This document provides details on a federal contract solicitation to construct a prosthetics facility for the Department of Veterans Affairs. The solicitation number is 36C77623R0166_1 for the project "Y1DA--590-210 Construct Prosthetics Facility (VA-23-00044335)" issued by the Department of Veterans Affairs Technology Acquisition Center Austin. Offerors are required to submit bids by the due date to construct a new prosthetics facility for veterans. Eligible small businesses are encouraged to respond. The winning bidder will be selected and awarded the contract to complete the construction project for veterans.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:1
:0
P
M
MV504
VENTILATION SCHEDULES CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149
ROOMS OR AREAS DO NOT HAVE INDIVIDUAL HUMIDITY CONTROL UNLESS NOTED.
NOTE
126-45 ORTHO SUP OFFICE 45-DOAS-1 45-VRHP-101 YES 300 [ 140 ] 1 SD-13 R 250 [ 120 ] 1 RG-20 X + 0 [ 0 ] 50 [ 24 ]
125-45 MECH FIRE/H2O N/A 45-VRHP-101 NO 75 [ 35 ] 1 SD-51 R 40 [ 19 ] 1 RR-52 X + 0 [ 0 ] 35 [ 17 ]
124-45 ELECTRICAL N/A 45-SS-4 N/A 300 [ 140 ] 0 N/A N/A 300 [ 140 ] 0 N/A X 0 0 [ 0 ] 0 [ 0 ]
123-45 OPEN OFFICE 45-DOAS-1 45-VRHP-106 YES 600 [ 280 ] 3 SD-12 R 435 [ 210 ] 2 RG-20 X + 0 [ 0 ] 165 [ 78 ]
122-45 TOILET N/A N/A N/A 0 [ 0 ] 0 N/A E 125 [ 59 ] 1 EG-22 45-EF-2 X - - 125 [ 59 ] 0 [ 0 ]
120-45 TEAM EVALUATION 45-DOAS-1 45-VRHP-104 YES 600 [ 280 ] 2 N/A R 690 [ 330 ] 1 RG-20 X + 0 [ 0 ] 110 [ 52 ]
119-45 PAT/PUB TOILET 45-DOAS-1 45-VRHP-108 YES 50 [ 24 ] 1 SD-11 E 170 [ 80 ] 1 EG-22 45-EF-2 X - - 120 [ 57 ] 0 [ 0 ]
118-45 PAT/PUB TOILET 45-DOAS-1 45-VRHP-108 YES 50 [ 24 ] 1 SD-11 E 170 [ 80 ] 1 EG-22 45-EF-2 X - - 120 [ 57 ] 0 [ 0 ]
117-45 FITTING/EXAM 45-DOAS-1 45-VRHP-116 YES 300 [ 140 ] 1 SD-13 R 255 [ 120 ] 1 RG-20 X + 0 [ 0 ] 45 [ 21 ]
116-45 FITTING/EXAM 45-DOAS-1 45-VRHP-117 YES 200 [ 94 ] 1 SD-13 R 160 [ 76 ] 1 RG-20 X + 0 [ 0 ] 40 [ 19 ]
115-45 EQPT STORAGE 45-DOAS-1 45-VRHP-117 NO 50 [ 24 ] 1 SD-11 R 35 [ 17 ] 1 RG-20 X + 0 [ 0 ] 15 [ 7 ]
114-45 CAST 45-DOAS-1 45-VRHP-127 YES 300 [ 140 ] 1 SD-13 R 230 [ 110 ] 1 RG-20 X + 0 [ 0 ] 70 [ 33 ]
113-45 DYNAMIC ALIGNMENT 45-DOAS-1 45-VRHP-125 YES 200 [ 94 ] 1 SD-12 R 150 [ 71 ] 1 RG-20 X + 0 [ 0 ] 50 [ 24 ]
112-45 SOILED HOLDING N/A N/A NO 0 [ 0 ] N/A N/A E 135 [ 64 ] 1 EG-22 45-EF-2 X - - 135 [ 64 ] 0 [ 0 ]
111-45 STAFF TOILET N/A N/A NO 0 [ 0 ] N/A N/A E 110 [ 52 ] 1 EG-22 45-EF-2 X - - 110 [ 52 ] 0 [ 0 ]
110-45 HAC N/A N/A NO 0 [ 0 ] N/A N/A E 100 [ 47 ] 1 EG-22 45-EF-2 X - - 100 [ 47 ] 0 [ 0 ]
109-45
FACIAL/BODY FIT
STUDIO
45-DOAS-1 45-VRHP-126 YES 300 [ 140 ] 1 SD-13 R 220 [ 100 ] 1 RG-20 X + 0 [ 0 ] 80 [ 38 ]
108-45 FITTING/EXAM 45-DOAS-1 45-VRHP-124 YES 300 [ 140 ] 1 SD-13 R 250 [ 120 ] 1 RG-20 X + 0 [ 0 ] 50 [ 24 ]
107-45 FITTING/EXAM 45-DOAS-1 45-VRHP-122 YES 300 [ 140 ] 1 SD-13 R 250 [ 120 ] 1 RG-20 X + 0 [ 0 ] 50 [ 24 ]
106-45 FITTING/EXAM 45-DOAS-1 45-VRHP-121 YES 300 [ 140 ] 1 SD-13 R 255 [ 120 ] 1 RG-20 X + 0 [ 0 ] 45 [ 21 ]
105-45 FITTING/EXAM 45-DOAS-1 45-VRHP-120 YES 300 [ 140 ] 1 SD-13 R 255 [ 120 ] 1 RG-20 X + 0 [ 0 ] 45 [ 21 ]
104-45 FITTING/EXAM 45-DOAS-1 45-VRHP-119 YES 300 [ 140 ] 1 SD-13 R 250 [ 120 ] 1 RG-20 X + 0 [ 0 ] 50 [ 24 ]
103-45 FITTING/EXAM 45-DOAS-1 45-VRHP-118 YES 250 [ 120 ] 1 SD-13 R 200 [ 94 ] 1 RG-20 X + 0 [ 0 ] 50 [ 24 ]
102-45 PATIENT TOILET 45-DOAS-1 45-VHRP-118 YES 50 [ 24 ] 1 SD-11 E 185 [ 87 ] 1 EG-22 45-EF-2 X - - 135 [ 64 ] 0 [ 0 ]
101-45 RECEPTION 45-DOAS-1 45-VRHP-108 YES 780 [ 370 ] 3 SD-52/SD-54 R 430 [ 200 ] 1 RG-20 X + 0 [ 0 ] 350 [ 170 ]
100-45 LOBBY 45-DOAS-1 45-VRHP-114 YES 1260 [ 590 ] 3 SD-314 R 705 [ 330 ] 1 RG-20 X + 0 [ 0 ] 555 [ 260 ]
CFM L/S CFM L/S CV VAV CFM [L/s] CFM [L/s]
ROOM AIR FLOW
# OF AIR
DEVICES
AIR DEVICE
MARK
SUPPLY
FAN
RETURN OR
EXHAUST (R/E)
ROOM AIR FLOW
# OF AIR
DEVICES
AIR DEVICE
MARK
RETURN OR
EXHAUST FAN
REMARKS
ROOM NO ROOM NAME
AIR HANDLING
UNIT NO
TERMINAL UNIT
INDIVIDUAL
ROOM TEMP
CONTROL
SUPPLY RETURN OR EXHAUST
ROOM AIR
FLOW ROOM AIR
BALANCE
NET
INFILTRATION
NET
EXFILTRATION
ROOM AIR BALANCE SCHEDULE
NOTES:
1.PROVIDE COMPLETE PULSE JET FILTRATION SYSTEM WITH A MINIMUM 99.99% SEPARATION EFFICIENCY DOWN TO 0.5 MICRON.
2.EXHAUST FAN TO BE REMOVE TYPE DUE TO EQUIPMENT HEIGHT LIMITATIONS. FAN TO BE MOUNTED TO SIDE OF THE MAIN DUST COLLECTOR SYSTEM.
3.SYSTEM TO HAVE AUTOMATIC FILTER CLEANING, QUICK ACCESS FILTER CABINET, NEMA 12 SYSTEM CONTROL PANEL WITH TIMER AND VFD FAN CONTROL VIA PRESSURE TRANSDUCER, FLOW ACTIVATED PASSIVE INLET
EXPLOSION ISOLATION VALVE, DEFLAGRATION SUPPRESSION SYSTEM.
DUST COLLECTOR SCHEDULE
TAG
NAME
AREA
SERVED COLLECTOR TYPE CFM
S.P. IN.
W.C.
INLET
SIZE
OUTLET
SIZE
ELECTRICAL
REMARKSHP VOLTAGE PHASES
DISCONNECT CONTROLLER/ STARTER
BY
(NOTE A)
TYPE
(NOTE B)
BY
(NOTE A)
TYPE
(NOTE C) SCCR
DC-1 FIRST
FLOOR LAB
PULSE JET
CARTRIDGE FILTER
1400 12 8" 10" 5 208 3 MFR F MFG VFD 0 1, 2, 315k
Revisions: Date:
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:1
:0
P
M
MV505
VENTILATION SCHEDULES CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149
ROOMS OR AREAS DO NOT HAVE INDIVIDUAL HUMIDITY CONTROL UNLESS NOTED.
NOTE
S102-45 STAIR 2 45-DOAS-1 45-VRHP-100 YES 800 [ 380 ] 0 N/A R 800 [ 380 ] 0 N/A X 0 0 [ 0 ] 0 [ 0 ]
S100-45 STAIR 1 45-DOAS-1 45-VRHP-123 YES 800 [ 380 ] 0 N/A R 800 [ 380 ] 0 N/A X 0 0 [ 0 ] 0 [ 0 ]
C200-45 CORRIDOR 45-DOAS-1 45-VRHP-214 YES 300 [ 140 ] 3 SD-11 R 200 [ 94 ] 1 RG-20 X + 0 [ 0 ] 100 [ 47 ]
C103-45 CORRIDOR 45-DOAS-1 45-VRHP-107 YES 300 [ 140 ] 1 SD-13 R 165 [ 78 ] 1 RG-20 X + 0 [ 0 ] 135 [ 64 ]
C102-45 CORRIDOR 45-DOAS-1 45-VRHP-125 YES 255 [ 120 ] 3 SD-310 R 135 [ 64 ] 0 RG-20 X + 0 [ 0 ] 120 [ 57 ]
C100-45 CORRIDOR 45-DOAS-1 45-VRHP-108 YES 165 [ 78 ] 1 SD-12 R 15 [ 7 ] 1 RG-20 X + 0 [ 0 ] 150 [ 71 ]
228-45
PROST/ORTH
MAINTENANCE
45-DOAS-1 45-VRHP-205 YES 300 [ 140 ] 1 SD-310 R 245 [ 120 ] 1 RG-20 X + 0 [ 0 ] 55 [ 26 ]
227-45 ELECTRICAL 45-DOAS-1 N/A N/A 60 [ 28 ] 0 N/A R 0 [ 0 ] 0 N/A X + 0 [ 0 ] 60 [ 28 ]
226-45 DME ACTIVE STORAGE 45-DOAS-1 45-VRHP-204 NO 300 [ 140 ] 2 SD-310 R 300 [ 140 ] 1 RG-20 X 0 0 [ 0 ] 0 [ 0 ]
225-45
WHEELCHAIR PARTS
STOR
45-DOAS-1 45-VRHP-203 NO 300 [ 140 ] 2 SD-310 R 260 [ 120 ] 1 RG-20 X + 0 [ 0 ] 40 [ 19 ]
224-45 SHOE MOD STORAGE 45-DOAS-1 45-VRHP-200 NO 300 [ 140 ] 1 SD-13 R 285 [ 130 ] 1 RG-20 X + 0 [ 0 ] 15 [ 7 ]
223-45 PARTS STORAGE 45-DOAS-1 45-VRHP-201 NO 300 [ 140 ] 1 SD-53 R 280 [ 130 ] 1 RR-59 X + 0 [ 0 ] 20 [ 9 ]
222-45 ELEVATOR EQUIPMENT N/A 45-SS-3 N/A 380 [ 180 ] 0 N/A R 380 [ 180 ] 1 RG-20 X 0 0 [ 0 ] 0 [ 0 ]
221-45 TELECOM N/A 45-SS-1 YES 380 [ 180 ] 0 N/A R 300 [ 140 ] 1 RG-20 X + 0 [ 0 ] 80 [ 38 ]
220-45 MECHANICAL 45-DOAS-1 45-VRHP-202 YES 1270 [ 600 ] 4 SD-64 E 1060 [ 500 ] 1 EG-64 45-EF-2 X - 210 [ 99 ] 0 [ 0 ]
208-45 STAFF TOILET N/A N/A NO 0 [ 0 ] 0 N/A E 115 [ 54 ] 1 EG-22 45-EF-2 X - - 115 [ 54 ] 0 [ 0 ]
207-45 COPY/WORK 45-DOAS-1 45-VRHP-213 YES 300 [ 140 ] 1 SD-13 R 250 [ 120 ] 1 RG-20 X + 0 [ 0 ] 50 [ 24 ]
206-45
PROSTHETICS REP
OFFICE
45-DOAS-1 45-VRHP-217 YES 300 [ 140 ] 1 SD-13 R 265 [ 130 ] 1 RG-20 X + 0 [ 0 ] 35 [ 17 ]
205-45 ASST CHIEF OFFICE 45-DOAS-1 45-VRHP-212 YES 300 [ 140 ] 1 SD-13 R 265 [ 130 ] 1 RG-20 X + 0 [ 0 ] 35 [ 17 ]
204-45 CHIEF OFFICE 45-DOAS-1 45-VRHP-211 YES 300 [ 140 ] 1 SD-13 R 245 [ 120 ] 1 RG-20 X + 0 [ 0 ] 55 [ 26 ]
203A-45 LOCKERS 45-DOAS-1 45-VRHP-210 YES 200 [ 94 ] 1 SD-12 E 250 [ 120 ] 1 EG-23 45-EF-2 X - 50 [ 24 ] 0 [ 0 ]
203-45 STAFF LOUNGE 45-DOAS-1 45-VRHP-210 YES 400 [ 190 ] 1 SD-13 R/E 410 [ 190 ] 2 RG-20/EG-23 45-EF-2 X - 10 [ 5 ] 0 [ 0 ]
202-45 CONFERENCE 45-DOAS-1 45-VRHP-209 YES 600 [ 280 ] 2 SD-13 R 500 [ 240 ] 1 RG-20 X + 0 [ 0 ] 100 [ 47 ]
201-45
OPEN OFFICE
(INTERIOR)
45-DOAS-1 45-VRHP-208 YES 495 [ 230 ] 3 SD-12 R 335 [ 160 ] 1 RG-20 X + 0 [ 0 ] 160 [ 76 ]
201-45
OPEN OFFICE
(EXTERIOR)
45-DOAS-1 45-VRHP-206 YES 885 [ 420 ] 3 SD-13 R 685 [ 320 ] 1 RG-20 X + 0 [ 0 ] 200 [ 94 ]
151-45 TELECOM N/A 45-SS-1 YES 380 [ 180 ] 0 N/A R 275 [ 130 ] 1 RG-20 X + 0 [ 0 ] 105 [ 50 ]
150-45 ELECTRICAL N/A N/A NO 50 [ 24 ] 0 N/A R 0 [ 0 ] 1 RG-20 X 0 0 [ 0 ] 0 [ 0 ]
130E-45 TRASH N/A N/A NO 0 [ 0 ] 0 N/A E 115 [ 54 ] 1 EG-22 45-EF-2 X - - 115 [ 54 ] 0 [ 0 ]
130D-45 CAD/CAM 45-DOAS-1 45-VRHP-112 YES 880 [ 420 ] 3 SD-13 R/E 980 [ 460 ] 1 RG-20/EG-23 45-EF-2 X - 100 [ 47 ] 0 [ 0 ]
130C-45 PROST/ORTH FUME 45-DOAS-1 45-VRHP-111 YES 880 [ 420 ] 2 SD-14 R/E 1210 [ 570 ] 1
RG-20/HEAT
CAPTURE...
45-EF-1 X - 330 [ 160 ] 0 [ 0 ]
130B-45 LAB DUST ROOM 45-DOAS-1 45-VRHP-110 YES 880 [ 420 ] 3 SD-13 R/E 970 [ 460 ] 2 RG-20/EG-23 45-EF-2 X - 110 [ 52 ] 0 [ 0 ]
130A-45 LAB/ RESTORATION 45-DOAS-1 45-VRHP-109 YES 890 [ 420 ] 3 SD-13 R/E 1190 [ 560 ] 2 RG-20/EG-23 45-EF-2 X - 100 [ 47 ] 0 [ 0 ]
130-45 PROSTHETICS LAB 45-DOAS-1 45-VRHP-113 YES 600 [ 280 ] 2 SD-13 R/E 700 [ 330 ] 1 RG-20/EG-23 45-EF-2 X - 100 [ 47 ] 0 [ 0 ]
CFM L/S CFM L/S CV VAV CFM [L/s] CFM [L/s]
ROOM AIR FLOW
# OF AIR
DEVICES
AIR DEVICE
MARK
RETURN OR
EXHAUST (R/E)
ROOM AIR FLOW
# OF AIR
DEVICES
AIR DEVICE
MARK
RETURN OR
EXHAUST FAN
REMARKS
ROOM NO ROOM NAME
AIR HANDLING
UNIT NO
TERMINAL UNIT
INDIVIDUAL
ROOM TEMP
CONTROL
SUPPLY RETURN OR EXHAUST ROOM AIR
FLOW ROOM AIR
BALANCE
NET
INFILTRATION
NET
EXFILTRATION
ROOM AIR BALANCE SCHEDULE
PLUMBING SYMBOL LIST
SYMBOL: DESCRIPTION:
PIPE SERVING FIXTURE ON FLOOR ABOVE
(EXAMPLE: FD = FLOOR DRAIN)FD
PITCH PIPE IN DIRECTION
RD-1
6"(1000)
ROOF DRAIN PROPERTIES SYMBOL
SIZE (ROOF SQ. FT.)
DIELECTRIC CONNECTION
UNION/FLANGE
BALANCING VALVE (NUMBER INDICATES GPM)
GPM
CHECK VALVE
REDUCER - REFERENCE SPECIFICATION
FOR CONCENTRIC/ECCENTRIC AND FOT/FOB
METERM
ALIGNMENT GUIDE
PIPE ANCHOR
EXPANSION JOINT
PIPE CAP
PIPE DOWN
PIPE UP OR UP/DOWN
DIRECTION OF FLOW IN PIPE
SHUTOFF VALVE NORMALLY OPEN
SHUTOFF VALVE NORMALLY CLOSED
ACID VENTAV
ACID WASTEAW
COLD WATER - POTABLECW
DT DRAIN TILE
SANITARY DRAINAGE (GREASE SANITARY DRAINAGE)GSAN
HOT WATER - POTABLEHW
HOT WATER CIRCULATING - POTABLEHWC
HOT WATER - POTABLE NUMBER INDICATES TEMPHW140
HOT WATER CIRC. - POTABLE NUMBER INDICATES TEMPHWC140
NON-POTABLE COLD WATERNCW
NON-POTABLE HOT WATERNHW
PUMPED DISCHARGEPD
SANITARY DRAINAGESAN
SOFT COLD WATERSCW
SOFT HOT WATERSHW
STORM DRAINAGE (ROOF SQUARE FOOTAGE)ST(1,000)
STS STORM DRAINAGE (SECONDARY)
VENTV
WASTE ANETHESIA GAS DISPOSALWAGD
GREASE VENTGV
COMPRESSED AIRCA
DEIONIZED WATERDI
PROPANE GASP
REVERSE OSMOSIS WATERRO
STW SOFT TEMPERED WATER
TW TEMPERED WATER
DRAIND
G NATURAL GAS
NOT ALL SYMBOLS MAY APPLY.
PRESSURE REDUCING VALVE (LIQUID/GAS)
OIL RETURNOR
OIL SUPPLYOS
LAB VACUUMVAC
SOLENOID VALVE
SAFETY/RELIEF VALVE
VACUUM BREAKER
PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P
TEMPERATURE SENSOR WITH WELL
T
THERMOMETER WITH WELL (DIAL TYPE)T
THERMOMETER WITH WELL (FILLED TYPE)
PUMP
GRV GAS REGULATOR VENT
INSTRUMENT AIRIA
MEDICAL AIRMA
MEDICAL VACUUMMV
NITROGENN
NITROUS OXIDENO
OXYGENO
PURE WATERPW
SERVICE WATER - POTABLEW
PIPE CONTINUATION
PRESSURE SENSOR (FURNISHED WITH BALL VALVE)P
ROUTE TO DRAIN
BACKFLOW PREVENTER
MEDIUM PRESSURE GASMPG
PLUMBING ABBREVIATION KEY
BATHTUBBT
CO CLEANOUT
CLINICAL SINKCS
DRINKING FOUNTAINDF
EMERGENCY EYEWASHEE
FLOOR CLEANOUTFCO
FLOOR DRAINFD
FLOOR SINKFS
GARBAGE DISPOSERGD
GREASE INTERCEPTORGI
HOSE BIBBHB
I.E. INVERT ELEVATION (FOR REFERENCE ONLY)
LAVATORYLAV
MOP BASINMB
MH MANHOLE
MIXING VALVEMV
NEUTRALIZATION TANKNT
OIL SEPARATOROS
ROOF DRAINRD
SHOWERSH
SINKSK
SERVICE SINKSS
TRENCH DRAINTD
TRAP PRIMERTP
URINALUR
WATER CLOSETWC
WALL CLEANOUTWCO
WASH FOUNTAINWF
WATER HEATERWH
WASHING MACHINE FIXTUREWMF
YARD CLEANOUTYCO
EMERGENCY SHOWERES
EMERGENCY SHOWER/EYEWASHESE
ELECTRIC WATER COOLEREWC
VENT THROUGH ROOFVTR
AD ACCESS DOOR
ABOVE FINISHED FLOORAFF
BFP BACKFLOW PREVENTER
NOT IN CONTRACTNIC
ABBR: DESCRIPTION:
TYPICALTYP
UNLESS OTHERWISE NOTESUON
EXISTINGE
FLOW METERFM
WATER SOFTENERWS
WATER METERWM
DIALYSIS BOXDB
CATCH BASINCB
CAST IRONCI
DUCTILE IRONDI
UTILITY BOXUB
SHORT CIRCUIT CURRENT RATINGSCCR
NOT ALL SYMBOLS MAY APPLY.
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
VIEW NAME
1/8" = 1'-0"
M101
SIMSIM
INDICATES SIMILAR DETAIL REFERENCED
IN MULTIPLE LOCATIONS
LEVEL NAME
10' - 0" HEIGHT ABOVE
PROJECT 0' - 0"
1 INDICATES NOTE USED TO DESCRIBE
ADDITIONAL INFORMATION ABOUT
WORK REQUIRED, SPECIFIC TO THE
SHEET AND/OR DETAIL
N
O R HT
INDICATES DIRECTION OF TRUE NORTH
VIEW KEY
LINE TYPE AND TAG KEY:
NEW WORK BY THIS CONTRACTOR (WIDE LINE)
NEW
EXISTING TO BE REMOVED (SHORT DASHED PATTERN)
NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)
EXISTING
EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)
EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
HALFTONING DOES NOT MODIFY SCOPE.
'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING
TAG-1 UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL
INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST
INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL
T101
THE LINE TYPES SHOWN ARE FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR
SHALL VERIFY RATINGS WITH THE LATEST SET OF ARCHITECTURAL PLANS AND FURNISH ALL
MATERIALS REQUIRED TO COMPLY WITH THOSE RATINGS WHETHER SHOWN OR NOT.
FIRE / SMOKE BARRIER DESIGNATIONS
1 HOUR FIRE BARRIER
SMOKE BARRIER
1 HOUR FIRE/SMOKE BARRIER
OR SHAFT ENCLOSURE
2 HOUR FIRE/SMOKE BARRIER
OR SHAFT ENCLOSURE
3 HOUR FIRE/SMOKE BARRIER
4 HOUR FIRE/SMOKE BARRIER
SMOKE PARTITION
FIRE PARTITION
2 HOUR FIRE BARRIER OR WALL
3 HOUR FIRE BARRIER OR WALL
4 HOUR FIRE BARRIER OR WALL
MECHANICAL GENERAL NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE
CONTROL.
1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.
3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO
VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE
REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER
ACCESS.
5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO
COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR
EXPENSE TO OTHERS.
6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL
CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF
DESIGN.
7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY
AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING
MOUNTED DEVICES, OTHER THAN SPRINKLERS.
8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,
FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS
RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND
FINISH.
9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE
GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE
PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS
PANELS PRIOR TO BIDDING.
10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,
AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE
SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER
FOR OUTDOOR USE.
11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,
PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE
TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS
WITHIN ROOMS.
12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED
OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL
RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.
13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT
MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND
REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,
PIPING, DUCTWORK, ETC.
14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.
15. MAINTAIN MINIMUM 3'-6” CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR
STARTERS, SWITCHES, AND DISCONNECTS.
16. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL
EXTEND MINIMUM 6” BEYOND ALL SIDES OF EQUIPMENT.
17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER
NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE
CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.
MECHANICAL RENOVATION NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE
CONTROL.
1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD
SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND
REPORT ANY CONFLICTS BEFORE PROCEEDING.
2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS
BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.
3. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS/HER WORK
AND SHALL NOTIFY THE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE
REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO HIS/HER AREA OF
WORK.
4. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF
ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.
CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF
CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL
CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO
BIDDING.
6. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH
NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL
EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT
DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL
SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.
7. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING
CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT
REMAIN ACTIVE.
8. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY
REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW
SYSTEMS ARE INSTALLED.
9. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR
TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND
CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY
DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.
10. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT
THAT HAS BEEN REMOVED.
1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.
CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR
FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.
2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID TO
THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS
RESPONSIBLE FOR A COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND IN
THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES
PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER LISTED IS THE
BASIS OF DESIGN.
3. CONTRACTOR SHALL VERIFY THAT FIXTURES SUPPLIED ARE APPROVED PER ALL
APPLICABLE STATE, LOCAL AND GOVERNING AUTHORITIES.
4. ALL FIXTURES SHALL CONFORM TO FEDERAL ACT S.3874
5. INVERT ELEVATIONS ARE FROM EXISTING DRAWINGS AND MAY NOT BE ACCURATE. VERIFY
ALL ELEVATIONS BEFORE BEGINNING WORK.
6. VERIFY UNDERGROUND PIPE SIZES, INVERT ELEVATIONS, AND LOCATIONS PRIOR TO
BEGINNING ANY WORK.
7. REFER TO THE PLUMBING ROUGH-IN SCHEDULE FOR THE SIZES OF BRANCH PIPES TO
PLUMBING FIXTURES.
8. FOR CLARITY, NOT ALL VALVES HAVE BEEN SHOWN. PROVIDE SHUTOFF VALVES IN
DOMESTIC WATER PIPING SERVING EACH ROOM WITH FIXTURES. ANGLE STOPS SHALL NOT
BE CONSIDERED SHUTOFF VALVES.
9. EXISTING CONDITIONS ON DEMOLITION PLANS ARE PROVIDED TO INDICATE THE GENERAL
SCOPE OF ITEMS TO BE REMOVED. REFER TO SPECIFICATION SECTION 22 05 05 FOR
ADDITIONAL DEMOLITION INFORMATION.
10. P.C. SHALL CUT AND PATCH EXISTING AS REQUIRED FOR NEW OR DEMOLITION WORK
UNLESS NOTED OTHERWISE. REFER TO SPECIFICATION SECTION 22 05 05 FOR ADDITIONAL
INFORMATION.
PLUMBING GENERAL NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:0
:3
P
M
P000
PLUMBING COVERSHEET CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149Revisions: Date:
A
B
E
G
F
H
D
3 4 6 8 10 11 12 13 14 15 17 18165 972
REMOVE EXISTING 5" SANITARY TO 5'
OUTSIDE BUILDING.
REMOVE EXISTING WATER HEATER,
PLUMBING PIPING, HANGERS,
ACCESSORIES AND TRIM WITHIN
BASEMENT AND CRAWL-SPACE.
REMOVE ALL EXISTING PLUMBING
PIPING, ACCESSORIES AND TRIM
WITHIN AREA OF WORK.
5"SANREMOVE CAP AND
PREPARE FOR NEW
CONNECTION
"S
A N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:0
:0
P
M
PD101-B50
BASEMENT PLAN - PLUMBING
DEMOLITION
CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149
N O R
HT
1/8" = 1'-0"
BASEMENT PLAN - PLUMBING DEMOLITION
SHEET NOTES:
1. REFER TO MECHANICAL AND PLUMBING
NOTES ON P000.
B
E
G
F
H
D
3 4 6 8 10 11 12 13 14 15 17 18165 972
REMOVE ALL EXISTING PLUMBING
PIPING, ACCESSORIES AND TRIM
WITHIN AREA OF WORK.
REMOVE EXISTING PLUMBING FIXTURES,
PIPING, TRIM AND ACCESSORIES IN THEIR
ENTIRETY.
REMOVE EXISTING PLUMBING
FIXTURES, PIPING, TRIM AND
ACCESSORIES IN THEIR ENTIRETY.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:0
:0
P
M
PD111-B50
FIRST LEVEL PLAN - PLUMBING
DEMOLITION
CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149
N O R
HT
1/8" = 1'-0"
FIRST LEVEL PLAN - PLUMBING DEMOLITION
B
E
G
F
H
D
3 4 6 8 10 11 12 13 14 15 17 18165 972
REMOVE ALL EXISTING PLUMBING
PIPING, ACCESSORIES AND TRIM
WITHIN AREA OF WORK.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:0
:0
P
M
PD121-B50
SECOND LEVEL PLAN - PLUMBING
DEMOLITION
CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149
N O R
HT
1/8" = 1'-0"
SECOND LEVEL PLAN - PLUMBING DEMOLITION
REMOVE EXISTING HEADWALL AND
MEDICAL GAS OUTLETS (OXYGEN,
MEDICAL AIR, MEDICAL VACUUM).
REMOVE EXISTING MEDICAL GAS
PIPING BACK TO MAIN AND CAP.
EXISTING HEADWALL,
MEDICAL GAS OUTLETS AND
MEDICAL GAS PIPING TO
REMAIN.
EXISTING MEDICAL GAS SHUTOFF
VALVES (OXYGEN, MEDICAL AIR
AND MEDICAL VACUUM) AND
ALARM PANEL TO REMAIN.
REMOVE EXISTING HEADWALL AND
MEDICAL GAS OUTLETS (OXYGEN,
MEDICAL AIR, MEDICAL VACUUM).
REMOVE EXISTING MEDICAL GAS
PIPING BACK TO MAIN AND CAP.
REMOVE EXISTING HEADWALL AND
MEDICAL GAS OUTLETS (OXYGEN,
MEDICAL AIR, MEDICAL VACUUM).
REMOVE EXISTING MEDICAL GAS
PIPING BACK TO MAIN AND CAP.
REMOVE EXISTING HEADWALL AND
MEDICAL GAS OUTLETS (OXYGEN,
MEDICAL AIR, MEDICAL VACUUM).
REMOVE EXISTING MEDICAL GAS
PIPING BACK TO MAIN AND CAP.
REMOVE EXISTING SERVICE SINK,
PLASTER TRAP, ASSOCIATED
PIPING AND TRIM. CAP EXISTING
SANITARY AND VENT PIPING AT
MAIN WITHIN CHASE.
REMOVE EXISTING EYE/FACE
WASH AND ASSOCIATED PIPING
AND TRIM. CAP EXISTING SANITARY
AND VENT PIPING AT MAIN WITHIN
CHASE.
REMOVE EXISTING HEADWALL AND
MEDICAL GAS OUTLETS (OXYGEN,
MEDICAL AIR, MEDICAL VACUUM).
REMOVE EXISTING MEDICAL GAS
PIPING BACK TO MAIN AND CAP.
REMOVE EXISTING HEADWALL AND
MEDICAL GAS OUTLETS (OXYGEN,
MEDICAL AIR, MEDICAL VACUUM).
REMOVE EXISTING MEDICAL GAS
PIPING BACK TO MAIN AND CAP.
REMOVE EXISTING HEADWALL AND
MEDICAL GAS OUTLETS (OXYGEN,
MEDICAL AIR, MEDICAL VACUUM).
REMOVE EXISTING MEDICAL GAS
PIPING BACK TO MAIN AND CAP.
REMOVE EXISTING HEADWALL AND
MEDICAL GAS OUTLETS (OXYGEN,
MEDICAL AIR, MEDICAL VACUUM).
REMOVE EXISTING MEDICAL GAS
PIPING BACK TO MAIN AND CAP.
REMOVE EXISTING HEADWALL AND
MEDICAL GAS OUTLETS (OXYGEN,
MEDICAL AIR, MEDICAL VACUUM).
REMOVE EXISTING MEDICAL GAS
PIPING BACK TO MAIN AND CAP.
REMOVE EXISTING HEADWALL AND
MEDICAL GAS OUTLETS (OXYGEN,
MEDICAL AIR, MEDICAL VACUUM).
REMOVE EXISTING MEDICAL GAS
PIPING BACK TO MAIN AND CAP.
MV
MA
O
MV
MA
O
EXISTING MEDICAL VACUUM,
MEDICAL AIR AND OXYGEN PIPING
TO MAINS TO REMAIN.
REMOVE EXISTING LAVATORY
ROUGH-IN. REMOVE DOMESTIC
HOT AND COLD WATER BACK TO
MAIN AND CAP. REMOVE SANITARY
INTO WALL AND CAP. VERTICAL
SANITARY/VENT WITHIN WALL MAY
REMAIN.
REMOVE EXISTING LAVATORY IN
ITS ENTIRETY. REMOVE DOMESTIC
HOT AND COLD WATER BACK TO
MAIN AND CAP. REMOVE SANITARY
INTO WALL AND CAP. VERTICAL
SANITARY/VENT WITHIN WALL MAY
REMAIN.
REMOVE EXISTING LAVATORY IN
ITS ENTIRETY. REMOVE DOMESTIC
HOT AND COLD WATER BACK TO
MAIN AND CAP. REMOVE SANITARY
INTO WALL AND CAP. VERTICAL
SANITARY/VENT WITHIN WALL MAY
REMAIN.
REMOVE EXISTING LAVATORY IN
ITS ENTIRETY. REMOVE DOMESTIC
HOT AND COLD WATER BACK TO
MAIN AND CAP. REMOVE SANITARY
INTO WALL AND CAP. VERTICAL
SANITARY/VENT WITHIN WALL MAY
REMAIN.
REMOVE EXISTING LAVATORY IN
ITS ENTIRETY. REMOVE DOMESTIC
HOT AND COLD WATER BACK TO
MAIN AND CAP. REMOVE SANITARY
INTO WALL AND CAP. VERTICAL
SANITARY/VENT WITHIN WALL MAY
REMAIN.
CAP EXISTING MEDICAL VACUUM,
MEDICAL AIR AND OXYGEN
PIPING.
REMOVE PORTION OF PIPING BACK
TO THIS LOCATION AND PREPARE
FOR NEW CONNECTION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:0
:0
P
M
PD121-B110
SECOND LEVEL PLAN - PLUMBING
DEMOLITION - 110
CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149
1/8" = 1'-0"
SECOND LEVEL PLAN - PLUMBING DEMOLITION - 110
N
O R HT
UNDER DEDUCT ALTERNATE 1, ALL WORK ON
THIS SHEET IS REMOVED FROM PROJECT SCOPE.
B
E
G
F
H
D
3 4 6 8 10 11 12 13 14 15 17 18165 972
FD
MB
WC
LAV
LAV
2"SAN
"S
A N
WC
LAV
4" SAN FROM
ABOVE
WC
LAV
4"SAN
WC
LAV
CONNECT TO EXISTING CAST-IRON 5"
SAN OUTSIDE BUILDING. REFER TO
CIVIL DRAWINGS FOR CONTINUATION.
SK
SK
SK
2"SAN
"S
A N
SK
2"SAN
SK
SK
SK/SK
2"SAN
4"SAN
45-SP1
EWC
2"SAN
SK SK
SK
SK
SK SK
2" V UP
6" W UP
"S
A N
FS
CONNECT VENT TO TOP OF
SANITARY LINE AND ROUTE AT
45° TO VERTICAL IN WALL ABOVE.
6" STORM DRAINAGE TO 5'
OUTSIDE BUILDING. REFER TO
CIVIL DRAWINGS FOR
CONTINUATION.
PROVIDE VALVE AND CHECK
VALVE IN VERTICAL OF 2"
PUMP DISCHARGE.
EW
4"SAN
FCO
FCO
FCO
SK
FCO
FCO
4"SAN
FCO
4"SAN
1/2" CW UP
2" V UP
6" W
COORDINATE LOCATION OF
POST INDICATOR VALVE WITH
CIVIL CONTRACTOR
2"SAN
0.00' (100.00')
FINISH FLOOR
4"SAN
1/2"CW
FROM TP-2
3"SAN
4"SAN
ROUTE THROUGH CENTRAL
MIDDLE THIRD OF FOOTING AT
THIS LOCAITON. COORDINATE
WITH STRUCTURAL ENGINEER
FOR SLEEVES REQUIREMENTS
ROUTE THROUGH CENTER MIDDLE THIRD
OF FOOTING AT THIS LOCAITON.
COORDINATE WITH STRUCTURAL
ENGINEER FOR SLEEVE REQUIREMENTS
I.E.= -7' - 6 1/2"
1/2"CW UP FROM TRAP PRIMER
"S
A N
4"SAN
FD
2" V UP
4"SAN
4"SAN
2"SAN
2"SAN
FCO
4" ST
6" ST
REFER TO 8/P301
FOR ADDITIONAL
INFORMATION.
I.E.= -2' - 0"
ROLL FITTING INTO TOP OF
DRAIN TILE MAIN OR CONNECT
DIRECTLY INTO THE TOP OF THE
EXTERIOR DRAIN TILE LINE.
4"DT
6" STORM DRAINAGE TO 5'
OUTSIDE BUILDING. REFER TO
CIVIL DRAWINGS FOR
CONTINUATION.
CRITICAL INVERT ELEVATION.
COORDINATE SLEEVE WITH
STRUCTURAL ENGINEER.
I.E.= -2' - 0"
I.E.= -2' - 6"
CRITICAL INVERT ELEVATION.
COORDINATE SLEEVE WITH
STRUCTURAL ENGINEER.
45-SP2
COORDINATE LOCATION OF
ELEVATOR BASINS WITH STRUCTURAL
AND ELEVATOR MANUFACTURER.
REFER TO 11/P301 FOR
ADDITIONAL INFORMATION
I.E.= -1' - 1"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:0
:3
P
M
P100-B45
UNDERFLOOR PLAN - PLUMBING CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149
N O R
HT
1/8" = 1'-0"
UNDERFLOOR PLAN - PLUMBING
B
E
G
F
H
D
3 4 6 8 10 11 12 13 14 15 17 18165 972
STAIR 1
S100-45
RECEPTION
101-45
CORRIDOR
C102-45
CORRIDOR
C100-45
CORRIDOR
C103-45
ORTHO SUPERVISOR OFFICE
126-45
STAIR 2
S102-45
STAFF TOILET
122-45
TELECOM
151-45
TEAM EVALUATION
120-45
TRASH
130E-45
ELECTRICAL
150-45
FITTING / EXAM SOFT GOODS
108-45
HAC
110-45
EQUIPMENT STORAGE
115-45
DYNAMIC ALIGNMENT
113-45
CAST
114-45
FACIAL/ BODY FITTING STUDIO
109-45
FITTING / EXAM SOFT GOODS
116-45
SOILED HOLDING
112-45
FITTING / EXAM SOFT GOODS
107-45
FITTING / EXAM CUSTOM FAB
117-45
FITTING / EXAM SOFT GOODS
106-45
FITTING / EXAM SOFT GOODS
105-45
FITTING / EXAM SOFT GOODS
104-45
FITTING / EXAM SOFT GOODS
103-45
PATIENT TOILET
102-45
PROSTHETICS LAB
130-45
MECHANICAL FIRE/H20
125-45 ELECTRICAL
124-45
PATIENT / PUBLIC TOILET
119-45
PATIENT / PUBLIC TOILET
118-45
LOBBY
100-45
OPEN OFFICE
123-45
STAFF TOILET
111-45
CAD/ CAM
130D-45
LAB RESTORATION
130A-45
PROSTHETICS/ ORTHOTICS FUME
130C-45
LAB DUST ROOM
130B-45
ELEVATOR
E-1-45
CORRIDOR
C101-45
P-408 P-528
P-408
FD-C
P-502
LAV
WC
P-528
P-103
P-408
P-103
P-103
1 1/2"V DN
P-408 P-408
2"V
2" V UP
2"SAN DN, 1 1/2"V
P-103
P-408
2"SAN DN,
1 1/2"V
P-528
P-507
P-103
P-528
P-528 P-414
P-528
2"V
2"V
2" V
3"CW
3/4"HWC
3/4"CW
3/4"HWC
1 1/2"HW
0.5
1 1/2"CW
PROVIDE
SECONDARY STORM
OUTLET.
PROVIDE SECONDARY STORM
OUTLET. PROVIDE BIRD SCREEN OR
INTEGRAL PERFORATED COVER ON
OUTLET. CONFIRM FINAL COLOR
SELECTION WITH ARCHITECT.
P-609
P-708 P-528
P-408
P-528
1 1/2"V
P-528 P-528
P-528
1 1/2"V
1 1/2"V
P-528 P-528
2"V UP
12.10' (100.00')
FINISH FLOOR
1 1/2"V
2"V
P111-B45
3" SAN DN
FD
2"V UP
3"SAN
FCO
3/4"CW
1 1/4"CW
6"STS
1 1/2"V
2 1/2"CW
4"STS
FS-S
2" SAN
2" SAN DN
P-801
P-801
P-801P-801
1 1/2"CW UP
3/4"HWC
1"HW UP
TP-2
FCO-1
FCO-1
FCO-1
1/2"CW DN
1/2"CW UP
2"SAN DN, 1 1/2"V
2"V
2"SAN DN, 1 1/2"V
2"SAN DN, 1 1/2"V
2"SAN DN, 1 1/2"V
2"SAN DN,
1 1/2"V
2"SAN DN, 1 1/2"V
WHA-1
2"V2
"V
4"SAN DN, 2"V
2"SAN DN, 1 1/2"V
WHA-1
2"SAN DN, 1 1/2"V
4"SAN DN, 2"V
2"V
2"SAN DN, 1 1/2"V 2"SAN DN, 1 1/2"V 2"SAN DN, 1 1/2"V
2"SAN DN, 1 1/2"V
2"SAN DN,
1 1/2"V
2"SAN DN,
1 1/2"V
2"SAN DN, 1 1/2"V
SK
CO
3"SAN DN
3/4"CW
PROVIDE FLOW SPLITTER VALVE
AT THIS LOCATION ON HW SIDE
FCO-1
2"HW
2"CW
1 1/2"HW
1 1/2"V
"V
1 1/4"CW
3/4"HW
2" PD DN
2" SAN DN,
1 1/2"V
2"SAN DN,
1 1/2"V
RD RD
RD
RD
3"CW
2"HW
2 1/2"CW
2"HW
1 1/2"CW
2 1/2"CW
2"CW
1 1/2"CW
2"CW
1 1/2"HW
2" SAN DN
1/2"CW DN
1/2"CW
2"V
3/4"HWC
2"HW
3"CW
2 1/2"CW
2"CW
1 1/2"CW
WHA-1
0.5
1 1/2"HW
1 1/2"HW
3/4"CW
1 1/2"HW
1 1/2"HW
3/4"CW
FCO-1
COORDINATE PIPE ROUTING AT THIS
LOCATION WITH ARCHITECTURAL
DRAWINGS. NO PIPING SHALL BE
ROUTED IN RATED WALL.
FD
1/2"CW UP
FROM TP-1
3"SAN
3/4"HWC
1 1/2"HW
FCO-1
WCO-1 WCO-1
4"ST
6"ST
1 1/2"HW
FD-C
2"V
2" V
1/2"CW DN TO
FLOOR SINK TRAP
/2 "V
2"V
1 1/2"V
PROVIDE FLOW SPLITTER VALVE
AT THIS LOCATION ON HW SIDE
WHA-1
B
MECHANICAL FIRE/H20
125-45
6" W UP AND DN
45-WH-1
"H
W
BACKFLOW PREVENTER DRAIN
REDUCED PRESSURE BACKFLOW
PREVENTER
45-PP1
/4
"H W
C
DISCHARGE DRAIN ONTO
SPLASH BLOCK AT GRADE
LEVEL.
REFER TO 6/P301 FOR
WATER HEATER
INSTALLATION DETAIL.
45-ET-1
PROVIDE HOUSEKEEPING
PAD UNDER EQUIPMENT
FD-E
TP-1
1P-801
6" SERVICE ENTRANCE IN THIS
CORNER OF ROOM 125. TAP IN
VERTICAL FOR CW, 6" W UP TO
FIRE PROTECTION BACKFLOW
PREVENTER. REFER TO FP101.
3" CW
2"CW
3"CW
VALVE IN VERTICAL
2"PD
VALVE IN VERTICAL
TERMINATE PUMP DISCHARGE
18" ABOVE THE GRADE ON
CONRETE SPLASHBLOCK
2" V
2"PD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:0
:3
P
M
P111-B45
FIRST LEVEL PLAN - PLUMBING CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149
N O R
HT
1/8" = 1'-0"
FIRST LEVEL PLAN - PLUMBING
KEYNOTES:
1. PROVIDE 4" DRAIN FROM BACKFLOW
PREVENTER DISCHARGE THROUGH BUILDING
WALL. DRAIN ON TO SPLASH BLOCK ON
GRADE. PROVIDE WIRE MESH TO PROTECT
FROM INSECT/ANIMAL INTRUSION.
2. MOUNT THERMOSTATIC MIXING VALVE,PART
OF FIXTURE P-708 (REFER TO SECTION 224000
ABOVE CEILING. ROUTE EYEWASH DRAIN INTO
WALL AND CONNECT TO SANITARY/VENT.
N O R
HT
1/2" = 1'-0"
ENLARGED PLAN OF MECHANICAL FIRE/H20
B
E
G
F
H
D
3 4 6 8 10 11 12 13 14 15 17 18165 972
OPEN OFFICE
201-45
CONFERENCE
202-45
STAIR 1
S200-45
LOCKERS
203A-45
STAFF LOUNGE
203-45CHIEF OFFICE
204-45
ASSIST CHIEF OFFICE
205-45
PROSTHETICS REP OFFICE
206-45
COPY/ WORK/MAILING
207-45
ELECTRICAL
227-45
STAFF TOILET
208-45
CORRIDOR
C200-45
DME ACTIVE STORAGE
226-45
ELEVATOR EQUIP
222-45
MECHANICAL
220-45
TELECOM
221-45
WHEELCHAIR PARTS STORAGE
225-45
STAIR 2
S202-45
PROSTHETICS/ ORTHOTICS
MAINTENANCE
228-45
SHOE MODIFICATION STORAGE
224-45
PARTS STORAGE
223-45
CORRIDOR
C200-45
P-528
2" SAN DN
1 1/2" V UP
2" V UP TO
4" VTR
P-408
P-103
3"V UP, 4"VTR
1"HW DN
1 1/2"CW DN
3/4" HW & CW
1 1/4" CW DN
TO P-103
2" V UP
3/4" HWC DN
0.5
FD-C
FCO-1
TP-1
1/2" CW DN
4"SAN DN, 2"V
2"SAN DN,
1 1/2"V
2" V DN
FD-C
TP-1
SHUTOFF VALVE IN
VERTICAL. 1/2" CW DN TO
FLOOR DRAIN TRAP
1 1/2"CW
3/4"HW
1"HW
1"CW
1"HW
3/4"HW
6/3668
RD-1
6/3668
RD-2
4/2457
RD-1
4/2457
RD-2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:0
:4
P
M
P121-B45
SECOND LEVEL PLAN - PLUMBING CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149
N O R
HT
1/8" = 1'-0"
SECOND LEVEL PLAN - PLUMBING
ET WORKSHOP
B246-110
TECH OFFICE
B247-110
TECH OFFICE
B245-110
BIOMED PARTS
B243-110HAC
B244-110
BIOMED
B242-110
CORRIDOR
C2B-5-110
CORRIDOR
C2B-1-110
WORKSTATION
B227-110
TOILET
B216-110
BREAK
B227A-110
OFFICE
B229-110
FILES
B227B-110
CORRIDOR
C2B-4-110
TELECOM
B214-110
COPY
B226-110
OFFICE
B228-110
OFFICE
B230-110
STORAGE
B230A-110
OFFICE
B232-110
OFFICE
B234-110
OFFICE
B236-110
CONFERENCE
B238-110
WORKSTATION
B239-110
WORKSTATION
B235-110
WORKSTATION
B231-110
STAIR
S2B-5-110
ELEC
B212-110
STAIR-2
S2B-2-110
WOMEN'S TOILET
B219
BIO ENGINEERING
B220
ELEVATOR 10
E2B-10
CHASE
B209A
STORAGE
B209
Room
E2B-11
EXISTING MEDICAL
VACUUM, MEDICAL
AIR AND OXYGEN
PIPING TO MAINS TO
REMAIN.
EXISTING MEDICAL
GAS OUTLETS TO
REMAIN.
MV
MA
O
MV
MA
O
PROVIDE NEW
OXYGEN MEDICAL
GAS OUTLET.
3/4"O1/2"O
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:0
:4
P
M
P121-B110
SECOND LEVEL PLAN - PLUMBING
- 110
CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149
1/8" = 1'-0"
SECOND LEVEL PLAN - PLUMBING - 110
N
O R HT
UNDER DEDUCT ALTERNATE 1, ALL WORK ON
THIS SHEET IS REMOVED FROM PROJECT SCOPE.
B
E
G
F
H
D
3 4 6 8 10 11 12 13 14 15 17 18165 972
4" VTR
4"VTR
4" VTR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:0
:4
P
M
P131-B45
ROOF PLAN - PLUMBING CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149
N O R
HT
1/8" = 1'-0"
ROOF PLAN - PLUMBING
BACKFLOW PREVENTER PIPING DETAIL
NTS
[3 m m
WALL LINE
REDUCED PRESSURE
PRINCIPLE BACKFLOW
PREVENTER WITH GATE
VALVES
PLAN
AIR GAP
FITTINGWATER LINE
FROM METER
PIPE TO DRAIN
(TYPICAL)
FINISHED FLOOR
COLD WATER TO
SYSTEM
PIPE SUPPORT
ELEVATION
[3 m m
T O
B O
T T
O M
O F
R E
L
IE
F O
P E
N
IN
G S
TYPE "C" FLOOR DRAIN DETAIL
NTS
NICKLE BRONZE
ADJUSTABLE STRAINER
(FLUSH WITH FINISHED
FLOOR)
CEMENT BED
TILE FLOOR
CONCRETE FILL
STRUCTURAL SLAB
FLASHING
CLAMP WITH
WEEP HOLES
THREADED, CAULKED OR
NO-HUB CONNECTION
WATERPROOF
MEMBRANE
PROVIDE A METAL SUPPORT
PLATE WHEN DRAIN IS INSTALLED
IN AN EXISTING FLOOR - CAULK
AROUND DRAIN PRIOR TO
RE-GROUTING
CLAMP WATERPROOF
MEMBRANE INSIDE OF DRAIN
BODY TO DRAIN TO WEEP
HOLES
NOTE:
SLOPE MEMBRANE LINER 2% TO DRAIN.
LOOSE GRAVEL AT
WEEP HOLES
3mm to 6mm SIZE
P-103 WATER CLOSET DETAIL
NTS
FINISHED FLOOR
FINISHED WALL
3/4" [19mm]
CONDUIT
TWO GANG
ELECTRICAL BOX
W/STAINLESS STEEL
COVER PLATE
LOCATION
OF PUSH
BUTTON
SPLIT GRAB BAR
SEE ARCH. DWGS
C WATER CLOSET
PLAN
ELEVATION
L
[250mm]
[450mm]
F O
R F
IX
T
U R
E H
E
IG
H T
S E
E A
R C
H
IT
E C
T U
R A
L D
R A
W
IN
G S
TYPICAL WHEELCHAIR LAVATORY DETAIL
NTS
FAUCET SEE
SPECIFICATIONS
LAMINAR FLOW
CONTROL DEVICE
OFFSET
WASTE
TRAP
PARALLEL
TO WALL
LOOSE KEY
STOP
ESCUTCHEON
FINISHED
FLOOR
[8 m m
[200mm]
[2 m m
F O
R F
IX
T
U R
E H
E
IG
H T
S S
E E
A R
C H
IT
E
C T
U R
A L D
R A
W
IN
G S
PROVIDE COVER FOR EXPOSED PIPING
NOTE:
LAVATORY MOUNTING DETAIL
NTS
MINIMUM 16 GAGE GALVANIZED STEEL
PLATE 12"x48" [300x1200mm] MIN.
SECURED TO A MIN. 4 STUDS PER
LAVATORY
1/4" [6mm]∅ MOLLY BOLT HOLLOW WALL
ANCHOR (1 EA. SIDE OF LAV)
MIN. (3) 1/4" [6mm]
MACHINE BOLTS
W/DOUBLE LOCK NUTS
ON BACK SIDE
MIN. 5 1/4" [131mm]∅
GALV. MACHINE BOLTS
WELDED TO PLATE
1/4" [6mm]
TYP. 1/8"
TYP. [3mm]
A A
PLAN
SECTION A
NOTE:
1.
2.
AT LAVS WITH FOOT PEDAL CONTROLS PROVIDE
AN ADDITIONAL 16 GAGE GALVANIZED STEEL
PLATE 12"x16" [300x600mm] SECURED TO A
MINIMUM OF 2 STUDS PER FOOT PEDAL.
PROVIDE 20 GAGE STUDS WHEN HEIGHT
EXCEEDS 12'-0" [3600mm]
STEEL HANGER BY LAV MFGR
STEEL WALL PLATE
WALL ANCHOR
STUDS
FOR FIXTURE
HEIGHT SEE
ARCHITECTURAL
DRAWINGS
SEE FP DRAWINGS
FOR CONTINUATION
BY F.P.C.
BY P.C.
PROVIDE INSULATION ON
PIPING
M
IN
10"
18"
8"
/4
V A
R
IE
S
[9 m m
T
O F
L O
O R
CW
C W
H W
VACUUM RELIEF VALVE.
WATTS N36 OR EQUAL.
EXPANSION
TANK 45-ET-1
CIRCULATING
PUMP 45-PP1
UNION (TYP.)
DRAIN
A.S.M.E. PRESSURE AND
TEMPERATURE RELIEF VALVE
THERMOMETER IN WELL (0-200˚F)
PIPE DIRECTLY OVER
FLOOR DRAIN
HOUSEKEEPING
PAD
HWC
BYPASS FOR HOT WATER CIRC.
45-WH-1
NORMALLY CLOSED
CLAMPING RING
WATER CUTOFF MASTIC
ADJUSTABLE EXTENSION
ROOF DECK
ROOF INSULATION
DOME STRAINER
BEARING PAN
UNDERDECK CLAMP
OUTLET SIZE AS
SHOWN ON DRAWINGS
PRIMARY ROOF DRAINSECONDARY ROOF DRAIN
INTERNAL
WATER DAM ROOF MEMBRANE
BASIN WITH
PERFORATED
COVER PLATE
ON/OFF INTEGRAL OR
PIGGY BACK FLOAT SWITCH
DISCHARGE PIPE.
SHUTOFF VALVE
CHECK VALVE.
UNION
BACKFILL AROUND BASIN
WITH 6" OF CONCRETE.
SUMP PUMP
FLANGED COUPLING
OR UNION.
ANCHOR FLANGE
12" DEEP CONCRETE
ALARM WHEN WATER
LEVEL IS 3" BELOW INVERT
OF LOWEST INLET.
CONTROL PANEL WITH HIGH
WATER AND OIL PRESENT ALARMS.
OIL SENSOR
NOTES:
1. INSTALL CONTROL PANEL PER MANUFACTURER INSTRUCTIONS. COMPONENTS
AND WIRING ARRANGEMENT MAY DIFFER FROM THAT SHOWN.
2. SUMP PUMPS THAT DISCHARGE TO STORM SHALL BE INSTALLED WITH THE TOP OF
THE SUMP BASIN 2" ABOVE FLOOR LEVEL A 2" HIGH X4" WIDE CONCRETE CURB
AROUND THE PERIMETER OF THE BASIN LID MAY BE USED IN LIEU OF RAISING THE
ENTIRE SUMP BASIN.
CLEANOUT
CONNECT TO TOP OF
HORIZONTAL GRAVITY PIPE
FLOOR
NONCORROSIVE, HEAVY DUTY SLEEVE (E.G.
CAST IRON, CONCRETE PIPE). PROVIDE A
MINIMUM OF 2" CLEAR FROM TOP OF
CARRIER PIPE TO INSIDE OF SLEEVE.
CARRIER PIPE. NO JOINTS
INSIDE SLEEVE.
ENCASE SLEEVE WITH CONCRETE
A MINIMUM OF 9" ALL AROUND. IF
TOP OF SLEEVE IS WITHIN 18" OF
BOTTOM OF FOOTING CONCRETE
SHALL EXTEND TO UNDERSIDE OF
FOOTING.
[NTS:
NTS: COORDINATE THIS NOTE (#1) WITH STRUCTURAL ENGINEER PRIOR TO ADDING TO
DRAWINGS. THE GENERAL CONTRACTOR WON'T SEE THIS DRAWING AND WON'T VOLUNTARILY
STEP THE FOOTING WITHOUT CLARIFICATION FROM STRUCTURAL ENGINEER. THIS DETAIL IS NOT INTENDED AS A GENERIC-SHOW-ON-EVERY-PROJECT DETAIL. ROUTING PIPE BENEATH A BUILDING
FOOTING OR FOUNDATION WALL SHOULD ONLY BE DONE AS A LAST RESORT WHEN ALL OTHER
OPTIONS ARE IMPOSSIBLE OR FINANCIALLY NOT FEASABLE.]
NOTES:
1. STEP FOOTING DOWN AS REQUIRED TO MAINTAIN 8" MINIMUM
DIMENSION.
6" MIN.
9" MIN.
6" (TYP.)
2" MIN
8" MIN
(NOTE 1)
9" MIN. NO SLEEVES PERMITTED.
GRADE
2" MIN
[NTS: ONLY USE THIS PORTION OF
THE DETAIL AS A LAST RESORT
WHEN ALL OTHER OPTIONS ARE
IMPOSSIBLE OR FINANCIALLY NOT
FEASABLE.]. ERASE HATCHING IF
YOU PLAN TO USE IT.
(ERASE THIS ONLY AFTER READING NOTES TO SPECIFIER)
THREADED ROD. (TYP.)
OVERSIZE HANGER TO ALLOW
LONGITUDINAL PIPE EXPANSION
AND PIPE INSULATION TO PASS
THROUGH UNBROKEN. (TYP.)
UNI-STRUT OR EQUIVALENT
HIGH DENSITY INSULATION INSERT
OR, FOR APPLICATIONS PERMITTED
IN SPEC SECTION (SECTION 22 05 11-
PLUMBING), STEEL SADDLE FILLED
WITH INSULATION. (TYP.)
THREADED ROD. (TYP.)
PIPE INSULATION (TYP.)
INSULATION SHIELD (TYP.)
INSULATION SHIELD
INSTALL CLAMP ON ALL
PIPES LESS THAN 4"Ø
THREADED ROD
INSULATION
CLEVIS HANGER
HIGH DENSITY INSULATION INSERT
OR, FOR APPLICATIONS PERMITTED
IN SPEC SECTION (SECTION 22 05 11-
PLUMBING), STEEL SADDLE FILLED
WITH INSULATION.
NOTES:
1. REFER TO SPECIFICATION SECTIONS SECTION 22 05 11 - PLUMBING.
BASIN WITH SOLID
COVER PLATE
REFER TO DRAWINGS
FOR NUMBER AND
LOCATION OF INLET.
ON/OFF INTEGRAL OR
PIGGY BACK FLOAT SWITCH
DISCHARGE PIPE.
SHUTOFF VALVE
CHECK VALVE.
UNION
BACKFILL AROUND BASIN
WITH 6" OF CONCRETE.
SUMP PUMP
FLANGED COUPLING
OR UNION.
ANCHOR FLANGE
12" DEEP CONCRETE
ALARM WHEN WATER
LEVEL IS 3" BELOW INVERT
OF LOWEST INLET.
CONTROL PANEL WITH
HIGH WATER ALARMS.
NOTES:
1. INSTALL CONTROL PANEL PER MANUFACTURER INSTRUCTIONS.
COMPONENTS AND WIRING ARRANGEMENT MAY DIFFER FROM THAT
SHOWN.
ROUTE TO THE EXTERIOR OF
THE BUILDING AND TERMINATE
MANUFACTURER
RECOMMENDED BACKFILL
AROUND THE BASIN.
FINISH FLOOR
I.E. = SEE PLAN.
SMOOTH AND LEVEL
PAD SURFACE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:0
:4
P
M
P301
PLUMBING DETAILS CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149
NO SCALE
WATER HEATER DETAIL
NO SCALE
ROOF DRAIN DETAIL
NO SCALE
SUMP PUMP DETAIL
(OIL SENSOR - CONTROL PANEL)
NO SCALE
PIPE FOUNDATION AND SLEEVE DETAIL
NO SCALE
PIPE SUPPORT DETAIL
Revisions: Date:
NO SCALE
DRAIN TILE SUMP PUMP DETAIL
P-408
P-103
P-528
P-528
P-408
P-408
P-103
P-103
P-609
P-708
P-408
P-103
P-414
P-528
P-103
P-408
P-528
P-528
P-528
P-528
P-528
P-528
P-528 P-408
P-528
P-528
P-408
P-408
P-103
P-502
P-528
P-507
P-528
TO 4" VTR
2"SAN
4"SAN
2"V
1 1/2"V
2"V
2"V
FD-C
FCO-1
2"V
4"SAN
45-SP1
4"SAN
1 1/2"V
2"SAN
2"V
4"SAN
2"SAN
2"V
1 1/2"V
4"SAN
4"SAN
4"SAN
2"SAN FS-S
1 1/2"V
1 1/2"V
2"V
2"SAN
4"SAN
2"SAN
1 1/2"V
4" VTR
4"SAN
2"SAN
1 1/2"V
2"SAN
1 1/2"V
3"V
4"SAN
3"V
4"SAN
2"SAN
1 1/2"V
4"SAN
2"V
2"SAN
1 1/2"V
2"SAN
2"V
2"SAN
2"SAN
2"V
2"SAN
1 1/2"V
2"V
2"SAN
1 1/2"V
2"SAN
2"SAN
1 1/2"V
2"SAN
1 1/2"V
2"SAN
4"SAN
FD-C
2"V
2"V
1 1/2"V
2"SAN
1 1/2"V
3" VTR
2"V
2"SAN
1 1/2"V
2"SAN
1 1/2"V
FCO-1
FCO-1
FCO-1
4"SAN
2"V
2"V
REFER TO CIVIL
DRAWINGS FOR
CONTINUATION
2"SAN
6/3668
RD-2
6/3668
RD-1
2"SAN
1 1/2"V
4"SAN
2"V
4/2457
RD-1
4/2457
RD-2
2"V
4"SAN
2"V
4"SAN
4"SAN
2"V
FCO-1
2"PD
TERMINATE PUMP DISCHARGE
18" ABOVE THE GRADE ON
CONCRETE SPLASHBLOCK
FD-E
1 1/2"V
CO
6"STS (3,668)
4"STS (2,457)
4"SAN
2"V
FD-C
4"ST (2,457)
WCO-1
FD-C
2"V
2"V
WCO-1
6"ST (3,668)
2"SAN
FCO-1
4"SAN
45-SP2
2"PD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:0
:5
P
M
P401
PLUMBING DIAGRAMS CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149
NO SCALE
PLUMBING RISER SANITARY/VENT
GENERAL NOTES:
1. RISER DIAGRAM SHOWN FOR REFERENCE
PURPOSES ONLY. REFER TO DRAWINGS FOR
ADDITIONAL INFORMATION.
P-408
P-103
P-528
P-528
P-408
P-408
P-103
P-103
P-609
P-708
P-408
P-103
P-414
P-528
P-103
P-408
P-528
P-528
P-528
P-528
P-528
P-528
P-528
P-408
P-528
P-528
P-408
P-408
P-103
P-502
P-528
P-507
P-528
1 1/2"HW
1 1/2"CW
3/4"CW
3/4"HW
1 1/2"CW
3/4"HW
1 1/4"CW
3"CW
2"CW
2"HW
3"CW
6"CW
3"CW
1 1/2"CW
P-801
P-801
P-801
P-801
P-801
45-WH-1
3/4"HWC
BFP-1
45-PP1
3/4"HW
3/4"HW
1"HW
1"CW
1 1/2"HW
BALANCING ASSEMBLY.
REFER TO DRAWINGS FOR
BALANCING INFORMATION.
PROVIDE 45-ET-1
AT THIS LOCATION
1"HW
45-ET-1
TP-1
BALANCING ASSEMBLY.
REFER TO DRAWINGS FOR
BALANCING INFORMATION.
BALANCING ASSEMBLY.
REFER TO DRAWINGS FOR
BALANCING INFORMATION.
2"HW
3/4"HWC
WHA-1
2"HW
2 1/2"CW
WHA-1
1 1/2"CW
3/4"HW
1"HW
TP-2
1 1/2"CW
3/4"HWC
2 1/2"CW
2"CW
2"HW
3/4"HWC
1 1/2"CW
1 1/2"HW
3/4"HW
2"CW
1 1/2"CW
2"CW
WHA-1
3/4"CW
1 1/4"CW
1 1/2"HW
1 1/2"HW
3/4"CW
3/4"CW
3/4"CW
TP-1
1 1/2"CW
1 1/2"HW
1"HW
1 1/2"CW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:0
:5
P
M
P402
PLUMBING DIAGRAMS CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149
NO SCALE
PLUMBING RISER DOMESTIC
GENERAL NOTES:
1. RISER DIAGRAM SHOWN FOR REFERENCE
PURPOSES ONLY. REFER TO DRAWINGS FOR
ADDITIONAL INFORMATION.
BY F.P.C.
BY P.C.
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
REVIEW
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C R e v it L o c a l F ile s \M
P
.0
V A
H a m p to n
P ro s th e ti c s C
A a ro n .C
.M e y e r.
rv t
/3
/2
:0
:5
P
M
P501
PLUMBING SCHEDULES CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
45 & 110
09/02/2022 IMEG RUSARN16149
45-SP2 ELEV E-1-45 DRAIN TILE SUMP SUMP PUMP CENT WATER 20 [ 1 ] 27 [ 430 ] 1 NA 70 [ 21 ] 1 0.50 [0.4] 1 120 1750 CONSTANT
45-SP1 ELEV E-1-45 ELEVATOR SUMP SUMP PUMP CENT WATER 50 [ 3 ] 27 [ 430 ] 1 NA 70 [ 21 ] 1 0.50 [0.4] 1 120 1750 CONSTANT
45-PP1 MECH 125-45 BLDG 45 HOT WATER RECIR CENT DOMESTIC WATER 2 [ ] 10 [ 160 ] 0 NA 140 [ 60 ] 1 0.166666667 [ ] 1 120 1750 CONSTANT ----
GPM [L/s] FT [kPa] FT [kPa] °F [°C] HP [kW]
FLUID
FLOW HEAD NPSH AVAILABLE TEMPERATURE
SP. GR.
MIN. %
EFF
NOMINAL POWER
PHASE VOLT MAX RPM
SPEED
CONTROL
REMARKS
MARK LOCATION
AREA AND/OR
BLDG SERVED
SYSTEM AND/OR
SERVICE
TYPE
CIRCULATING FLUID ELECTRICAL MOTOR
PLUMBING PUMP SCHEDULE
45-WH-1 MECH 125-45 BLDG 45 DOMESTIC HOT WATER ELECTRIC 80 [ 300 ] 176 [ 670 ] 39 50 [ 350 ] 6 30 5 3 208 -----
GAL [L] GAL/HR [L/HR] PSIG [kPa] TOTAL kW kW PER
ELEMENT
PHASE VOLT
MARK LOCATION
AREA AND/OR BLDG
SERVED
SYSTEM AND/OR
SERVICE
TYPE
STORAGE CAPACITY
RECOVERY @ 70 °F [21°C]
RISE
TIME TO
RECOVER
CONTENTS,
MINUTES
RELIEF VALVE SETTING
NO OF
ELEMENTS
ELECTRICAL INPUT
REMARKS
ELECTRIC WATER HEATER SCHEDULE
45-ET-1 BLDG 45
POTABLE THERMAL
EXPANSION TANK
40 [ 4 ] 140 [ 60 ] 30 [ 210 ] 125 [ 860 ] 50 [ 350 ] 3 [ 11 ] 5 [ 19 ] 0.75 [ 19 ] -----
°F [°C] °F [°C] PSIG [kPa] PSIG [kPa] PSIG [kPa] GAL [L] GAL [L] IN [mm]
MIN MAXMARK LOCATION TYPE
SYSTEM TEMPERATURE RANGE
INITIAL PRESSURE IN TANK MAX OPERATING PRESSURE RELIEF VALVE PSIG [kPA] MIN TANK VOLUME MIN ACCEPT VOLUME PIPE SIZE TO TANK
REMARKS
DOMESTIC WATER THERMAL EXPANSION TANK SCHEDULE
FD-S FLOOR SINK 3 [ 75 ] 1.5 [ 38 ] N/A N/A N/A N/A NO
FD-E FLOOR DRAIN 4 [ 100 ] 2 [ 50 ] N/A N/A N/A N/A NO
FD-C FLOOR DRAIN 3 [ 75 ] 1.5 [ 38 ] N/A N/A N/A N/A NO
P-801 WALL HYDRANT N/A N/A .75 [ 19 ] N/A N/A 5 N/A NO
P-710 SWING-DOWN EYE WASH N/A N/A .75 [ 19 ] .75 [ 19 ] NA 3 N/A NO MOUNTED ON P-414 AND P-528 FIXTURES, REFER TO THOSE FIXTURES FOR WASTE
FIXTURE UNITS.
P-708
WALL MOUNTED EYE/FACE
WASH
2 [ 50 ] 1.5 [ 38 ] .75 [ 19 ] .75 [ 19 ] 2 3 N/A NO
P-609 ELECTRIC WATER COOLER 2 [ 50 ] 1.5 [ 38 ] .5 [ 13 ] N/A 1 1 N/A NO
P-528 SINK COUNTER MOUNTED 2 [ 50 ] 2 [ 50 ] .75 [ 19 ] .75 [ 19 ] 2 4 N/A NO PROVIDE MIXING VALVE RATED FOR 0.5 GPM AT 5 PSI OF PRESSURE DROP
P-507 PLASTER SINK 2 [ 50 ] 1.5 [ 38 ] .5 [ 13 ] .5 [ 13 ] 1 1 N/A NO PROVIDE MIXING VALVE RATED FOR 0.5 GPM AT 5 PSI OF PRESSURE DROP
P-502 SINK SERVICE 3 [ 75 ] 2 [ 50 ] .75 [ 19 ] .75 [ 19 ] 2 3 N/A NO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .