This document provides details for a federal contract solicitation to construct a prosthetics facility for the Department of Veterans Affairs. The solicitation number is 36C77623R0166_1 for the project "Y1DA--590-210 Construct Prosthetics Facility (VA-23-00044335)" issued by the Department of Veterans Affairs Technology Acquisition Center Austin. Offerors should review the 20MB Bid Documents Part 1 file for specifications on constructing the prosthetics facility. The opportunity type is listed as a solicitation, suggesting the government will accept and evaluate proposals before awarding a firm fixed-price construction contract. No other salient details are provided such as response dates, set asides, incumbent contractors, or pricing terms. A full review of the Bid Documents Part 1 file is needed to understand technical requirements and proposal instructions for the prosthetics facility construction project.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPROVAL SIGNATURES:
• COR – ILSM & ICRA COMPLETED DATE:
• REVIEWED: AFGE DATE:
• REVIEWED: NAGE DATE:
• APPROVED: INFECTION CONTROL DATE:
• APPROVED: CONSTRUCTION SAFETY MANAGER DATE:
• APPROVED: SAFETY MANAGER DATE:
• APPROVED: INDUSTRIAL HYGIENIST DATE:
• APPROVED: SAFE PATIENT HANDLING AND MOBILITY FACILITY COORDINATOR (SPHM FC) DATE:
• APPROVED: FIRE INSPECTOR DATE:
• APPROVED: SUPERVISORY FACILITIES OPERATIONS SPECIALIST DATE:
• APPROVED: CHIEF, POLICE & SECURITY DATE:
• APPROVED: PHYSICAL SECURITY SPECIALIST DATE:
• APPROVED: ENVIRONMENTAL MANAGEMENT SERVICE DATE:
• APPROVED: OFFICE OF INFORMATION & TECHNOLOGY DATE:
• APPROVED: WOMEN’S VETERAN PROGRAM MANAGER DATE:
• APPROVED: CONTRACTING DATE:
• APPROVED: PATIENT SAFETY MANAGER DATE:
• APPROVED: HAMPTON ENERGY MANAGER DATE:
• APPROVED: SUPERVISORY PROJECT ENGINEER DATE:
• APPROVED: ASSISTANT CHIEF, ENGINEERING DATE:
• APPROVED: CHIEF, ENGINEERING DATE:
• APPROVED: ASSOCIATE DIRECTOR FOR PATIENT CARE SERVICES DATE:
• APPROVED: CHIEF OF STAFF DATE:
• APPROVED: ASSOCIATE DIRECTOR FOR OPERATIONS DATE:
• APPROVED: EXECUTIVE DIRECTOR, HAMPTON VA MEDICAL CENTER DATE:
HVAMC PRE CONSTRUCTION RISK ASSESSMENT / EVALUATION
PROJECT NAME: CONSTRUCT PROSTHETICS FACILITY
ASSESSMENT DATE:
EXPECTED IMPACTS PLANS / MEASURES TO ADDRESS IMPACTS
PLUMBING OUTAGES
MECHANICAL OUTAGES
ELECTRICAL OUTAGES
MISCELLANEOUS UTILITIES
FIRE ALARM
VIBRATIONS
DUST (INFECTION CONTROL) / AIR
QUALITY
NOISE
EQUIPMENT
CREATION OR SPREAD OF
CONTAMINATES
TRAFFIC FLOW -- PATIENTS,
VISITORS, STAFF, CONTRACT
PERSONNEL
LIMITS OF CONSTRUCTION
BARRIER LOCATION
HVAMC 2020 ANNUAL TB RISK
ASSESSMENT LEVEL IS LOW
14 PROJECT LOCATION: FACILITY GROUNDS, 110
RISK ASSESSMENT REQUIRED BASED ON VICINITY OF
PATIENT CARE AREAS? YES
SUBJECT TO CHANGE DURING CONSTRUCTION PHASE:
PPD / TB RISK ASSESSMENT COMPLETED: X
NON-PATIENT CARE AREA NO TB SCREENING: _____
OUTAGES EXPECTED THROUGHOUT DIFFERENT PHASES OF
CONSTRUCTION
CONTRACTOR TO NOTIFY COR 14 DAYS (2 WEEKS) MINIMUM IN
ADVANCE
OUTAGES EXPECTED THROUGHOUT DIFFERENT PHASES OF
CONSTRUCTION
CONTRACTOR TO NOTIFY COR 14 DAYS (2 WEEKS) MINIMUM IN
ADVANCE
OUTAGES EXPECTED THROUGHOUT DIFFERENT PHASES OF
CONSTRUCTION
CONTRACTOR TO NOTIFY COR 14 DAYS (2 WEEKS) MINIMUM IN
ADVANCE
OUTAGES EXPECTED THROUGHOUT DIFFERENT PHASES OF
CONSTRUCTION
CONTRACTOR TO NOTIFY COR 14 DAYS (2 WEEKS) MINIMUM IN
ADVANCE
OUTAGES WILL BE REQUIRED THROUGHOUT THE PROJECT.
CONTRACTOR IS RESPONSIBLE FOR PERFORMING FIRE WATCH
FOR ANY OUTAGE LASTING LONGER THEN EIGHT (8) HOURS.
FIRE ALARM IS TO BE MAINTAINED AND KEPT OPERATIONAL AS
LONG AS POSSIBLE DURING DEMOLITION. CONTRACTOR SHALL
ACTIVATE PHASES OF THE FIRE ALARM AS CONSTRUCTION
PROGRESSES.
VIBRATIONS ARE EXPECTED DURING THE PROJECT WORK IN BUILDING 110 THAT MAY DISRUPT HOSPITAL
OPERATIONS WILL REQUIRE OFF HOURS AS DETERMINED BY
THE COR
DUST IS EXPECTED DURING DEMOLITION AND CONSTRUCTION. OUTDOOR OPERATIONS WILL REQUIRE THE USE OF WETTING
MATERIALS DURING DEMOLITION TO MITIGATE DUST.
CONTRACTOR MUST FOLLOW ICRA GUIDELINES AS REQUIRED.
NOISE IS EXPECTED DURING THE PROJECT WORK IN BUILDING 110 THAT MAY DISRUPT HOSPITAL
OPERATIONS WILL REQUIRE OFF HOURS AS DETERMINED BY
THE COR
HEAVY MACHINERY IS EXPECTED DURING DEMOLITION. CONTRACTORS ARE REQUIRED TO WEAR HIGH VISIBILITY
CLOTHING. TRAFFIC CONTROL IS REQUIRED AT ALL TIMES WHEN
EQUIPMENT LEAVES SITE, WHEN ONLOADING - OFFLOADING,
ETC.
CONTRACTOR MUST FOLLOW ALL ICRA GUIDELINES AS
REQUIRED. RISK CLASSIFICATION SUBJECT TO CHANGES AS
NEEDED ACCORDING TO HOSPITAL INFECTION CONTROL.
DUST IS EXPECTED DURING DEMOLITION AND CONSTRUCTION.
CONTRACTOR IS RESPONSIBLE FOR TRAFFIC CONTROL FOR
EQUIPMENT ENTERING AND EXITING THE SITE AND WHILE IN-
ROUTE ON FACILITY GROUNDS. ANY ROAD CLOSURE WILL
REQUIRE TRAFFIC CONTROL PROVIDED BY THE CONTRACTOR.
TRAFFIC MAY BE AFFECTED AT TIMES.
ALL CONSTRUCTION ACTIVITIES SHALL BE CONTAINED WITHIN A
6'-0" HIGH MINIMUM CHAIN LINK FENCE WITH FULL HEIGHT
PRIVACY SCREENING. A PERMANENT FENCE POST INSTALLED IN
THE GROUND AROUND THE SITE AND TEMPORARY FENCING
WHEN OUTSIDE OF THE SITE (UTILITY WORK, ETC.)
VARIOUS LOCATIONS. CHAIN LINK FENCE WITH PRIVACY
SCREENING IS REQUIRED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT NAME:
SITE ADDRESS:
VA PROJECT NUMBER:
OWNER AND CONSULTANTS:
VICINITY MAP:
ARCHITECT/ENGINEER OF RECORD
NOT FOR CONSTRUCTION
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/8
/2
:2
:2
A
M
GI000
COVER SHEET CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
09/02/2022 LA GJB
CONSTRUCT PROSTHETICS FACILITY
100 EMANCIPATION DRIVE HAMPTON, VA 23667
590-210
16149
VA COR:
CONTACT:
ADDRESS:
PHONE:
Alessadra K. A. Twomey, P.M.P.
100 EMANCIPATION DRIVE
HAMPTON, VA 23667
757.722.9961 X5010
ARCHITECT:
NAME:
ADDRESS:
CONTACT:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
Steve Schlotthauer
PHONE: 763-412-4050
STRUCTURAL ENGINEER:
NAME:
ADDRESS:
CONTACT:
IMEG Corp.
15 Sunned Drive, Suite 104 St. Louis MO 63143
Katie M Goldberg, SE, PE
PHONE: 515.334.7936
MECH/ELEC/PLUMB/FIRE ENGINEER:
NAME:
ADDRESS:
CONTACT:
IMEG Corp.
15 Sunnen Drive, Suite 104 St. Louis, MO 63143
Russ Arneson
PHONE: 314.951.2518
SITE MAP:
BUILDING 45
BUILDING 110
Revisions: Date: 09/12/2022
I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name: Steve Schlotthauer
Signature:_________________
Date:__________ License# 42138
█ ISSUED
NOT ISSUED
ISSUED FOR REFERENCE ONLY
ISSUED AS NOTED
R
N
SHEET ABBREVIATION AND NUMBERING
AE 1 1 1 - B20
DI
SC
IP
LI
NE
D
ES
IG
NA
TO
R
SH
EE
T
TY
PE
D
ES
IG
NA
TO
R
FL
O
O R
LE
VE
L
SH
EE
T G
RO
UP
IN
G
BU
IL
DI
NG
N
UM
BE
R
AE 111-B20
ARCHITECTURAL ELEMENTS, PLAN, FIRST LEVEL, FLOOR PLAN, BUILDING 20
QH 1 1 0 - B20
DI
SC
IP
LI
NE
D
ES
IG
NA
TO
R
SH
EE
T
TY
PE
D
ES
IG
NA
TO
R
FL
O
O R
LE
VE
L
SH
EE
T G
RO
UP
IN
G
BU
IL
DI
NG
N
UM
BE
R
QH110-B20
EQUIPMENT HOSPITAL, PLAN, FIRST LEVEL, BUILDING 20
DISCIPLINE
DESIGNATOR
SHEET TYPE
DESIGNATOR
FLOOR
LEVEL
SHEET
GROUPING
GC - GENERAL CONTRACT
GI - GENERAL INFORMATION
AC - ARCHITECTURAL RCP
AD - ARCHITECTURAL DEMOLITION
AS - ARCHITECTURAL SITE
AE - ARCHITECTURAL ELEMENTS
AF - ARCHITECTURAL FINISHES
IF - INTERIOR FURNISHINGS
QC - EQUIPMENT LAUNDRY
QF - EQUIPMENT FOOD SERVICE
QH - EQUIPMENT HOSPITAL
QL - EQUIPMENT LABORATORY
0 - GENERAL
1 - PLANS
2 - ELEVATIONS
3 - SECTIONS
4 - LARGE SCALE VIEWS
5 - DETAILS
6 - SCHEDULES & DIAGRAMS
0 - LOWER LEVEL
1 - FIRST LEVEL
2 - SECOND LEVEL
3 - THIRD LEVEL
4 - FOURTH LEVEL
GENERAL:
00-10 - TITLE SHEET, NOTES,
ABBREVIATIONS, SYMBOLS,
SCHEDULES
PLANS:
1 - LEVEL FLOOR PLAN
2 - DIMENSION PLAN
ELEVATIONS:
01-10 - EXTERIOR ELEVATIONS
11-19 - INTERIOR ELEVATION
SECTIONS:
01-10 - BUILDING SECTIONS
11-19 - WALL SECTIONS
20-29 -STAIR SECTIONS & PLANS
DETAILS:
01-19 - EXTERIOR PLAN DETAILS
20-29 - EXTERIOR SECTION DETAILS
30-39 - ROOF DETAILS
40-49 - INTERIOR PLAN DETAILS
50-59 - INTERIOR SECTION DETAILS
60-69 - CEILING DETAILS
PLANS ONLY
AE 5 1 2
DI
SC
IP
LI
NE
D
ES
IG
NA
TO
R
SH
EE
T
TY
PE
D
ES
IG
NA
TO
R
SH
EE
T G
RO
UP
IN
G
AE 501
ARCHITECTURAL ELEMENTS, EXTERIOR PLAN DETAILS
AF 6 7 0
DI
SC
IP
LI
NE
D
ES
IG
NA
TO
R
SH
EE
T
TY
PE
D
ES
IG
NA
TO
R
SH
EE
T G
RO
UP
IN
G
AF 670
ARCHITECTURAL FINISHES, FINISH SCHEDULE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/8
/2
:2
:3
A
M
GI001
SHEET INDEX CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
09/02/2022 LA GJB16149
SHEET INDEX - ARCHITECTURAL
SHEET NO. SHEET TITLE BI
D
DO
CU
M
EN
TS
-X X-
XX
HA101-50 LOWER LEVEL ABATEMENT & REMEDIATION PLAN - BUILDING 50
HA111-50 FIRST LEVEL ABATEMENT & REMEDIATION PLAN - BUILDING 50
HA121-50 SECOND LEVEL ABATEMENT & REMEDIATION PLAN - BUILDING 50
HA121-110 SECOND LEVEL ABATEMENT & REMEDIATION PLAN - BUILDING 110
AD101-B50 LOWER LEVEL DEMOLITION PLAN - BUILDING 50
AD111-B50 FIRST LEVEL DEMOLITION PLAN - BUILDING 50
AD121-B50 SECOND LEVEL DEMOLITION PLAN - BUILDING 50
AD131-B50 ROOF DEMOLITION PLAN - BUILDING 50
AD311-B50 DEMOLITION - WALL SECTIONS
AD520-B50 DEMOLITION - DETAILS AND EXISTING CONDITIONS - PHOTOGRAPHS
AD521-B50 DEMOLITION - EXISTING CONDITIONS - PHOTOGRAPHS
AD121-B110 SECOND LEVEL DEMOLITION PLAN - BUILDING 110
AE111-B45 FIRST LEVEL FLOOR PLAN - BUILDING 45
AE112-B45 FIRST LEVEL DIMENSION PLAN - BUILDING 45
AE011-B45 DEDUCT ALTERNATE OVERALL PLANS - BUILDING 45
AE111.1-B45 DEDUCT ALT. - FLOOR PLANS AND ELEVATIONS -BUILDING 45
AE111.2-B45 DEDUCT ALT. - FLOOR PLANS AND EXTERIOR ELEVATIONS -BUILDING 45
AE121-B45 SECOND LEVEL FLOOR PLAN - BUILDING 45
AE122-B45 SECOND LEVEL DIMENSION PLAN - BUILDING 45
AE131-B45 ROOF PLAN - BUILDING 45
AE131.1-B45 DEDUCT ALT. - ROOF PLAN AND EXTERIOR ELEVATIONS -BUILDING 45
AC111-B45 FIRST LEVEL REFLECTED CEILING PLAN - BUILDING 45
AC121-B45 SECOND LEVEL REFLECTED CEILING PLAN - BUILDING 45
AE122-B110 SECOND LEVEL FLOOR PLAN - BUILDING 110
AC121-B110 SECOND LEVEL REFLECTED CEILING PLAN - BUILDING 110
AE201-B45 EXTERIOR ELEVATIONS - BUILDING 45
AE202-B45 EXTERIOR ELEVATIONS - BUILDING 45
AE211-B45 INTERIOR ELEVATIONS - BUILDING 45
AE212-B45 INTERIOR ELEVATIONS - BUILDING 45
AE301-B45 BUILDING SECTIONS - BUILDING 45
AE302-B45 BUILDING SECTIONS - BUILDING 45
AE303-B45 BUILDING SECTIONS - BUILDING 45
AE311-B45 WALL SECTIONS - BUILDING 45
AE312-B45 WALL SECTIONS - BUILDING 45
AE313-B45 WALL SECTIONS - BUILDING 45
AE314-B45 WALL SECTIONS - BUILDING 45
AE315-B45 WALL SECTIONS - BUILDING 45
AE320-B45 STAIR SECTIONS AND ENLARGED PLANS - BUILDING 45
AE321-B45 STAIR SECTIONS, ENLARGED PLANS, DETAILS & ELEVATIONS - BLDG 45
AE322-B45 STAIR/RAMP ENLARGED PLANS AND ELEVATIONS
AE323-B45 ELEVATOR ENLARGED PLANS AND SECTIONS
AE324-B45 DEDUCT ALT.- ELEVATOR ENLARGED PLANS AND SECTIONS
AE325-B45 MECH STAIRS & DEDUCT ALT.- LADDER ENLARGED PLANS AND SECTIONS
AE411-B45 ENLARGED FLOOR PLANS & INTERIOR ELEVATIONS
AE412-B45 ENLARGED FLOOR PLAN, RCP & INTERIOR ELEVATIONS
AE413-B45 ENLARGED FLOOR PLAN, RCP & INTERIOR ELEVATIONS
AE414-B45 ENLARGED FLOOR PLAN, RCP & INTERIOR ELEVATIONS
AE415-B45 ENLARGED FLOOR PLANS, RCP & INTERIOR ELEVATIONS
AE416-B45 ENLARGED TOILET PLANS & INTERIOR ELEVATIONS
AE417-B45 ENLARGED TOILET PLANS & INTERIOR ELEVATIONS
AE418-B45 ENLARGED PLANS, RCP & INTERIOR ELEVATIONS
AE501 EXTERIOR PLAN DETAILS
AE502 EXTERIOR PLAN DETAILS
AE503 EXTERIOR PLAN DETAILS
AE520 EXTERIOR SECTION DETAILS
AE521 EXTERIOR SECTION DETAILS
AE522 EXTERIOR SECTION DETAILS
AE523 EXTERIOR SECTION DETAILS
AE524 EXTERIOR SECTION DETAILS
AE525 EXTERIOR SECTION DETAILS
AE526 EXTERIOR SECTION DETAILS
AE530 ROOF DETAILS
AE540 INTERIOR PLAN DETAILS
AE541 INTERIOR PLAN DETAILS
AE542 INTERIOR PLAN DETAILS
AE543 INTERIOR PLAN DETAILS
AE550 INTERIOR SECTION DETAILS
AE551 INTERIOR SECTION DETAILS
AE560 CEILING DETAILS
AE601 WALL & PARTITION TYPES AND DETAILS
AE602 DOOR SCHEDULE AND ELEVATIONS
AE603 CURTAIN WALL, WINDOW TYPES AND PROFILES
AE640 MOUNTING HEIGHTS
SHEET INDEX - INTERIOR
SHEET NO. SHEET TITLE BI
D
DO
CU
M
-X X-
XX
AF111-B45 FIRST LEVEL FINISH PLAN - BUILDING 45
AF121-B45 SECOND LEVEL FINISH PLAN - BUILDING 45
AF121-B110 SECOND LEVEL FINISH PLAN - BUILDING 110
AF600 MATERIAL AND ROOM FINISH SCHEDULE & FINISH DETAILS
SHEET INDEX - GENERAL
SHEET NO. SHEET TITLE BI
D
DO
CU
M
-X X-
XX
GI000 COVER SHEET
GI001 SHEET INDEX
GI002 ABBREVIATIONS
GI003 GENERAL NOTES AND SYMBOLS
GI111-B45 FIRST LEVEL LIFE SAFETY PLAN - BUILDING 45
GI121-B45 SECOND LEVEL LIFE SAFETY PLAN - BUILDING 45
GC111-B45 FIRST LEVEL INFECTION CONTROL & PHASING PLAN-BUILDING 45
GC121-B45 SECOND LEVEL INFECTION CONTROL & PHASING PLAN-BUILDING 45
GC121-B110 SECOND LEVEL INFECTION CONTROL & PHASING PLAN-BUILDING 110
SHEET INDEX - EQUIPMENT
SHEET NO. SHEET TITLE BI
D
DO
CU
M
-X X-
XX
QH110 FIRST LEVEL EQUIPMENT PLAN - BUILDING 45
QH120 SECOND LEVEL EQUIPMENT PLAN - BUILDING 45
QH411 FIRST LEVEL ENLARGED EQUIPMENT PLANS - BUILDING 45
QH412 FIRST LEVEL ENLARGED EQUIPMENT PLANS - BUILDING 45
QH413 SECOND LEVEL ENLARGED EQUIPMENT PLANS - BUILDING 45
SHEET INDEX - MECHANICAL
SHEET NO. SHEET TITLE BI
D
DO
CU
M
-X X-
XX
MP000 PIPING COVERSHEET
MV000 VENTILATION COVERSHEET
MP111 FIRST LEVEL PLAN - MECHANICAL PIPING
MP121 SECOND LEVEL PLAN - MECHANICAL PIPING
MVD111-B50 FIRST LEVEL PLAN - VENTILATION DEMOLITION
MVD122-B110 SECOND LEVEL PLAN - VENTILATION DEMOLITION - 110
MV110-B45 FIRST LEVEL PLAN - VENTILATION ZONING
MV111-B45 FIRST LEVEL PLAN - VENTILATION
MV120-B45 SECOND LEVEL PLAN - VENTILATION ZONING
MV121-B45 SECOND LEVEL PLAN - VENTILATION
MV131-B45 THIRD LEVEL PLAN - VENTILATION
MV211 ENLARGED PLAN - VENTILATION
MV301 VENTILATION DETAILS
MV302 VENTILATION DETAILS
MV303 VENTILATION DETAILS
MV401 VENTILATION DIAGRAMS
MV402 CONTROL DIAGRAMS
MV501 VENTILATION SCHEDULES
MV502 VENTILATION SCHEDULES
MV503 VENTILATION SCHEDULES
MV504 VENTILATION SCHEDULES
MV505 VENTILATION SCHEDULES
SHEET INDEX - PLUMBING
SHEET NO. SHEET TITLE BI
D
DO
CU
M
-X X-
XX
P000 PLUMBING COVERSHEET
PD101-B50 BASEMENT PLAN - PLUMBING DEMOLITION
PD111-B50 FIRST LEVEL PLAN - PLUMBING DEMOLITION
PD121-B50 SECOND LEVEL PLAN - PLUMBING DEMOLITION
PD121-B110 SECOND LEVEL PLAN - PLUMBING DEMOLITION - 110
P100-B45 UNDERFLOOR PLAN - PLUMBING
P111-B45 FIRST LEVEL PLAN - PLUMBING
P121-B45 SECOND LEVEL PLAN - PLUMBING
P121-B110 SECOND LEVEL PLAN - PLUMBING - 110
P131-B45 ROOF PLAN - PLUMBING
P301 PLUMBING DETAILS
P401 PLUMBING DIAGRAMS
P402 PLUMBING DIAGRAMS
P501 PLUMBING SCHEDULES
SHEET INDEX - ELECTRICAL
SHEET NO. SHEET TITLE BI
D
DO
CU
M
-X X-
XX
E004 SITE LIGHTING
E001 ELECTRICAL COVERSHEET
EL111-B45 FIRST LEVEL PLAN - ELECTRICAL LIGHTING
EL121-B45 SECOND LEVEL PLAN - ELECTRICAL LIGHTING
EP111-B45 FIRST LEVEL PLAN - ELECTRICAL POWER
EP121-B45 SECOND LEVEL PLAN - ELECTRICAL POWER
ES111-B45 FIRST LEVEL PLAN - ELECTRICAL SYSTEMS
ES121-B45 SECOND LEVEL PLAN - ELECTRICAL SYSTEMS
E301 ELECTRICAL DETAILS
E401-B45 ELECTRICAL RISER DIAGRAMS
E501-B45 ELECTRICAL SCHEDULES - BUILDING 45
E002 ELECTRICAL NOTES
ED111-B50 FIRST LEVEL PLAN - ELECTRICAL DEMOLITION
ED121-B50 SECOND LEVEL PLAN - ELECTRICAL DEMOLITION
E502-B45 ELECTRICAL SCHEDULES - BUILDING 45
EL122-B110 SECOND LEVEL PLAN - ELECTRICAL LIGHTING - 110
EP122-B110 SECOND LEVEL PLAN - ELECTRICAL POWER - 110
ES122-B110 SECOND LEVEL PLAN - ELECTRICAL SYSTEMS - 110
ED122-B110 SECOND LEVEL PLAN - ELECTRICAL DEMOLITION - 110
ET101-B45 SITE PLAN - ELECTRICAL & TECHNOLOGY
E003 MASTER SITE PLAN - ELECTRICAL
ES500-B45 FIRE ALARM DETAILS
E600-B45 ENLARGED PLANS
E503-B110 ELECTRICAL SCHEDULES - BUILDING 110
SHEET INDEX - CIVIL
SHEET NO. SHEET TITLE BI
D
DO
CU
M
-X X-
XX
D-101 EXISTING CONDITIONS & REMOVALS PLAN
C-001 OVERALL SITE PLAN
C-101 SITE PLAN
C-102 UTILITY PLAN
C-103 GRADING AND EROSION CONTROL PLAN
C-104 GRADING ENLARGEMENT
C-105 SITE DETAILS
L-101 SITE RESTORATION PLAN
L-102 SITE RESTORATION DETAILS
SHEET INDEX - STRUCTURAL
SHEET NO. SHEET TITLE BI
D
DO
CU
M
-X X-
XX
SG000-B45 GENERAL NOTES
SG001-B45 ABBREVIATIONS & SYMBOLS
SD100-B45 DEMO AND BRACING PHASING PLAN
SB100-B45 FOUNDATION / FIRST LEVEL PLAN
SF101-B45 SECOND FLOOR / LOW ROOF FRAMING PLAN
SF102-B45 HIGH ROOF FLOOR FRAMING PLAN
SF103-B45 ROOF OVERBUILD FRAMING PLAN
SJ300-B45 FOUNDATION DETAILS
SJ301-B45 FOUNDATION DETAILS
SJ400-B45 MASONRY DETAILS
SJ500-B45 STEEL DETAILS
SJ501-B45 STEEL DETAILS
SJ502-B45 STEEL AND COLDFORM DETAILS
SJ700-B45 ELEVATIONS
SHEET INDEX - TECHNOLOGY
SHEET NO. SHEET TITLE BI
D
DO
CU
M
-X X-
XX
T001 TECHNOLOGY COVERSHEET
T003 MASTER SITE - TECHNOLOGY
T100 - B110 OVERALL GROUND FLOOR PLAN - TECHNOLOGY - BLDG 110
T103 - B146 OVERALL FIRST FLOOR PLAN - TECHNOLOGY - BLDG 146
T104 - B135 OVERALL GROUND FLOOR PLAN - TECHNOLOGY - BLDG 135
T106 - B110B OVERALL FIRST FLOOR PLAN - TECHNOLOGY - BLDG 110B
T122-B110 SECOND LEVEL PLAN - TECHNOLOGY - 110
T111-B45 FIRST LEVEL PLAN - TECHNOLOGY
T121-B45 SECOND LEVEL PLAN - TECHNOLOGY
TD122-B110 SECOND LEVEL PLAN - TECHNOLOGY DEMOLITION - 110
T131-B45 ROOF PLAN - TECHNOLOGY
T201 ENLARGED PLANS - TECHNOLOGY
T301 TECHNOLOGY DETAILS
T401 TECHNOLOGY DIAGRAMS
T402 TECHNOLOGY DIAGRAMS
T501 TECHNOLOGY SCHEDULES
SHEET INDEX - FIRE PROTECTION
SHEET NO. SHEET TITLE BI
D
DO
CU
M
-X X-
XX
FP000 FIRE PROTECTION COVERSHEET
FPD101-B50 BASEMENT PLAN - FIRE PROTECTION DEMOLITION
FPD111-B50 FIRST LEVEL PLAN - FIRE PROTECTION DEMOLITION
FPD121-B50 SECOND LEVEL PLAN - FIRE PROTECTION DEMOLITION
FPD131-B50 ATTIC PLAN - FIRE PROTECTION DEMOLITION
FP111-B45 FIRST LEVEL PLAN - FIRE PROTECTION
FP121-B45 SECOND LEVEL PLAN - FIRE PROTECTION
FP301 FIRE PROTECTION DETAILS
FP401 FIRE PROTECTION DIAGRAMS
FP501 FIRE PROTECTION SCHEDULES
Revisions: Date: 09/12/2022
I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name: Steve Schlotthauer
ARCHITECTURAL ABBREVIATIONS
A/C
A/C UNIT
A/E
AAMA
AAP
AB
ABC
ACC
ACI
ACT
ACS DR
ACS FLR
ACS PNL
ACST
AD
ADA
ADC
ADDL
ADDN
ADH
ADJ
ADMIN
AFF
AFG
AFS
AGC
AGGR
AHJ
AHR
AHU
AIA
AISC
ALT
ALT NO
ALUM
AMT
ANOD
ANSI
ANT
AP
APA
APC
APPD
APPROX
AR
ARCH
ASB
ASI
ASKLR
ASPH
ASSN
ASTM
ATCH
ATM
AUTO
AUX
AV
AVG
AW
AWI
AWPA
AWS
B PL
BAT
BD
BD FT
BEV
BHMA
BI FLD DR
BITUM
BKG
BLD
BLDG
BM
BOT
BRCG
BRDG
BRDG JST
BRG
BRG PL
BRKT
BRZ
BSMT
BTWN
BUR
C CONC
C TO C
CAB
CAC
CB
CBB
CCD
CCTV
CCW
CD
CEM
CEM PLAS
CER
CF
CF/CI
CF/OI
CFLG
CFMF
CG
CGSFU
CH
CHEM
CHFR
CHK
CI
CIP
CIR
CIRC
CJ
CL
CLDG
CLG
CLR
CM
CMU
AIR CONDITION
AIR CONDITIONING UNIT
ARCHITECT/ENGINEER
AMERICAN ARCHITECTURAL MANUFACTURERS ASSN
ALARM ANNUNCIATOR PANEL
ANCHOR BOLT
AGGREGATE BASE COURSE
ACCESSIBLE
AMERICAN CONCRETE INSTITUTE
ACOUSTICAL CEILING TILE
ACCESS DOOR
ACCESS FLOOR
ACCESS PANEL
ACOUSTIC
AREA DRAIN
AMERICANS WITH DISABILITIES ACT
AUTOMATIC DOOR CLOSER
ADDITIONAL
ADDITION
ADHESIVE
ADJACENT, ADJOINING, OR ADJUSTABLE
ADMINISTRATION
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ABOVE FINISHED SLAB
ASSOCIATED GENERAL CONTRACTORS
AGGREGATE
AUTHORITY HAVING JURISDICTION
ANCHOR
AIR HANDLING UNIT
AMERICAN INSTITUTE OF ARCHITECTS
AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALTERNATE
ALTERNATE NUMBER
ALUMINUM
AMOUNT
ANODIZE
AMERICAN NATIONAL STANDARDS INSTITUTE
ANTENNA
ACCESS PANEL
AMERICAN PLYWOOD ASSOCIATION
ARCHITECTURAL PRECAST CONCRETE
APPROVED
APPROXIMATE
AS REQUIRED
ARCHITECT
ASBESTOS
ARCHITECT'S SUPPLEMENTAL INSTRUCTION
AUTOMATIC SPRINKLER
ASPHALT
ASSOCIATION
AMERICAN SOCIETY FOR TESTING AND MATERIALS
ATTACHMENT
AUTOMATIC TELLER MACHINE
AUTOMATIC
AUXILIARY
AUDIO VISUAL
AVERAGE
ACID WASTE
ARCHITECTURAL WOODWORKING INSTITUTE
AMERICAN WOOD PRESERVERS' ASSOCIATION
AMERICAN WELDING SOCIETY
BASE PLATE
BATTEN
BOARD
BOARD FEET (FOOT)
BEVEL
BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION
BIFOLDING DOORS
BITUMINOUS
BACKING
BUILD
BUILDING
BEAM OR BENCHMARK
BOTTOM
BRACING
BRIDGING
BRIDGING JOIST
BEARING
BEARING PLATE
BRACKET
BRONZE
BASEMENT
BETWEEN
BUILT-UP ROOFING
CAST CONCRETE
CENTER TO CENTER
CABINET
CEILING ATTENUATION CLASS
CATCH BASIN OR CORNER BEAD
CEMENTITIOUS (BACKER) BOARD
CONSTRUCTION CHANGE DIRECTIVE
CLOSED CIRCUIT TELEVISION
COUNTERCLOCKWISE
CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS
CEMENT
CEMENT PLASTER
CERAMIC
CONTRACTOR FURNISHED
CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CONTRACTOR FURNISHED/OWNER INSTALLED
COUNTERFLASHING
COLD-FORMED METAL FRAMING
CORNER GUARD
CERAMIC GLAZED STRUCTURAL FACING UNITS
COAT HOOK
CHEMICAL
CHAMFER
CHECK
CAST IRON
CAST-IN-PLACE
CIRCLE
CIRCULAR
CONSTRUCTION JOINT OR CONTROL JOINT
CENTER LINE
CLADDING
CEILING
CLEAR
CONSTRUCTION MANAGEMENT
CONCRETE MASONRY UNIT
CNR
CNTR
CRTP
CO
CO2
COL
COM
COMB
COMM
COMP
CONC
CONC FLR
COND
CONF
CONN
CONSTR
CONT
CONTR
COORD
CORR
CPM
CPRS
CR
CRS
CRSI
CSB
CSG
CSI
CSK
CSMT
CSWK
CTG
CTR
CTRL
CTV
CU FT
CU IN
CU YD
CURT
CYL
CYL L
D
DAT
DBL
DBL GLZ
DCS
DP
DEG
DEL
DEMO
DEPT
DET
DF
DIA
DIAG
DIFF
DIM
DIR
DISP
DIST
DIV
DL
DOC
DR
DR CL
DR FR
DR OPNG
DS
DSGN
DW
DWG
E
EA
EFF
EFS
EIFS
EJ
EL
ELAST
ELEC
ELEC DR OP
ELEV
EMER
EMER SHR
ENCL
ENGR
ENVIR
EO
EPA
EPDM
EPO
EPS
EQ
EQL SP
EQUIP
EQUIV
ERD
ESC
ESMT
ESP
EST
ETC
EW
EWC
EWS
EXH
EXIST
EXP
EXP BT
EXST GR
EXT
EXT GR
CORNER
COUNTER
COUNTERTOP
CARBON MONOXIDE
CARBON DIOXIDE
COLUMN
COMMON
COMBINATION, COMBINED
COMMUNICATION
COMPONENT
CONCRETE
CONCRETE FLOOR
CONDENSER OR CONDITION
CONFERENCE
CONNECT
CONSTRUCTION
CONTINUOUS
CONTRACTOR
COORDINATE
CORRIDOR
CRITICAL PATH METHOD
COMPRESSIBLE
CARD READER
COLD ROLLED STEEL
CONCRETE REINFORCING STEEL INSTITUTE
CONCRETE SPLASH BLOCK
CASING
CONSTRUCTION SPECIFICATIONS INSTITUTE
COUNTER SUNK
CASEMENT
CASEWORK
COATING
CENTER
CONTROL
CABLE TELEVISION
CUBIC FEET
CUBIC INCH
CUBIC YARD
CURTAIN
CYLINDER
CYLINDER LOCK
DEPTH OR PENNY (NAIL)
DATUM
DOUBLE
DOUBLE GLAZE
DIAPER CHANGING STATION
DECORATIVE PANEL
DEGREE
DELETE
DEMOLITION
DEPARTMENT
DETAIL
DRINKING FOUNTAIN
DIAMETER
DIAGONAL
DIFFERENCE OR DIFFUSER
DIMENSION
DIRECTION
DISPENSER
DISTANCE
DIVIDE OR DIVISION
DEAD LOAD
DOCUMENT
DOOR, DRAIN, DRESSING ROOM, OR DRIVE
DOOR CLOSER
DOOR FRAME
DOOR OPENING
DOWNSPOUT
DESIGN
DISHWASHER
DRAWING
EAST
EACH
EFFICIENCY
EXTERIOR FINISH SYSTEM
EXTERIOR INSULATION AND FINISH SYSTEM
EXPANSION JOINT
ELEVATION
ELASTOMERIC
ELECTRIC
ELECTRIC DOOR OPENER
ELEVATOR
EMERGENCY
EMERGENCY SHOWER
ENCLOSURE
ENGINEER
ENVIRONMENT
ELECTRICAL OUTLET
ENVIRONMENTAL PROTECTION AGENCY
ETHYLENE PROPYLENE DIENE MONOMER
EMERGENCY POWER OFF
EXPANDED POLYSTYRENE BOARD (INSULATION)
EQUAL
EQUALLY SPACED
EQUIPMENT
EQUIVALENT
EXISTING ROOF DRAIN
ESCAPE OR ESCUTCHEON
EASEMENT
ESPECIALLY
ESTIMATE
AND SO FORTH OR ET CETERA
EACH WAY
ELECTRIC WATER COOLER
EYE WASH STATION
EXHAUST
EXISTING
EXPANSION OR EXPOSED
EXPANSION BOLT
EXISTING GRADE
EXTERIOR, EXTERNAL, OR EXTINGUISHER
EXTERIOR GRADE
F
FA
FAB
FAC
FACIL
FAS
FAS BD
FCU
FCO
FCTY
FD
FDC
FDTN
FE
FEC
FF
FF EL
FF&E
FHC
FHP
FIG
FIL
FIN
FIN FLR
FIN GR
FIN WD
FIXT
FL
FLASH
FLDG
FLEX
FLG
FLR
FLR FIN
FLR SK
FLUOR
FLUOR FIX
FM
FM-G
FO
FOC
FOF
FOM
FOS
FOUNT
FOW
FP
FR
FR SNK
FREQ
FRMG
FRP
FRZ
FS
FSB
FSTNR
FT
FTG
FURG
FURN
FUT
FV
FVC
GA
GAL
GALV
GALV STL
GB
GC
GD
GDR
GEN
GFRC
GFRG
GFRP
GI
GL
GL BLK
GLU LAM
GP
GR FL
GRAN
GRTG
GSB
GSM
GSU
GT
GUAR
GUT
GYP
GYP BD
GYP PLAS
H
HAZ MAT
HB
HC
HCWD
HDBD
HDO
HDR
HDW
HDWD
HEPA
HEX
HGR
HM
HMD
HMDF
HMF
HNDRL
HO
HORIZ
HOSP
HP
HPD
HPDL
HQ
HS
HSE
HSKPG
FAHRENHEIT OR FEMALE
FIRE ALARM
FABRIC
FACTOR
FACILITY
FASCIA
FASCIA BOARD
FAN COIL UNIT
FLOOR CLEANOUT
FACTORY
FLOOR DRAIN
FIRE DEPARTMENT CONNECTION
FOUNDATION
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FINISH FACE
FINISH FLOOR ELEVATION
FURNITURE, FIXTURE, AND EQUIPMENT
FIRE HOSE CABINET
FULL HEIGHT PARTITION
FIGURE
FILLET
FINISH
FINISH FLOOR
FINISH GRADE
FINISH WOOD
FIXTURE
FLOORLINE
FLASHING
FOLDING
FLEXIBLE
FLOORING
FLOOR
FLOOR FINISH
FLOOR SINK
FLUORESCENT
FLUORESCENT FIXTURE
FACTORY MUTUAL
FACTORY MUTUAL GLOBAL
FINISHED OPENING
FACE OF CONCRETE OR FACE OF CURB
FACE OF FINISH
FACE OF MASONRY
FACE OF SLAB OR FACE OF STUD
FOUNTAIN
FACE OF WALL
FIRE PROTECTION OR FIREPROOF
FIRE RATING, FIRE RESISTANT, OR FRAME
FLUSHING RIM SINK
FREQUENCY
FRAMING
FIBERGLASS REINFORCED PLASTIC
FREEZER
FEDERAL SPECIFICATION
FOLDING SHOWER BENCH
FASTENER
FEET OR FOOT
FOOTING
FURRING
FURNISH OR FURNITURE
FUTURE
FIELD VERIFY
FIRE VALVE CABINET
GAGE OR GYPSUM ASSOCIATION
GALLON
GALVANIC OR GALVANIZED
GALVANIZED STEEL
GRAB BAR
GENERAL CONTRACTOR
GUARD
GUARD RAIL
GENERAL OR GENERATOR
GLASS-FIBER-REINFORCED CONCRETE
GLASS-FIBER-REINFORCED GYPSUM
GLASS-FIBER-REINFORCED PLASTIC
GALVANIZED IRON
GLASS
GLASS BLOCK
GLUED LAMINATED WOOD
GRAB BAR
GROUND FLOOR
GRANITE
GRATING
GYPSUM SHEATHING BOARD
GALVANIZED SHEET METAL
GLAZED STRUCTURAL UNIT
GROUT
GUARANTEE
GUTTER
GYPSUM
GYPSUM BOARD
GYPSUM PLASTER
HIGH OR HUMIDISTAT
HAZARDOUS MATERIALS
HOSE BIBB
HOLLOW CORE
HOLLOW CORE WOOD DOOR
HARDBOARD
HIGH DENSITY OVERLAY
HEADER
HARDWARE
HARDWOOD
HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HEXAGON
HANGER
HOLLOW METAL
HOLLOW METAL DOOR
HOLLOW METAL DOOR AND FRAME
HOLLOW METAL FRAME
HANDRAIL
HOLD OPEN
HORIZONTAL
HOSPITAL
HIGH PRESSURE
HYGIENE PRODUCT DISPOSAL
HIGH PRESSURE DECORATIVE LAMINATE
HEADQUARTERS
HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH
HOUSE
HOUSEKEEPING
HST
HSS
HT
HVAC
HVY
HW
HYD
HYDR
IAQ
IBC
IC
ICW
ID
ID NO
ILLUM
INCL
IND
INFO
INSUL
INT
INTL
IWH
JAN
KD
KIT
KO
KPL
LAB
LAD
LAM
LAM GL
LAU
LAV
LBR
LBS
LCS
LD BRG
LDR
LED
LF
LIB
LIN
LIQ
LKR
LKR RM
LL
LMST
LRG
LRV
LS
LT
LT GA
LT WT
LTG
LTNG
LVD
LVR
LWC
LWIC
LYR
MACH
MACH RM
MAINT
MAN
MATL
MATV
MAX
MBD
MCB
MD
MDF
MDO
ME
MEAS
MECH
MECH RM
MED
MEK
MEMB
MEMO
MEZZ
MF
MFD
MFG
MFR
MFR REC
MGT
MIC
MID
MIL STD
MIN
MIR
MISC
MIT
MKR
ML
MLDG
MLWK
mm
MO
MOD
MOD BIT
MON
MOPR
MR
MS
MTD
MTG
MTL
MULL
MW
MWP
HOIST
HOLLOW STRUCTURAL STEEL
HEIGHT
HEATING, VENTILATING, AND AIR CONDITIONING
HEAVY
HOT WATER
HYDRANT
HYDRAULIC
INDOOR AIR QUALITY
INTERNATIONAL BUILDING CODE
INFECTION CONTROL
INFECTION CONTROL WALL
INSIDE DIAMETER
IDENTIFICATION NUMBER
ILLUMINATION
INCLUDED
INDEPENDENT OR INDUSTRIAL
INFORMATION
INSULATION
INTERIOR
INTERNATIONAL
INSTANTANEOUS WATER HEATER
JANITOR
KILN DRIED OR KNOCKED DOWN
KITCHEN
KNOCKOUT
KICKPLATE
ANGLE
LABORATORY
LADDER
LAMINATE
LAMINATED GLASS
LAUNDRY
LAVATORY
LUMBER
POUND
LOCKABLE CHARTING STATION/MED CABINET
LOAD-BEARING
LEADER
LIGHT EMITTING DIODE
LINEAR FEET (FOOT)
LIBRARY
LINEAR
LIQUID
LOCKER
LOCKER ROOM
LEAD LINED
LIMESTONE
LARGE
LOUVERED ROOF VENT
LIGHT SWITCH
LIGHT
LIGHT GAGE
LIGHTWEIGHT
LIGHTING
LIGHTNING
LOUVERED
LOUVER
LIGHTWEIGHT CONCRETE
LIGHTWEIGHT INSULATING CONCRETE
LAYER
MACHINE
MACHINE ROOM
MAINTENANCE
MANUAL
MATERIAL
MASTER ANTENNA TELEVISION SYSTEM
MAXIMUM
MARKER BOARD
METAL CORNER BEAD
DECK
MEDIUM DENSITY FIBERBOARD
MEDIUM DENSITY OVERLAY
MECHANICAL ENGINEER
MEASURE
MECHANICAL
MECHANICAL ROOM
MEDICAL, MEDIUM
METHYL ETHYL KETONE
MEMBRANE
MEMORANDUM
MEZZANINE
MILL FINISH
MANUFACTURED
MANUFACTURING
MANUFACTURER
MANUFACTURER'S RECOMMENDATION
MANAGEMENT
MICROPHONE
MIDDLE
MILITARY STANDARD
MINIMUM
MIRROR
MISCELLANEOUS
MITER
MARKER
METAL LATH
MOLDING (MOULDING)
MILLWORK
MILLIMETER
MASONRY OPENING
MODEL, MODIFY OR MODULE
MODIFIED BITUMEN
MONITOR
MOP RACK
MOISTURE RESISTANT
MOP SINK
MOUNTED
MOUNTING
METAL
MULLION
MICROWAVE
MEMBRANE WATERPROOFING
N
NA
NAT
NATL
NC
NCOMBL
NEC
NEG
NEMA
NEUT
NFC
NFPA
NIC
NO
NOM
NR
NRC
NRCA
NRP
NS
NUM
O/O O
OA
OC
OCC
OCT
OD
OD
OF/CI
OFD
OFF
OF/OI
OH
OH DR
OPH
OPNG
OPP
OPR
OPT
OR
ORD
ORG
ORIG
ORN
OSHA
OUT
OZ
P
PAR
PARA
PART
PAT
PB
PBD
PC
PCA
PCC
PCCP
PCD
PCF
PCP
PCT
PED
PEN
PEND
PERF
PERIM
PERP
PHAR
PHOTO
PKG
PL
PL GL
PLAM
PLAS
PLBG
PLYWD
PMTL
PNEU
PNL
PO
POLY
PP
PR
PRCST
PREFAB
PREFIN
PRELIM
PREP
PRESS
PREV
PRKG
PRMLD
PROJ
PROP
PSF
PSI
PT
PTD
PTN
PTS
PVC
PVG
PWR
QA
QC
QRY
QTR
QTY
QUAD
QUAL
R
RA
RAD
RBM
RBR
NORTH
NOT APPLICABLE
NATURAL
NATIONAL
NOISE CRITERIA OR NURSE CALL
NONCOMBUSTIBLE
NATIONAL ELECTRICAL CODE
NEGATIVE
NATIONAL ELECTRICAL MANUFACTURERS ASSN
NEUTRAL
NATIONAL FIRE CODE
NATIONAL FIRE PROTECTION ASSOCIATION
NOT IN CONTRACT
NUMBER
NOMINAL
NOISE REDUCTION
NOISE REDUCTION COEFFICIENT
NATIONAL ROOFING CONTRACTORS ASSOCIATION
NONREMOVABLE
NARROW STILE
NUMERAL
OUT TO OUT
OXYGEN
OUTSIDE AIR OR OVERALL
ON CENTER
OCCUPY
OCTAGON
OUTSIDE DIAMETER, OUTSIDE DIMENSION
OUTSIDE DIAMETER/OUTSIDE DIMENSION
OWNER FURNISHED/CONTRACTOR INSTALLED
OVERFLOW DRAIN
OFFICE
OWNER FURNISHED/OWNER INSTALLED
OVERHANG
OVERHEAD (COILING) DOOR
OPPOSITE HAND
OPENING
OPPOSITE
OPERABLE
OPTIONAL
OPERATING ROOM OR OUTSIDE RADIUS
ORDNANCE OR OVERFLOW ROOF DRAIN
ORGANIC
ORIGINAL
ORNAMENTAL
OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION
OUTLET
OUNCE
PAINT
PARALLEL OR PARAPET
PARAGRAPH
PARTIAL
PATTERN
PUSHBUTTON
PARTICLEBOARD
PIECE, POLYCARBONATE OR PORTLAND CEMENT
PORTLAND CEMENT ASSOCIATION
PRECAST CONCRETE
CONCRETE PAVEMENT
PAPER CUP DISPENSER
POUNDS PER CUBIC FOOT
PORTLAND CEMENT PLASTER
PRIVACY CURTAIN TRACK
PEDESTAL
PENETRATE
PENDANT
PERFORATED
PERIMETER
PERPENDICULAR
PHARMACY
PHOTOGRAPH
PACKAGE
PROPERTY LINE
PLATE GLASS
PLASTIC LAMINATE
PLASTER OR PLASTIC
PLUMBING
PLYWOOD
PAINTED METAL
PNEUMATIC
PANEL
POST OFFICE, PURCHASE ORDER
POLYETHYLENE (PLASTIC)
PUSH PLATE
PAIR
PRECAST
PREFABRICATE
PREFINISH
PRELIMINARY
PREPARATION
PRESSURE
PREVIOUS
PARKING
PREMOLDED
PROJECT
PROPERTY
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PORCELAIN TILE OR PRESSURE TREATED
PAPER TOWEL DISPENSER
PARTITION
PNEUMATIC TUBE STATION
POLYVINYL CHLORIDE (PLASTIC)
PAVING
POWER
QUALITY ASSURANCE
QUALITY CONTROL
QUARRY
QUARTER
QUANTITY
QUADRANT
QUALITY
RADIUS OR RISER
RETURN AIR
RADIATOR
REINFORCED BRICK MASONRY
RUBBER
RC
RCP
RCVR
RD
REC
RECD
RECPT
RECT
REF
REFR
REG
REINF
REP
REPL
REQ
REQD
RET
REV
RFG
RFI
RFP
RFS
RL
RLG
RM
RM LT
RND
RO
ROW
RS
RSV
RT
RV
RVS
RWL
S
SA
SALV
SAMP
SAN
SB
SBS
SBSTR
SC
SCH
SCHED
SCHEM
SCP
SCRN
SCT
SCWD
SD
SDG
SECT
SEG
SEL
SEP
SF
SFTWD
SGD
SGL
SHR
SHR HD
SHRD
SHT
SHTHG
SHV
SIM
SJ
SJI
SK
SKLT
SLDG
SLNT
SM
SMK
SND INS
SPEC
SPKLR
SPKR
SPLY
SPR
SQ
SQ IN
SQ YD
SST
ST
STC
STD
STIF
STL JST
STL LNTL
STL PL
STL RF DK
STL TB
STL TR
STNLS
STOR
STR
STRUCT
STRUCT STL
SUB
SURF
SUSP
SUSP CLG
SW
SWDR
SYM
SYNTH
SYS
REMOTE CONTROL
REFLECTED CEILING PLAN
RECEIVER
ROAD OR ROOF DRAIN
RECESSED
RECEIVED
RECEPTACLE
RECTANGLE
REFERENCE OR REFRIGERATOR
REFRACTORY, REFRIGERATION
REGISTER
REINFORCE
REPAIR
REPLACE
REQUIRE
REQUIRED
RETURN
REVISION
ROOFING
REQUEST FOR INFORMATION
REQUEST FOR PROPOSAL
ROOM FINISH SCHEDULE
ROOF LEADER
RAILING
ROOM
NURSE CALL LIGHT/ROOM LIGHT
ROUND
ROUGH OPENING
RIGHT OF WAY
ROUGH SAWN
RESILIENT SHEET VINYL
RIGHT
ROOF VENT
REVERSE
RAIN WATER LEADER
SOLID SURFACE
SUPPLY AIR
SALVAGE
SAMPLE
SANITARY
SPLASH BLOCK
STYRENE BUTADIEN STYRENE
SUBSTRATE
SHARPS CONTAINER
SCHOOL
SCHEDULE
SCHEMATIC
SCUPPER
SCREEN
SHOWER CURTAIN TRACK
SOLID CORE WOOD DOOR
SMOKE DETECTOR/SOAP DISPENSER
SIDING
SECTION
SEGMENT
SELECT
SEPARATE
SQUARE FOOT (FEET)
SOFTWOOD
SLIDING GLASS DOOR
SINGLE
SHOWER
SHOWER HEAD
SHOWER DRAIN
SHEET
SHEATHING
SHELVING
SIMILAR
SCORED JOINT
STEEL JOIST INSTITUTE
SKETCH
SKYLIGHT
SLIDING
SEALANT
SHEET METAL
SMOKE
SOUND INSULATION
SPECIFICATION
SPRINKLER
SPEAKER
SUPPLY
SINGLE PLY ROOF SYSTEM
SQUARE
SQUARE INCH
SQUARE YARD
STAINLESS STEEL
STAIRS OR STREET
SOUND TRANSMISSION CLASS
STANDARD
STIFFENER
STEEL JOIST
STEEL LINTEL
STEEL PLATE
STEEL ROOF DECK
STEEL TUBE
STEEL TRUSS
STAINLESS
STORAGE
STRINGERS
STRUCTURAL
STRUCTURAL STEEL
SUBSTITUTE
SURFACE
SUSPEND
SUSPENDED CEILING
SWITCH
SWING DOOR
SYMBOL
SYNTHETIC
SYSTEM
T T&M
TB
TBD
TECH
TEL
TEMP
THERM
THK
THRES
THRU
THRUOUT
TMPD
TMPD GL
TN
TO
TO FDN
TOB
TOM
TOP
TOS
TOW
TPD
TRANS
TRTD
TS
TSTAT
TV
TYP
U
UC
UGND
UL
ULT
UNFIN
UNO
UPS
UR
UTIL
UV
VAC
VAR
VEH
VENT
VERT
VEST
VFD
VIC
VID
VIF
VNR
VOC
VOL
VR
VTR
VWC
W/ W/O
WBL
WC
WD
WDW
WF
WFR
WFS
WH
WHSE
WP
WPM
WR
WS
WSCT
WT
X BRACE
XPS
YD
TREAD OR THERMOSTAT
TIME AND MATERIALS
TOWEL BAR
TACK BOARD
TECHNICAL
TELEPHONE
TEMPERATURE OR TEMPORARY
THERMAL
THICKNESS
THRESHOLD
THROUGH
THROUGHOUT
TEMPERED
TEMPERED GLASS
TRUE NORTH
TOP OF ___
TOP OF FOUNDATION
TOP OF BEAM
TOP OF MASONRY
TOP OF PARAPET
TOP OF STEEL
TOP OF WALL
TOILET PAPER DISPENSER
TRANSOM
TREATED
TUBE STEEL
THERMOSTAT
TELEVISION
TYPICAL
HEAT TRANSFER COEFFICIENT
UNDERCUT
UNDERGROUND
UNDERWRITERS LABORATORIES
ULTIMATE
UNFINISH
UNLESS NOTED OTHERWISE
UNINTERRUPTIBLE POWER SUPPLY
URINAL
UTILITY
ULTRAVIOLET
VACUUM
VARIES
VEHICLE
VENTILATION
VERTICAL
VESTIBULE
VARIABLE FREQUENCY DRIVE
VICINITY
VIDEO
VERIFY IN FIELD
VENEER
VOLATILE ORGANIC COMPOUND
VOLUME
VAPOR RETARDER
VENT THROUGH ROOF
VINYL WALL COVERING
WITH
WITHOUT
WOOD BLOCKING
WATER CLOSET
WOOD
WINDOW
WIDE FLANGE
WOOD FRAME
WOOD FURRING STRIPS
WATER HEATER
WAREHOUSE
WATERPROOFING
WATERPROOF MEMBRANE
WEATHER RESISTANT
WEATHERSTRIP OR WALL SCONCE
WAINSCOT
WEIGHT OR WINDOW TREATMENT
CROSS BRACE
EXTRUDED POLYSTYRENE BOARD
YARD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/8
/2
:2
:3
A
M
GI002
ABBREVIATIONS CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
09/02/2022 LA GJB16149Revisions: Date: 09/12/2022
I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name: Steve Schlotthauer
GENERAL NOTES
1. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF
CONSTRUCTION WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT.
INCIDENTAL WORK MAY BE NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURAL
DRAWINGS DUE TO CHANGES AFFECTING ELECTRICAL, MECHANICAL AND PLUMBING
ALONG WITH OTHER SYSTEMS. THIS INCIDENTAL WORK SHALL BE PART OF THIS
CONTRACT, AND ALL TRADES SHALL INSPECT THESE AREAS, ASCERTAIN WORK
REQUIRED AND DO THE WORK IN ACCORDANCE OF CONTRACT REQUIREMENTS AT
NO ADDITIONAL COST.
2. CONTRACTORS SHALL VISIT THE SITE DURING BIDDING TO BECOME FAMILIAR WITH
THE EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL LOCATE, INSPECT
AND FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS PRIOR
TO DEMOLITION AND CONSTRUCTION. NOTIFY ARCHITECT IMMEDIATELY OF ANY
DISCREPANCIES.
3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY
DISCREPANCIES.
4. WHEREVER OPENINGS ARE CUT THROUGH FIRE RATED PARTITIONS, IT SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR FOR WHOM THE HOLE IS CUT TO PATCH
AND REPAIR ANY OPENING TO MAINTAIN THE INTEGRITY OF THE FIRE RATING.
5. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES
AND DUCTS FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL
CONTRACTOR PRIOR TO PROCEEDING WITH REMODELING.
6. FIREPROOFING SHALL BE UNPIERCED. ANY SUBCONTRACTOR PENETRATING THE
FIREPROOFING SHALL BE REQUIRED TO REPLACE FIREPROOFING TO THE ORIGINAL
CONDITION AND FIRE RATING, AT THE SUBCONTRACTORS EXPENSE.
7. EQUIPMENT UNIT DIMENSIONS ARE FOR PRODUCT DESCRIPTION ONLY, VERIFY SIZE
WITH MANUFACTURER.
8. ALL DIMENSIONS PERTAINING TO MECHANICAL OR ELECTRICAL SERVICES OR
EQUIPMENT SHALL BE VERIFIED WITH THE RESPECTIVE TRADE.
9. ALL CONTRACTORS THAT PENETRATE AND/OR DISTURB ANY AREAS AT EXISTING
CONDITIONS SHALL PATCH AREA TO MATCH EXISTING ADJACENT AREA OR
SURFACE AND PREPARE FOR SCHEDULED FINISH APPLICATION. COORDINATE WORK
WITH GENERAL CONTRACTOR PRIOR TO PROCEEDING.
10. VERIFY HEIGHTS AND LOCATIONS OF ACCESS PANELS (AP) AND COORDINATE
TYPES WITH TRADES WHICH REQUIRE THEM.
11. PROVIDE LINTELS AND FRAMING FOR GRILLES, LOUVERS, AND ROOF VENTS AS
REQUIRED BY MECHANICAL CONTRACTOR, VERIFY SIZE AND LOCATION.
12. STRUCTURAL, MECHANICAL, AND ELECTRICAL ABBREVIATIONS AND SYMBOLS MAY
DIFFER FROM ARCHITECTURAL. SEE RESPECTIVE SECTIONS AND/OR DRAWINGS FOR
DEFINITIONS.
13. AT MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, PROVIDE 3/4" FRT
PLYWOOD BACKING BEHIND ALL SURFACE MOUNTED FIXTURES AND EQUIPMENT,
UNLESS NOTED OTHERWISE.
14. CONTRACTOR SHALL EVALUATE INTEGRITY OF ALL PARTITIONS INDICATED BY
SYMBOLS ON THE LIFE SAFETY PLAN(S) WITHIN THE PROJECT SCOPE AND UPGRADE
AS REQUIRED. ALL FIRE RESISTIVE RATED WALLS SHALL BE CONSTRUCTED OF
MATERIALS / ASSEMBLIES MEETING THE RATING INDICATED, TERMINATE AT THE
DECK ABOVE WITH A TESTED HEAD OF WALL ASSEMBLY AND ALL PENETRATIONS
SHALL BE SEALED WITH A TESTED ASSEMBLY. ALL SMOKE PARTITIONS SHALL BE
CONSTRUCTED OF MATERIALS THAT RESIST THE PASSAGE OF SMOKE, TERMINATE
AT THE DECK ABOVE WITH A JOINT SEALED WITH FIRE CAULK AND ALL
PENETRATIONS SHALL BE SEALED WITH FIRE CAULK.
DEMOLITION GENERAL NOTES
1. GENERAL CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK, PHASING
AND SEQUENCING WITH THE OWNER. ANY INFORMATION REGARDING SEQUENCING
PROVIDED IN THESE DOCUMENTS IS FOR ARCHITECT - OWNER PLANNING
PURPOSES ONLY, UNLESS NOTED OTHERWISE.
2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH ALL
TRADES FOR THE DEMOLITION WORK REQUIRED FOR THIS PROJECT.
3. WHERE PARTITIONS ARE INDICATED TO BE REMOVED, REMOVE PARTITION ALONG
WITH ALL ITEMS CONTAINED WITHIN, INCLUDING DOORS, FRAMES, HARDWARE,
SIDELIGHTS, WINDOWS, MECHANICAL AND ELECTRICAL EQUIPMENT, ETC. TO
STRUCTURE ABOVE, UNLESS NOTED OTHERWISE.
4. WHERE CEILING IS INDICATED TO BE DEMOLISHED, REMOVE CEILING SUSPENSION
SYSTEM ALONG WITH ALL ASSOCIATED MECHANICAL AND ELECTRICAL ITEMS,
UNLESS NOTED OTHERWISE. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
EXTENT OF CONDUIT, PIPING AND DUCTWORK DEMOLITION WITHIN AREA TO BE
REMODELED.
5. WHERE INDICATED, REMOVE ALL WALL/PARTITION EXISTING FINISHES AND
PREPARE THE SURFACES FOR SCHEDULED FINISHES, SEE FINISH SCHEDULE FOR
FINISHES.
6. ALL DISTURBED AREAS, WALLS, PARTITIONS, FLOORS, ETC, DAMAGED BY
DEMOLITION WORK SHALL BE PATCHED TO MATCH ADJACENT AREA.
7. OWNER RESERVES THE RIGHT OF FIRST REFUSAL OF ALL SALVAGED ITEMS SUCH
AS: DOORS, LIGHT FIXTURES, PLUMBING FIXTURES ETC.
8. SALVAGED ITEMS SCHEDULED FOR REUSE SHALL BE CLEANED, RESTORED AND/OR
REFINISHED TO LIKE NEW CONDITION, UNLESS NOTED OTHERWISE.
9. DO NOT REMOVE ANY EXISTING STRUCTURAL SUPPORT MEMBERS SUCH AS
COLUMNS, BEAMS, JOISTS, LOAD-BEARING PARTITIONS ETC, UNTIL ADEQUATE
PERMANENT OR TEMPORARY SUPPORT IS IN PLACE. ALL EXISTING STRUCTURAL
MEMBERS SHALL BE ADEQUATELY PROTECTED, COORDINATE WITH STRUCTURAL
ENGINEER.
10. SEE HAZARDOUS MATERIALS, STRUCTURAL, MECHANICAL AND ELECTRICAL
DRAWINGS FOR RELATED DEMOLITION AND PREP WORK.
11. WALL AND CEILING MOUNTED ITEMS SHOWN DASHED, SUCH AS WALL CABINETS,
SHELVING, CUBICLE CURTAIN TRACKS, PROJECTION SCREENS ETC, SHALL BE
REMOVED, UNLESS NOTED OTHERWISE.
1. FIELD FINISH VENTS, GRILLES, ACCESS PANELS, PLUG STRIP, BASEBOARD RADIATION
ENCLOSURES, ELECTRICAL PANEL BOARDS (IN FINISHED SPACES AS THEY OCCUR) TO MATCH
SURFACE ON WHICH THEY OCCUR UNLESS OTHERWISE INDICATED. EXCEPTION: ITEMS WITH
FACTORY WHITE FINISH, OCCURRING ON WHITE ACT OR WHITE GYPSUM BOARD CEILING
SHALL NOT BE PAINTED. STAINLESS STEEL ITEMS SHALL NOT BE PAINTED
2. FIELD VERIFY ALL NEW CONDITIONS. NOTIFY ARCHITECT OF ANY DISCREPANCIES PRIOR TO
INSTALLATION
3. LOCATE CHANGES IN FLOOR FINISH MATERIAL UNDER CENTERLINE OF CLOSED DOOR
UNLESS OTHERWISE INDICATED
4. PROVIDE CLEAR SILICONE SEALANT AT PERIMETER OF PLUMBING FLOOR DRAINS, CLEAN
OUTS, ETC IN RESILIENT AND CERAMIC TILE FLOORS
5. PROVIDE SEALANT TO HORIZONTAL AND VERTICAL INTERIOR CERAMIC TILE CORNERS,
COLOR TO MATCH GROUT COLOR
6. PROVIDE SEALANT AT JOINT BETWEEN COUNTER TOP, BACK OR SIDE SPLASH AND WALLS
7. PROVIDE CLEAR SILICONE SEALANT AT THE BASE OF DOOR FRAME TO RESILIENT AND CT
FLOORING, TYP. SEE PLANS AND ROOM FINISH SCHEDULE FOR FLOOR FINISH LOCATIONS
8. HOLLOW METAL DOORS AND FRAMES TO BE PAINTED AS NOTED IN THE FINISH SCHEDULE
9. WOOD: PRE-FINISHED TO MATCH BUILDING STANDARD, REFER TO SPECIFICATION
10. CEILING HEIGHTS AND MATERIALS/FINISHES CALLED OUT IN ROOM FINISH SCHEDULE ARE
FOR ENTIRE CEILING OR MAJORITY OF THAT ROOM, UNLESS OTHERWISE INDICATED. SEE
REFLECTED CEILING PLAN FOR CHANGES IN CEILING MATERIAL AND CEILING HEIGHT. PAINT
ALL SURFACES OF SOFFIT SAME COLOR AS INDICATED
11. COLOR SELECTIONS ARE BASED ON USE OF PRODUCTS INDICATED IN THE PROJECT
MANUAL SPECIFICATION. IF MANUFACTURERS OTHER THAN THOSE INDICATED ARE USED,
ARCHITECT MAY REVISE COLOR SELECTIONS OF OTHER FINISHES TO ENSURE PROPER
COORDINATION
12. PAINT ALL FIRE EXTINGUISHER CABINETS TO MATCH COLOR OF THE ADJACENT WALLS
13. CEILING HEIGHTS ARE MEASURED FROM FINISH FLOOR
14. FOR FLOOR FINISH MATERIALS AND PATTERN, SEE FINISH PLAN
15. SEE INTERIOR ELEVATIONS FOR MORE FINISH INFO
FINISH PLAN GENERAL NOTES
RCP GENERAL NOTES
1. GENERAL CONTRACTOR TO COORDINATE ALL CEILING MOUNTED EQUIPMENT SUPPORT
REQUIREMENTS, LOCATIONS, DIMENSIONS, ETC WITH EQUIPMENT SUPPLIER AND OWNER,
PRIOR TO INSTALLATION.
2. ALL CEILING MOUNTED ITEMS SUCH AS LIGHT FIXTURES, GRILLES, DIFFUSERS, SPEAKERS, EXIT LIGHTS, ETC SHALL BE LOCATED IN THE CENTER OF ACT PANELS, GYP BD SOFFITS
AND/OR PLASTER SOFFIT BAYS, UNLESS NOTED OTHERWISE. COORDINATE WITH
MECHANICAL AND ELECTRICAL DRAWINGS.
3. FINISHED GYP BD SOFFITS SHALL EXTEND 1" BEYOND FACE AND EXPOSED ENDS OF WALL
CABINETS, FULL-HEIGHT CABINETS, ETC UNLESS NOTED OTHERWISE. COORDINATE CABINET
DIMENSIONS WITH SUPPLIER. GYP BD FASCIA/SOFFIT DETAILS ARE REFERENCED FROM THE
REFLECTED CEILING PLAN.
4. SEE MECHANICAL DRAWINGS FOR SPRINKLER HEAD TYPES AND LOCATIONS. CENTER ALL
HEADS IN ACT UNLESS NOTED OTHERWISE.
DEMOLITION PLAN KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
DE1 REMOVE CEILING AND ALL CEILING MOUNTED EQUIPMENT AND
ACCESSORIES, IN ITS ENTIRETY, INCLUDING ALL MECHANICAL AND
ELECTRICAL. SEE MECHANICAL AND ELECTRICAL FOR ADDITIONAL
INFORMATION
DE2 REMOVE PLUMBING FIXTURES AND ACCESSORIES. SEE MECHANICAL AND
FLOOR PLAN FOR ADDITIONAL INFORMATION
DE3 REMOVE GYP BD ONE SIDE OF PARTITION AS REQUIRED FOR MECHANICAL
/ ELECTRICAL. - SEE MECHANICAL / ELECTRICAL PLANS FOR ADDITIONAL
INFORMATION.
DE4 REMOVE HOLLOW METAL WINDOW SYSTEM IN ITS ENTIRETY.
DE5 REMOVE VCT OR LVT FLOORING IN ITS ENTIRETY. PATCH & PREP FLOOR
FOR SCHEDULED FINISH. SEE SPECIFICATIONS SECTION 09 05 16
SUBSURFACE PREPARATION FOR FLOOR FINISHES.
DE6 CUT OPENING IN CLAY TILE AS REQUIRED FOR MECHANICAL WORK. SEE
MEP DRAWINGS FOR ADDITIONAL INFORMATION.
DE7 REMOVE WINDOW / DOOR SYSTEM IN ITS ENTIRETY INCLUDING TRANSOM
WINDOW, ALL ASSOCIATED HARDWARE AND INTERIOR WOOD TRIM ALL
SIDES OF OPENING.
DE8 REMOVE CONCRETE STAIR, LANDING AND METAL RAILING SYSTEM IN ITS
ENTIRETY. SAW CUT CONCRETE FLUSH AT BRICK AS REQUIRED
DE9 REMOVE METAL RAILING SYSTEM. SAW CUT FLUSH AT CONCRETE.
REMOVE EMBEDDED PIPE RAILING MOUNT IN CONCRETE. PREP FOR
PATCHING. SEE PLANS FOR ADDITIONAL INFORMATION
DE10 REMOVE BREAK METAL TRIM, METAL CEILING SOFFIT AND BACKUP
MATERIAL AT PORCH CEILING, BEAMS AND BRICK WALLS ALL SIDES.
DE11 REMOVE WALL COVERING AND J CHANNEL. PREP PARTITION FOR FINISHES
AS SCHEDULED.
DE12 REMOVE CERAMIC WALL TILE. PREP PARTITION FOR FINISHES AS
SCHEDULED.
DE13 REMOVE WINDOW BLINDS AND ALL ASSOCIATED MOUNTING HARDWARE.
DE14 REMOVE SURFACE MOUNTED VERTICAL PATIENT HEADWALL SYSTEM IN
ITS ENTIRETY. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
DE15 REMOVE PAINTED FABRIC BACKED WALL COVERING AND ALL ASSOCIATED
FINISH TRIM, ON ALL PARTITIONS, TO 6" ABOVE CEILING MINIMUM. PATCH
AND PREP SURFACES AS REQUIRED FOR SCHEDULED FINISH.
DE16 SAW CUT BULLNOSE GLAZED BRICK (MID HEIGHT OF WALL) AND COVED
GLAZED BRICK (AT BASE OF WALL/FLOOR) ALONG ENTIRE WALL, FOR
STRUCTURAL STEEL BRACING AND COLD FORMED METAL STUD
INSTALLATION. SEE PLANS AND STRUCTURAL FOR ADDITIONAL
INFORMATION.
DE17 REMOVE GYP BD AND STUD FURRING SYSTEM AT EXTERIOR WALL. SEE
PLANS FOR ADDITIONAL INFORMATION.
DE18 SAW CUT AND GRIND BRICK FLUSH AS REQUIRED FOR DEMOLITION. SEE
PLANS FOR ADDITIONAL INFORMATION
DE19 REMOVE WOOD COLUMN AND/OR GYP BD FURRING - SEE STRUCTURAL
FOR ADDITIONAL INFORMATION
DE20 REMOVE WOOD JOIST AND FLOOR SYSTEM IN ITS ENTIRETY
DE21 SAW CUT AND REMOVE CONCRETE FLOOR AS REQUIRED. SEE PLANS FOR
ADDITIONAL INFORMATION.
DE22 REMOVE WOOD JOIST, WOOD PLANK CATWALK SYSTEM AND ENTIRE ROOF
SYSTEM ABOVE
DE23 REMOVE METAL GUTTER, DOWNSPOUTS AND BREAK METAL FASCIA AND
SOFFIT SYSTEM AND BACKUP MATERIAL AT ROOF/ WALL ALL SIDES (TYP).
DE24 REMOVE MEMBRANE ROOF SYSTEM IN ITS ENTIRETY, INCLUDING ROOF
SLOPING MATERIAL, PITCH POCKETS AND ALL FLASHING. REMOVE
DAMAGED ROOF SUBSTRATE AS REQUIRED, APPROXIMATELY 35%
DE25 REMOVE BREAK METAL FASCIA (INCLUDING MEAT AT DOOR AND WINDOW
HEAD AT PORCH), SOFFIT AND METAL PORCH CEILING SYSTEM. REMOVE
SUBSTRATE THAT METAL IS MOUNTED TOO. PORCH STRUCTURE TO
REMAIN. FIELD VERIFY.
DE26 REMOVE CERAMIC FLOOR TILE. PREP FLOOR FOR SCHEDULED FINISHES.
SEE PLAN FOR ADDITIONAL INFORMATION
DE27 REMOVE STAINLESS STEEL ACCESS HOPPER
DE28 CUT HOLES IN ROOF DECK FOR STRUCTURAL BRACING. -SEE STRUCTURAL
DE29 REMOVE RAILING SYSTEM AND SALVAGE FOR RESTORATION, REFINISHING
AND REINSTALLATION. SEE FLOOR PLAN, SECTIONS AND DETAILS FOR
ADDITIONAL INFORMATION
FINISH PLAN KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
FN1 INSTALL HANDRAIL
FN2 NOT USED
FN3 NOT USED
FN4 NOT USED
FN5 INSTALL TS-5 AT TRANSITION FROM NEW FINISH FLOOR TO EXISTING
FLOORING OUTSIDE THE LIMITS OF CONSTRUCTION.
FN6
FN7
FN8
REFLECTED CEILING KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
RC1 CUBICAL CURTAIN TRACK. SEE SHEET AE560 FOR TYPES
RC2 VENT HOOD. SEE MECHANICAL
RC3 SPLIT CEILING GRID AT THIS LOCATION
RC4 PATIENT LIFT. SEE STRUCTURAL FOR ADDITIONAL INFORMATION.
RC5 PROVIDE 24" X 24" MINIMUM ACCESS PANELS AS NEEDED PER
SPECIFICATIONS SECTION 08 31 13
RC6 ACCESS PANEL, MIN 2'-0" x 2'-0". COORDINATE SIZE AND LOCATION WITH
SPEC SECTION 08 31 13 AND MEP. AT RECEPTION DESK PLAM SOFFIT
ACCESS PANELS TO BE ON THE TOP OF SOFFIT.
RC7 CENTER RECESSED LIGHT FIXTURE ON CENTERLINE OF EXISTING WDW
OPENING TYP
RC8 PAINT PORCH CEILING P-10
RC9 PAINT GYP BD CEILING P-4
RC10 PATIENT FALL PROTECTION RAIL. SEE STRUCTURAL FOR ADDITIONAL
INFORMATION.
FLOOR PLAN SYMBOLS
EXISTING WALL TO
REMAIN
WALL
EXISTING DOOR
AND FRAME TO
REMAIN
DOOR
INTERIOR
BORROWED LIGHT
101B
101A
8'-0" DIMENSION LINE,
NOMINAL
8'-0" EXTENDED
DIMENSION LINE,
NOMINAL
AE2111A
INTERIOR
ELEVATION
INDICATOR TAG
2B
AE2O1
EXTERIOR
ELEVATION
INDICATOR TAG
1A
203 EQUIPMENT TAG
100 FLOOR SPOT
ELEVATIONWALL TAG
OFFICE
ROOM NAME AND
NUMBER AE501
1A
DETAIL REFERENCE
TAG
AE2O1
EXTERIOR SECTION
REFERENCE TAG
1A
AE2O1
INTERIOR SECTION
REFERENCE TAG
1A
KEY NOTE
A
GRIDLINE
REVISION TAG
PR01
REVISION CLOUD
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
FP10
B3
REFLECTED CEILING PLAN SYMBOLS
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
GYP BD
CEILING /
SOFFIT
ACT CEILING
SYSTEM
EXISTING
ACT CEILING
SYSTEM
IV TRACK
CUBICLE
CURTAIN
TRACK
ACCESS
PANEL
2'-0" x 4'-0"
LIGHT FIXTURE
2'-0" x 2'-0"
LIGHT FIXTURE
PENDANT STRIP
LIGHT FIXTURE
SUSPENDED
LIGHT FIXTURE
RECESSED LIGHT
FIXTURE OR
PENDANT LIGHT -
SEE PLAN
MECHANICAL
SUPPLY GRILL
MECHANICAL
RETURN GRILL
WALL SCONCE
LIGHT FIXTURE
MECHANICAL
LINEAR SUPPLY
GRILL
CEILING
ELEVATION AND
FINISH
9'-0" AFF
ACT
DEMOLITION PLAN SYMBOLS
EXISTING WALL TO
REMAIN
WALL OR
PARTITION TO BE
REMOVED
EXISTING DOOR
AND FRAME TO
REMAIN
KEY NOTE
A
GRIDLINE
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
EXISTING DOOR
AND FRAME TO BE
DEMOLISHED
DASHED LINE
INDICATES ITEM TO
BE REMOVED (UNO)
DE10
ACT ACOUSTICAL CEILING TILE
CPT MODULAR CARPET TILE
CT CERAMIC TILE
EPY EPOXY FLOORING
GWB (SC) GYPSUM WALLBACK SYSTEMS (SPECIAL COATING)
LVT LUXURY VINYL TILE
P PAINT
PT PORCELAIN TILE (FLOOR AND BASE)
RB RESILIENT BASE
RES RESINOUS EPOXY FLOORING
RES-W RESINOUS/EPOXY WALL/CEILING
RF RUBBER FLOORING
RWC RIGID VINYL WALL COVERING
S SOLID SURFACE
SC SPECIAL COATING
SD STATIC DISSIPATIVE
SP SPECIAL FACED
VWC VINYL WALL COVERING
WP WALL PROTECTION
WSF WELDED SEAM SHEET FLOORING (HEAT WELDED WITH ROD)
ROOM FINISH LEGEND &
ABBREVIATIONS
MATERIAL INSTALL
DIRECTION
KEYNOTECORNER GUARD
WALL PROTECTION
AS INDICATED
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
CG
AF10
WALLCOVERING AS
INDICATED
FLOOR PLAN KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
FL1 PATCH PARTITION, WITH MATERIALS TO MATCH EXISTING ADJACENT
SURFACES, AS REQUIRED FROM DEMOLITION. WHERE EXISTING FINISHES
ARE DISTURBED PAINT TO MATCH ADJACENT FINISH, PAINT ENTIRE
PARTITION WHERE PATCHING OCCURS.
FL2 PROVIDE FIRE RETARDANT PLYWOOD 3 SIDES OF ROOM. SEE TYPICAL
ELEVATIONS SHEET AE211
FL3 AT AREAS OF ELECTRICAL, TECHNOLOGY OR MED GAS WORK. SAW CUT
OPENING IN CLAY TILE PARTITION FOR ELECTRICAL OR MED GAS BOX AND
GRIND VERTICAL CHANNEL FROM ABOVE CEILING TO BOX FOR CONDUIT.
INSTALL CONDUIT / PIPE IN CHANNEL AND PATCH PLASTER. PAINT ENTIRE
PARTITION WHERE PATCHING OCCURS. - SEE ELECTRICAL & TECHNOLOGY
OR MED GAS PLANS FOR ADDITIONAL INFORMATION
FL4 INFILL OPENING AND PATCH PARTITION, WITH MATERIALS TO MATCH
EXISTING ADJACENT SURFACES, AS REQUIRED FROM DEMOLITION. WHERE
EXISTING FINISHES ARE DISTURBED PAINT TO MATCH ADJACENT FINISH,
PAINT ENTIRE PARTITION, BOTH SIDES AS REQUIRED, WHERE PATCHING
OCCURS.
FL5 PATCH PARTITION, WITH MATERIALS TO MATCH EXISTING ADJACENT
SURFACES, AS REQUIRED FROM WATER DAMAGE AND REMOVAL OF
WALLCOVERING. PAINT TO MATCH ADJACENT FINISH, PAINT ENTIRE
PARTITION / WALL WHERE PATCHING OCCURS.
FL6 REPAIR, REFINISH, MODIFY AND REINSTALL SALVAGED RAILING IN SAME
LOCATION. SEE DETAILS AND ELEVATIONS FOR ADDITIONAL WORK.
FL7 SEE CIVIL FOR RAMP, STOOP AND STAIR AT DOOR
FL8 PATCH / INFILL OPENINGS IN BRICK VENT. USE SALVAGED BRICK AS
REQUIRED TO FILL GAPS. SIZE OF BRICK VENT AREAS VARIES. FIELD
VERIFY
FL9 PATCH FLOOR SUBSTRATE
FL10 PROVIDE SPANDREL GLASS SPANDREL INSULATION AT THIS LOCATION.
SEAL INSULATION VAPOR TIGHT TO WINDOW FRAME.
FL11 PATCH OPENING IN CONCRETE FLOOR AT REMOVED DOWNSPOUT
FL12 PATCH ALL OPENINGS IN CONCRETE STAIRS AT REMOVED RAILINGS
FL13 EXPOSED STRUCTURE PAINT
FL14 PROVIDE PRECAST CONCRETE SPLASH BLOCK, 24" x 16" MIN
FL15 INFILL OPENING WITH XN3 OR PROVIDE RATED SHAFT WALL PARTITION AS
REQUIRED AND PATCH PARTITION, WITH MATERIALS TO MATCH EXISTING
ADJACENT SURFACES, AS REQUIRED FROM DEMOLITION. WHERE EXISTING
FINISHES ARE DISTURBED PAINT TO MATCH ADJACENT FINISH, PAINT
ENTIRE PARTITION, BOTH SIDES AS REQUIRED, WHERE PATCHING
OCCURS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/8
/2
:2
:4
A
M
GI003
GENERAL NOTES AND SYMBOLS CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
09/02/2022 LA GJB16149Revisions: Date: 09/12/2022
I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name: Steve Schlotthauer
NOYES
APPLICABLE REGULATIONS
GENERAL TYPE OF PROJECT
NFPA NATIONAL FIRE CODES (EXCEPTION: NFPA 5000 & 900)
2018 FGI GUIDELINES
2021 NFPA 101 (LIFE SAFETY CODE)
ABA STANDARDS (2015) (ABAAS)
2021 IBC
REMODEL
ADDITION
NEW BUILDING
PROJECT DESCRIPTION
CODE SUMMARY
PRESERVATION OF PORTION OF FRONT FACADE. NEW
CONSTRUCTION FOR PROSTHETICS DEPARTMENT.
VA BARRIER FREE DESIGN STANDARD (PG-18-13)
NOYESAUTHORITIES HAVING JURISDICTION (AHJ's)
THE JOINT COMMISSION (TJC)
TESTRATING (HRS)
ACTUAL
TOTAL
EXTERIOR DOORS AND WINDOWS
SHAFTS AND EXIT PASSAGEWAYS
OTHER
ROOF CONSTRUCTION
PRIME & SEC. FLOOR BEAMS, JOISTS
FLOOR/CEILING ASSEMBLY
FLOOR CONSTRUCTION
INTERIOR
NON-BEARING WALLS AND PARTITIONS
BEARING WALLS
COLUMNS
GIRDERS
TRUSSES
ROOF/CEILING ASSEMBLY
PRIME & SEC. ROOF BEAMS, JOISTS
EXTERIOR
INTERIOR BEARING WALLS
EXTERIOR BEARING WALLS
STRUCTURAL FRAME
AREA SEPARATIONS / FIRE WALLS
FIRE-RESISTIVE REQUIREMENTS
TYPE(S) OF CONSTRUCTION
ACTUAL AREA PER FLOOR
CONSTRUCTION TYPE(S)
SECOND FLOOR
FIRST FLOOR
ADDITIONAL NOTES
SEE LIFE SAFETY PLANS
See Life Safety Plans
VA PSRDM LIFE SAFETY PROTECTED BUILDING.
PLUMBING FIXTURES
TOILETS
LAVATORIES
DRINKING FOUNTAINS
SERVICE SINKS
PROVIDED RQD FACTOR
6 3 1/25 for first 50 occupants, then 1/50
6 2 1/40 for first 80 occupants, then 1/80 1/100 occupants. 50% may be vending
URINALS 0 -- --
OCCUPANT LOAD OF BUILDING
SF/OCCUPANT OCCUPANTS
TOTAL BUILDING OCCUPANT LOAD:
ACTUAL AREAAREA LOCATION
FIRST LEVEL
SECOND LEVEL
9,236 SF
7,011 SF
16,247 SF
9,236 SF
7,012SF 150SF 108
E136
(IBC CH 29)
(NAPA 220 TABLE 4.1.1)
OSHA STANDARDS
VA SEISMIC DESIGN REQUIREMENTS H-18-8
NATIONAL ELECTRIC CODE (NEC)
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,
AMERICAN CONCRETE INSTITUTE AND COMETARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
ENERGY POLICY ACT OF 2005 (EPAct)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS
FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE
RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL
BUILDINGS, 10 CFR PARTS 433,434 AND 435
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE
BU…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .