-2P-K SWITCH - TWO POLE - KEY LOCK

K2

SW-3W-K SWITCH - THREE WAY - KEY LOCK

K3

SW-4W-K SWITCH - FOUR WAY - KEY LOCK

K4

SW-LS-PC PHOTOCELL26 09 33PC

26 09 33

26 09 33

26 09 33

MD-SD-# 26 28 16 MOBILE DIAGNOSTICS SERVICE DISCONNECT.

REFER TO DISC/STA SCHEDULE

CB-# 26 28 16 CIRCUIT BREAKER - SURFACE MOUNTED.

REFER TO DISC/STA SCHEDULE

CB-# 26 28 16 CIRCUIT BREAKER - FLUSH MOUNTED.

REFER TO DISC/STA SCHEDULE

DS-#/FDS-#/DSS-# 26 28 16 DISCONNECT. REFER TO DISC/STA SCHEDULE

SW-OC-D-W OCCUPANCY SENSOR - DUAL

TECHNOLOGY - WALL MOUNTED

D

26 09 33OC

SW-OC-P-W OCCUPANCY SENSOR - PASSIVE INFRARED -

WALL MOUNTED

P

26 09 33OC

SW-OC-U-W OCCUPANCY SENSOR - ULTRASONIC - WALL

MOUNTED

U

26 09 33OC

26 09 33

26 09 33

26 09 33

26 09 33

AS

SW-D-LED DIMMER - LED

D

26 09 33

SW-D3-LED DIMMER - LED - 3-WAY

D3

26 09 33

ELECTRICAL SYMBOL LIST

SYMBOL: TAG:

SPEC

SECTION:

DESCRIPTION:

ELECTRICAL SYMBOL LIST

SYMBOL: TAG:

SPEC

SECTION:

DESCRIPTION:

FA-254 28 31 00 FIRE ALARM SMOKE DAMPER WITH DUCT

DETECTOR AND ADDRESSABLE RELAY

SD

SW-DCS DIMMER CONTROL STATION26 09 33#B

SW-LCS DIMMER CONTROL STATION WITH FADERS26 09 33

TC-# TIME SWITCH 26 09 33TC

RI-TV 26 05 33 TV ANTENNA OUTLET ROUGH-INTV

FB-# or PT-# 26 27 26 FLOOR BOX or POKE THROUGH

JB 26 05 33 JUNCTION BOX

J

J

ECONN 26 05 33 ELECTRICAL CONNECTION

E

E

WW-# 26 05 35 ELECTRICAL WIREWAY w/ DEVICES SHOWN

WM-# 26 05 35 MULTI OUTLET SYSTEM

RI-TECH-C 26 05 33 TECHNOLOGY ROUGH-IN, CEILING

RI

RI-TECH-W 26 05 33 TECHNOLOGY ROUGH-IN, WALL PHONE

DPM 26 09 13/

26 24 13

DIGITAL POWER METERDPM

PANEL '###' 26 24 16 PANELBOARD - SURFACE MOUNT

PANEL '###' 26 24 16 PANELBOARD - RECESS MOUNT

IPP-# 26 24 21 ISOLATED POWER PANEL

MG 26 24 21 MASTER GROUND STATION MODULEMG

GB 26 05 26 GROUND BUSGB

IBT 26 05 26 INTERSYSTEM BONDING TERMINATIONIBT

ES ES 26 09 16 EMERGENCY STOP, N.C. CONTACT

EPO 26 09 16 EMERGENCY STOP, N.O. CONTACTEPO

CPC 26 09 16 CONTROL POWER CABINETCPC

MX-#/MS-#

/CB-#/CS-#

26 24 19 MANUAL SWITCH / STARTER / COMBINATION

STARTER/ CIRCUIT BREAKER. REFER TO

DISC/STA SCHEDULE

LCS-# 26 09 33 LIGHTING CONTROL STATION

#B#F

ELECTRICAL SYMBOL LIST

SYMBOL: TAG:

SPEC

SECTION:

DESCRIPTION:

DEM DEM ENERGY METER26 09 13

EEM EEM EXTERNAL ENERGY METER26 09 13

PQM PQM POWER QUALITY METER26 09 13

TR-#/DTR-# 26 22 00 TRANSFORMER. REFER TO

TRANSFORMER SCHEDULE

SW-1P-DJ 26 09 33 SWITCH - DOOR JAMBJ

SW-OD DIMMER - WALL DIMMER

OCCUPANCY SENSORO

26 09 33

SW WALL CONTROL STATION26 09 33SW

SW-LV 26 09 33 CENTRAL CONTROL - STATIONLV

LCD SW-LCD LIGHTING CONTROL LCD STATION26 09 33

NLC SW-NLC NURSE CALL LIGHTING CONTOLLER26 09 33

ASSD-# AIR SAMPLING SMOKE DETECTION 28 31 50

CUP-# CUSTOM UTILITY PEDESTAL 26 27 16

26 12 16

EVCS-# ELECTRICAL VEHICLE CHARGING STATION 26 27 29

W

26 32 13

LINEAR LUMINAIRES

TROFFER

WALL SCONCE LUMINAIRE

DOWNLIGHT LUMINAIRE

AIMABLE OR WALL WASH LUMINAIRE

INDUSTRIAL LUMINAIRE

POLE MOUNTED LUMINAIRE

SINGLE FACE EXIT SIGN

DOUBLE FACE EXIT SIGN

EMERGENCY UNIT

WALL BRACKET LUMINAIRE

ELECTRICAL SYMBOL LIST

SYMBOL: TAG:

SPEC

SECTION:

DESCRIPTION:

WALL/CEILING EMERGENCY EXIT SIGN

REC-DUP-GFI-R 26 27 26 GROUND FAULT DEVICEG

REC-TAMP 26 27 26 DUPLEX RECEPTACLE, TAMPER RESISTANT, 125V

REC-TAMP-GFI 26 27 26 GFI DUPLEX RECEPTACLE,

TAMPER RESISTANT, 125V

REC-TAMP-QUAD 26 27 26 QUAD RECEPTACLE, TAMPER RESISTANT, 125V

REC-ISO-

SUR-QUAD

26 27 26 ISOLATED GROUND QUAD RECEPTACLE WITH

SURGE SUPPRESSION, 125V

REC-DUP 26 27 26 DUPLEX RECEPTACLE, 125V

REC-DUP-XP 26 27 26 DUPLEX RECEPTACLE, EXPLOSION PROOF, 125V

REC-DUP-GFI 26 27 26 DUPLEX GFI RECEPTACLE, 125V

REC-DUP-WP 26 27 26 DUPLEX GFI WEATHERPROOF RECEPTACLE 125V

W

REC-ISO 26 27 26 ISOLATED GROUND RECEPTACLE, 125V

REC-ISO-SUR 26 27 26 ISOLATED GROUND RECEPTACLE WITH SURGE

SUPPRESSION, 125V

REC-QUAD 26 27 26 QUAD RECEPTACLE, 125V

REC-QUAD-GFI 26 27 26 QUAD GFI RECEPTACLE, 125V

REC-SIM-XP 26 27 26 RECEPTACLE, EXPLOSION PROOF, 125V

ELECTRICAL SYMBOL LIST

SYMBOL: TAG:

SPEC

SECTION:

DESCRIPTION:

REC-USB 26 27 26 DUPLEX RECEPTACLE, USB CHARGING

X

S

S

U

X

DUPLEX RECEPTACLE CONTROLLED BY

OCCUPANCY

O REC-DUP-O 26 27 26

REC-PED-QUAD 26 05 33 RECEPTACLE - PEDESTAL STYLE

REC-DUP-PED 26 05 33 RECEPTACLE - PEDESTAL STYLE

REC-ARC 26 27 26 ARC FAULT CIRCUIT INTERRUPTER RECEPT 125V

REC-QUAD-USB 26 27 26 QUAD RECEPTACLE, USB 125V

U

REC-QUAD-WP 26 27 26 QUAD GFI WEATHERPROOF RECEPTACLE, 125V

W

REC-Z# 26 27 26 IEC PIN AND SLEEVE RECEPTACLE, 600V

PP# 26 27 23 POWER POLE

QUAD RECEPTACLE CONTROLLED BY

OCCUPANCY

O REC-QUAD-O 26 27 26

P

REFER TO LUMINAIRE

SCHEDULE

W/RI

RI

RI-TECH 26 05 33 TECHNOLOGY OUTLET ROUGH-IN

FA-220 28 31 00 EMERGENCY NOTIFICATION -

AUDIO/VISUAL - WALL MOUNTED

A11 A33

A77 AHH

AS#

FA-202 28 31 00 EMERGENCY NOTIFICATION - VISUAL -

WALL MOUNTED

V11 V33

V77 VHH

FA-221 28 31 00 EMERGENCY NOTIFICATION -

AUDIO/VISUAL - CEILING MOUNTED

A11 A33

A99AHH

A77

AS#

FA-222 28 31 00 EMERGENCY NOTIFICATION - VISUAL

ONLY - CEILING MOUNTED

V11 V33

V99

V77

VS#

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

SIMSIM

INDICATES SIMILAR DETAIL REFERENCED

IN MULTIPLE LOCATIONS

LEVEL NAME

10' - 0" HEIGHT ABOVE

PROJECT 0' - 0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

N O R

HT

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

LINE TYPE AND TAG KEY:

NEW WORK BY THIS CONTRACTOR (WIDE LINE)

NEW

EXISTING TO BE REMOVED (SHORT DASHED PATTERN)

NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)

EXISTING

EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)

EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

HALFTONING DOES NOT MODIFY SCOPE.

'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING

TAG-1 UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL

INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST

INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL

T101

TEMPERATURE CONTROLS CONTRACTORT.C.C.

SECURITY CONTRACTORS.C.

AUDIO/VISUAL CONTRACTORA.V.C.

NURSE CALL CONTRACTORN.C.C.

CIVIL CONTRACTORC.C.

ASBESTOS ABATEMENT CONTRACTOR

FIRE PROTECTION CONTRACTORF.P.C.

HEATING CONTRACTORH.C.

PLUMBING CONTRACTORP.C.

GENERAL CONTRACTORG.C.

MECHANICAL CONTRACTORM.C.

VENTILATION CONTRACTORV.C.

ELECTRICAL CONTRACTORE.C.

A.C.

CONTRACTOR ABBREVIATION KEY

ABBR: DESCRIPTION:

TECHNOLOGY CONTRACTORT.C.

CONSTRUCTION MANAGERC.M.

FOOD SERVICE CONTRACTORF.S.C.

BUILDING CODE: IBC 2015 EDITION

ELECTRICAL CODE: NFPA 70 (NEC) 2020 EDITION

LIFE SAFETY CODE: NFPA 101 2021 EDITION

ENERGY CONSERVATION CODE: IECC 2018

LOCAL BUILDING CODE: VA STANDARARDS

APPLICABLE CODES

CONTRACTOR SHALL COMPLY WITH APPLICABLE CODES AND LOCAL AMENDMENTS.

ELECTRICAL SHEET INDEX

E003 SITE LIGHTING

E001 ELECTRICAL COVERSHEET

E002 ELECTRICAL NOTES

E301 ELECTRICAL DETAILS

E401-B45 ELECTRICAL RISER DIAGRAMS

E501-B45 ELECTRICAL SCHEDULES - BUILDING 45

E502-B45 ELECTRICAL SCHEDULES - BUILDING 45

E503-B110 ELECTRICAL SCHEDULES - BUILDING 110

E600-B45 ENLARGED PLANS

ED111-B50 FIRST LEVEL PLAN - ELECTRICAL DEMOLITION

ED121-B50 SECOND LEVEL PLAN - ELECTRICAL DEMOLITION

ED122-B110 SECOND LEVEL PLAN - ELECTRICAL DEMOLITION - 110

EL111-B45 FIRST LEVEL PLAN - ELECTRICAL LIGHTING

EL121-B45 SECOND LEVEL PLAN - ELECTRICAL LIGHTING

EL122-B110 SECOND LEVEL PLAN - ELECTRICAL LIGHTING - 110

EP111-B45 FIRST LEVEL PLAN - ELECTRICAL POWER

EP121-B45 SECOND LEVEL PLAN - ELECTRICAL POWER

EP122-B110 SECOND LEVEL PLAN - ELECTRICAL POWER - 110

ES111-B45 FIRST LEVEL PLAN - ELECTRICAL SYSTEMS

ES121-B45 SECOND LEVEL PLAN - ELECTRICAL SYSTEMS

ES122-B110 SECOND LEVEL PLAN - ELECTRICAL SYSTEMS - 110

ES500-B45 FIRE ALARM DETAILS

ET101-B45 SITE PLAN - ELECTRICAL & TECHNOLOGY

GRAND TOTAL: 23

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \E

.0

V A

H a m p to n P ro s th e ti c s C

J o h n .A

.M a rs a c .r v t

/9

/2

:1

:1

A

M

E001

ELECTRICAL COVERSHEET CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG JOHMAR16149Revisions: Date:

FEEDERS: SWITCHBOARDS, DISTRIBUTION PANELS,

PANELBOARDS, MOTOR CONTROL CENTERS, ETC.

BRANCH CIRCUITS: LIGHTING, RECEPTACLES,

CONTROLS, ETC.

MECHANICAL EQUIPMENT FEEDERS: PUMPS, CHILLERS,

AIR HANDLING UNITS, ETC.

FLOOR MOUNTED EQUIPMENT FEEDERS: PUMPS, ETC.

(INCLUDE NO MORE THAN 6 FEET OF LFMC TO PUMP)

CONTROLS (LIGHTING, POWER, BUILDING AUTOMATION, ETC.)

WET AND DAMP LOCATIONS: (CONDUIT, BOXES, FITTINGS,

INSTALLED AND EQUIPPED TO PREVENT WATER ENTRY)

FINISHED SPACES / CONCEALED

CONDUIT INSTALLATION SCHEDULE

THE FOLLOWING SCHEDULE SHALL BE ADHERED TO UNLESS THEY CONSTITUTE A VIOLATION OF APPLICABLE CODES OR ARE NOTED OTHERWISE ON THE DRAWINGS. THE INSTALLATION OF RMC CONDUIT WILL BE PERMITTED IN PLACE OF ALL CONDUIT SPECIFIED IN THIS SCHEDULE. REFER TO CONDUIT AND BOXES SPECIFICATION 25 05 33 FOR ADDITIONAL INFORMATION.

INSTALLATION TYPE RMC IMC EMT RTRC PVC

COATED

RMC

PVC PVC

CONCRETE

ENCASED

HDPE ASR

X X

X X

X X

X X

X X

X

X X

CORROSIVE LOCATIONS

X X

ELEVATED CONCRETE SLABS (ABOVE GRADE)

XX

INTERIOR LOCATIONS: CONCEALED

INTERIOR LOCATIONS: EXPOSED

WITHIN 5’ FROM THE PERIMETER OF THE BUILDING WHEN PASSING

THROUGH THE PERIMETER OF THE BUILDING FOUNDATION:

UNDERGROUND SITE CONDUITS:

INTERIOR LOCATIONS: EXISTING WALLS AND EXPOSED

INSTALLATION (FINISHED SPACES)

WITHIN 5’ FROM THE PERIMETER OF THE BUILDING

UNDERGROUND / SLABS ON GRADE

(IN OR UNDER SLABS ON GRADE)

5' OR GREATER FROM THE PERIMETER OF A BUILDING FOUNDATION

WITHIN 5' FROM THE PERIMETER OF A BUILDING FOUNDATION

UNDER ROADS, DRIVES, AND VEHICLE TRAVELED WAYS.WHEN HDPE

DIRECTIONAL BORING IS ALLOWED: PROVIDE PRESSURIZED GROUT

DUCTBANKS

(REFER TO DUCTBANK DETAILS WHEN APPLICABLE)

BARS SHALL OVERLAP 40 DIAMETERS AND SHALL EXTEND 5' BEYOND

ROADS, DRIVES, TRAVELED WAYS, ETC.

REINFORCING SHALL CONSIST OF ONE-HALF INCH DEFORMED BARS

SPACED 12 INCHES ON CENTER, PARALLELING THE DUCTS ON

BOTTOM, WITH ONE-HALF INCH DEFORMED TIE BARS SPACED

TWELVE INCHES ON CENTERS.

PROVIDE MINIMUM 3" CONCRETE COVER ON ALL SIDES OF

REINFORCING.

ENTIRE DUCTBANK SHALL BE INSTALLED ON PRECAST CONCRETE

PAVERS ON 3’ CENTERS.

HAZARDOUS (CLASSIFIED LOCATIONS AS DEFIED BY THE NATIONAL

ELECTRICAL CODE:

COMPLETE WITH SCREWED FITTINGS AND CONDUIT SEALS

FIRE RATED ASSEMBLIES:

FIRE RATED ASSEMBLIES LISTED WITH PHENOLIC RTRC RACEWAY

DEFINITIONS:

CONCRETE ENCASEMENT: CONDUIT WITH A MINIMUM OF 3"

THICKNESS BETWEEN THE SURFACE OF THE CONCRETE AND THE

NEAREST CONDUIT. CONCRETE TO BE DOWELED INTO THE

FOUNDATION.

X

XX

X X

X X

XXX

X X X

XXX

X X X

X

X

X

X

X

X

ELECTRICAL PHASING NOTES:

THESE NOTES APPLY TO ALL ELECTRICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, LIGHTING, POWER, AND SYSTEMS.

1. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF PHASES. REFER TO

COR INSTRUCTIONS FOR MORE DETAILS AND PHASING SCHEDULES AND FOR CONCURRENT

WORK. MECHANICAL, ELECTRICAL AND TECHNOLOGY DRAWINGS DEPICT THE INTENT OF

THE FINAL DESIGN. THE MECHANICAL, ELECTRICAL, AND TECHNOLOGY DRAWINGS DO NOT

DEPICT THE MEANS AND METHODS TO MEET THE REQUIREMENTS OF THE PHASING

CRITERIA.

2. REVIEW PROJECT PHASING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES, ETC.

WITH AFFECTED ADJACENT AREAS.

3. PROVIDE TEMPORARY LIGHTING, POWER, SYSTEMS, ETC. AS NEEDED TO MAINTAIN

SERVICE TO ALL AREAS DURING ALL PHASES OF PROJECT.

4. INSTALL TEMPORARY LIGHTING, CIRCUITS, ETC. AS NECESSARY TO KEEP ALL OCCUPIED

SPACES OPERATIONAL THROUGHOUT ALL PHASES OF THE PROJECT

5. PHASE DEMOLITION WORK TO MINIMIZE DOWNTIME.

1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD

SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND

REPORT ANY CONFLICTS BEFORE PROCEEDING.

2. NOT ALL EXISTING EQUIPMENT, LUMINAIRES, AND CONDUIT ARE SHOWN. VERIFY EXISTING

CONDITIONS AND REPORT ANY CONFLICTS WITH NEW WORK BEFORE STARTING WORK.

3. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF

ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.

CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.

4. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF

CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL

CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO

BIDDING.

5. WHERE EXISTING ELECTRICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH NEW

EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL EITHER

ARRANGE NEW EQUIPMENT, CONDUIT, OR DUCTWORK IN SUCH A FASHION THAT IT DOES

NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING ELECTRICAL SYSTEMS TO

ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.

ELECTRICAL RENOVATION NOTES:

THESE NOTES APPLY TO ALL ELECTRICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, LIGHTING, POWER, AND SYSTEMS.

1. ##-### INDICATES ELECTRICAL EQUIPMENT DEFINED IN ELECTRICAL SCHEDULES OR

SPECIFICATION. REFER TO DRAWINGS CONTAINING ELECTRICAL SCHEDULES. PERMANENT

NAMEPLATE SHALL MATCH FINAL EQUIPMENT NOMENCLATURE, NOT ELECTRICAL

EQUIPMENT TAG NAME, REFER TO SPECIFICATIONS.

2. {L###} INDICATES THE LIGHTING SEQUENCE OF OPERATION FOR THE SPACE. REFER TO THE

LIGHTING SEQUENCE OF OPERATION MATRIX ON SHEET E501-B45.

3. "NL" INDICATES LUMINAIRE IS UNSWITCHED FOR NIGHT LIGHT.

4. "SE" INDICATES LUMINAIRE IS SWITCHED/CONTROLLED DURING NORMAL OPERATION AND

OPERATES FROM EMERGENCY CIRCUIT UPON LOSS OF POWER.

5. SHADED LUMINAIRE OR DEVICE INDICATES LUMINAIRE OR DEVICE IS CONNECTED TO AN

EMERGENCY CIRCUIT.

6. REFER TO SHEET E501-B45 FOR LUMINAIRE SCHEDULE.

7. { Z###} INDICATES THE LIGHTING ZONES FOR THE SPACE. PROVIDE SEPARATE CONTROL OF

EACH CONTROLLED ZONE. LUMINAIRES ASSOCIATED WITH THE SAME ZONE SHALL OPERATE

TOGETHER WITHIN THE SAME PROGRAMMED SCENE. REFER TO SHEET E-XXX.

8. VACANCY/OCCUPANCY SENSOR LAYOUT: SENSORS ARE SHOWN ON THE PLANS FOR

DESIGN INTENT AND MAY NOT REPRESENT EVERY DEVICE. PROVIDE MANUFACTURER

SPECIFIC FLOOR PLAN LAYOUTS SHOWING LOCATION, ORIENTATION, AND COVERAGE AREA

OF EACH CONTROL DEVICE, SENSOR, AND CONTROLLER/INTERFACE. AREAS REQUIRING

MULTIPLE SENSOR DEVICES FOR APPROPRIATE COVERAGE, SUBMIT SPECIFIC

MANUFACTURER-APPROVED SENSOR LAYOUT AS AN OVERLAY DIRECTLY ON THE PROJECT

DRAWINGS, EITHER IN PRINT OR APPROVED ELECTRONIC FORM.

ELECTRICAL MOUNTING SUBSCRIPT KEY:

A MOUNT AT +6" TO CENTERLINE ABOVE COUNTER OR BACKSPLASH

C MOUNT AT CEILING

H MOUNT ORIENTED HORIZONTALLY

L MOUNT IN CASEWORK

M MOUNT IN MODULAR FURNITURE

R MOUNT IN SURFACE RACEWAY

EWC ELECTRIC WATER COOLER

ELECTRICAL GENERAL NOTES:

LUMINAIRE

F1 = FIXTURE TAG

1 = CIRCUIT NUMBER

a = SWITCH DESIGNATION

NL = SUBSCRIPT (IF APPLICABLE)

Z = ZONE DESIGNATION

*IF LABEL IS ORIENTED HORIZONTALLY A SLASH WILL SEPARATE THIS

INFORMATION. EX: F1 / 1 / a / NL

DEVICE

A = MOUNTING (IF APPLICABLE)

1 = CIRCUIT NUMBER

*IF LABEL IS ORIENTED HORIZONTALLY A SLASH WILL SEPARATE THIS

INFORMATION. EX: A / 1

LUMINAIRE KEY:

DEVICE KEY:

1. THE ELECTRICAL LIGHTING DRAWINGS INDICATE EXISTING ELECTRICAL ITEMS TO BE

REMOVED. THE DRAWINGS ARE INTENDED TO INDICATE THE SCOPE OF WORK REQUIRED

AND DO NOT INDICATE EVERY BOX, CONDUIT, OR WIRE THAT MUST BE REMOVED. THE

CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTING A BID AND VERIFY EXISTING

CONDITIONS.

2. EQUIPMENT REMOVAL IN CERTAIN LOCATIONS MAY REQUIRE THE INSTALLATION OF A

JUNCTION BOX TO RECONNECT CIRCUITS THAT REMAIN IN OPERATION. EXTEND CONDUIT

AND WIRING AS REQUIRED TO MAINTAIN POWER TO REMAINING EQUIPMENT.

3. BALLASTS MANUFACTURED PRIOR TO 1980 CONTAIN PCBs AND SHALL BE DISPOSED OF BY

A FEDERAL OR STATE E.P.A. APPROVED METHOD AND IN ACCORDANCE WITH

SPECIFICATIONS.

4. HID AND FLUORESCENT LAMPS CONTAIN MERCURY AND SHALL BE DISPOSED OF BY A

FEDERAL OR STATE E.P.A. APPROVED METHOD AND IN ACCORDANCE WITH

SPECIFICATIONS.

5. REUSE EXISTING CONDUIT, CIRCUITS AND LIGHTING CONTROL WHERE POSSIBLE. PROVIDE

NEW CONDUIT AND WIRE WHERE SHOWN, MISSING OR REQUIRED TO INSTALL THE NEW

LIGHT FIXTURES.

6. WHERE REMOVED EXTERIOR LIGHT FIXTURE IS NOT BEING REPLACED. PROVIDE

WATERPROOF GROMMETS, SEALS OR PLUGS TO COVER EXISTING HOLES IN POLES.

7. VERIFY MANUFACTURERS INSTALLATION GUIDELINES WITH EXISTING FIELD CONDITIONS

PRIOR TO BIDDING AND ORDERING NEW LIGHT FIXTURES AND INSTALLATION MATERIAL.

8. MATCH EXISTING PAINTED SURFACES. WHERE REPLACED LUMINAIRE DOES NOT FULLY

COVER EXISTING JUNCTION BOX OR PAINTED SURFACE. PROVIDE CUSTOM BACK PLATE

WHERE NECESSARY TO COVER ANY FIELD CONDITIONS THAT WOULD ALLOW INTRUSION

OF WATER AND CAULK WHERE NECESSARY.

9. REFER TO 26.51.00 SPECIFICATIONS FOR COMMISSIONING OF FIXTURES.

10. COORDINATE EXISTING LIGHTING CONTROL AND REPROGRAM PHOTOCELLS AS

NECESSARY TO MEET EXISTING CONTROL SEQUENCES. VERIFY WITH OWNER ANY

CHANGES.

11. VERIFY WITH EXISTING CONDITIONS PRIOR TO REMOVING ALL FIXTURES WITH A QUARTZ

RESTRIKE. IF THE QUARTZ RESTRIKE IS A SEPARATE CIRCUIT, NOTIFY THE ENGINEERING

IMMEDIATELY.

ELECTRICAL LIGHTING DEMOLITION NOTES:

1. COORDINATE LUMINAIRE IN MECHANICAL ROOMS WITH DUCTWORK, PIPING AND ANY

MECHANICAL EQUIPMENT. PROVIDE LUMINAIRE WITH CHAINS OR HANGAR KIT WHERE

REQUIRED. BOTTOM OF FIXTURE TO BE 9’ AFF. COORDINATE MOUNTING PRIOR TO

ORDERING LUMINAIRES.

2. COORDINATE ALL LUMINAIRE LOCATIONS WITH STRUCTURAL TRUSS AND BEAMS PRIOR TO

ROUGH-IN.

3. PROVIDE SEPARATE BRANCH CIRCUIT TO SUPPLY POWER TO THE HOIST WAY PIT

LIGHTING. LIGHTING SHALL NOT BE CONNECTED TO THE LOAD SIDE OF ANY GFCI DEVICE.

MOUNT PIT LUMINAIRES VERTICALLY 48” FROM TOP OF PIT OR BELOW PIT CEILING. REFER

TO ELEVATOR MANUFACTURER FOR EXACT LOCATION.

4. LUMINAIRES SHALL BE TARGETED AND ADJUSTED BY THE CONTRACTOR UNDER THE

OBSERVATION AND IN COMPLIANCE WITH RECOMMENDATIONS OF THE ENGINEER. ALL

LABOR AND MATERIAL COSTS MADE NECESSARY BY THIS REQUIREMENT SHALL BE

INCLUDED.

TYPICAL NEW CONSTRUCTION:

1. HALF SHADED FIXTURE INDICATE UNSWITCHED LUMINAIRES FOR NIGHT LIGHTING

CONNECTED TO PANEL AS NOTE.

2. FULLY SHADED FIXTURES INDICATE EMERGENCY LUMINAIRES THAT ARE TO BE

CONNECTED VIA AN EMERGENCY TRANSFER DEVICE (ETD) TO TURN LIGHTS ON UPON

LOSS OF POWER. THE THIRD LEG OF THE ETD IS CONNECTED TO THE EMERGENCY

LIGHTING PANEL.

3. SITE HAS UNDERGROUND UTILITIES, STEAM, WATER, ELECTRIC AND VAULTS. POLE

LOCATIONS HAVE BEEN COORDINATED WITH CIVIL PLANS. CONTRACTOR SHALL FIELD

VERIFY ALL UNDERGROUND UTILITIES PRIOR TO INSTALLING ALL LIGHT POLES. HAND

EXCAVATE IF NECESSARY, TO ASCERTAIN EXACT LOCATION OF UNDERGROUND UTILITIES

PRIOR TO INSTALLING 'ANY' POLE.

4. WHERE LUMINAIRE QUANTITIES OR LAYOUT DIFFER BETWEEN ELECTRICAL LIGHTING

PLANS AND ARCHITECTURAL REFLECTED CEILING PLANS, HIGHER QUANTITY SHALL TAKE

PRECEDENCE. CONTRACTOR SHALL CONFIRM QUANTITY AND LAYOUT WITH DESIGN TEAM.

5. #B PUSH BUTTON REFERS TO SCENE QUANTITY. COORDINATE NUMBER OF BUTTONS FOR

CONTROL STATIONS WITH LIGHTING CONTROL MANUFACTURER. CONTROL SHALL BE

CAPABLE OF DIMMING UP/DOWN AND SWITCHING ON/OFF FOR MULTIPLE ZONES AS

INDICATED AND PER LIGHTING SEQUENCE OF OPERATIONS.

6. Z## INDICATES ZONING AND REFLECTS A LIGHTING CONTROL GROUP. PROVIDE RELAYS AS

REQUIRED TO ALLOW LUMINAIRES WITHIN THE DEFINED ZONE TO FUNCTION TOGETHER

DURING NORMAL POWER.

TYPICAL NEW CONSTRUCTION:

1. ALL LUMINAIRES SHOWN TO BE DEMOLISHED SHALL BE DISPOSED OF IF NOT REQUIRED BY

OWNER FOR ATTIC STOCK. CONFIRM WITH OWNER PRIOR TO DISPOSAL IF THE LAMPS,

LENS OR SUBSET OF LUMINAIRES SHOULD BE TURNED OVER FOR ATTIC STOCK.

2. REMOVE EXISTING LUMINAIRES AND WALL SWITCHES WHERE SHOWN. LOCATE AND

IDENTIFY ELECTRICAL CIRCUIT SERVING REMOVED LUMINAIRES FOR REUSE WITH NEW

DEVICES.

3. COORDINATE HOURS OF ACCESS WITH OWNER.

4. EXISTING EMERGENCY LIGHTING AND EXIT SIGNAGE SHALL REMAIN.

5. REMOVE EXISTING LUMINAIRE AND PREPARE FOR INSTALLATION OF NEW LUMINAIRE IN

SAME LOCATION OR NEW LOCATION.

6. MATCH EXISTING FACEPLATE FINISH AND TYPE FOR ALL LOCATIONS WHERE NEW WALL

CONTROL DEVICE IS BEING INSTALLED.

7. WHERE WALL SWITCH DEVICE IS REMOVED AND NOT REPLACED. PROVIDE WITH BLANK

SWITCH PLATE.

8. EXPOSED 3/4" CONDUIT TO NEW OR EXISTING FIXTURES OR DEVICES IS ACCEPTABLE AS

LONG AS IT IS INSTALLED IN A NEAT AND ORDERLY METHOD AND MEETS ADOPTED CODES.

COORDINATE NEW RUNS WITH OWNER PRIOR TO INSTALLATIONS.

9. REUSE EXISTING CONDUIT, WIRE, CONTROL AND JUNCTION BOXES. PROVIDE NEW IF

REQUIRED TO INSTALL THE NEW LUMINAIRE.

10. PROVIDE (1) UNSWITCHED LEG FROM PANEL SERVING THE EMERGENCY FIXTURES TO THE

SENSOR LEG SERVING THE NEW BATTERY BACK UP IN NEW LUMINAIRES.

11. CONNECT NEW LUMINAIRES TO CIRCUIT THAT SERVED PREVIOUSLY REMOVED LUMINAIRE

USING 2#12 &1#12 GND IN 3/4" C. EXTEND CONDUIT AND CONDUCTORS AS REQUIRED TO

MAKE CONNECTION. CONDUIT IN GOOD CONDITION SHALL BE REUSED IN PLACE.

12. NEW OCCUPANCY SENSORS TO BE INSTALLED IN A MANUAL ON/AUTO OFF'

CONFIGURATION.

13. REPLACE CEILING TILES WITH LIKE IN AREAS WITH A REDUCTION IN LUMINAIRE. REUSE

EXISTING CEILING TILES WHERE APPLICABLE. PROVIDE NEW TO MATCH EXISTING IF

REQUIRED. ADJUST AND MOVE AIR RETURN GRILLS AS REQUIRED TO COORDINATE WITH

REVISED LUMINAIRE LAYOUT IN AREAS WITH A LAYIN CEILING.

14. COORDINATE LOCATIONS OF NEW LUMINAIRES WITH EXISTING DUCT, PIPING, STRUCTURAL

AND CEILING…