Bid Documents Part 4.pdf

PDF 20 MB Posted

Attached to
Y1DA--590-210 Construct Prosthetics Facility (VA-23-00044335) Federal contract opportunity
Solicitation number
36C77623R0166_1
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This file provides details on a federal solicitation to construct a prosthetics facility for the Department of Veterans Affairs. Solicitation number 36C77623R0166_1 seeks to award a contract to build a prosthetics facility, with the opportunity name listed as "Y1DA--590-210 Construct Prosthetics Facility (VA-23-00044335)." The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas. The file contains bid documents for offerors to review in preparation of submitting responses for the contract to construct the prosthetics facility by the specified due date. Key information on required services, response timing, and the awarding agency are included for offerors.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--590-210 Construct Prosthetics Facility (VA-23-00044335), newest first.
File Type Posted
Amendment 0008 Attachment 1 - Hampton VA RFIs All.docx DOCX document
36C77623R0166 0008.docx DOCX document
Amendment 0008 Attachment 3 - 081113 Hollow Metal Doors and Frames.pdf PDF
Amendment 0008 Attachment 2 - 329000.pdf PDF
36C77623R0166 0007.docx DOCX document
36C77623R0166 0006.docx DOCX document
Amendment 0006 Attachment 1 - Hampton VA RFIs 1-97.docx DOCX document
Amendment 0006 Attachment 2 - 117300 ceiling mounted patient lift system.pdf PDF
Amendment 0006 Attachment 3 - 087113-11 LE Power Assist Door Operators.pdf PDF
Amendment 0006 Attachment 4 - 019100 General Commissioning Rev 1.pdf PDF
Amendment 0006 Attachment 5 - 000110 TOC Rev 1.pdf PDF
36C77623R0166 0005.docx DOCX document
36C77623R0166 0004.docx DOCX document
S06 - 36C77623R0166 0003.docx DOCX document
36C77623R0166 0002.docx DOCX document
wage rates.pdf PDF
36C77623R0166-0001.docx DOCX document
S04 - Site Visit Sign-in Sheet Completed.pdf PDF
36C77623R0166 0001.docx DOCX document
Construction Documents Section 1.pdf PDF
Bid Documents Part 6.pdf PDF
Wage Determination.pdf PDF
Construction Documents Section 3.pdf PDF
Construction Document Section 5.pdf PDF
Bid Documents Part 1.pdf PDF
Bid Documents Part 7.pdf PDF
SPEC VOL I - A.pdf PDF
S02 - RFP - 36C77623R0166_1.docx DOCX document
Construction Documents Section 2.pdf PDF
Bid Documents Part 2.pdf PDF
Hampton VAMC Site Plan.pdf PDF
Site Visit Instructions.docx DOCX document
Construction Document Section 4.pdf PDF
Bid Documents Part 5.pdf PDF
Bid Documents Part 3.pdf PDF
SPEC VOL I - B.pdf PDF
SPEC VOL II -.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs

\P u b lic \D o c u m e n ts \R e v it P ro je c ts

\1

-R g b a rb a ri a e -m n .c o m

.r v t

/8

/2

:1

:1

A

M

AD521-B50

DEMOLITION - EXISTING

CONDITIONS - PHOTOGRAPHS

CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

09/02/2022 LA GJB/JT16149

1 1/2" = 1'-0"6 PHOTO 20

1 1/2" = 1'-0"3 PHOTO 17

1 1/2" = 1'-0"2 PHOTO 16

1 1/2" = 1'-0"4 PHOTO 18

1 1/2" = 1'-0"5 PHOTO 19

1 1/2" = 1'-0"1 PHOTO 15

1 1/2" = 1'-0"7 PHOTO 21

Revisions: Date: 09/12/2022

I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.

Name: Steve Schlotthauer

Signature:_________________

Date:__________ License# 42138

LI

M

IT

S

O F

CO

NS

TR

UC

TI

O

N

LI

M

IT

S

O F

CO

NS

TR

UC

TI

O

N

LIMITS OF CONSTRUCTION

DE1 DE5

DE1 DE5

DE1 DE5

DE1 DE5

DE1 DE5

DE1 DE5

DE1 DE5

DE1 DE5

DE1 DE5

DE1 DE5

DE1 DE5

DE1 DE5

DE1 DE5

DE1 DE5

DE1 DE5

DE1 DE5

DE1 DE5

DE1 DE5

DE1

DE1

DE2

DE6

DE1

DE1

DE1

EXISTING EXPANSION JOINT TO REMAIN

DE1

DE2

DE6

DE6

DE14

DE3

DE4

DE4

DE13

DE6

DE6

DE14

DE14

DE14 DE2

DE6

DE14

DE14

DE14

DE14

DE14

DE14

DE14

DE14

DE14

DE14

DE2

DE6

DE2

DE6

DE2

DE6

DE2

DE6

DE6

DE6

DE12

DE12

DE12

DE12

DE12

DE12

DE12

DE12

DE12

DE12

DE12

DE12

DE12

DE12

LIMITS OF CONSTRUCTION

DE13

DE13

DE13

DE13

DE13

DE13

DE13

DE13

DE13

DE13

DE13

DE13 DE13

DE13

DE13 DE13

DE13

DE13 DE14 DE13

DE13

DE13

DE13

DE13

DE13

DE15

DE15

DE15

DE15

DE15

DE15

DE15

DE15

DE15

DE15

DE15

DE15

DE15

DE15

DE15

DE15

DE15

DE12

DE11

DE15

DE12

DE12

DE26

DE26

DE26

NOTE: COORDINATE GENERAL DEMOLITION WORK

WITH ABATEMENT AND REMEDIATION WORK

DE27

DEMOLITION GENERAL NOTES

1. GENERAL CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK, PHASING

AND SEQUENCING WITH THE OWNER. ANY INFORMATION REGARDING SEQUENCING

PROVIDED IN THESE DOCUMENTS IS FOR ARCHITECT - OWNER PLANNING

PURPOSES ONLY, UNLESS NOTED OTHERWISE.

2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH ALL

TRADES FOR THE DEMOLITION WORK REQUIRED FOR THIS PROJECT.

3. WHERE PARTITIONS ARE INDICATED TO BE REMOVED, REMOVE PARTITION ALONG

WITH ALL ITEMS CONTAINED WITHIN, INCLUDING DOORS, FRAMES, HARDWARE,

SIDELIGHTS, WINDOWS, MECHANICAL AND ELECTRICAL EQUIPMENT, ETC. TO

STRUCTURE ABOVE, UNLESS NOTED OTHERWISE.

4. WHERE CEILING IS INDICATED TO BE DEMOLISHED, REMOVE CEILING SUSPENSION

SYSTEM ALONG WITH ALL ASSOCIATED MECHANICAL AND ELECTRICAL ITEMS,

UNLESS NOTED OTHERWISE. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR

EXTENT OF CONDUIT, PIPING AND DUCTWORK DEMOLITION WITHIN AREA TO BE

REMODELED.

5. WHERE INDICATED, REMOVE ALL WALL/PARTITION EXISTING FINISHES AND

PREPARE THE SURFACES FOR SCHEDULED FINISHES, SEE FINISH SCHEDULE FOR

FINISHES.

6. ALL DISTURBED AREAS, WALLS, PARTITIONS, FLOORS, ETC, DAMAGED BY

DEMOLITION WORK SHALL BE PATCHED TO MATCH ADJACENT AREA.

7. OWNER RESERVES THE RIGHT OF FIRST REFUSAL OF ALL SALVAGED ITEMS SUCH

AS: DOORS, LIGHT FIXTURES, PLUMBING FIXTURES ETC.

8. SALVAGED ITEMS SCHEDULED FOR REUSE SHALL BE CLEANED, RESTORED AND/OR

REFINISHED TO LIKE NEW CONDITION, UNLESS NOTED OTHERWISE.

9. DO NOT REMOVE ANY EXISTING STRUCTURAL SUPPORT MEMBERS SUCH AS

COLUMNS, BEAMS, JOISTS, LOAD-BEARING PARTITIONS ETC, UNTIL ADEQUATE

PERMANENT OR TEMPORARY SUPPORT IS IN PLACE. ALL EXISTING STRUCTURAL

MEMBERS SHALL BE ADEQUATELY PROTECTED, COORDINATE WITH STRUCTURAL

ENGINEER.

10. SEE HAZARDOUS MATERIALS, STRUCTURAL, MECHANICAL AND ELECTRICAL

DRAWINGS FOR RELATED DEMOLITION AND PREP WORK.

11. WALL AND CEILING MOUNTED ITEMS SHOWN DASHED, SUCH AS WALL CABINETS,

SHELVING, CUBICLE CURTAIN TRACKS, PROJECTION SCREENS ETC, SHALL BE

REMOVED, UNLESS NOTED OTHERWISE.

DEMOLITION PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL OR

PARTITION TO BE

REMOVED

EXISTING DOOR

AND FRAME TO

REMAIN

KEY NOTE

A

GRIDLINE

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

EXISTING DOOR

AND FRAME TO BE

DEMOLISHED

DASHED LINE

INDICATES ITEM TO

BE REMOVED (UNO)

DE10

B246

OFFICE

B247

STORAGE

B245

3D PRINT

B243

STORAGE

S2B-2

STAIR- 2

B244

HAC

C2B-5

CORRIDOR

B242

EQUIP

STORAGE

C2B-1

CORRIDOR

B227

LOBBY

B216

STAFF

TOILET

B251

HALLWAY

B227a

BREAK

B226

RECEPTIONIST

B228

OFFICE

B230

EXAM

B229

OFFICE

B231

OFFICE

B235

ORTHOTICS

LAB

B239

ORTHOTICS

LAB

B238

OFFICE

S2B-5

STAIR 5

B236

OFFICE

B234

CAST

B232

EXAM

B230a

STORAGEC2B-4

CORRIDOR

B212

ELECTRICAL

CLOSET

B214

TELECOM

E2B-10

ELEVATOR

10B219

WOMEN'S

TOILET

B22

STORAGEB223

OFFICE

B225

STORAGE

C2B-10

CORRIDOR

B224

SHARTED

OFFICE

B220

BIO

ENGINEERING

E2B-11 Room

B209A

CHASE B209

STORAGE

DEMOLITION PLAN KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

DE1 REMOVE CEILING AND ALL CEILING MOUNTED EQUIPMENT AND

ACCESSORIES, IN ITS ENTIRETY, INCLUDING ALL MECHANICAL AND

ELECTRICAL. SEE MECHANICAL AND ELECTRICAL FOR ADDITIONAL

INFORMATION

DE2 REMOVE PLUMBING FIXTURES AND ACCESSORIES. SEE MECHANICAL AND

FLOOR PLAN FOR ADDITIONAL INFORMATION

DE3 REMOVE GYP BD ONE SIDE OF PARTITION AS REQUIRED FOR MECHANICAL

/ ELECTRICAL. - SEE MECHANICAL / ELECTRICAL PLANS FOR ADDITIONAL

INFORMATION.

DE4 REMOVE HOLLOW METAL WINDOW SYSTEM IN ITS ENTIRETY.

DE5 REMOVE VCT OR LVT FLOORING IN ITS ENTIRETY. PATCH & PREP FLOOR

FOR SCHEDULED FINISH. SEE SPECIFICATIONS SECTION 09 05 16

SUBSURFACE PREPARATION FOR FLOOR FINISHES.

DE6 CUT OPENING IN CLAY TILE AS REQUIRED FOR MECHANICAL WORK. SEE

MEP DRAWINGS FOR ADDITIONAL INFORMATION.

DE7 REMOVE WINDOW / DOOR SYSTEM IN ITS ENTIRETY INCLUDING TRANSOM

WINDOW, ALL ASSOCIATED HARDWARE AND INTERIOR WOOD TRIM ALL

SIDES OF OPENING.

DE8 REMOVE CONCRETE STAIR, LANDING AND METAL RAILING SYSTEM IN ITS

ENTIRETY. SAW CUT CONCRETE FLUSH AT BRICK AS REQUIRED

DE9 REMOVE METAL RAILING SYSTEM. SAW CUT FLUSH AT CONCRETE.

REMOVE EMBEDDED PIPE RAILING MOUNT IN CONCRETE. PREP FOR

PATCHING. SEE PLANS FOR ADDITIONAL INFORMATION

DE10 REMOVE BREAK METAL TRIM, METAL CEILING SOFFIT AND BACKUP

MATERIAL AT PORCH CEILING, BEAMS AND BRICK WALLS ALL SIDES.

DE11 REMOVE WALL COVERING AND J CHANNEL. PREP PARTITION FOR FINISHES

AS SCHEDULED.

DE12 REMOVE CERAMIC WALL TILE. PREP PARTITION FOR FINISHES AS

SCHEDULED.

DE13 REMOVE WINDOW BLINDS AND ALL ASSOCIATED MOUNTING HARDWARE.

DE14 REMOVE SURFACE MOUNTED VERTICAL PATIENT HEADWALL SYSTEM IN

ITS ENTIRETY. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR

ADDITIONAL INFORMATION.

DE15 REMOVE PAINTED FABRIC BACKED WALL COVERING AND ALL ASSOCIATED

FINISH TRIM, ON ALL PARTITIONS, TO 6" ABOVE CEILING MINIMUM. PATCH

AND PREP SURFACES AS REQUIRED FOR SCHEDULED FINISH.

DE16 SAW CUT BULLNOSE GLAZED BRICK (MID HEIGHT OF WALL) AND COVED

GLAZED BRICK (AT BASE OF WALL/FLOOR) ALONG ENTIRE WALL, FOR

STRUCTURAL STEEL BRACING AND COLD FORMED METAL STUD

INSTALLATION. SEE PLANS AND STRUCTURAL FOR ADDITIONAL

INFORMATION.

DE17 REMOVE GYP BD AND STUD FURRING SYSTEM AT EXTERIOR WALL. SEE

PLANS FOR ADDITIONAL INFORMATION.

DE18 SAW CUT AND GRIND BRICK FLUSH AS REQUIRED FOR DEMOLITION. SEE

PLANS FOR ADDITIONAL INFORMATION

DE19 REMOVE WOOD COLUMN AND/OR GYP BD FURRING - SEE STRUCTURAL

FOR ADDITIONAL INFORMATION

DE20 REMOVE WOOD JOIST AND FLOOR SYSTEM IN ITS ENTIRETY

DE21 SAW CUT AND REMOVE CONCRETE FLOOR AS REQUIRED. SEE PLANS FOR

ADDITIONAL INFORMATION.

DE22 REMOVE WOOD JOIST, WOOD PLANK CATWALK SYSTEM AND ENTIRE ROOF

SYSTEM ABOVE

DE23 REMOVE METAL GUTTER, DOWNSPOUTS AND BREAK METAL FASCIA AND

SOFFIT SYSTEM AND BACKUP MATERIAL AT ROOF/ WALL ALL SIDES (TYP).

DE24 REMOVE MEMBRANE ROOF SYSTEM IN ITS ENTIRETY, INCLUDING ROOF

SLOPING MATERIAL, PITCH POCKETS AND ALL FLASHING. REMOVE

DAMAGED ROOF SUBSTRATE AS REQUIRED, APPROXIMATELY 35%

DE25 REMOVE BREAK METAL FASCIA (INCLUDING MEAT AT DOOR AND WINDOW

HEAD AT PORCH), SOFFIT AND METAL PORCH CEILING SYSTEM. REMOVE

SUBSTRATE THAT METAL IS MOUNTED TOO. PORCH STRUCTURE TO

REMAIN. FIELD VERIFY.

DE26 REMOVE CERAMIC FLOOR TILE. PREP FLOOR FOR SCHEDULED FINISHES.

SEE PLAN FOR ADDITIONAL INFORMATION

DE27 REMOVE STAINLESS STEEL ACCESS HOPPER

DE28 CUT HOLES IN ROOF DECK FOR STRUCTURAL BRACING. -SEE STRUCTURAL

DE29 REMOVE RAILING SYSTEM AND SALVAGE FOR RESTORATION, REFINISHING

AND REINSTALLATION. SEE FLOOR PLAN, SECTIONS AND DETAILS FOR

ADDITIONAL INFORMATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs

\P u b lic \D o c u m e n ts \R e v it P ro je c ts

\1

-R g b a rb a ri a e -m n .c o m

.r v t

/8

/2

:1

:0

A

M

AD121-B110

SECOND LEVEL DEMOLITION PLAN

- BUILDING 110

CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

09/02/2022 LA GJB/JT16149

1/8" = 1'-0"1 SECOND LEVEL DEMOLITION PLAN - BUILDING 110 (DEDUCT ALTERNATE 1)

Revisions: Date: 09/12/2022

I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.

Name: Steve Schlotthauer

UP

UP

UP

UP

UP

UP

AE201-B45

AE201-B45

AE201-B45

AE202-B45

AE301-B45

AE302-B45

EXISTING

BRICK FACADE

TO REMAIN

31 4 6 8 10 11 12 13 14 15 17

9'-9" 2'-3" 14'-0" 12'-5" 5'-7" 4'-11" 6'-3 1/2" 7'-1 7/8" 10'-10 5/8" 14'-0" 10'-1" 14'-0" 18'-7" 21'-6" 2'-9" 18'-3" 12'-2"

A

B

E

G

S100-45

STAIR 1

101-45

RECEPTION

C102-45

CORRIDORC100-45

CORRIDOR

C103-45

CORRIDOR

126-45

ORTHO

SUPERVISOR

OFFICE

S102-45

STAIR 2

122-45

STAFF

TOILET

151-45

TELECOM

120-45

TEAM

EVALUATION

130E-45

TRASH

150-45

ELECTRICAL

108-45

FITTING /

EXAM SOFT

GOODS

110-45

HAC

115-45

EQUIPMENT

STORAGE

113-45

DYNAMIC

ALIGNMENT

114-45

CAST 109-45

FACIAL/

BODY

FITTING

STUDIO

116-45

FITTING /

EXAM SOFT

GOODS

112-45

SOILED

HOLDING

107-45

FITTING /

EXAM SOFT

GOODS

117-45

FITTING /

EXAM

CUSTOM

FAB

106-45

FITTING /

EXAM SOFT

GOODS

105-45

FITTING /

EXAM SOFT

GOODS

104-45

FITTING /

EXAM SOFT

GOODS103-45

FITTING /

EXAM SOFT

GOODS

102-45

PATIENT

TOILET

130-45

PROSTHETICS

LAB125-45

MECHANICAL

FIRE/H20

124-45

ELECTRICAL

119-45

PATIENT /

PUBLIC

TOILET

118-45

PATIENT /

PUBLIC

TOILET

100-45

LOBBY

123-45

OPEN

OFFICE

AE303-B45

55'-3 1/2" 120'-3 5/8"

6'- 0"

111-45

STAFF

TOILET

130D-45

CAD/ CAM

130A-45

LAB

RESTORATION

130C-45

PROSTHETICS/

ORTHOTICS

FUME 130B-45

LAB DUST

ROOM

1'-6"

AE303-B45

AE301-B452

AE303-B45

1'- 6"

AE302-B45

AE315-B45

'-1

0"

1'-6" 1'-8"

1'- 6"

1'-6"

F

1'- 6"

H

1'- 6"

2'-9"

C

D

HOLD

6'-0"

HOLD

6'-0"

E-1-45

ELEVATOR

6'-0 1/4"

FEC

FEC

FEC

AE417-B45

AE415-B45

AE418-B45

AE416-B45

AE416-B45

AE416-B45

AE413-B45

AE412-B45

AE411-B459

AE411-B45

AE211-B45

AE211-B453

126-45

S102A-45

5-

2-

124-45

0-

9-

8-

2-

3-

4-

5-

45 10 6-

7-

S100A-45

108-45

S100B-45

112-45

111-45

110-45

9-

6-

7-

-4

0B

-4

0C

-4

0D

-4

C100A-45

120A-45

C103-45

0B

-4

100-45

114-45

115-45

3-

130A-45

151-45

S102B-45

C100B-45 C1

C-

AE212-B45

AE211-B45

AE320-B45

AE320-B45

FIED VERIFY

12'-0"

CR

CR

PP

CR

CR

CR

AE414-B45

CR

AE315-B45

AE323-B45

CO2 FEC

AE211-B455

AE211-B45

PP

PP

AE322-B45

C101-45

CORRIDOR

9'- 4"

1'-5" 8'-7"

10'-0"

C1

-4

2'-4"

AE314-B45

AE313-B45

AE322-B45

AE322-B45

6AE322-B45

AE322-B45

AE312-B45

AE322-B45

8'- 0"

AE501

AE501

AE501

PP C101-45

PP C100-45

AE502

AE501

TYP

1-

FL7

FL8

FL8

FL13

FL10

FL11

FL11

FL12

FL8

FL8

CR

CR

AE311-B45

AE541

AE502

AE502

AE541

AE541

AE501

AE541

NOTE:

SEE EQUIPMENT PLAN FOR ADDITIONAL INFORMATION.

SEE SHEET GI003 FOR NOTES, SYMBOLS AND KEYNOTES.

FIELD VERIFY ALL EXISTING MASONRY OPENINGS

AE541

AE541

AE541

AE541

MIR

AE502

AE502

AE542

AE543

AE540

AE540

AE540

AE540

SIM

AE111.2-B45

FL2

FL8

FL8

AE313-B45

AE502

AE322-B45

AE322-B45

AE211-B45 1

AE211-B452

AE542

AE501

TYP AT LOBBY

AE501

TYP

TYP

AE501

SIM

FL14FL14

FL14

FL10

FL14

COORDINATE W/ PLUMBING

AND FIRE PROTECTION

FL14

COORDINATE W/

FIRE PROTECTION

AE542

TYP

AE542

AE503

AE503

AE503

AE503

MIR/SIM

AE542

TYP

AE503

AE503

SIM

AE542

AE503

AE503

AE503

AE540

AE540

AE540

4AE540

DEDUCT ALTERNATE

AE312-B45

AE551

FL13

FL13

FL14

COORDINATE

W/ PLUMBING

FL14

COORDINATE

W/ PLUMBING

AE314-B45

AE312-B45

AE313-B45

MIR/SIM

AE313-B45

SIM

AE313-B45

AE313-B45

AE313-B45

MIR/SIM

AE313-B45

MIR/

SIM

AE313-B45

MIR/SIM

AE501

TYP

SIM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs

\P u b lic \D o c u m e n ts \R e v it P ro je c ts

\1

-R g b a rb a ri a e -m n .c o m

.r v t

/8

/2

:1

:3

A

M

AE111-B45

FIRST LEVEL FLOOR PLAN -

BUILDING 45

CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

09/02/2022 LA GJB16149

3/16" = 1'-0"1 FIRST LEVEL FLOOR PLAN - BUILDING 45

Revisions: Date: 09/12/2022

I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.

Name: Steve Schlotthauer

ALIGN

UP

UP

UP

ALIGN

AE301-B45

AE302-B45

31 4 6 8 10 11 12 13 14 15 17 18

A

B

E

G

AE303-B45

AE303-B45

AE301-B452

AE303-B45

AE302-B45

AE315-B45

F

HH

C

D

130D-45

CAD/ CAM

130C-45

PROSTHETICS/

ORTHOTICS

FUME 130B-45

LAB DUST

ROOM

130A-45

LAB

RESTORATION

114-45

CAST

109-45

FACIAL/

BODY

FITTING

STUDIO

108-45

FITTING /

EXAM SOFT

GOODS

110-45

HAC

111-45

STAFF

TOILET

112-45

SOILED

HOLDING

113-45

DYNAMIC

ALIGNMENT

115-45

EQUIPMENT

STORAGE

116-45

FITTING /

EXAM SOFT

GOODS

117-45

FITTING /

EXAM

CUSTOM

FAB

130E-45

TRASH151-45

TELECOM

C100-45

CORRIDOR

C102-45

CORRIDOR

100-45

LOBBY101-45

RECEPTION

118-45

PATIENT /

PUBLIC

TOILET

119-45

PATIENT /

PUBLIC

TOILET15

0-

EL

EC

TR

IC

AL

123-45

OPEN

OFFICE

120-45

TEAM

EVALUATION

124-45

ELECTRICAL

E-1-45

ELEVATOR

122-45

STAFF

TOILET

125-45

MECHANICAL

FIRE/H20

126-45

ORTHO

SUPERVISOR

OFFICE

S102-45

STAIR 2

C103-45

CORRIDOR

107-45

FITTING /

EXAM SOFT

GOODS

106-45

FITTING /

EXAM SOFT

GOODS

105-45

FITTING /

EXAM SOFT

GOODS

104-45

FITTING /

EXAM SOFT

GOODS

103-45

FITTING /

EXAM SOFT

GOODS

102-45

PATIENT

TOILET

S100-45

STAIR 1

0D

-4

0C

-4

C1

C-

0B

-4

-4

0-

9-

8-

5-

2-

3-

4-

5-

45 10 6-

7-

3-

6-

7-

C100B-45

151-45

120A-45

C103-45

0B

-4

S102A-45

S102B-45

126-45

124-45

2-

100-45

S100B-45

S100A-45

108-45

110-45

9-

111-45

112-45

114-45 130A-45

115-45

5'-11 3/4" 16'-10 7/8" 16'-1 1/2" 23'-7 3/8" 23'-7 1/8" 11'-1" 20'-10 3/4"

4'-1 1/8"

5'-

10'-4 1/4" 42'-2 1/2" 4'-2 7/8" 7'-9 7/8"

'-1

1/

8"

11'-9 3/8" 12'-10 7/8" 12'-7 1/4" 1'-4 7/8" 15'-11 7/8"

5'- 9"

3' -1

1/

8"

6'-3 9/16" 9'-6 5/8"

5'-4 7/8"

C100A-45

9'-4 7/8" 11'-7 1/4" 15'-8 3/8" 6'-0" 10'-8" 10'-4" 10'-6"

HOLD

6'-0" 11'-7 1/4" 1'-4 7/8"

10'-7 1/8"

4' -4

/2

HO

LD

6'- 0"

'-1

7/

8" 5'-

0"

'-4

/4

10'-6 3/8" 12'-6" 10'-7 1/8" 10'-0 7/8" 11'-0 1/8" 11'-4 7/8"

7' -1

1/

8" 7'

-1

/8

5' -7

/4

'-8

/8

HOLD

6'-0" 13'-0"

AE315-B45

AE314-B45

8'- 0"

6'- 9"

5'- 5"

7'- 2"

'-0

'-3

/8

12'-0" 14'-0" 12'-5" 5'-7" 11'-2 1/2" 18'-0 1/2" 14'-0" 10'-1" 14'-0" 18'-7" 21'-6" 21'-0" 12'-2"

120'-3 5/8"

2'-9"

1'-5" 8'-7"

10'-0"

1'-6"

'-1

0" 1'-

6"

1'- 6"

1'-6"

12'-0"

1' -8

/8

'-9

/8

'-6

5"

1'-6"

AE320-B45

AE416-B45

AE323-B45

AE412-B45

AE416-B45

AE418-B45

AE416-B45

AE415-B45

AE320-B45

AE413-B45

AE417-B45

AE414-B45

B6bs

B6bs

4' -6

/2

3'-4"

5'-7" 4'-0"6'-2"5'-6 1/2"

2'- 0"

4'-1 3/4"

AE540

AE540

AE540

AE540

AE540

7AE540

SIM

AE501

6' -6

/8

'-9

/8

'-1

/8

8"

XN3 MA8

XN3

MA8

XN3

MA8

XN3

XN3

MA12

1-

XN3

AE313-B45

130-45

PROSTHETICS

LAB

AE312-B45

3'-8" MO 6'-8" 3'-8" MO 7'-0" 3'-8" MO 26'-0" 3'-8" MO 7'-4" 3'-8" MO 7'-8" 3'-8" MO 9'-4" 5'-4" MO 2'-8" 10'-6" 1'-6"

2'- 8"

5' -4

" M O

3'-8" MO 7'-8" 3'-8" MO 10'-8"

AE501

1'-8"

7'- 8"

XN3

XN3

XN3

2'- 0"

4'-11 1/2"

XN3

XN3

XN2

'-1

3/

8"

XP3 XP3

XP3

XP3

XP3

XP3

XP3

'-1

1/

2"

'-1

1/

2"

XN6

XN6

XN10

XN6

XN6

'-5

/4

1'-

1'-8" 2'-1"

XN6 XN6

XN6XN6

7'-7 5/8"

7' -4

/4

1'

-4

/8

XN10

XN6

XN6

XN6XN6

SEE CIVIL FOR

RAMP

AE322-B45

AE322-B45

AE311-B45

NOTE:

SEE EQUIPMENT PLAN FOR ADDITIONAL INFORMATION.

SEE SHEET GI003 FOR NOTES, SYMBOLS AND KEYNOTES.

FIELD VERIFY ALL EXISTING MASONRY OPENINGS

AE502

SIM/MIR

AE502

SIM/MIR

AE313-B45

B6bs

B3bs

AE312-B45

36'-3"

AE551

2'-0"

1'- 8"

XP3

AE312-B45

AE313-B45

AE313-B45

1'- 6"

1'- 6"

AE542

TYP

AE501

AE542

AE501

TYP

TYP

AE541

AE541

MIR

AE502

AE543

AE501

AE503

AE503

AE503

MIR/SIM

AE501

TYP

AE541

TYP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs

\P u b lic \D o c u m e n ts \R e v it P ro je c ts

\1

-R g b a rb a ri a e -m n .c o m

.r v t

/8

/2

:1

:4

A

M

AE112-B45

FIRST LEVEL DIMENSION PLAN -

BUILDING 45

CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

09/02/2022 LA GJB16149

3/16" = 1'-0"1 FIRST LEVEL DIMENSION PLAN - BUILDING 45

Revisions: Date: 09/12/2022

I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.

Name: Steve Schlotthauer

UP

UP

UP

UP

UP

DN

DN

UP

31 4 6 8 10 11 12 13 14 15 17 18

A

B

E

G

F

H

C

D

S100-45

STAIR 1

101-45

RECEPTION

C102-45

CORRIDORC100-45

CORRIDOR

C103-45

CORRIDOR

126-45

ORTHO

SUPERVISOR

OFFICE

S102-45

STAIR 2

122-45

STAFF

TOILET 151-45

TELECOM

120-45

TEAM

EVALUATION

130E-45

TRASH

0-

EL

EC

TR

IC

AL

108-45

FITTING /

EXAM SOFT

GOODS

110-45

HAC

115-45

EQUIPMENT

STORAGE

113-45

DYNAMIC

ALIGNMENT

114-45

CAST

109-45

FACIAL/

BODY

FITTING

STUDIO

116-45

FITTING /

EXAM SOFT

GOODS

112-45

SOILED

HOLDING

107-45

FITTING /

EXAM SOFT

GOODS

117-45

FITTING /

EXAM

CUSTOM

FAB

106-45

FITTING /

EXAM SOFT

GOODS

105-45

FITTING /

EXAM SOFT

GOODS

104-45

FITTING /

EXAM SOFT

GOODS

103-45

FITTING /

EXAM SOFT

GOODS

102-45

PATIENT

TOILET

130-45

PROSTHETICS

LAB

125-45

MECHANICAL

FIRE/H20

124-45

ELECTRICAL

119-45

PATIENT /

PUBLIC

TOILET

118-45

PATIENT /

PUBLIC

TOILET

100-45

LOBBY

123-45

OPEN

OFFICE

111-45

STAFF

TOILET

130D-45

CAD/ CAM

130A-45

LAB

RESTORATION

130C-45

PROSTHETICS/

ORTHOTICS

FUME

130B-45

LAB DUST

ROOM

E-1-45

ELEVATOR

C101-45

CORRIDOR

FL9

AE111.1-B45

DEDUCT

ALTERNATE 12

AE324-B45

DEDUCT

ALTERNATE 2

AE111.2-B45

DEDUCT

ALTERNATE 13

DEDUCT

ALTERNATE 5

31 4 6 8 10 11 12 13 14 15 17 18

A

B

E

G

F

H

C

D

201-45

OPEN

OFFICE 202-45

CONFERENCE S200-45

STAIR 1

203A-45

LOCKERS203-45

STAFF

LOUNGE

204-45

CHIEF

OFFICE

205-45

ASSIST

CHIEF

OFFICE206-45

PROSTHETICS

REP OFFICE

207-45

COPY/

WORK/MAILING

7-

EL

EC

TR

IC

AL

208-45

STAFF

TOILET

C200-45

CORRIDOR

226-45

DME ACTIVE

STORAGE

222-45

ELEVATOR

EQUIP

220-45

MECHANICAL

221-45

TELECOM

225-45

WHEELCHAIR

PARTS

STORAGE

S202-45

STAIR 2

OPEN TO

BELOW

228-45

PROSTHETICS/

ORTHOTICS

MAINTENANCE

224-45

SHOE

MODIFICATION

STORAGE

223-45

PARTS

STORAGE

C200-45

CORRIDOR

AE324-B45

DEDUCT

ALTERNATE 2

AE325-B45

DEDUCT

ALTERNATE 11

AE111.2-B45

DEDUCT

ALTERNATE 13

DEDUCT ALTERNATE 9

DEDUCT

ALTERNATE 3

31 4 6 8 10 11 12 13 14 15 17 18

A

B

E

G

F

H

C

D

SL

O

PE

SL

O

PE

SL

O

PE

SLO

PE SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

SL

O

PE

SL

O

PE

SLOPE

SLO

PE

SLOPE

SLOPE

SLOPE

SLOPE

AE131.1-B45

DEDUCT

ALTERNATE 4

AE131.1-B45

DEDUCT

ALTERNATE 4

1/4" PER 1'-0" MIN SLOPESLOPESLOPE

SL

O

PE

SL

O

PE

SL

O

PE

SL

O

PE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs

\P u b lic \D o c u m e n ts \R e v it P ro je c ts

\1

-R g b a rb a ri a e -m n .c o m

.r v t

/8

/2

:1

:2

A

M

AE011-B45

DEDUCT ALTERNATE OVERALL

PLANS - BUILDING 45

CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

09/02/2022 LA GJB/JT16149

3/32" = 1'-0"1 DEDUCT ALTERNATE OVERALL -FIRST LEVEL FLOOR PLAN - BUILDING 45

3/32" = 1'-0"2 DEDUCT ALTERNATE OVERALL -SECOND LEVEL FLOOR PLAN - BUILDING 45

3/32" = 1'-0"3 DEDUCT ALTERNATE OVERALL - ROOF PLAN - BUILDING 45

Revisions: Date: 09/12/2022

I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.

Name: Steve Schlotthauer

15 17

A

AE413-B45

QH412

QH4123

MO

3'-8" 2'-8"

2'- 8"

M O

3'- 8"

109-45

FACIAL/

BODY

FITTING

STUDIO

109-45

XN3

XN3

3'-1" 3'-0"

AE111.1-B45

AE111.1-B45

DEDUCT ALTERNATE

DEDUCT

ALTERNATE

DEDUCT ALT. REDUCE SIZE OF WINDOW TO W21.

PROVIDE ROLLER SHADE BETWEEN JAMB TO FIT

WINDOW SIZE.

DEDUCT ALT. REDUCE

SIZE OF WINDOW TO W21.

PROVIDE ROLLER SHADE

BETWEEN JAMB TO FIT

WINDOW SIZE.

FIRST LEVEL

0"

SECOND LEVEL

14'-0"

TOP OF EXISTING MASONRY

25'-10 3/8"

Grade -2'-0"

TO MASONRY @ ADDITION

12'-0"

EXISTING NEW

EXISTING NEW

W21

DEDUCT ALT. REDUCE SIZE OF WINDOW TO W21

FIRST LEVEL

0"

SECOND LEVEL

14'-0"

TOP OF EXISTING MASONRY

25'-10 3/8"

Grade -2'-0"

TO MASONRY @ ADDITION

12'-0"

W21

NEWEXISTING

DEDUCT ALT. REDUCE SIZE

OF WINDOW TO W21

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs

\P u b lic \D o c u m e n ts \R e v it P ro je c ts

\1

-R g b a rb a ri a e -m n .c o m

.r v t

/8

/2

:1

:3

A

M

AE111.1-B45

DEDUCT ALT. - FLOOR PLANS

AND ELEVATIONS -BUILDING 45

CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

09/02/2022 LA GJB/JT16149

1/2" = 1'-0"1 DEDUCT ALTERNATE 12 - ENLARGED PLAN - FACIAL / BODY FITTING STUDIO 109-45

1/8" = 1'-0"2 DEDUCT ALTERNATE 12 -EAST ELEVATION - BUILDING 45

1/8" = 1'-0"3 DEDUCT ALTERNATE 12 -SOUTH ELEVATION - BUILDING 45

Revisions: Date: 09/12/2022

I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.

Name: Steve Schlotthauer

DN

31 4 6 8 10 11 12 13 14 15 17 18

A

B

C

S100-45

STAIR 1

126-45

ORTHO

SUPERVISOR

OFFICE

S102-45

STAIR 2 151-45

TELECOM

120-45

TEAM

EVALUATION

130E-45

TRASH

108-45

FITTING /

EXAM SOFT

GOODS

110-45

HAC

115-45

EQUIPMENT

STORAGE

113-45

DYNAMIC

ALIGNMENT

114-45

CAST 109-45

FACIAL/

BODY

FITTING

STUDIO

116-45

FITTING /

EXAM SOFT

GOODS

117-45

FITTING /

EXAM

CUSTOM

FAB

130-45

PROSTHETICS

LAB125-45

MECHANICAL

FIRE/H20

124-45

ELECTRICAL

55'-3 1/2"

111-45

STAFF

TOILET

130D-45

CAD/ CAM

130A-45

LAB

RESTORATION

130C-45

PROSTHETICS/

ORTHOTICS

FUME

130B-45

LAB DUST

ROOM

1'-6"1'-6"

2'-9"

5"

HOLD

6'-0"

HOLD

6'-0"

6'-0 1/4"

126-45

S102A-45

5-

124-45

S100A-45

108-45

S100B-45

111-45

110-45

9-

-4

0B

-4

0C

-4

0D

-4

C100A-45

114-45

115-45

130A-45

151-45

S102B-45

C1

C-

CR

PP

CR

CR

CO2 FEC

C101-45

CORRIDOR

C1

-4

DEDUCT ALT

DEDUCT ALTERNATE 13 - ELIMINATE WINDOWS

AE111.2-B45

DEDUCT ALTERNATE 13 -

ELIMINATE WINDOWS

AE313-B45

AE313-B45

31 4 6 8 10 11 12 13 14 15 17 18

A

B

C

AE111.1-B45

AE111.1-B45

FLAT ROOF BELOW

S200-45

STAIR 1

203A-45

LOCKERS

203-45

STAFF

LOUNGE

204-45

CHIEF

OFFICE205-45

ASSIST

CHIEF

OFFICE

206-45

PROSTHETICS

REP OFFICE

207-45

COPY/

WORK/MAILING208-45

STAFF

TOILET

222-45

ELEVATOR

EQUIP

220-45

MECHANICAL

221-45

TELECOMS202-45

STAIR 2

224-45

SHOE

MODIFICATION

STORAGE 223-45

PARTS

STORAGE

10'-0"

FEC

224-45

S202-45 223-45

8-

220B-45

6-

5-

4-

3B

-4

203A-45

S201-45

C200-45

CORRIDOR

AE111.2-B45

DEDUCT ALTERNATE 13 -

ELIMINATE WINDOWS

DEDUCT ALTERNATE 13 -

ELIMINATE WINDOWS

DEDUCT ALTERNATE 13 -

ELIMINATE WINDOWS

AE313-B45

AE313-B45

FIRST LEVEL

0"

SECOND LEVEL

14'-0"

TOP OF EXISTING MASONRY

25'-10 3/8"

TO MASONRY @ ADDITION

12'-0"

DEDUCT ALTERNATE 13 - ELIMINATE

WINDOWS

DEDUCT ALTERNATE 13 - ELIMINATE

WINDOWS

DEDUCT ALTERNATE 13 - ELIMINATE

WINDOWS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs

\P u b lic \D o c u m e n ts \R e v it P ro je c ts

\1

-R g b a rb a ri a e -m n .c o m

.r v t

/8

/2

:1

:4

A

M

AE111.2-B45

DEDUCT ALT. - FLOOR PLANS

AND EXTERIOR ELEVATIONS

-BUILDING 45

CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

09/02/2022 LA GJB/JT16149

3/16" = 1'-0"1 DEDUCT ALTERNATE 13- PARTIAL FIRST LEVEL FLOOR PLAN - BUILDING 45

3/16" = 1'-0"2 DEDUCT ALTERNATE 13 - PARTIAL SECOND LEVEL FLOOR PLAN - BUILDING 45

1/8" = 1'-0"3 DEDUCT ALTERNATE 13 - EAST ELEVATION - BUILDING 45

Revisions: Date: 09/12/2022

I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.

Name: Steve Schlotthauer

Sheets
AD521-B50 - DEMOLITION - EXISTING CONDITIONS - PHOTOGRAPHS
AD121-B110 - SECOND LEVEL DEMOLITION PLAN - BUILDING 110
AE111-B45 - FIRST LEVEL FLOOR PLAN - BUILDING 45
AE112-B45 - FIRST LEVEL DIMENSION PLAN - BUILDING 45
AE011-B45 - DEDUCT ALTERNATE OVERALL PLANS - BUILDING 45
AE111.1-B45 - DEDUCT ALT. - FLOOR PLANS AND ELEVATIONS -BUILDING 45
AE111.2-B45 - DEDUCT ALT. - FLOOR PLANS AND EXTERIOR ELEVATIONS -BUILDING 45
AE121-B45 - SECOND LEVEL FLOOR PLAN - BUILDING 45
AE122-B45 - SECOND LEVEL DIMENSION PLAN - BUILDING 45
AE131-B45 - ROOF PLAN - BUILDING 45
AE131.1-B45 - DEDUCT ALT. - ROOF PLAN AND EXTERIOR ELEVATIONS -BUILDING 45
AC111-B45 - FIRST LEVEL REFLECTED CEILING PLAN - BUILDING 45
AC121-B45 - SECOND LEVEL REFLECTED CEILING PLAN - BUILDING 45
AE122-B110 - SECOND LEVEL FLOOR PLAN - BUILDING 110
AC121-B110 - SECOND LEVEL REFLECTED CEILING PLAN - BUILDING 110
AE201-B45 - EXTERIOR ELEVATIONS - BUILDING 45
AE202-B45 - EXTERIOR ELEVATIONS - BUILDING 45
AE211-B45 - INTERIOR ELEVATIONS - BUILDING 45
AE212-B45 - INTERIOR ELEVATIONS - BUILDING 45
AE301-B45 - BUILDING SECTIONS - BUILDING 45
AE302-B45 - BUILDING SECTIONS - BUILDING 45
AE303-B45 - BUILDING SECTIONS - BUILDING 45

File details come from the government source that posted it. Updated .