Y1DA--590-210 Construct Prosthetics Facility (VA-23-00044335) Federal contract opportunity
Solicitation number
36C77623R0166_1
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document provides details on a federal contract solicitation to construct a prosthetics facility for the Department of Veterans Affairs. The solicitation number is 36C77623R0166_1 for the project "Y1DA--590-210 Construct Prosthetics Facility (VA-23-00044335)" issued by the Department of Veterans Affairs Technology Acquisition Center Austin. Offerors are required to submit bids by the due date to construct a new prosthetics facility for veterans. Eligible small businesses are encouraged to respond. The winning bidder will be selected and awarded the contract to complete the construction project for veterans.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--590-210 Construct Prosthetics Facility (VA-23-00044335), newest first.
File Type Posted
Amendment 0008 Attachment 1 - Hampton VA RFIs All.docx DOCX document
36C77623R0166 0008.docx DOCX document
Amendment 0008 Attachment 3 - 081113 Hollow Metal Doors and Frames.pdf PDF
Amendment 0008 Attachment 2 - 329000.pdf PDF
36C77623R0166 0007.docx DOCX document
36C77623R0166 0006.docx DOCX document
Amendment 0006 Attachment 1 - Hampton VA RFIs 1-97.docx DOCX document
Amendment 0006 Attachment 2 - 117300 ceiling mounted patient lift system.pdf PDF
Amendment 0006 Attachment 3 - 087113-11 LE Power Assist Door Operators.pdf PDF
Amendment 0006 Attachment 4 - 019100 General Commissioning Rev 1.pdf PDF
Amendment 0006 Attachment 5 - 000110 TOC Rev 1.pdf PDF
36C77623R0166 0005.docx DOCX document
36C77623R0166 0004.docx DOCX document
S06 - 36C77623R0166 0003.docx DOCX document
36C77623R0166 0002.docx DOCX document
wage rates.pdf PDF
36C77623R0166-0001.docx DOCX document
S04 - Site Visit Sign-in Sheet Completed.pdf PDF
36C77623R0166 0001.docx DOCX document
Construction Documents Section 1.pdf PDF
Bid Documents Part 6.pdf PDF
Bid Documents Part 4.pdf PDF
Wage Determination.pdf PDF
Construction Documents Section 3.pdf PDF
Construction Document Section 5.pdf PDF
Bid Documents Part 1.pdf PDF
SPEC VOL I - A.pdf PDF
S02 - RFP - 36C77623R0166_1.docx DOCX document
Construction Documents Section 2.pdf PDF
Bid Documents Part 2.pdf PDF
Hampton VAMC Site Plan.pdf PDF
Site Visit Instructions.docx DOCX document
Construction Document Section 4.pdf PDF
Bid Documents Part 5.pdf PDF
Bid Documents Part 3.pdf PDF
SPEC VOL I - B.pdf PDF
SPEC VOL II -.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:1

:0

P

M

MV504

VENTILATION SCHEDULES CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149

ROOMS OR AREAS DO NOT HAVE INDIVIDUAL HUMIDITY CONTROL UNLESS NOTED.

NOTE

126-45 ORTHO SUP OFFICE 45-DOAS-1 45-VRHP-101 YES 300 [ 140 ] 1 SD-13 R 250 [ 120 ] 1 RG-20 X + 0 [ 0 ] 50 [ 24 ]

125-45 MECH FIRE/H2O N/A 45-VRHP-101 NO 75 [ 35 ] 1 SD-51 R 40 [ 19 ] 1 RR-52 X + 0 [ 0 ] 35 [ 17 ]

124-45 ELECTRICAL N/A 45-SS-4 N/A 300 [ 140 ] 0 N/A N/A 300 [ 140 ] 0 N/A X 0 0 [ 0 ] 0 [ 0 ]

123-45 OPEN OFFICE 45-DOAS-1 45-VRHP-106 YES 600 [ 280 ] 3 SD-12 R 435 [ 210 ] 2 RG-20 X + 0 [ 0 ] 165 [ 78 ]

122-45 TOILET N/A N/A N/A 0 [ 0 ] 0 N/A E 125 [ 59 ] 1 EG-22 45-EF-2 X - - 125 [ 59 ] 0 [ 0 ]

120-45 TEAM EVALUATION 45-DOAS-1 45-VRHP-104 YES 600 [ 280 ] 2 N/A R 690 [ 330 ] 1 RG-20 X + 0 [ 0 ] 110 [ 52 ]

119-45 PAT/PUB TOILET 45-DOAS-1 45-VRHP-108 YES 50 [ 24 ] 1 SD-11 E 170 [ 80 ] 1 EG-22 45-EF-2 X - - 120 [ 57 ] 0 [ 0 ]

118-45 PAT/PUB TOILET 45-DOAS-1 45-VRHP-108 YES 50 [ 24 ] 1 SD-11 E 170 [ 80 ] 1 EG-22 45-EF-2 X - - 120 [ 57 ] 0 [ 0 ]

117-45 FITTING/EXAM 45-DOAS-1 45-VRHP-116 YES 300 [ 140 ] 1 SD-13 R 255 [ 120 ] 1 RG-20 X + 0 [ 0 ] 45 [ 21 ]

116-45 FITTING/EXAM 45-DOAS-1 45-VRHP-117 YES 200 [ 94 ] 1 SD-13 R 160 [ 76 ] 1 RG-20 X + 0 [ 0 ] 40 [ 19 ]

115-45 EQPT STORAGE 45-DOAS-1 45-VRHP-117 NO 50 [ 24 ] 1 SD-11 R 35 [ 17 ] 1 RG-20 X + 0 [ 0 ] 15 [ 7 ]

114-45 CAST 45-DOAS-1 45-VRHP-127 YES 300 [ 140 ] 1 SD-13 R 230 [ 110 ] 1 RG-20 X + 0 [ 0 ] 70 [ 33 ]

113-45 DYNAMIC ALIGNMENT 45-DOAS-1 45-VRHP-125 YES 200 [ 94 ] 1 SD-12 R 150 [ 71 ] 1 RG-20 X + 0 [ 0 ] 50 [ 24 ]

112-45 SOILED HOLDING N/A N/A NO 0 [ 0 ] N/A N/A E 135 [ 64 ] 1 EG-22 45-EF-2 X - - 135 [ 64 ] 0 [ 0 ]

111-45 STAFF TOILET N/A N/A NO 0 [ 0 ] N/A N/A E 110 [ 52 ] 1 EG-22 45-EF-2 X - - 110 [ 52 ] 0 [ 0 ]

110-45 HAC N/A N/A NO 0 [ 0 ] N/A N/A E 100 [ 47 ] 1 EG-22 45-EF-2 X - - 100 [ 47 ] 0 [ 0 ]

109-45

FACIAL/BODY FIT

STUDIO

45-DOAS-1 45-VRHP-126 YES 300 [ 140 ] 1 SD-13 R 220 [ 100 ] 1 RG-20 X + 0 [ 0 ] 80 [ 38 ]

108-45 FITTING/EXAM 45-DOAS-1 45-VRHP-124 YES 300 [ 140 ] 1 SD-13 R 250 [ 120 ] 1 RG-20 X + 0 [ 0 ] 50 [ 24 ]

107-45 FITTING/EXAM 45-DOAS-1 45-VRHP-122 YES 300 [ 140 ] 1 SD-13 R 250 [ 120 ] 1 RG-20 X + 0 [ 0 ] 50 [ 24 ]

106-45 FITTING/EXAM 45-DOAS-1 45-VRHP-121 YES 300 [ 140 ] 1 SD-13 R 255 [ 120 ] 1 RG-20 X + 0 [ 0 ] 45 [ 21 ]

105-45 FITTING/EXAM 45-DOAS-1 45-VRHP-120 YES 300 [ 140 ] 1 SD-13 R 255 [ 120 ] 1 RG-20 X + 0 [ 0 ] 45 [ 21 ]

104-45 FITTING/EXAM 45-DOAS-1 45-VRHP-119 YES 300 [ 140 ] 1 SD-13 R 250 [ 120 ] 1 RG-20 X + 0 [ 0 ] 50 [ 24 ]

103-45 FITTING/EXAM 45-DOAS-1 45-VRHP-118 YES 250 [ 120 ] 1 SD-13 R 200 [ 94 ] 1 RG-20 X + 0 [ 0 ] 50 [ 24 ]

102-45 PATIENT TOILET 45-DOAS-1 45-VHRP-118 YES 50 [ 24 ] 1 SD-11 E 185 [ 87 ] 1 EG-22 45-EF-2 X - - 135 [ 64 ] 0 [ 0 ]

101-45 RECEPTION 45-DOAS-1 45-VRHP-108 YES 780 [ 370 ] 3 SD-52/SD-54 R 430 [ 200 ] 1 RG-20 X + 0 [ 0 ] 350 [ 170 ]

100-45 LOBBY 45-DOAS-1 45-VRHP-114 YES 1260 [ 590 ] 3 SD-314 R 705 [ 330 ] 1 RG-20 X + 0 [ 0 ] 555 [ 260 ]

CFM L/S CFM L/S CV VAV CFM [L/s] CFM [L/s]

ROOM AIR FLOW

# OF AIR

DEVICES

AIR DEVICE

MARK

SUPPLY

FAN

RETURN OR

EXHAUST (R/E)

ROOM AIR FLOW

# OF AIR

DEVICES

AIR DEVICE

MARK

RETURN OR

EXHAUST FAN

REMARKS

ROOM NO ROOM NAME

AIR HANDLING

UNIT NO

TERMINAL UNIT

INDIVIDUAL

ROOM TEMP

CONTROL

SUPPLY RETURN OR EXHAUST

ROOM AIR

FLOW ROOM AIR

BALANCE

NET

INFILTRATION

NET

EXFILTRATION

ROOM AIR BALANCE SCHEDULE

NOTES:

1.PROVIDE COMPLETE PULSE JET FILTRATION SYSTEM WITH A MINIMUM 99.99% SEPARATION EFFICIENCY DOWN TO 0.5 MICRON.

2.EXHAUST FAN TO BE REMOVE TYPE DUE TO EQUIPMENT HEIGHT LIMITATIONS. FAN TO BE MOUNTED TO SIDE OF THE MAIN DUST COLLECTOR SYSTEM.

3.SYSTEM TO HAVE AUTOMATIC FILTER CLEANING, QUICK ACCESS FILTER CABINET, NEMA 12 SYSTEM CONTROL PANEL WITH TIMER AND VFD FAN CONTROL VIA PRESSURE TRANSDUCER, FLOW ACTIVATED PASSIVE INLET

EXPLOSION ISOLATION VALVE, DEFLAGRATION SUPPRESSION SYSTEM.

DUST COLLECTOR SCHEDULE

TAG

NAME

AREA

SERVED COLLECTOR TYPE CFM

S.P. IN.

W.C.

INLET

SIZE

OUTLET

SIZE

ELECTRICAL

REMARKSHP VOLTAGE PHASES

DISCONNECT CONTROLLER/ STARTER

BY

(NOTE A)

TYPE

(NOTE B)

BY

(NOTE A)

TYPE

(NOTE C) SCCR

DC-1 FIRST

FLOOR LAB

PULSE JET

CARTRIDGE FILTER

1400 12 8" 10" 5 208 3 MFR F MFG VFD 0 1, 2, 315k

Revisions: Date:

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:1

:0

P

M

MV505

VENTILATION SCHEDULES CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149

ROOMS OR AREAS DO NOT HAVE INDIVIDUAL HUMIDITY CONTROL UNLESS NOTED.

NOTE

S102-45 STAIR 2 45-DOAS-1 45-VRHP-100 YES 800 [ 380 ] 0 N/A R 800 [ 380 ] 0 N/A X 0 0 [ 0 ] 0 [ 0 ]

S100-45 STAIR 1 45-DOAS-1 45-VRHP-123 YES 800 [ 380 ] 0 N/A R 800 [ 380 ] 0 N/A X 0 0 [ 0 ] 0 [ 0 ]

C200-45 CORRIDOR 45-DOAS-1 45-VRHP-214 YES 300 [ 140 ] 3 SD-11 R 200 [ 94 ] 1 RG-20 X + 0 [ 0 ] 100 [ 47 ]

C103-45 CORRIDOR 45-DOAS-1 45-VRHP-107 YES 300 [ 140 ] 1 SD-13 R 165 [ 78 ] 1 RG-20 X + 0 [ 0 ] 135 [ 64 ]

C102-45 CORRIDOR 45-DOAS-1 45-VRHP-125 YES 255 [ 120 ] 3 SD-310 R 135 [ 64 ] 0 RG-20 X + 0 [ 0 ] 120 [ 57 ]

C100-45 CORRIDOR 45-DOAS-1 45-VRHP-108 YES 165 [ 78 ] 1 SD-12 R 15 [ 7 ] 1 RG-20 X + 0 [ 0 ] 150 [ 71 ]

228-45

PROST/ORTH

MAINTENANCE

45-DOAS-1 45-VRHP-205 YES 300 [ 140 ] 1 SD-310 R 245 [ 120 ] 1 RG-20 X + 0 [ 0 ] 55 [ 26 ]

227-45 ELECTRICAL 45-DOAS-1 N/A N/A 60 [ 28 ] 0 N/A R 0 [ 0 ] 0 N/A X + 0 [ 0 ] 60 [ 28 ]

226-45 DME ACTIVE STORAGE 45-DOAS-1 45-VRHP-204 NO 300 [ 140 ] 2 SD-310 R 300 [ 140 ] 1 RG-20 X 0 0 [ 0 ] 0 [ 0 ]

225-45

WHEELCHAIR PARTS

STOR

45-DOAS-1 45-VRHP-203 NO 300 [ 140 ] 2 SD-310 R 260 [ 120 ] 1 RG-20 X + 0 [ 0 ] 40 [ 19 ]

224-45 SHOE MOD STORAGE 45-DOAS-1 45-VRHP-200 NO 300 [ 140 ] 1 SD-13 R 285 [ 130 ] 1 RG-20 X + 0 [ 0 ] 15 [ 7 ]

223-45 PARTS STORAGE 45-DOAS-1 45-VRHP-201 NO 300 [ 140 ] 1 SD-53 R 280 [ 130 ] 1 RR-59 X + 0 [ 0 ] 20 [ 9 ]

222-45 ELEVATOR EQUIPMENT N/A 45-SS-3 N/A 380 [ 180 ] 0 N/A R 380 [ 180 ] 1 RG-20 X 0 0 [ 0 ] 0 [ 0 ]

221-45 TELECOM N/A 45-SS-1 YES 380 [ 180 ] 0 N/A R 300 [ 140 ] 1 RG-20 X + 0 [ 0 ] 80 [ 38 ]

220-45 MECHANICAL 45-DOAS-1 45-VRHP-202 YES 1270 [ 600 ] 4 SD-64 E 1060 [ 500 ] 1 EG-64 45-EF-2 X - 210 [ 99 ] 0 [ 0 ]

208-45 STAFF TOILET N/A N/A NO 0 [ 0 ] 0 N/A E 115 [ 54 ] 1 EG-22 45-EF-2 X - - 115 [ 54 ] 0 [ 0 ]

207-45 COPY/WORK 45-DOAS-1 45-VRHP-213 YES 300 [ 140 ] 1 SD-13 R 250 [ 120 ] 1 RG-20 X + 0 [ 0 ] 50 [ 24 ]

206-45

PROSTHETICS REP

OFFICE

45-DOAS-1 45-VRHP-217 YES 300 [ 140 ] 1 SD-13 R 265 [ 130 ] 1 RG-20 X + 0 [ 0 ] 35 [ 17 ]

205-45 ASST CHIEF OFFICE 45-DOAS-1 45-VRHP-212 YES 300 [ 140 ] 1 SD-13 R 265 [ 130 ] 1 RG-20 X + 0 [ 0 ] 35 [ 17 ]

204-45 CHIEF OFFICE 45-DOAS-1 45-VRHP-211 YES 300 [ 140 ] 1 SD-13 R 245 [ 120 ] 1 RG-20 X + 0 [ 0 ] 55 [ 26 ]

203A-45 LOCKERS 45-DOAS-1 45-VRHP-210 YES 200 [ 94 ] 1 SD-12 E 250 [ 120 ] 1 EG-23 45-EF-2 X - 50 [ 24 ] 0 [ 0 ]

203-45 STAFF LOUNGE 45-DOAS-1 45-VRHP-210 YES 400 [ 190 ] 1 SD-13 R/E 410 [ 190 ] 2 RG-20/EG-23 45-EF-2 X - 10 [ 5 ] 0 [ 0 ]

202-45 CONFERENCE 45-DOAS-1 45-VRHP-209 YES 600 [ 280 ] 2 SD-13 R 500 [ 240 ] 1 RG-20 X + 0 [ 0 ] 100 [ 47 ]

201-45

OPEN OFFICE

(INTERIOR)

45-DOAS-1 45-VRHP-208 YES 495 [ 230 ] 3 SD-12 R 335 [ 160 ] 1 RG-20 X + 0 [ 0 ] 160 [ 76 ]

201-45

OPEN OFFICE

(EXTERIOR)

45-DOAS-1 45-VRHP-206 YES 885 [ 420 ] 3 SD-13 R 685 [ 320 ] 1 RG-20 X + 0 [ 0 ] 200 [ 94 ]

151-45 TELECOM N/A 45-SS-1 YES 380 [ 180 ] 0 N/A R 275 [ 130 ] 1 RG-20 X + 0 [ 0 ] 105 [ 50 ]

150-45 ELECTRICAL N/A N/A NO 50 [ 24 ] 0 N/A R 0 [ 0 ] 1 RG-20 X 0 0 [ 0 ] 0 [ 0 ]

130E-45 TRASH N/A N/A NO 0 [ 0 ] 0 N/A E 115 [ 54 ] 1 EG-22 45-EF-2 X - - 115 [ 54 ] 0 [ 0 ]

130D-45 CAD/CAM 45-DOAS-1 45-VRHP-112 YES 880 [ 420 ] 3 SD-13 R/E 980 [ 460 ] 1 RG-20/EG-23 45-EF-2 X - 100 [ 47 ] 0 [ 0 ]

130C-45 PROST/ORTH FUME 45-DOAS-1 45-VRHP-111 YES 880 [ 420 ] 2 SD-14 R/E 1210 [ 570 ] 1

RG-20/HEAT

CAPTURE...

45-EF-1 X - 330 [ 160 ] 0 [ 0 ]

130B-45 LAB DUST ROOM 45-DOAS-1 45-VRHP-110 YES 880 [ 420 ] 3 SD-13 R/E 970 [ 460 ] 2 RG-20/EG-23 45-EF-2 X - 110 [ 52 ] 0 [ 0 ]

130A-45 LAB/ RESTORATION 45-DOAS-1 45-VRHP-109 YES 890 [ 420 ] 3 SD-13 R/E 1190 [ 560 ] 2 RG-20/EG-23 45-EF-2 X - 100 [ 47 ] 0 [ 0 ]

130-45 PROSTHETICS LAB 45-DOAS-1 45-VRHP-113 YES 600 [ 280 ] 2 SD-13 R/E 700 [ 330 ] 1 RG-20/EG-23 45-EF-2 X - 100 [ 47 ] 0 [ 0 ]

CFM L/S CFM L/S CV VAV CFM [L/s] CFM [L/s]

ROOM AIR FLOW

# OF AIR

DEVICES

AIR DEVICE

MARK

RETURN OR

EXHAUST (R/E)

ROOM AIR FLOW

# OF AIR

DEVICES

AIR DEVICE

MARK

RETURN OR

EXHAUST FAN

REMARKS

ROOM NO ROOM NAME

AIR HANDLING

UNIT NO

TERMINAL UNIT

INDIVIDUAL

ROOM TEMP

CONTROL

SUPPLY RETURN OR EXHAUST ROOM AIR

FLOW ROOM AIR

BALANCE

NET

INFILTRATION

NET

EXFILTRATION

ROOM AIR BALANCE SCHEDULE

PLUMBING SYMBOL LIST

SYMBOL: DESCRIPTION:

PIPE SERVING FIXTURE ON FLOOR ABOVE

(EXAMPLE: FD = FLOOR DRAIN)FD

PITCH PIPE IN DIRECTION

RD-1

6"(1000)

ROOF DRAIN PROPERTIES SYMBOL

SIZE (ROOF SQ. FT.)

DIELECTRIC CONNECTION

UNION/FLANGE

BALANCING VALVE (NUMBER INDICATES GPM)

GPM

CHECK VALVE

REDUCER - REFERENCE SPECIFICATION

FOR CONCENTRIC/ECCENTRIC AND FOT/FOB

METERM

ALIGNMENT GUIDE

PIPE ANCHOR

EXPANSION JOINT

PIPE CAP

PIPE DOWN

PIPE UP OR UP/DOWN

DIRECTION OF FLOW IN PIPE

SHUTOFF VALVE NORMALLY OPEN

SHUTOFF VALVE NORMALLY CLOSED

ACID VENTAV

ACID WASTEAW

COLD WATER - POTABLECW

DT DRAIN TILE

SANITARY DRAINAGE (GREASE SANITARY DRAINAGE)GSAN

HOT WATER - POTABLEHW

HOT WATER CIRCULATING - POTABLEHWC

HOT WATER - POTABLE NUMBER INDICATES TEMPHW140

HOT WATER CIRC. - POTABLE NUMBER INDICATES TEMPHWC140

NON-POTABLE COLD WATERNCW

NON-POTABLE HOT WATERNHW

PUMPED DISCHARGEPD

SANITARY DRAINAGESAN

SOFT COLD WATERSCW

SOFT HOT WATERSHW

STORM DRAINAGE (ROOF SQUARE FOOTAGE)ST(1,000)

STS STORM DRAINAGE (SECONDARY)

VENTV

WASTE ANETHESIA GAS DISPOSALWAGD

GREASE VENTGV

COMPRESSED AIRCA

DEIONIZED WATERDI

PROPANE GASP

REVERSE OSMOSIS WATERRO

STW SOFT TEMPERED WATER

TW TEMPERED WATER

DRAIND

G NATURAL GAS

NOT ALL SYMBOLS MAY APPLY.

PRESSURE REDUCING VALVE (LIQUID/GAS)

OIL RETURNOR

OIL SUPPLYOS

LAB VACUUMVAC

SOLENOID VALVE

SAFETY/RELIEF VALVE

VACUUM BREAKER

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P

TEMPERATURE SENSOR WITH WELL

T

THERMOMETER WITH WELL (DIAL TYPE)T

THERMOMETER WITH WELL (FILLED TYPE)

PUMP

GRV GAS REGULATOR VENT

INSTRUMENT AIRIA

MEDICAL AIRMA

MEDICAL VACUUMMV

NITROGENN

NITROUS OXIDENO

OXYGENO

PURE WATERPW

SERVICE WATER - POTABLEW

PIPE CONTINUATION

PRESSURE SENSOR (FURNISHED WITH BALL VALVE)P

ROUTE TO DRAIN

BACKFLOW PREVENTER

MEDIUM PRESSURE GASMPG

PLUMBING ABBREVIATION KEY

BATHTUBBT

CO CLEANOUT

CLINICAL SINKCS

DRINKING FOUNTAINDF

EMERGENCY EYEWASHEE

FLOOR CLEANOUTFCO

FLOOR DRAINFD

FLOOR SINKFS

GARBAGE DISPOSERGD

GREASE INTERCEPTORGI

HOSE BIBBHB

I.E. INVERT ELEVATION (FOR REFERENCE ONLY)

LAVATORYLAV

MOP BASINMB

MH MANHOLE

MIXING VALVEMV

NEUTRALIZATION TANKNT

OIL SEPARATOROS

ROOF DRAINRD

SHOWERSH

SINKSK

SERVICE SINKSS

TRENCH DRAINTD

TRAP PRIMERTP

URINALUR

WATER CLOSETWC

WALL CLEANOUTWCO

WASH FOUNTAINWF

WATER HEATERWH

WASHING MACHINE FIXTUREWMF

YARD CLEANOUTYCO

EMERGENCY SHOWERES

EMERGENCY SHOWER/EYEWASHESE

ELECTRIC WATER COOLEREWC

VENT THROUGH ROOFVTR

AD ACCESS DOOR

ABOVE FINISHED FLOORAFF

BFP BACKFLOW PREVENTER

NOT IN CONTRACTNIC

ABBR: DESCRIPTION:

TYPICALTYP

UNLESS OTHERWISE NOTESUON

EXISTINGE

FLOW METERFM

WATER SOFTENERWS

WATER METERWM

DIALYSIS BOXDB

CATCH BASINCB

CAST IRONCI

DUCTILE IRONDI

UTILITY BOXUB

SHORT CIRCUIT CURRENT RATINGSCCR

NOT ALL SYMBOLS MAY APPLY.

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

SIMSIM

INDICATES SIMILAR DETAIL REFERENCED

IN MULTIPLE LOCATIONS

LEVEL NAME

10' - 0" HEIGHT ABOVE

PROJECT 0' - 0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

N

O R HT

INDICATES DIRECTION OF TRUE NORTH

VIEW KEY

LINE TYPE AND TAG KEY:

NEW WORK BY THIS CONTRACTOR (WIDE LINE)

NEW

EXISTING TO BE REMOVED (SHORT DASHED PATTERN)

NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)

EXISTING

EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)

EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

HALFTONING DOES NOT MODIFY SCOPE.

'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING

TAG-1 UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL

INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST

INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL

T101

THE LINE TYPES SHOWN ARE FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR

SHALL VERIFY RATINGS WITH THE LATEST SET OF ARCHITECTURAL PLANS AND FURNISH ALL

MATERIALS REQUIRED TO COMPLY WITH THOSE RATINGS WHETHER SHOWN OR NOT.

FIRE / SMOKE BARRIER DESIGNATIONS

1 HOUR FIRE BARRIER

SMOKE BARRIER

1 HOUR FIRE/SMOKE BARRIER

OR SHAFT ENCLOSURE

2 HOUR FIRE/SMOKE BARRIER

OR SHAFT ENCLOSURE

3 HOUR FIRE/SMOKE BARRIER

4 HOUR FIRE/SMOKE BARRIER

SMOKE PARTITION

FIRE PARTITION

2 HOUR FIRE BARRIER OR WALL

3 HOUR FIRE BARRIER OR WALL

4 HOUR FIRE BARRIER OR WALL

MECHANICAL GENERAL NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE

CONTROL.

1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.

3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO

VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE

REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER

ACCESS.

5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO

COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR

EXPENSE TO OTHERS.

6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL

CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF

DESIGN.

7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY

AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING

MOUNTED DEVICES, OTHER THAN SPRINKLERS.

8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,

FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS

RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND

FINISH.

9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE

GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE

PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS

PANELS PRIOR TO BIDDING.

10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,

AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE

SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER

FOR OUTDOOR USE.

11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,

PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE

TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS

WITHIN ROOMS.

12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED

OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL

RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.

13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT

MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND

REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,

PIPING, DUCTWORK, ETC.

14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.

15. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR

STARTERS, SWITCHES, AND DISCONNECTS.

16. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL

EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT.

17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER

NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE

CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.

MECHANICAL RENOVATION NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE

CONTROL.

1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD

SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND

REPORT ANY CONFLICTS BEFORE PROCEEDING.

2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS

BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.

3. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS/HER WORK

AND SHALL NOTIFY THE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE

REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO HIS/HER AREA OF

WORK.

4. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF

ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.

CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.

5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF

CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL

CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO

BIDDING.

6. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH

NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL

EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT

DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL

SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.

7. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING

CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT

REMAIN ACTIVE.

8. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY

REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW

SYSTEMS ARE INSTALLED.

9. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR

TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND

CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY

DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.

10. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT

THAT HAS BEEN REMOVED.

1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.

CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR

FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.

2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID TO

THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS

RESPONSIBLE FOR A COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND IN

THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES

PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER LISTED IS THE

BASIS OF DESIGN.

3. CONTRACTOR SHALL VERIFY THAT FIXTURES SUPPLIED ARE APPROVED PER ALL

APPLICABLE STATE, LOCAL AND GOVERNING AUTHORITIES.

4. ALL FIXTURES SHALL CONFORM TO FEDERAL ACT S.3874

5. INVERT ELEVATIONS ARE FROM EXISTING DRAWINGS AND MAY NOT BE ACCURATE. VERIFY

ALL ELEVATIONS BEFORE BEGINNING WORK.

6. VERIFY UNDERGROUND PIPE SIZES, INVERT ELEVATIONS, AND LOCATIONS PRIOR TO

BEGINNING ANY WORK.

7. REFER TO THE PLUMBING ROUGH-IN SCHEDULE FOR THE SIZES OF BRANCH PIPES TO

PLUMBING FIXTURES.

8. FOR CLARITY, NOT ALL VALVES HAVE BEEN SHOWN. PROVIDE SHUTOFF VALVES IN

DOMESTIC WATER PIPING SERVING EACH ROOM WITH FIXTURES. ANGLE STOPS SHALL NOT

BE CONSIDERED SHUTOFF VALVES.

9. EXISTING CONDITIONS ON DEMOLITION PLANS ARE PROVIDED TO INDICATE THE GENERAL

SCOPE OF ITEMS TO BE REMOVED. REFER TO SPECIFICATION SECTION 22 05 05 FOR

ADDITIONAL DEMOLITION INFORMATION.

10. P.C. SHALL CUT AND PATCH EXISTING AS REQUIRED FOR NEW OR DEMOLITION WORK

UNLESS NOTED OTHERWISE. REFER TO SPECIFICATION SECTION 22 05 05 FOR ADDITIONAL

INFORMATION.

PLUMBING GENERAL NOTES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:0

:3

P

M

P000

PLUMBING COVERSHEET CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149Revisions: Date:

A

B

E

G

F

H

D

3 4 6 8 10 11 12 13 14 15 17 18165 972

REMOVE EXISTING 5" SANITARY TO 5'

OUTSIDE BUILDING.

REMOVE EXISTING WATER HEATER,

PLUMBING PIPING, HANGERS,

ACCESSORIES AND TRIM WITHIN

BASEMENT AND CRAWL-SPACE.

REMOVE ALL EXISTING PLUMBING

PIPING, ACCESSORIES AND TRIM

WITHIN AREA OF WORK.

5"SANREMOVE CAP AND

PREPARE FOR NEW

CONNECTION

"S

A N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:0

:0

P

M

PD101-B50

BASEMENT PLAN - PLUMBING

DEMOLITION

CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149

N O R

HT

1/8" = 1'-0"

BASEMENT PLAN - PLUMBING DEMOLITION

SHEET NOTES:

1. REFER TO MECHANICAL AND PLUMBING

NOTES ON P000.

B

E

G

F

H

D

3 4 6 8 10 11 12 13 14 15 17 18165 972

REMOVE ALL EXISTING PLUMBING

PIPING, ACCESSORIES AND TRIM

WITHIN AREA OF WORK.

REMOVE EXISTING PLUMBING FIXTURES,

PIPING, TRIM AND ACCESSORIES IN THEIR

ENTIRETY.

REMOVE EXISTING PLUMBING

FIXTURES, PIPING, TRIM AND

ACCESSORIES IN THEIR ENTIRETY.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:0

:0

P

M

PD111-B50

FIRST LEVEL PLAN - PLUMBING

DEMOLITION

CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149

N O R

HT

1/8" = 1'-0"

FIRST LEVEL PLAN - PLUMBING DEMOLITION

B

E

G

F

H

D

3 4 6 8 10 11 12 13 14 15 17 18165 972

REMOVE ALL EXISTING PLUMBING

PIPING, ACCESSORIES AND TRIM

WITHIN AREA OF WORK.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:0

:0

P

M

PD121-B50

SECOND LEVEL PLAN - PLUMBING

DEMOLITION

CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149

N O R

HT

1/8" = 1'-0"

SECOND LEVEL PLAN - PLUMBING DEMOLITION

REMOVE EXISTING HEADWALL AND

MEDICAL GAS OUTLETS (OXYGEN,

MEDICAL AIR, MEDICAL VACUUM).

REMOVE EXISTING MEDICAL GAS

PIPING BACK TO MAIN AND CAP.

EXISTING HEADWALL,

MEDICAL GAS OUTLETS AND

MEDICAL GAS PIPING TO

REMAIN.

EXISTING MEDICAL GAS SHUTOFF

VALVES (OXYGEN, MEDICAL AIR

AND MEDICAL VACUUM) AND

ALARM PANEL TO REMAIN.

REMOVE EXISTING HEADWALL AND

MEDICAL GAS OUTLETS (OXYGEN,

MEDICAL AIR, MEDICAL VACUUM).

REMOVE EXISTING MEDICAL GAS

PIPING BACK TO MAIN AND CAP.

REMOVE EXISTING HEADWALL AND

MEDICAL GAS OUTLETS (OXYGEN,

MEDICAL AIR, MEDICAL VACUUM).

REMOVE EXISTING MEDICAL GAS

PIPING BACK TO MAIN AND CAP.

REMOVE EXISTING HEADWALL AND

MEDICAL GAS OUTLETS (OXYGEN,

MEDICAL AIR, MEDICAL VACUUM).

REMOVE EXISTING MEDICAL GAS

PIPING BACK TO MAIN AND CAP.

REMOVE EXISTING SERVICE SINK,

PLASTER TRAP, ASSOCIATED

PIPING AND TRIM. CAP EXISTING

SANITARY AND VENT PIPING AT

MAIN WITHIN CHASE.

REMOVE EXISTING EYE/FACE

WASH AND ASSOCIATED PIPING

AND TRIM. CAP EXISTING SANITARY

AND VENT PIPING AT MAIN WITHIN

CHASE.

REMOVE EXISTING HEADWALL AND

MEDICAL GAS OUTLETS (OXYGEN,

MEDICAL AIR, MEDICAL VACUUM).

REMOVE EXISTING MEDICAL GAS

PIPING BACK TO MAIN AND CAP.

REMOVE EXISTING HEADWALL AND

MEDICAL GAS OUTLETS (OXYGEN,

MEDICAL AIR, MEDICAL VACUUM).

REMOVE EXISTING MEDICAL GAS

PIPING BACK TO MAIN AND CAP.

REMOVE EXISTING HEADWALL AND

MEDICAL GAS OUTLETS (OXYGEN,

MEDICAL AIR, MEDICAL VACUUM).

REMOVE EXISTING MEDICAL GAS

PIPING BACK TO MAIN AND CAP.

REMOVE EXISTING HEADWALL AND

MEDICAL GAS OUTLETS (OXYGEN,

MEDICAL AIR, MEDICAL VACUUM).

REMOVE EXISTING MEDICAL GAS

PIPING BACK TO MAIN AND CAP.

REMOVE EXISTING HEADWALL AND

MEDICAL GAS OUTLETS (OXYGEN,

MEDICAL AIR, MEDICAL VACUUM).

REMOVE EXISTING MEDICAL GAS

PIPING BACK TO MAIN AND CAP.

REMOVE EXISTING HEADWALL AND

MEDICAL GAS OUTLETS (OXYGEN,

MEDICAL AIR, MEDICAL VACUUM).

REMOVE EXISTING MEDICAL GAS

PIPING BACK TO MAIN AND CAP.

MV

MA

O

MV

MA

O

EXISTING MEDICAL VACUUM,

MEDICAL AIR AND OXYGEN PIPING

TO MAINS TO REMAIN.

REMOVE EXISTING LAVATORY

ROUGH-IN. REMOVE DOMESTIC

HOT AND COLD WATER BACK TO

MAIN AND CAP. REMOVE SANITARY

INTO WALL AND CAP. VERTICAL

SANITARY/VENT WITHIN WALL MAY

REMAIN.

REMOVE EXISTING LAVATORY IN

ITS ENTIRETY. REMOVE DOMESTIC

HOT AND COLD WATER BACK TO

MAIN AND CAP. REMOVE SANITARY

INTO WALL AND CAP. VERTICAL

SANITARY/VENT WITHIN WALL MAY

REMAIN.

REMOVE EXISTING LAVATORY IN

ITS ENTIRETY. REMOVE DOMESTIC

HOT AND COLD WATER BACK TO

MAIN AND CAP. REMOVE SANITARY

INTO WALL AND CAP. VERTICAL

SANITARY/VENT WITHIN WALL MAY

REMAIN.

REMOVE EXISTING LAVATORY IN

ITS ENTIRETY. REMOVE DOMESTIC

HOT AND COLD WATER BACK TO

MAIN AND CAP. REMOVE SANITARY

INTO WALL AND CAP. VERTICAL

SANITARY/VENT WITHIN WALL MAY

REMAIN.

REMOVE EXISTING LAVATORY IN

ITS ENTIRETY. REMOVE DOMESTIC

HOT AND COLD WATER BACK TO

MAIN AND CAP. REMOVE SANITARY

INTO WALL AND CAP. VERTICAL

SANITARY/VENT WITHIN WALL MAY

REMAIN.

CAP EXISTING MEDICAL VACUUM,

MEDICAL AIR AND OXYGEN

PIPING.

REMOVE PORTION OF PIPING BACK

TO THIS LOCATION AND PREPARE

FOR NEW CONNECTION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:0

:0

P

M

PD121-B110

SECOND LEVEL PLAN - PLUMBING

DEMOLITION - 110

CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149

1/8" = 1'-0"

SECOND LEVEL PLAN - PLUMBING DEMOLITION - 110

N

O R HT

UNDER DEDUCT ALTERNATE 1, ALL WORK ON

THIS SHEET IS REMOVED FROM PROJECT SCOPE.

B

E

G

F

H

D

3 4 6 8 10 11 12 13 14 15 17 18165 972

FD

MB

WC

LAV

LAV

2"SAN

"S

A N

WC

LAV

4" SAN FROM

ABOVE

WC

LAV

4"SAN

WC

LAV

CONNECT TO EXISTING CAST-IRON 5"

SAN OUTSIDE BUILDING. REFER TO

CIVIL DRAWINGS FOR CONTINUATION.

SK

SK

SK

2"SAN

"S

A N

SK

2"SAN

SK

SK

SK/SK

2"SAN

4"SAN

45-SP1

EWC

2"SAN

SK SK

SK

SK

SK SK

2" V UP

6" W UP

"S

A N

FS

CONNECT VENT TO TOP OF

SANITARY LINE AND ROUTE AT

45° TO VERTICAL IN WALL ABOVE.

6" STORM DRAINAGE TO 5'

OUTSIDE BUILDING. REFER TO

CIVIL DRAWINGS FOR

CONTINUATION.

PROVIDE VALVE AND CHECK

VALVE IN VERTICAL OF 2"

PUMP DISCHARGE.

EW

4"SAN

FCO

FCO

FCO

SK

FCO

FCO

4"SAN

FCO

4"SAN

1/2" CW UP

2" V UP

6" W

COORDINATE LOCATION OF

POST INDICATOR VALVE WITH

CIVIL CONTRACTOR

2"SAN

0.00' (100.00')

FINISH FLOOR

4"SAN

1/2"CW

FROM TP-2

3"SAN

4"SAN

ROUTE THROUGH CENTRAL

MIDDLE THIRD OF FOOTING AT

THIS LOCAITON. COORDINATE

WITH STRUCTURAL ENGINEER

FOR SLEEVES REQUIREMENTS

ROUTE THROUGH CENTER MIDDLE THIRD

OF FOOTING AT THIS LOCAITON.

COORDINATE WITH STRUCTURAL

ENGINEER FOR SLEEVE REQUIREMENTS

I.E.= -7' - 6 1/2"

1/2"CW UP FROM TRAP PRIMER

"S

A N

4"SAN

FD

2" V UP

4"SAN

4"SAN

2"SAN

2"SAN

FCO

4" ST

6" ST

REFER TO 8/P301

FOR ADDITIONAL

INFORMATION.

I.E.= -2' - 0"

ROLL FITTING INTO TOP OF

DRAIN TILE MAIN OR CONNECT

DIRECTLY INTO THE TOP OF THE

EXTERIOR DRAIN TILE LINE.

4"DT

6" STORM DRAINAGE TO 5'

OUTSIDE BUILDING. REFER TO

CIVIL DRAWINGS FOR

CONTINUATION.

CRITICAL INVERT ELEVATION.

COORDINATE SLEEVE WITH

STRUCTURAL ENGINEER.

I.E.= -2' - 0"

I.E.= -2' - 6"

CRITICAL INVERT ELEVATION.

COORDINATE SLEEVE WITH

STRUCTURAL ENGINEER.

45-SP2

COORDINATE LOCATION OF

ELEVATOR BASINS WITH STRUCTURAL

AND ELEVATOR MANUFACTURER.

REFER TO 11/P301 FOR

ADDITIONAL INFORMATION

I.E.= -1' - 1"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:0

:3

P

M

P100-B45

UNDERFLOOR PLAN - PLUMBING CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149

N O R

HT

1/8" = 1'-0"

UNDERFLOOR PLAN - PLUMBING

B

E

G

F

H

D

3 4 6 8 10 11 12 13 14 15 17 18165 972

STAIR 1

S100-45

RECEPTION

101-45

CORRIDOR

C102-45

CORRIDOR

C100-45

CORRIDOR

C103-45

ORTHO SUPERVISOR OFFICE

126-45

STAIR 2

S102-45

STAFF TOILET

122-45

TELECOM

151-45

TEAM EVALUATION

120-45

TRASH

130E-45

ELECTRICAL

150-45

FITTING / EXAM SOFT GOODS

108-45

HAC

110-45

EQUIPMENT STORAGE

115-45

DYNAMIC ALIGNMENT

113-45

CAST

114-45

FACIAL/ BODY FITTING STUDIO

109-45

FITTING / EXAM SOFT GOODS

116-45

SOILED HOLDING

112-45

FITTING / EXAM SOFT GOODS

107-45

FITTING / EXAM CUSTOM FAB

117-45

FITTING / EXAM SOFT GOODS

106-45

FITTING / EXAM SOFT GOODS

105-45

FITTING / EXAM SOFT GOODS

104-45

FITTING / EXAM SOFT GOODS

103-45

PATIENT TOILET

102-45

PROSTHETICS LAB

130-45

MECHANICAL FIRE/H20

125-45 ELECTRICAL

124-45

PATIENT / PUBLIC TOILET

119-45

PATIENT / PUBLIC TOILET

118-45

LOBBY

100-45

OPEN OFFICE

123-45

STAFF TOILET

111-45

CAD/ CAM

130D-45

LAB RESTORATION

130A-45

PROSTHETICS/ ORTHOTICS FUME

130C-45

LAB DUST ROOM

130B-45

ELEVATOR

E-1-45

CORRIDOR

C101-45

P-408 P-528

P-408

FD-C

P-502

LAV

WC

P-528

P-103

P-408

P-103

P-103

1 1/2"V DN

P-408 P-408

2"V

2" V UP

2"SAN DN, 1 1/2"V

P-103

P-408

2"SAN DN,

1 1/2"V

P-528

P-507

P-103

P-528

P-528 P-414

P-528

2"V

2"V

2" V

3"CW

3/4"HWC

3/4"CW

3/4"HWC

1 1/2"HW

0.5

1 1/2"CW

PROVIDE

SECONDARY STORM

OUTLET.

PROVIDE SECONDARY STORM

OUTLET. PROVIDE BIRD SCREEN OR

INTEGRAL PERFORATED COVER ON

OUTLET. CONFIRM FINAL COLOR

SELECTION WITH ARCHITECT.

P-609

P-708 P-528

P-408

P-528

1 1/2"V

P-528 P-528

P-528

1 1/2"V

1 1/2"V

P-528 P-528

2"V UP

12.10' (100.00')

FINISH FLOOR

1 1/2"V

2"V

P111-B45

3" SAN DN

FD

2"V UP

3"SAN

FCO

3/4"CW

1 1/4"CW

6"STS

1 1/2"V

2 1/2"CW

4"STS

FS-S

2" SAN

2" SAN DN

P-801

P-801

P-801P-801

1 1/2"CW UP

3/4"HWC

1"HW UP

TP-2

FCO-1

FCO-1

FCO-1

1/2"CW DN

1/2"CW UP

2"SAN DN, 1 1/2"V

2"V

2"SAN DN, 1 1/2"V

2"SAN DN, 1 1/2"V

2"SAN DN, 1 1/2"V

2"SAN DN,

1 1/2"V

2"SAN DN, 1 1/2"V

WHA-1

2"V2

"V

4"SAN DN, 2"V

2"SAN DN, 1 1/2"V

WHA-1

2"SAN DN, 1 1/2"V

4"SAN DN, 2"V

2"V

2"SAN DN, 1 1/2"V 2"SAN DN, 1 1/2"V 2"SAN DN, 1 1/2"V

2"SAN DN, 1 1/2"V

2"SAN DN,

1 1/2"V

2"SAN DN,

1 1/2"V

2"SAN DN, 1 1/2"V

SK

CO

3"SAN DN

3/4"CW

PROVIDE FLOW SPLITTER VALVE

AT THIS LOCATION ON HW SIDE

FCO-1

2"HW

2"CW

1 1/2"HW

1 1/2"V

"V

1 1/4"CW

3/4"HW

2" PD DN

2" SAN DN,

1 1/2"V

2"SAN DN,

1 1/2"V

RD RD

RD

RD

3"CW

2"HW

2 1/2"CW

2"HW

1 1/2"CW

2 1/2"CW

2"CW

1 1/2"CW

2"CW

1 1/2"HW

2" SAN DN

1/2"CW DN

1/2"CW

2"V

3/4"HWC

2"HW

3"CW

2 1/2"CW

2"CW

1 1/2"CW

WHA-1

0.5

1 1/2"HW

1 1/2"HW

3/4"CW

1 1/2"HW

1 1/2"HW

3/4"CW

FCO-1

COORDINATE PIPE ROUTING AT THIS

LOCATION WITH ARCHITECTURAL

DRAWINGS. NO PIPING SHALL BE

ROUTED IN RATED WALL.

FD

1/2"CW UP

FROM TP-1

3"SAN

3/4"HWC

1 1/2"HW

FCO-1

WCO-1 WCO-1

4"ST

6"ST

1 1/2"HW

FD-C

2"V

2" V

1/2"CW DN TO

FLOOR SINK TRAP

/2 "V

2"V

1 1/2"V

PROVIDE FLOW SPLITTER VALVE

AT THIS LOCATION ON HW SIDE

WHA-1

B

MECHANICAL FIRE/H20

125-45

6" W UP AND DN

45-WH-1

"H

W

BACKFLOW PREVENTER DRAIN

REDUCED PRESSURE BACKFLOW

PREVENTER

45-PP1

/4

"H W

C

DISCHARGE DRAIN ONTO

SPLASH BLOCK AT GRADE

LEVEL.

REFER TO 6/P301 FOR

WATER HEATER

INSTALLATION DETAIL.

45-ET-1

PROVIDE HOUSEKEEPING

PAD UNDER EQUIPMENT

FD-E

TP-1

1P-801

6" SERVICE ENTRANCE IN THIS

CORNER OF ROOM 125. TAP IN

VERTICAL FOR CW, 6" W UP TO

FIRE PROTECTION BACKFLOW

PREVENTER. REFER TO FP101.

3" CW

2"CW

3"CW

VALVE IN VERTICAL

2"PD

VALVE IN VERTICAL

TERMINATE PUMP DISCHARGE

18" ABOVE THE GRADE ON

CONRETE SPLASHBLOCK

2" V

2"PD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:0

:3

P

M

P111-B45

FIRST LEVEL PLAN - PLUMBING CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149

N O R

HT

1/8" = 1'-0"

FIRST LEVEL PLAN - PLUMBING

KEYNOTES:

1. PROVIDE 4" DRAIN FROM BACKFLOW

PREVENTER DISCHARGE THROUGH BUILDING

WALL. DRAIN ON TO SPLASH BLOCK ON

GRADE. PROVIDE WIRE MESH TO PROTECT

FROM INSECT/ANIMAL INTRUSION.

2. MOUNT THERMOSTATIC MIXING VALVE,PART

OF FIXTURE P-708 (REFER TO SECTION 224000

ABOVE CEILING. ROUTE EYEWASH DRAIN INTO

WALL AND CONNECT TO SANITARY/VENT.

N O R

HT

1/2" = 1'-0"

ENLARGED PLAN OF MECHANICAL FIRE/H20

B

E

G

F

H

D

3 4 6 8 10 11 12 13 14 15 17 18165 972

OPEN OFFICE

201-45

CONFERENCE

202-45

STAIR 1

S200-45

LOCKERS

203A-45

STAFF LOUNGE

203-45CHIEF OFFICE

204-45

ASSIST CHIEF OFFICE

205-45

PROSTHETICS REP OFFICE

206-45

COPY/ WORK/MAILING

207-45

ELECTRICAL

227-45

STAFF TOILET

208-45

CORRIDOR

C200-45

DME ACTIVE STORAGE

226-45

ELEVATOR EQUIP

222-45

MECHANICAL

220-45

TELECOM

221-45

WHEELCHAIR PARTS STORAGE

225-45

STAIR 2

S202-45

PROSTHETICS/ ORTHOTICS

MAINTENANCE

228-45

SHOE MODIFICATION STORAGE

224-45

PARTS STORAGE

223-45

CORRIDOR

C200-45

P-528

2" SAN DN

1 1/2" V UP

2" V UP TO

4" VTR

P-408

P-103

3"V UP, 4"VTR

1"HW DN

1 1/2"CW DN

3/4" HW & CW

1 1/4" CW DN

TO P-103

2" V UP

3/4" HWC DN

0.5

FD-C

FCO-1

TP-1

1/2" CW DN

4"SAN DN, 2"V

2"SAN DN,

1 1/2"V

2" V DN

FD-C

TP-1

SHUTOFF VALVE IN

VERTICAL. 1/2" CW DN TO

FLOOR DRAIN TRAP

1 1/2"CW

3/4"HW

1"HW

1"CW

1"HW

3/4"HW

6/3668

RD-1

6/3668

RD-2

4/2457

RD-1

4/2457

RD-2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:0

:4

P

M

P121-B45

SECOND LEVEL PLAN - PLUMBING CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149

N O R

HT

1/8" = 1'-0"

SECOND LEVEL PLAN - PLUMBING

ET WORKSHOP

B246-110

TECH OFFICE

B247-110

TECH OFFICE

B245-110

BIOMED PARTS

B243-110HAC

B244-110

BIOMED

B242-110

CORRIDOR

C2B-5-110

CORRIDOR

C2B-1-110

WORKSTATION

B227-110

TOILET

B216-110

BREAK

B227A-110

OFFICE

B229-110

FILES

B227B-110

CORRIDOR

C2B-4-110

TELECOM

B214-110

COPY

B226-110

OFFICE

B228-110

OFFICE

B230-110

STORAGE

B230A-110

OFFICE

B232-110

OFFICE

B234-110

OFFICE

B236-110

CONFERENCE

B238-110

WORKSTATION

B239-110

WORKSTATION

B235-110

WORKSTATION

B231-110

STAIR

S2B-5-110

ELEC

B212-110

STAIR-2

S2B-2-110

WOMEN'S TOILET

B219

BIO ENGINEERING

B220

ELEVATOR 10

E2B-10

CHASE

B209A

STORAGE

B209

Room

E2B-11

EXISTING MEDICAL

VACUUM, MEDICAL

AIR AND OXYGEN

PIPING TO MAINS TO

REMAIN.

EXISTING MEDICAL

GAS OUTLETS TO

REMAIN.

MV

MA

O

MV

MA

O

PROVIDE NEW

OXYGEN MEDICAL

GAS OUTLET.

3/4"O1/2"O

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:0

:4

P

M

P121-B110

SECOND LEVEL PLAN - PLUMBING

- 110

CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149

1/8" = 1'-0"

SECOND LEVEL PLAN - PLUMBING - 110

N

O R HT

UNDER DEDUCT ALTERNATE 1, ALL WORK ON

THIS SHEET IS REMOVED FROM PROJECT SCOPE.

B

E

G

F

H

D

3 4 6 8 10 11 12 13 14 15 17 18165 972

4" VTR

4"VTR

4" VTR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:0

:4

P

M

P131-B45

ROOF PLAN - PLUMBING CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149

N O R

HT

1/8" = 1'-0"

ROOF PLAN - PLUMBING

BACKFLOW PREVENTER PIPING DETAIL

NTS

[3 m m

WALL LINE

REDUCED PRESSURE

PRINCIPLE BACKFLOW

PREVENTER WITH GATE

VALVES

PLAN

AIR GAP

FITTINGWATER LINE

FROM METER

PIPE TO DRAIN

(TYPICAL)

FINISHED FLOOR

COLD WATER TO

SYSTEM

PIPE SUPPORT

ELEVATION

[3 m m

T O

B O

T T

O M

O F

R E

L

IE

F O

P E

N

IN

G S

TYPE "C" FLOOR DRAIN DETAIL

NTS

NICKLE BRONZE

ADJUSTABLE STRAINER

(FLUSH WITH FINISHED

FLOOR)

CEMENT BED

TILE FLOOR

CONCRETE FILL

STRUCTURAL SLAB

FLASHING

CLAMP WITH

WEEP HOLES

THREADED, CAULKED OR

NO-HUB CONNECTION

WATERPROOF

MEMBRANE

PROVIDE A METAL SUPPORT

PLATE WHEN DRAIN IS INSTALLED

IN AN EXISTING FLOOR - CAULK

AROUND DRAIN PRIOR TO

RE-GROUTING

CLAMP WATERPROOF

MEMBRANE INSIDE OF DRAIN

BODY TO DRAIN TO WEEP

HOLES

NOTE:

SLOPE MEMBRANE LINER 2% TO DRAIN.

LOOSE GRAVEL AT

WEEP HOLES

3mm to 6mm SIZE

P-103 WATER CLOSET DETAIL

NTS

FINISHED FLOOR

FINISHED WALL

3/4" [19mm]

CONDUIT

TWO GANG

ELECTRICAL BOX

W/STAINLESS STEEL

COVER PLATE

LOCATION

OF PUSH

BUTTON

SPLIT GRAB BAR

SEE ARCH. DWGS

C WATER CLOSET

PLAN

ELEVATION

L

[250mm]

[450mm]

F O

R F

IX

T

U R

E H

E

IG

H T

S E

E A

R C

H

IT

E C

T U

R A

L D

R A

W

IN

G S

TYPICAL WHEELCHAIR LAVATORY DETAIL

NTS

FAUCET SEE

SPECIFICATIONS

LAMINAR FLOW

CONTROL DEVICE

OFFSET

WASTE

TRAP

PARALLEL

TO WALL

LOOSE KEY

STOP

ESCUTCHEON

FINISHED

FLOOR

[8 m m

[200mm]

[2 m m

F O

R F

IX

T

U R

E H

E

IG

H T

S S

E E

A R

C H

IT

E

C T

U R

A L D

R A

W

IN

G S

PROVIDE COVER FOR EXPOSED PIPING

NOTE:

LAVATORY MOUNTING DETAIL

NTS

MINIMUM 16 GAGE GALVANIZED STEEL

PLATE 12"x48" [300x1200mm] MIN.

SECURED TO A MIN. 4 STUDS PER

LAVATORY

1/4" [6mm]∅ MOLLY BOLT HOLLOW WALL

ANCHOR (1 EA. SIDE OF LAV)

MIN. (3) 1/4" [6mm]

MACHINE BOLTS

W/DOUBLE LOCK NUTS

ON BACK SIDE

MIN. 5 1/4" [131mm]∅

GALV. MACHINE BOLTS

WELDED TO PLATE

1/4" [6mm]

TYP. 1/8"

TYP. [3mm]

A A

PLAN

SECTION A

NOTE:

1.

2.

AT LAVS WITH FOOT PEDAL CONTROLS PROVIDE

AN ADDITIONAL 16 GAGE GALVANIZED STEEL

PLATE 12"x16" [300x600mm] SECURED TO A

MINIMUM OF 2 STUDS PER FOOT PEDAL.

PROVIDE 20 GAGE STUDS WHEN HEIGHT

EXCEEDS 12'-0" [3600mm]

STEEL HANGER BY LAV MFGR

STEEL WALL PLATE

WALL ANCHOR

STUDS

FOR FIXTURE

HEIGHT SEE

ARCHITECTURAL

DRAWINGS

SEE FP DRAWINGS

FOR CONTINUATION

BY F.P.C.

BY P.C.

PROVIDE INSULATION ON

PIPING

M

IN

10"

18"

8"

/4

V A

R

IE

S

[9 m m

T

O F

L O

O R

CW

C W

H W

VACUUM RELIEF VALVE.

WATTS N36 OR EQUAL.

EXPANSION

TANK 45-ET-1

CIRCULATING

PUMP 45-PP1

UNION (TYP.)

DRAIN

A.S.M.E. PRESSURE AND

TEMPERATURE RELIEF VALVE

THERMOMETER IN WELL (0-200˚F)

PIPE DIRECTLY OVER

FLOOR DRAIN

HOUSEKEEPING

PAD

HWC

BYPASS FOR HOT WATER CIRC.

45-WH-1

NORMALLY CLOSED

CLAMPING RING

WATER CUTOFF MASTIC

ADJUSTABLE EXTENSION

ROOF DECK

ROOF INSULATION

DOME STRAINER

BEARING PAN

UNDERDECK CLAMP

OUTLET SIZE AS

SHOWN ON DRAWINGS

PRIMARY ROOF DRAINSECONDARY ROOF DRAIN

INTERNAL

WATER DAM ROOF MEMBRANE

BASIN WITH

PERFORATED

COVER PLATE

ON/OFF INTEGRAL OR

PIGGY BACK FLOAT SWITCH

DISCHARGE PIPE.

SHUTOFF VALVE

CHECK VALVE.

UNION

BACKFILL AROUND BASIN

WITH 6" OF CONCRETE.

SUMP PUMP

FLANGED COUPLING

OR UNION.

ANCHOR FLANGE

12" DEEP CONCRETE

ALARM WHEN WATER

LEVEL IS 3" BELOW INVERT

OF LOWEST INLET.

CONTROL PANEL WITH HIGH

WATER AND OIL PRESENT ALARMS.

OIL SENSOR

NOTES:

1. INSTALL CONTROL PANEL PER MANUFACTURER INSTRUCTIONS. COMPONENTS

AND WIRING ARRANGEMENT MAY DIFFER FROM THAT SHOWN.

2. SUMP PUMPS THAT DISCHARGE TO STORM SHALL BE INSTALLED WITH THE TOP OF

THE SUMP BASIN 2" ABOVE FLOOR LEVEL A 2" HIGH X4" WIDE CONCRETE CURB

AROUND THE PERIMETER OF THE BASIN LID MAY BE USED IN LIEU OF RAISING THE

ENTIRE SUMP BASIN.

CLEANOUT

CONNECT TO TOP OF

HORIZONTAL GRAVITY PIPE

FLOOR

NONCORROSIVE, HEAVY DUTY SLEEVE (E.G.

CAST IRON, CONCRETE PIPE). PROVIDE A

MINIMUM OF 2" CLEAR FROM TOP OF

CARRIER PIPE TO INSIDE OF SLEEVE.

CARRIER PIPE. NO JOINTS

INSIDE SLEEVE.

ENCASE SLEEVE WITH CONCRETE

A MINIMUM OF 9" ALL AROUND. IF

TOP OF SLEEVE IS WITHIN 18" OF

BOTTOM OF FOOTING CONCRETE

SHALL EXTEND TO UNDERSIDE OF

FOOTING.

[NTS:

NTS: COORDINATE THIS NOTE (#1) WITH STRUCTURAL ENGINEER PRIOR TO ADDING TO

DRAWINGS. THE GENERAL CONTRACTOR WON'T SEE THIS DRAWING AND WON'T VOLUNTARILY

STEP THE FOOTING WITHOUT CLARIFICATION FROM STRUCTURAL ENGINEER. THIS DETAIL IS NOT INTENDED AS A GENERIC-SHOW-ON-EVERY-PROJECT DETAIL. ROUTING PIPE BENEATH A BUILDING

FOOTING OR FOUNDATION WALL SHOULD ONLY BE DONE AS A LAST RESORT WHEN ALL OTHER

OPTIONS ARE IMPOSSIBLE OR FINANCIALLY NOT FEASABLE.]

NOTES:

1. STEP FOOTING DOWN AS REQUIRED TO MAINTAIN 8" MINIMUM

DIMENSION.

6" MIN.

9" MIN.

6" (TYP.)

2" MIN

8" MIN

(NOTE 1)

9" MIN. NO SLEEVES PERMITTED.

GRADE

2" MIN

[NTS: ONLY USE THIS PORTION OF

THE DETAIL AS A LAST RESORT

WHEN ALL OTHER OPTIONS ARE

IMPOSSIBLE OR FINANCIALLY NOT

FEASABLE.]. ERASE HATCHING IF

YOU PLAN TO USE IT.

(ERASE THIS ONLY AFTER READING NOTES TO SPECIFIER)

THREADED ROD. (TYP.)

OVERSIZE HANGER TO ALLOW

LONGITUDINAL PIPE EXPANSION

AND PIPE INSULATION TO PASS

THROUGH UNBROKEN. (TYP.)

UNI-STRUT OR EQUIVALENT

HIGH DENSITY INSULATION INSERT

OR, FOR APPLICATIONS PERMITTED

IN SPEC SECTION (SECTION 22 05 11-

PLUMBING), STEEL SADDLE FILLED

WITH INSULATION. (TYP.)

THREADED ROD. (TYP.)

PIPE INSULATION (TYP.)

INSULATION SHIELD (TYP.)

INSULATION SHIELD

INSTALL CLAMP ON ALL

PIPES LESS THAN 4"Ø

THREADED ROD

INSULATION

CLEVIS HANGER

HIGH DENSITY INSULATION INSERT

OR, FOR APPLICATIONS PERMITTED

IN SPEC SECTION (SECTION 22 05 11-

PLUMBING), STEEL SADDLE FILLED

WITH INSULATION.

NOTES:

1. REFER TO SPECIFICATION SECTIONS SECTION 22 05 11 - PLUMBING.

BASIN WITH SOLID

COVER PLATE

REFER TO DRAWINGS

FOR NUMBER AND

LOCATION OF INLET.

ON/OFF INTEGRAL OR

PIGGY BACK FLOAT SWITCH

DISCHARGE PIPE.

SHUTOFF VALVE

CHECK VALVE.

UNION

BACKFILL AROUND BASIN

WITH 6" OF CONCRETE.

SUMP PUMP

FLANGED COUPLING

OR UNION.

ANCHOR FLANGE

12" DEEP CONCRETE

ALARM WHEN WATER

LEVEL IS 3" BELOW INVERT

OF LOWEST INLET.

CONTROL PANEL WITH

HIGH WATER ALARMS.

NOTES:

1. INSTALL CONTROL PANEL PER MANUFACTURER INSTRUCTIONS.

COMPONENTS AND WIRING ARRANGEMENT MAY DIFFER FROM THAT

SHOWN.

ROUTE TO THE EXTERIOR OF

THE BUILDING AND TERMINATE

MANUFACTURER

RECOMMENDED BACKFILL

AROUND THE BASIN.

FINISH FLOOR

I.E. = SEE PLAN.

SMOOTH AND LEVEL

PAD SURFACE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:0

:4

P

M

P301

PLUMBING DETAILS CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149

NO SCALE

WATER HEATER DETAIL

NO SCALE

ROOF DRAIN DETAIL

NO SCALE

SUMP PUMP DETAIL

(OIL SENSOR - CONTROL PANEL)

NO SCALE

PIPE FOUNDATION AND SLEEVE DETAIL

NO SCALE

PIPE SUPPORT DETAIL

Revisions: Date:

NO SCALE

DRAIN TILE SUMP PUMP DETAIL

P-408

P-103

P-528

P-528

P-408

P-408

P-103

P-103

P-609

P-708

P-408

P-103

P-414

P-528

P-103

P-408

P-528

P-528

P-528

P-528

P-528

P-528

P-528 P-408

P-528

P-528

P-408

P-408

P-103

P-502

P-528

P-507

P-528

TO 4" VTR

2"SAN

4"SAN

2"V

1 1/2"V

2"V

2"V

FD-C

FCO-1

2"V

4"SAN

45-SP1

4"SAN

1 1/2"V

2"SAN

2"V

4"SAN

2"SAN

2"V

1 1/2"V

4"SAN

4"SAN

4"SAN

2"SAN FS-S

1 1/2"V

1 1/2"V

2"V

2"SAN

4"SAN

2"SAN

1 1/2"V

4" VTR

4"SAN

2"SAN

1 1/2"V

2"SAN

1 1/2"V

3"V

4"SAN

3"V

4"SAN

2"SAN

1 1/2"V

4"SAN

2"V

2"SAN

1 1/2"V

2"SAN

2"V

2"SAN

2"SAN

2"V

2"SAN

1 1/2"V

2"V

2"SAN

1 1/2"V

2"SAN

2"SAN

1 1/2"V

2"SAN

1 1/2"V

2"SAN

4"SAN

FD-C

2"V

2"V

1 1/2"V

2"SAN

1 1/2"V

3" VTR

2"V

2"SAN

1 1/2"V

2"SAN

1 1/2"V

FCO-1

FCO-1

FCO-1

4"SAN

2"V

2"V

REFER TO CIVIL

DRAWINGS FOR

CONTINUATION

2"SAN

6/3668

RD-2

6/3668

RD-1

2"SAN

1 1/2"V

4"SAN

2"V

4/2457

RD-1

4/2457

RD-2

2"V

4"SAN

2"V

4"SAN

4"SAN

2"V

FCO-1

2"PD

TERMINATE PUMP DISCHARGE

18" ABOVE THE GRADE ON

CONCRETE SPLASHBLOCK

FD-E

1 1/2"V

CO

6"STS (3,668)

4"STS (2,457)

4"SAN

2"V

FD-C

4"ST (2,457)

WCO-1

FD-C

2"V

2"V

WCO-1

6"ST (3,668)

2"SAN

FCO-1

4"SAN

45-SP2

2"PD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:0

:5

P

M

P401

PLUMBING DIAGRAMS CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149

NO SCALE

PLUMBING RISER SANITARY/VENT

GENERAL NOTES:

1. RISER DIAGRAM SHOWN FOR REFERENCE

PURPOSES ONLY. REFER TO DRAWINGS FOR

ADDITIONAL INFORMATION.

P-408

P-103

P-528

P-528

P-408

P-408

P-103

P-103

P-609

P-708

P-408

P-103

P-414

P-528

P-103

P-408

P-528

P-528

P-528

P-528

P-528

P-528

P-528

P-408

P-528

P-528

P-408

P-408

P-103

P-502

P-528

P-507

P-528

1 1/2"HW

1 1/2"CW

3/4"CW

3/4"HW

1 1/2"CW

3/4"HW

1 1/4"CW

3"CW

2"CW

2"HW

3"CW

6"CW

3"CW

1 1/2"CW

P-801

P-801

P-801

P-801

P-801

45-WH-1

3/4"HWC

BFP-1

45-PP1

3/4"HW

3/4"HW

1"HW

1"CW

1 1/2"HW

BALANCING ASSEMBLY.

REFER TO DRAWINGS FOR

BALANCING INFORMATION.

PROVIDE 45-ET-1

AT THIS LOCATION

1"HW

45-ET-1

TP-1

BALANCING ASSEMBLY.

REFER TO DRAWINGS FOR

BALANCING INFORMATION.

BALANCING ASSEMBLY.

REFER TO DRAWINGS FOR

BALANCING INFORMATION.

2"HW

3/4"HWC

WHA-1

2"HW

2 1/2"CW

WHA-1

1 1/2"CW

3/4"HW

1"HW

TP-2

1 1/2"CW

3/4"HWC

2 1/2"CW

2"CW

2"HW

3/4"HWC

1 1/2"CW

1 1/2"HW

3/4"HW

2"CW

1 1/2"CW

2"CW

WHA-1

3/4"CW

1 1/4"CW

1 1/2"HW

1 1/2"HW

3/4"CW

3/4"CW

3/4"CW

TP-1

1 1/2"CW

1 1/2"HW

1"HW

1 1/2"CW

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:0

:5

P

M

P402

PLUMBING DIAGRAMS CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149

NO SCALE

PLUMBING RISER DOMESTIC

GENERAL NOTES:

1. RISER DIAGRAM SHOWN FOR REFERENCE

PURPOSES ONLY. REFER TO DRAWINGS FOR

ADDITIONAL INFORMATION.

BY F.P.C.

BY P.C.

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

REVIEW

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C R e v it L o c a l F ile s \M

P

.0

V A

H a m p to n

P ro s th e ti c s C

A a ro n .C

.M e y e r.

rv t

/3

/2

:0

:5

P

M

P501

PLUMBING SCHEDULES CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

45 & 110

09/02/2022 IMEG RUSARN16149

45-SP2 ELEV E-1-45 DRAIN TILE SUMP SUMP PUMP CENT WATER 20 [ 1 ] 27 [ 430 ] 1 NA 70 [ 21 ] 1 0.50 [0.4] 1 120 1750 CONSTANT

45-SP1 ELEV E-1-45 ELEVATOR SUMP SUMP PUMP CENT WATER 50 [ 3 ] 27 [ 430 ] 1 NA 70 [ 21 ] 1 0.50 [0.4] 1 120 1750 CONSTANT

45-PP1 MECH 125-45 BLDG 45 HOT WATER RECIR CENT DOMESTIC WATER 2 [ ] 10 [ 160 ] 0 NA 140 [ 60 ] 1 0.166666667 [ ] 1 120 1750 CONSTANT ----

GPM [L/s] FT [kPa] FT [kPa] °F [°C] HP [kW]

FLUID

FLOW HEAD NPSH AVAILABLE TEMPERATURE

SP. GR.

MIN. %

EFF

NOMINAL POWER

PHASE VOLT MAX RPM

SPEED

CONTROL

REMARKS

MARK LOCATION

AREA AND/OR

BLDG SERVED

SYSTEM AND/OR

SERVICE

TYPE

CIRCULATING FLUID ELECTRICAL MOTOR

PLUMBING PUMP SCHEDULE

45-WH-1 MECH 125-45 BLDG 45 DOMESTIC HOT WATER ELECTRIC 80 [ 300 ] 176 [ 670 ] 39 50 [ 350 ] 6 30 5 3 208 -----

GAL [L] GAL/HR [L/HR] PSIG [kPa] TOTAL kW kW PER

ELEMENT

PHASE VOLT

MARK LOCATION

AREA AND/OR BLDG

SERVED

SYSTEM AND/OR

SERVICE

TYPE

STORAGE CAPACITY

RECOVERY @ 70 °F [21°C]

RISE

TIME TO

RECOVER

CONTENTS,

MINUTES

RELIEF VALVE SETTING

NO OF

ELEMENTS

ELECTRICAL INPUT

REMARKS

ELECTRIC WATER HEATER SCHEDULE

45-ET-1 BLDG 45

POTABLE THERMAL

EXPANSION TANK

40 [ 4 ] 140 [ 60 ] 30 [ 210 ] 125 [ 860 ] 50 [ 350 ] 3 [ 11 ] 5 [ 19 ] 0.75 [ 19 ] -----

°F [°C] °F [°C] PSIG [kPa] PSIG [kPa] PSIG [kPa] GAL [L] GAL [L] IN [mm]

MIN MAXMARK LOCATION TYPE

SYSTEM TEMPERATURE RANGE

INITIAL PRESSURE IN TANK MAX OPERATING PRESSURE RELIEF VALVE PSIG [kPA] MIN TANK VOLUME MIN ACCEPT VOLUME PIPE SIZE TO TANK

REMARKS

DOMESTIC WATER THERMAL EXPANSION TANK SCHEDULE

FD-S FLOOR SINK 3 [ 75 ] 1.5 [ 38 ] N/A N/A N/A N/A NO

FD-E FLOOR DRAIN 4 [ 100 ] 2 [ 50 ] N/A N/A N/A N/A NO

FD-C FLOOR DRAIN 3 [ 75 ] 1.5 [ 38 ] N/A N/A N/A N/A NO

P-801 WALL HYDRANT N/A N/A .75 [ 19 ] N/A N/A 5 N/A NO

P-710 SWING-DOWN EYE WASH N/A N/A .75 [ 19 ] .75 [ 19 ] NA 3 N/A NO MOUNTED ON P-414 AND P-528 FIXTURES, REFER TO THOSE FIXTURES FOR WASTE

FIXTURE UNITS.

P-708

WALL MOUNTED EYE/FACE

WASH

2 [ 50 ] 1.5 [ 38 ] .75 [ 19 ] .75 [ 19 ] 2 3 N/A NO

P-609 ELECTRIC WATER COOLER 2 [ 50 ] 1.5 [ 38 ] .5 [ 13 ] N/A 1 1 N/A NO

P-528 SINK COUNTER MOUNTED 2 [ 50 ] 2 [ 50 ] .75 [ 19 ] .75 [ 19 ] 2 4 N/A NO PROVIDE MIXING VALVE RATED FOR 0.5 GPM AT 5 PSI OF PRESSURE DROP

P-507 PLASTER SINK 2 [ 50 ] 1.5 [ 38 ] .5 [ 13 ] .5 [ 13 ] 1 1 N/A NO PROVIDE MIXING VALVE RATED FOR 0.5 GPM AT 5 PSI OF PRESSURE DROP

P-502 SINK SERVICE 3 [ 75 ] 2 [ 50 ] .75 [ 19 ] .75 [ 19 ] 2 3 N/A NO…