About this file

This document provides details for a federal contract solicitation to construct a prosthetics facility for the Department of Veterans Affairs. The solicitation number is 36C77623R0166_1 for the project "Y1DA--590-210 Construct Prosthetics Facility (VA-23-00044335)" issued by the Department of Veterans Affairs Technology Acquisition Center Austin. Offerors should review the 20MB Bid Documents Part 1 file for specifications on constructing the prosthetics facility. The opportunity type is listed as a solicitation, suggesting the government will accept and evaluate proposals before awarding a firm fixed-price construction contract. No other salient details are provided such as response dates, set asides, incumbent contractors, or pricing terms. A full review of the Bid Documents Part 1 file is needed to understand technical requirements and proposal instructions for the prosthetics facility construction project.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--590-210 Construct Prosthetics Facility (VA-23-00044335), newest first.
File Type Posted
Amendment 0008 Attachment 1 - Hampton VA RFIs All.docx DOCX document
36C77623R0166 0008.docx DOCX document
Amendment 0008 Attachment 3 - 081113 Hollow Metal Doors and Frames.pdf PDF
Amendment 0008 Attachment 2 - 329000.pdf PDF
36C77623R0166 0007.docx DOCX document
36C77623R0166 0006.docx DOCX document
Amendment 0006 Attachment 2 - 117300 ceiling mounted patient lift system.pdf PDF
Amendment 0006 Attachment 3 - 087113-11 LE Power Assist Door Operators.pdf PDF
Amendment 0006 Attachment 4 - 019100 General Commissioning Rev 1.pdf PDF
Amendment 0006 Attachment 5 - 000110 TOC Rev 1.pdf PDF
Amendment 0006 Attachment 1 - Hampton VA RFIs 1-97.docx DOCX document
36C77623R0166 0005.docx DOCX document
36C77623R0166 0004.docx DOCX document
S06 - 36C77623R0166 0003.docx DOCX document
36C77623R0166 0002.docx DOCX document
wage rates.pdf PDF
36C77623R0166-0001.docx DOCX document
S04 - Site Visit Sign-in Sheet Completed.pdf PDF
36C77623R0166 0001.docx DOCX document
Wage Determination.pdf PDF
Construction Documents Section 3.pdf PDF
Construction Document Section 5.pdf PDF
Bid Documents Part 7.pdf PDF
SPEC VOL I - A.pdf PDF
S02 - RFP - 36C77623R0166_1.docx DOCX document
Construction Documents Section 2.pdf PDF
Bid Documents Part 2.pdf PDF
Hampton VAMC Site Plan.pdf PDF
Site Visit Instructions.docx DOCX document
Construction Document Section 4.pdf PDF
Bid Documents Part 5.pdf PDF
Bid Documents Part 3.pdf PDF
SPEC VOL I - B.pdf PDF
SPEC VOL II -.pdf PDF
Construction Documents Section 1.pdf PDF
Bid Documents Part 6.pdf PDF
Bid Documents Part 4.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPROVAL SIGNATURES:

• COR – ILSM & ICRA COMPLETED DATE:

• REVIEWED: AFGE DATE:

• REVIEWED: NAGE DATE:

• APPROVED: INFECTION CONTROL DATE:

• APPROVED: CONSTRUCTION SAFETY MANAGER DATE:

• APPROVED: SAFETY MANAGER DATE:

• APPROVED: INDUSTRIAL HYGIENIST DATE:

• APPROVED: SAFE PATIENT HANDLING AND MOBILITY FACILITY COORDINATOR (SPHM FC) DATE:

• APPROVED: FIRE INSPECTOR DATE:

• APPROVED: SUPERVISORY FACILITIES OPERATIONS SPECIALIST DATE:

• APPROVED: CHIEF, POLICE & SECURITY DATE:

• APPROVED: PHYSICAL SECURITY SPECIALIST DATE:

• APPROVED: ENVIRONMENTAL MANAGEMENT SERVICE DATE:

• APPROVED: OFFICE OF INFORMATION & TECHNOLOGY DATE:

• APPROVED: WOMEN’S VETERAN PROGRAM MANAGER DATE:

• APPROVED: CONTRACTING DATE:

• APPROVED: PATIENT SAFETY MANAGER DATE:

• APPROVED: HAMPTON ENERGY MANAGER DATE:

• APPROVED: SUPERVISORY PROJECT ENGINEER DATE:

• APPROVED: ASSISTANT CHIEF, ENGINEERING DATE:

• APPROVED: CHIEF, ENGINEERING DATE:

• APPROVED: ASSOCIATE DIRECTOR FOR PATIENT CARE SERVICES DATE:

• APPROVED: CHIEF OF STAFF DATE:

• APPROVED: ASSOCIATE DIRECTOR FOR OPERATIONS DATE:

• APPROVED: EXECUTIVE DIRECTOR, HAMPTON VA MEDICAL CENTER DATE:

HVAMC PRE CONSTRUCTION RISK ASSESSMENT / EVALUATION

PROJECT NAME: CONSTRUCT PROSTHETICS FACILITY

ASSESSMENT DATE:

EXPECTED IMPACTS PLANS / MEASURES TO ADDRESS IMPACTS

PLUMBING OUTAGES

MECHANICAL OUTAGES

ELECTRICAL OUTAGES

MISCELLANEOUS UTILITIES

FIRE ALARM

VIBRATIONS

DUST (INFECTION CONTROL) / AIR

QUALITY

NOISE

EQUIPMENT

CREATION OR SPREAD OF

CONTAMINATES

TRAFFIC FLOW -- PATIENTS,

VISITORS, STAFF, CONTRACT

PERSONNEL

LIMITS OF CONSTRUCTION

BARRIER LOCATION

HVAMC 2020 ANNUAL TB RISK

ASSESSMENT LEVEL IS LOW

14 PROJECT LOCATION: FACILITY GROUNDS, 110

RISK ASSESSMENT REQUIRED BASED ON VICINITY OF

PATIENT CARE AREAS? YES

SUBJECT TO CHANGE DURING CONSTRUCTION PHASE:

PPD / TB RISK ASSESSMENT COMPLETED: X

NON-PATIENT CARE AREA NO TB SCREENING: _____

OUTAGES EXPECTED THROUGHOUT DIFFERENT PHASES OF

CONSTRUCTION

CONTRACTOR TO NOTIFY COR 14 DAYS (2 WEEKS) MINIMUM IN

ADVANCE

OUTAGES EXPECTED THROUGHOUT DIFFERENT PHASES OF

CONSTRUCTION

CONTRACTOR TO NOTIFY COR 14 DAYS (2 WEEKS) MINIMUM IN

ADVANCE

OUTAGES EXPECTED THROUGHOUT DIFFERENT PHASES OF

CONSTRUCTION

CONTRACTOR TO NOTIFY COR 14 DAYS (2 WEEKS) MINIMUM IN

ADVANCE

OUTAGES EXPECTED THROUGHOUT DIFFERENT PHASES OF

CONSTRUCTION

CONTRACTOR TO NOTIFY COR 14 DAYS (2 WEEKS) MINIMUM IN

ADVANCE

OUTAGES WILL BE REQUIRED THROUGHOUT THE PROJECT.

CONTRACTOR IS RESPONSIBLE FOR PERFORMING FIRE WATCH

FOR ANY OUTAGE LASTING LONGER THEN EIGHT (8) HOURS.

FIRE ALARM IS TO BE MAINTAINED AND KEPT OPERATIONAL AS

LONG AS POSSIBLE DURING DEMOLITION. CONTRACTOR SHALL

ACTIVATE PHASES OF THE FIRE ALARM AS CONSTRUCTION

PROGRESSES.

VIBRATIONS ARE EXPECTED DURING THE PROJECT WORK IN BUILDING 110 THAT MAY DISRUPT HOSPITAL

OPERATIONS WILL REQUIRE OFF HOURS AS DETERMINED BY

THE COR

DUST IS EXPECTED DURING DEMOLITION AND CONSTRUCTION. OUTDOOR OPERATIONS WILL REQUIRE THE USE OF WETTING

MATERIALS DURING DEMOLITION TO MITIGATE DUST.

CONTRACTOR MUST FOLLOW ICRA GUIDELINES AS REQUIRED.

NOISE IS EXPECTED DURING THE PROJECT WORK IN BUILDING 110 THAT MAY DISRUPT HOSPITAL

OPERATIONS WILL REQUIRE OFF HOURS AS DETERMINED BY

THE COR

HEAVY MACHINERY IS EXPECTED DURING DEMOLITION. CONTRACTORS ARE REQUIRED TO WEAR HIGH VISIBILITY

CLOTHING. TRAFFIC CONTROL IS REQUIRED AT ALL TIMES WHEN

EQUIPMENT LEAVES SITE, WHEN ONLOADING - OFFLOADING,

ETC.

CONTRACTOR MUST FOLLOW ALL ICRA GUIDELINES AS

REQUIRED. RISK CLASSIFICATION SUBJECT TO CHANGES AS

NEEDED ACCORDING TO HOSPITAL INFECTION CONTROL.

DUST IS EXPECTED DURING DEMOLITION AND CONSTRUCTION.

CONTRACTOR IS RESPONSIBLE FOR TRAFFIC CONTROL FOR

EQUIPMENT ENTERING AND EXITING THE SITE AND WHILE IN-

ROUTE ON FACILITY GROUNDS. ANY ROAD CLOSURE WILL

REQUIRE TRAFFIC CONTROL PROVIDED BY THE CONTRACTOR.

TRAFFIC MAY BE AFFECTED AT TIMES.

ALL CONSTRUCTION ACTIVITIES SHALL BE CONTAINED WITHIN A

6'-0" HIGH MINIMUM CHAIN LINK FENCE WITH FULL HEIGHT

PRIVACY SCREENING. A PERMANENT FENCE POST INSTALLED IN

THE GROUND AROUND THE SITE AND TEMPORARY FENCING

WHEN OUTSIDE OF THE SITE (UTILITY WORK, ETC.)

VARIOUS LOCATIONS. CHAIN LINK FENCE WITH PRIVACY

SCREENING IS REQUIRED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMPCONSULTANT

321 4 5 6 7 8 9 10

PROJECT NAME:

SITE ADDRESS:

VA PROJECT NUMBER:

OWNER AND CONSULTANTS:

VICINITY MAP:

ARCHITECT/ENGINEER OF RECORD

NOT FOR CONSTRUCTION

C U s e rs

\P u b lic \D o c u m e n ts \R e v it P ro je c ts

\1

-R g b a rb a ri a e -m n .c o m

.r v t

/8

/2

:2

:2

A

M

GI000

COVER SHEET CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

09/02/2022 LA GJB

CONSTRUCT PROSTHETICS FACILITY

100 EMANCIPATION DRIVE HAMPTON, VA 23667

590-210

16149

VA COR:

CONTACT:

ADDRESS:

PHONE:

Alessadra K. A. Twomey, P.M.P.

100 EMANCIPATION DRIVE

HAMPTON, VA 23667

757.722.9961 X5010

ARCHITECT:

NAME:

ADDRESS:

CONTACT:

ANDERSON ENGINEERING OF MN, LLC

13605 1ST AVE NORTH, SUITE 100

PLYMOUTH, MN 55441

Steve Schlotthauer

PHONE: 763-412-4050

STRUCTURAL ENGINEER:

NAME:

ADDRESS:

CONTACT:

IMEG Corp.

15 Sunned Drive, Suite 104 St. Louis MO 63143

Katie M Goldberg, SE, PE

PHONE: 515.334.7936

MECH/ELEC/PLUMB/FIRE ENGINEER:

NAME:

ADDRESS:

CONTACT:

IMEG Corp.

15 Sunnen Drive, Suite 104 St. Louis, MO 63143

Russ Arneson

PHONE: 314.951.2518

SITE MAP:

BUILDING 45

BUILDING 110

Revisions: Date: 09/12/2022

I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.

Name: Steve Schlotthauer

Signature:_________________

Date:__________ License# 42138

█ ISSUED

NOT ISSUED

ISSUED FOR REFERENCE ONLY

ISSUED AS NOTED

R

N

SHEET ABBREVIATION AND NUMBERING

AE 1 1 1 - B20

DI

SC

IP

LI

NE

D

ES

IG

NA

TO

R

SH

EE

T

TY

PE

D

ES

IG

NA

TO

R

FL

O

O R

LE

VE

L

SH

EE

T G

RO

UP

IN

G

BU

IL

DI

NG

N

UM

BE

R

AE 111-B20

ARCHITECTURAL ELEMENTS, PLAN, FIRST LEVEL, FLOOR PLAN, BUILDING 20

QH 1 1 0 - B20

DI

SC

IP

LI

NE

D

ES

IG

NA

TO

R

SH

EE

T

TY

PE

D

ES

IG

NA

TO

R

FL

O

O R

LE

VE

L

SH

EE

T G

RO

UP

IN

G

BU

IL

DI

NG

N

UM

BE

R

QH110-B20

EQUIPMENT HOSPITAL, PLAN, FIRST LEVEL, BUILDING 20

DISCIPLINE

DESIGNATOR

SHEET TYPE

DESIGNATOR

FLOOR

LEVEL

SHEET

GROUPING

GC - GENERAL CONTRACT

GI - GENERAL INFORMATION

AC - ARCHITECTURAL RCP

AD - ARCHITECTURAL DEMOLITION

AS - ARCHITECTURAL SITE

AE - ARCHITECTURAL ELEMENTS

AF - ARCHITECTURAL FINISHES

IF - INTERIOR FURNISHINGS

QC - EQUIPMENT LAUNDRY

QF - EQUIPMENT FOOD SERVICE

QH - EQUIPMENT HOSPITAL

QL - EQUIPMENT LABORATORY

0 - GENERAL

1 - PLANS

2 - ELEVATIONS

3 - SECTIONS

4 - LARGE SCALE VIEWS

5 - DETAILS

6 - SCHEDULES & DIAGRAMS

0 - LOWER LEVEL

1 - FIRST LEVEL

2 - SECOND LEVEL

3 - THIRD LEVEL

4 - FOURTH LEVEL

GENERAL:

00-10 - TITLE SHEET, NOTES,

ABBREVIATIONS, SYMBOLS,

SCHEDULES

PLANS:

1 - LEVEL FLOOR PLAN

2 - DIMENSION PLAN

ELEVATIONS:

01-10 - EXTERIOR ELEVATIONS

11-19 - INTERIOR ELEVATION

SECTIONS:

01-10 - BUILDING SECTIONS

11-19 - WALL SECTIONS

20-29 -STAIR SECTIONS & PLANS

DETAILS:

01-19 - EXTERIOR PLAN DETAILS

20-29 - EXTERIOR SECTION DETAILS

30-39 - ROOF DETAILS

40-49 - INTERIOR PLAN DETAILS

50-59 - INTERIOR SECTION DETAILS

60-69 - CEILING DETAILS

PLANS ONLY

AE 5 1 2

DI

SC

IP

LI

NE

D

ES

IG

NA

TO

R

SH

EE

T

TY

PE

D

ES

IG

NA

TO

R

SH

EE

T G

RO

UP

IN

G

AE 501

ARCHITECTURAL ELEMENTS, EXTERIOR PLAN DETAILS

AF 6 7 0

DI

SC

IP

LI

NE

D

ES

IG

NA

TO

R

SH

EE

T

TY

PE

D

ES

IG

NA

TO

R

SH

EE

T G

RO

UP

IN

G

AF 670

ARCHITECTURAL FINISHES, FINISH SCHEDULE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs

\P u b lic \D o c u m e n ts \R e v it P ro je c ts

\1

-R g b a rb a ri a e -m n .c o m

.r v t

/8

/2

:2

:3

A

M

GI001

SHEET INDEX CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

09/02/2022 LA GJB16149

SHEET INDEX - ARCHITECTURAL

SHEET NO. SHEET TITLE BI

D

DO

CU

M

EN

TS

-X X-

XX

HA101-50 LOWER LEVEL ABATEMENT & REMEDIATION PLAN - BUILDING 50

HA111-50 FIRST LEVEL ABATEMENT & REMEDIATION PLAN - BUILDING 50

HA121-50 SECOND LEVEL ABATEMENT & REMEDIATION PLAN - BUILDING 50

HA121-110 SECOND LEVEL ABATEMENT & REMEDIATION PLAN - BUILDING 110

AD101-B50 LOWER LEVEL DEMOLITION PLAN - BUILDING 50

AD111-B50 FIRST LEVEL DEMOLITION PLAN - BUILDING 50

AD121-B50 SECOND LEVEL DEMOLITION PLAN - BUILDING 50

AD131-B50 ROOF DEMOLITION PLAN - BUILDING 50

AD311-B50 DEMOLITION - WALL SECTIONS

AD520-B50 DEMOLITION - DETAILS AND EXISTING CONDITIONS - PHOTOGRAPHS

AD521-B50 DEMOLITION - EXISTING CONDITIONS - PHOTOGRAPHS

AD121-B110 SECOND LEVEL DEMOLITION PLAN - BUILDING 110

AE111-B45 FIRST LEVEL FLOOR PLAN - BUILDING 45

AE112-B45 FIRST LEVEL DIMENSION PLAN - BUILDING 45

AE011-B45 DEDUCT ALTERNATE OVERALL PLANS - BUILDING 45

AE111.1-B45 DEDUCT ALT. - FLOOR PLANS AND ELEVATIONS -BUILDING 45

AE111.2-B45 DEDUCT ALT. - FLOOR PLANS AND EXTERIOR ELEVATIONS -BUILDING 45

AE121-B45 SECOND LEVEL FLOOR PLAN - BUILDING 45

AE122-B45 SECOND LEVEL DIMENSION PLAN - BUILDING 45

AE131-B45 ROOF PLAN - BUILDING 45

AE131.1-B45 DEDUCT ALT. - ROOF PLAN AND EXTERIOR ELEVATIONS -BUILDING 45

AC111-B45 FIRST LEVEL REFLECTED CEILING PLAN - BUILDING 45

AC121-B45 SECOND LEVEL REFLECTED CEILING PLAN - BUILDING 45

AE122-B110 SECOND LEVEL FLOOR PLAN - BUILDING 110

AC121-B110 SECOND LEVEL REFLECTED CEILING PLAN - BUILDING 110

AE201-B45 EXTERIOR ELEVATIONS - BUILDING 45

AE202-B45 EXTERIOR ELEVATIONS - BUILDING 45

AE211-B45 INTERIOR ELEVATIONS - BUILDING 45

AE212-B45 INTERIOR ELEVATIONS - BUILDING 45

AE301-B45 BUILDING SECTIONS - BUILDING 45

AE302-B45 BUILDING SECTIONS - BUILDING 45

AE303-B45 BUILDING SECTIONS - BUILDING 45

AE311-B45 WALL SECTIONS - BUILDING 45

AE312-B45 WALL SECTIONS - BUILDING 45

AE313-B45 WALL SECTIONS - BUILDING 45

AE314-B45 WALL SECTIONS - BUILDING 45

AE315-B45 WALL SECTIONS - BUILDING 45

AE320-B45 STAIR SECTIONS AND ENLARGED PLANS - BUILDING 45

AE321-B45 STAIR SECTIONS, ENLARGED PLANS, DETAILS & ELEVATIONS - BLDG 45

AE322-B45 STAIR/RAMP ENLARGED PLANS AND ELEVATIONS

AE323-B45 ELEVATOR ENLARGED PLANS AND SECTIONS

AE324-B45 DEDUCT ALT.- ELEVATOR ENLARGED PLANS AND SECTIONS

AE325-B45 MECH STAIRS & DEDUCT ALT.- LADDER ENLARGED PLANS AND SECTIONS

AE411-B45 ENLARGED FLOOR PLANS & INTERIOR ELEVATIONS

AE412-B45 ENLARGED FLOOR PLAN, RCP & INTERIOR ELEVATIONS

AE413-B45 ENLARGED FLOOR PLAN, RCP & INTERIOR ELEVATIONS

AE414-B45 ENLARGED FLOOR PLAN, RCP & INTERIOR ELEVATIONS

AE415-B45 ENLARGED FLOOR PLANS, RCP & INTERIOR ELEVATIONS

AE416-B45 ENLARGED TOILET PLANS & INTERIOR ELEVATIONS

AE417-B45 ENLARGED TOILET PLANS & INTERIOR ELEVATIONS

AE418-B45 ENLARGED PLANS, RCP & INTERIOR ELEVATIONS

AE501 EXTERIOR PLAN DETAILS

AE502 EXTERIOR PLAN DETAILS

AE503 EXTERIOR PLAN DETAILS

AE520 EXTERIOR SECTION DETAILS

AE521 EXTERIOR SECTION DETAILS

AE522 EXTERIOR SECTION DETAILS

AE523 EXTERIOR SECTION DETAILS

AE524 EXTERIOR SECTION DETAILS

AE525 EXTERIOR SECTION DETAILS

AE526 EXTERIOR SECTION DETAILS

AE530 ROOF DETAILS

AE540 INTERIOR PLAN DETAILS

AE541 INTERIOR PLAN DETAILS

AE542 INTERIOR PLAN DETAILS

AE543 INTERIOR PLAN DETAILS

AE550 INTERIOR SECTION DETAILS

AE551 INTERIOR SECTION DETAILS

AE560 CEILING DETAILS

AE601 WALL & PARTITION TYPES AND DETAILS

AE602 DOOR SCHEDULE AND ELEVATIONS

AE603 CURTAIN WALL, WINDOW TYPES AND PROFILES

AE640 MOUNTING HEIGHTS

SHEET INDEX - INTERIOR

SHEET NO. SHEET TITLE BI

D

DO

CU

M

-X X-

XX

AF111-B45 FIRST LEVEL FINISH PLAN - BUILDING 45

AF121-B45 SECOND LEVEL FINISH PLAN - BUILDING 45

AF121-B110 SECOND LEVEL FINISH PLAN - BUILDING 110

AF600 MATERIAL AND ROOM FINISH SCHEDULE & FINISH DETAILS

SHEET INDEX - GENERAL

SHEET NO. SHEET TITLE BI

D

DO

CU

M

-X X-

XX

GI000 COVER SHEET

GI001 SHEET INDEX

GI002 ABBREVIATIONS

GI003 GENERAL NOTES AND SYMBOLS

GI111-B45 FIRST LEVEL LIFE SAFETY PLAN - BUILDING 45

GI121-B45 SECOND LEVEL LIFE SAFETY PLAN - BUILDING 45

GC111-B45 FIRST LEVEL INFECTION CONTROL & PHASING PLAN-BUILDING 45

GC121-B45 SECOND LEVEL INFECTION CONTROL & PHASING PLAN-BUILDING 45

GC121-B110 SECOND LEVEL INFECTION CONTROL & PHASING PLAN-BUILDING 110

SHEET INDEX - EQUIPMENT

SHEET NO. SHEET TITLE BI

D

DO

CU

M

-X X-

XX

QH110 FIRST LEVEL EQUIPMENT PLAN - BUILDING 45

QH120 SECOND LEVEL EQUIPMENT PLAN - BUILDING 45

QH411 FIRST LEVEL ENLARGED EQUIPMENT PLANS - BUILDING 45

QH412 FIRST LEVEL ENLARGED EQUIPMENT PLANS - BUILDING 45

QH413 SECOND LEVEL ENLARGED EQUIPMENT PLANS - BUILDING 45

SHEET INDEX - MECHANICAL

SHEET NO. SHEET TITLE BI

D

DO

CU

M

-X X-

XX

MP000 PIPING COVERSHEET

MV000 VENTILATION COVERSHEET

MP111 FIRST LEVEL PLAN - MECHANICAL PIPING

MP121 SECOND LEVEL PLAN - MECHANICAL PIPING

MVD111-B50 FIRST LEVEL PLAN - VENTILATION DEMOLITION

MVD122-B110 SECOND LEVEL PLAN - VENTILATION DEMOLITION - 110

MV110-B45 FIRST LEVEL PLAN - VENTILATION ZONING

MV111-B45 FIRST LEVEL PLAN - VENTILATION

MV120-B45 SECOND LEVEL PLAN - VENTILATION ZONING

MV121-B45 SECOND LEVEL PLAN - VENTILATION

MV131-B45 THIRD LEVEL PLAN - VENTILATION

MV211 ENLARGED PLAN - VENTILATION

MV301 VENTILATION DETAILS

MV302 VENTILATION DETAILS

MV303 VENTILATION DETAILS

MV401 VENTILATION DIAGRAMS

MV402 CONTROL DIAGRAMS

MV501 VENTILATION SCHEDULES

MV502 VENTILATION SCHEDULES

MV503 VENTILATION SCHEDULES

MV504 VENTILATION SCHEDULES

MV505 VENTILATION SCHEDULES

SHEET INDEX - PLUMBING

SHEET NO. SHEET TITLE BI

D

DO

CU

M

-X X-

XX

P000 PLUMBING COVERSHEET

PD101-B50 BASEMENT PLAN - PLUMBING DEMOLITION

PD111-B50 FIRST LEVEL PLAN - PLUMBING DEMOLITION

PD121-B50 SECOND LEVEL PLAN - PLUMBING DEMOLITION

PD121-B110 SECOND LEVEL PLAN - PLUMBING DEMOLITION - 110

P100-B45 UNDERFLOOR PLAN - PLUMBING

P111-B45 FIRST LEVEL PLAN - PLUMBING

P121-B45 SECOND LEVEL PLAN - PLUMBING

P121-B110 SECOND LEVEL PLAN - PLUMBING - 110

P131-B45 ROOF PLAN - PLUMBING

P301 PLUMBING DETAILS

P401 PLUMBING DIAGRAMS

P402 PLUMBING DIAGRAMS

P501 PLUMBING SCHEDULES

SHEET INDEX - ELECTRICAL

SHEET NO. SHEET TITLE BI

D

DO

CU

M

-X X-

XX

E004 SITE LIGHTING

E001 ELECTRICAL COVERSHEET

EL111-B45 FIRST LEVEL PLAN - ELECTRICAL LIGHTING

EL121-B45 SECOND LEVEL PLAN - ELECTRICAL LIGHTING

EP111-B45 FIRST LEVEL PLAN - ELECTRICAL POWER

EP121-B45 SECOND LEVEL PLAN - ELECTRICAL POWER

ES111-B45 FIRST LEVEL PLAN - ELECTRICAL SYSTEMS

ES121-B45 SECOND LEVEL PLAN - ELECTRICAL SYSTEMS

E301 ELECTRICAL DETAILS

E401-B45 ELECTRICAL RISER DIAGRAMS

E501-B45 ELECTRICAL SCHEDULES - BUILDING 45

E002 ELECTRICAL NOTES

ED111-B50 FIRST LEVEL PLAN - ELECTRICAL DEMOLITION

ED121-B50 SECOND LEVEL PLAN - ELECTRICAL DEMOLITION

E502-B45 ELECTRICAL SCHEDULES - BUILDING 45

EL122-B110 SECOND LEVEL PLAN - ELECTRICAL LIGHTING - 110

EP122-B110 SECOND LEVEL PLAN - ELECTRICAL POWER - 110

ES122-B110 SECOND LEVEL PLAN - ELECTRICAL SYSTEMS - 110

ED122-B110 SECOND LEVEL PLAN - ELECTRICAL DEMOLITION - 110

ET101-B45 SITE PLAN - ELECTRICAL & TECHNOLOGY

E003 MASTER SITE PLAN - ELECTRICAL

ES500-B45 FIRE ALARM DETAILS

E600-B45 ENLARGED PLANS

E503-B110 ELECTRICAL SCHEDULES - BUILDING 110

SHEET INDEX - CIVIL

SHEET NO. SHEET TITLE BI

D

DO

CU

M

-X X-

XX

D-101 EXISTING CONDITIONS & REMOVALS PLAN

C-001 OVERALL SITE PLAN

C-101 SITE PLAN

C-102 UTILITY PLAN

C-103 GRADING AND EROSION CONTROL PLAN

C-104 GRADING ENLARGEMENT

C-105 SITE DETAILS

L-101 SITE RESTORATION PLAN

L-102 SITE RESTORATION DETAILS

SHEET INDEX - STRUCTURAL

SHEET NO. SHEET TITLE BI

D

DO

CU

M

-X X-

XX

SG000-B45 GENERAL NOTES

SG001-B45 ABBREVIATIONS & SYMBOLS

SD100-B45 DEMO AND BRACING PHASING PLAN

SB100-B45 FOUNDATION / FIRST LEVEL PLAN

SF101-B45 SECOND FLOOR / LOW ROOF FRAMING PLAN

SF102-B45 HIGH ROOF FLOOR FRAMING PLAN

SF103-B45 ROOF OVERBUILD FRAMING PLAN

SJ300-B45 FOUNDATION DETAILS

SJ301-B45 FOUNDATION DETAILS

SJ400-B45 MASONRY DETAILS

SJ500-B45 STEEL DETAILS

SJ501-B45 STEEL DETAILS

SJ502-B45 STEEL AND COLDFORM DETAILS

SJ700-B45 ELEVATIONS

SHEET INDEX - TECHNOLOGY

SHEET NO. SHEET TITLE BI

D

DO

CU

M

-X X-

XX

T001 TECHNOLOGY COVERSHEET

T003 MASTER SITE - TECHNOLOGY

T100 - B110 OVERALL GROUND FLOOR PLAN - TECHNOLOGY - BLDG 110

T103 - B146 OVERALL FIRST FLOOR PLAN - TECHNOLOGY - BLDG 146

T104 - B135 OVERALL GROUND FLOOR PLAN - TECHNOLOGY - BLDG 135

T106 - B110B OVERALL FIRST FLOOR PLAN - TECHNOLOGY - BLDG 110B

T122-B110 SECOND LEVEL PLAN - TECHNOLOGY - 110

T111-B45 FIRST LEVEL PLAN - TECHNOLOGY

T121-B45 SECOND LEVEL PLAN - TECHNOLOGY

TD122-B110 SECOND LEVEL PLAN - TECHNOLOGY DEMOLITION - 110

T131-B45 ROOF PLAN - TECHNOLOGY

T201 ENLARGED PLANS - TECHNOLOGY

T301 TECHNOLOGY DETAILS

T401 TECHNOLOGY DIAGRAMS

T402 TECHNOLOGY DIAGRAMS

T501 TECHNOLOGY SCHEDULES

SHEET INDEX - FIRE PROTECTION

SHEET NO. SHEET TITLE BI

D

DO

CU

M

-X X-

XX

FP000 FIRE PROTECTION COVERSHEET

FPD101-B50 BASEMENT PLAN - FIRE PROTECTION DEMOLITION

FPD111-B50 FIRST LEVEL PLAN - FIRE PROTECTION DEMOLITION

FPD121-B50 SECOND LEVEL PLAN - FIRE PROTECTION DEMOLITION

FPD131-B50 ATTIC PLAN - FIRE PROTECTION DEMOLITION

FP111-B45 FIRST LEVEL PLAN - FIRE PROTECTION

FP121-B45 SECOND LEVEL PLAN - FIRE PROTECTION

FP301 FIRE PROTECTION DETAILS

FP401 FIRE PROTECTION DIAGRAMS

FP501 FIRE PROTECTION SCHEDULES

Revisions: Date: 09/12/2022

I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.

Name: Steve Schlotthauer

ARCHITECTURAL ABBREVIATIONS

A/C

A/C UNIT

A/E

AAMA

AAP

AB

ABC

ACC

ACI

ACT

ACS DR

ACS FLR

ACS PNL

ACST

AD

ADA

ADC

ADDL

ADDN

ADH

ADJ

ADMIN

AFF

AFG

AFS

AGC

AGGR

AHJ

AHR

AHU

AIA

AISC

ALT

ALT NO

ALUM

AMT

ANOD

ANSI

ANT

AP

APA

APC

APPD

APPROX

AR

ARCH

ASB

ASI

ASKLR

ASPH

ASSN

ASTM

ATCH

ATM

AUTO

AUX

AV

AVG

AW

AWI

AWPA

AWS

B PL

BAT

BD

BD FT

BEV

BHMA

BI FLD DR

BITUM

BKG

BLD

BLDG

BM

BOT

BRCG

BRDG

BRDG JST

BRG

BRG PL

BRKT

BRZ

BSMT

BTWN

BUR

C CONC

C TO C

CAB

CAC

CB

CBB

CCD

CCTV

CCW

CD

CEM

CEM PLAS

CER

CF

CF/CI

CF/OI

CFLG

CFMF

CG

CGSFU

CH

CHEM

CHFR

CHK

CI

CIP

CIR

CIRC

CJ

CL

CLDG

CLG

CLR

CM

CMU

AIR CONDITION

AIR CONDITIONING UNIT

ARCHITECT/ENGINEER

AMERICAN ARCHITECTURAL MANUFACTURERS ASSN

ALARM ANNUNCIATOR PANEL

ANCHOR BOLT

AGGREGATE BASE COURSE

ACCESSIBLE

AMERICAN CONCRETE INSTITUTE

ACOUSTICAL CEILING TILE

ACCESS DOOR

ACCESS FLOOR

ACCESS PANEL

ACOUSTIC

AREA DRAIN

AMERICANS WITH DISABILITIES ACT

AUTOMATIC DOOR CLOSER

ADDITIONAL

ADDITION

ADHESIVE

ADJACENT, ADJOINING, OR ADJUSTABLE

ADMINISTRATION

ABOVE FINISHED FLOOR

ABOVE FINISHED GRADE

ABOVE FINISHED SLAB

ASSOCIATED GENERAL CONTRACTORS

AGGREGATE

AUTHORITY HAVING JURISDICTION

ANCHOR

AIR HANDLING UNIT

AMERICAN INSTITUTE OF ARCHITECTS

AMERICAN INSTITUTE OF STEEL CONSTRUCTION

ALTERNATE

ALTERNATE NUMBER

ALUMINUM

AMOUNT

ANODIZE

AMERICAN NATIONAL STANDARDS INSTITUTE

ANTENNA

ACCESS PANEL

AMERICAN PLYWOOD ASSOCIATION

ARCHITECTURAL PRECAST CONCRETE

APPROVED

APPROXIMATE

AS REQUIRED

ARCHITECT

ASBESTOS

ARCHITECT'S SUPPLEMENTAL INSTRUCTION

AUTOMATIC SPRINKLER

ASPHALT

ASSOCIATION

AMERICAN SOCIETY FOR TESTING AND MATERIALS

ATTACHMENT

AUTOMATIC TELLER MACHINE

AUTOMATIC

AUXILIARY

AUDIO VISUAL

AVERAGE

ACID WASTE

ARCHITECTURAL WOODWORKING INSTITUTE

AMERICAN WOOD PRESERVERS' ASSOCIATION

AMERICAN WELDING SOCIETY

BASE PLATE

BATTEN

BOARD

BOARD FEET (FOOT)

BEVEL

BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION

BIFOLDING DOORS

BITUMINOUS

BACKING

BUILD

BUILDING

BEAM OR BENCHMARK

BOTTOM

BRACING

BRIDGING

BRIDGING JOIST

BEARING

BEARING PLATE

BRACKET

BRONZE

BASEMENT

BETWEEN

BUILT-UP ROOFING

CAST CONCRETE

CENTER TO CENTER

CABINET

CEILING ATTENUATION CLASS

CATCH BASIN OR CORNER BEAD

CEMENTITIOUS (BACKER) BOARD

CONSTRUCTION CHANGE DIRECTIVE

CLOSED CIRCUIT TELEVISION

COUNTERCLOCKWISE

CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS

CEMENT

CEMENT PLASTER

CERAMIC

CONTRACTOR FURNISHED

CONTRACTOR FURNISHED/CONTRACTOR INSTALLED

CONTRACTOR FURNISHED/OWNER INSTALLED

COUNTERFLASHING

COLD-FORMED METAL FRAMING

CORNER GUARD

CERAMIC GLAZED STRUCTURAL FACING UNITS

COAT HOOK

CHEMICAL

CHAMFER

CHECK

CAST IRON

CAST-IN-PLACE

CIRCLE

CIRCULAR

CONSTRUCTION JOINT OR CONTROL JOINT

CENTER LINE

CLADDING

CEILING

CLEAR

CONSTRUCTION MANAGEMENT

CONCRETE MASONRY UNIT

CNR

CNTR

CRTP

CO

CO2

COL

COM

COMB

COMM

COMP

CONC

CONC FLR

COND

CONF

CONN

CONSTR

CONT

CONTR

COORD

CORR

CPM

CPRS

CR

CRS

CRSI

CSB

CSG

CSI

CSK

CSMT

CSWK

CTG

CTR

CTRL

CTV

CU FT

CU IN

CU YD

CURT

CYL

CYL L

D

DAT

DBL

DBL GLZ

DCS

DP

DEG

DEL

DEMO

DEPT

DET

DF

DIA

DIAG

DIFF

DIM

DIR

DISP

DIST

DIV

DL

DOC

DR

DR CL

DR FR

DR OPNG

DS

DSGN

DW

DWG

E

EA

EFF

EFS

EIFS

EJ

EL

ELAST

ELEC

ELEC DR OP

ELEV

EMER

EMER SHR

ENCL

ENGR

ENVIR

EO

EPA

EPDM

EPO

EPS

EQ

EQL SP

EQUIP

EQUIV

ERD

ESC

ESMT

ESP

EST

ETC

EW

EWC

EWS

EXH

EXIST

EXP

EXP BT

EXST GR

EXT

EXT GR

CORNER

COUNTER

COUNTERTOP

CARBON MONOXIDE

CARBON DIOXIDE

COLUMN

COMMON

COMBINATION, COMBINED

COMMUNICATION

COMPONENT

CONCRETE

CONCRETE FLOOR

CONDENSER OR CONDITION

CONFERENCE

CONNECT

CONSTRUCTION

CONTINUOUS

CONTRACTOR

COORDINATE

CORRIDOR

CRITICAL PATH METHOD

COMPRESSIBLE

CARD READER

COLD ROLLED STEEL

CONCRETE REINFORCING STEEL INSTITUTE

CONCRETE SPLASH BLOCK

CASING

CONSTRUCTION SPECIFICATIONS INSTITUTE

COUNTER SUNK

CASEMENT

CASEWORK

COATING

CENTER

CONTROL

CABLE TELEVISION

CUBIC FEET

CUBIC INCH

CUBIC YARD

CURTAIN

CYLINDER

CYLINDER LOCK

DEPTH OR PENNY (NAIL)

DATUM

DOUBLE

DOUBLE GLAZE

DIAPER CHANGING STATION

DECORATIVE PANEL

DEGREE

DELETE

DEMOLITION

DEPARTMENT

DETAIL

DRINKING FOUNTAIN

DIAMETER

DIAGONAL

DIFFERENCE OR DIFFUSER

DIMENSION

DIRECTION

DISPENSER

DISTANCE

DIVIDE OR DIVISION

DEAD LOAD

DOCUMENT

DOOR, DRAIN, DRESSING ROOM, OR DRIVE

DOOR CLOSER

DOOR FRAME

DOOR OPENING

DOWNSPOUT

DESIGN

DISHWASHER

DRAWING

EAST

EACH

EFFICIENCY

EXTERIOR FINISH SYSTEM

EXTERIOR INSULATION AND FINISH SYSTEM

EXPANSION JOINT

ELEVATION

ELASTOMERIC

ELECTRIC

ELECTRIC DOOR OPENER

ELEVATOR

EMERGENCY

EMERGENCY SHOWER

ENCLOSURE

ENGINEER

ENVIRONMENT

ELECTRICAL OUTLET

ENVIRONMENTAL PROTECTION AGENCY

ETHYLENE PROPYLENE DIENE MONOMER

EMERGENCY POWER OFF

EXPANDED POLYSTYRENE BOARD (INSULATION)

EQUAL

EQUALLY SPACED

EQUIPMENT

EQUIVALENT

EXISTING ROOF DRAIN

ESCAPE OR ESCUTCHEON

EASEMENT

ESPECIALLY

ESTIMATE

AND SO FORTH OR ET CETERA

EACH WAY

ELECTRIC WATER COOLER

EYE WASH STATION

EXHAUST

EXISTING

EXPANSION OR EXPOSED

EXPANSION BOLT

EXISTING GRADE

EXTERIOR, EXTERNAL, OR EXTINGUISHER

EXTERIOR GRADE

F

FA

FAB

FAC

FACIL

FAS

FAS BD

FCU

FCO

FCTY

FD

FDC

FDTN

FE

FEC

FF

FF EL

FF&E

FHC

FHP

FIG

FIL

FIN

FIN FLR

FIN GR

FIN WD

FIXT

FL

FLASH

FLDG

FLEX

FLG

FLR

FLR FIN

FLR SK

FLUOR

FLUOR FIX

FM

FM-G

FO

FOC

FOF

FOM

FOS

FOUNT

FOW

FP

FR

FR SNK

FREQ

FRMG

FRP

FRZ

FS

FSB

FSTNR

FT

FTG

FURG

FURN

FUT

FV

FVC

GA

GAL

GALV

GALV STL

GB

GC

GD

GDR

GEN

GFRC

GFRG

GFRP

GI

GL

GL BLK

GLU LAM

GP

GR FL

GRAN

GRTG

GSB

GSM

GSU

GT

GUAR

GUT

GYP

GYP BD

GYP PLAS

H

HAZ MAT

HB

HC

HCWD

HDBD

HDO

HDR

HDW

HDWD

HEPA

HEX

HGR

HM

HMD

HMDF

HMF

HNDRL

HO

HORIZ

HOSP

HP

HPD

HPDL

HQ

HS

HSE

HSKPG

FAHRENHEIT OR FEMALE

FIRE ALARM

FABRIC

FACTOR

FACILITY

FASCIA

FASCIA BOARD

FAN COIL UNIT

FLOOR CLEANOUT

FACTORY

FLOOR DRAIN

FIRE DEPARTMENT CONNECTION

FOUNDATION

FIRE EXTINGUISHER

FIRE EXTINGUISHER CABINET

FINISH FACE

FINISH FLOOR ELEVATION

FURNITURE, FIXTURE, AND EQUIPMENT

FIRE HOSE CABINET

FULL HEIGHT PARTITION

FIGURE

FILLET

FINISH

FINISH FLOOR

FINISH GRADE

FINISH WOOD

FIXTURE

FLOORLINE

FLASHING

FOLDING

FLEXIBLE

FLOORING

FLOOR

FLOOR FINISH

FLOOR SINK

FLUORESCENT

FLUORESCENT FIXTURE

FACTORY MUTUAL

FACTORY MUTUAL GLOBAL

FINISHED OPENING

FACE OF CONCRETE OR FACE OF CURB

FACE OF FINISH

FACE OF MASONRY

FACE OF SLAB OR FACE OF STUD

FOUNTAIN

FACE OF WALL

FIRE PROTECTION OR FIREPROOF

FIRE RATING, FIRE RESISTANT, OR FRAME

FLUSHING RIM SINK

FREQUENCY

FRAMING

FIBERGLASS REINFORCED PLASTIC

FREEZER

FEDERAL SPECIFICATION

FOLDING SHOWER BENCH

FASTENER

FEET OR FOOT

FOOTING

FURRING

FURNISH OR FURNITURE

FUTURE

FIELD VERIFY

FIRE VALVE CABINET

GAGE OR GYPSUM ASSOCIATION

GALLON

GALVANIC OR GALVANIZED

GALVANIZED STEEL

GRAB BAR

GENERAL CONTRACTOR

GUARD

GUARD RAIL

GENERAL OR GENERATOR

GLASS-FIBER-REINFORCED CONCRETE

GLASS-FIBER-REINFORCED GYPSUM

GLASS-FIBER-REINFORCED PLASTIC

GALVANIZED IRON

GLASS

GLASS BLOCK

GLUED LAMINATED WOOD

GRAB BAR

GROUND FLOOR

GRANITE

GRATING

GYPSUM SHEATHING BOARD

GALVANIZED SHEET METAL

GLAZED STRUCTURAL UNIT

GROUT

GUARANTEE

GUTTER

GYPSUM

GYPSUM BOARD

GYPSUM PLASTER

HIGH OR HUMIDISTAT

HAZARDOUS MATERIALS

HOSE BIBB

HOLLOW CORE

HOLLOW CORE WOOD DOOR

HARDBOARD

HIGH DENSITY OVERLAY

HEADER

HARDWARE

HARDWOOD

HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HEXAGON

HANGER

HOLLOW METAL

HOLLOW METAL DOOR

HOLLOW METAL DOOR AND FRAME

HOLLOW METAL FRAME

HANDRAIL

HOLD OPEN

HORIZONTAL

HOSPITAL

HIGH PRESSURE

HYGIENE PRODUCT DISPOSAL

HIGH PRESSURE DECORATIVE LAMINATE

HEADQUARTERS

HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH

HOUSE

HOUSEKEEPING

HST

HSS

HT

HVAC

HVY

HW

HYD

HYDR

IAQ

IBC

IC

ICW

ID

ID NO

ILLUM

INCL

IND

INFO

INSUL

INT

INTL

IWH

JAN

KD

KIT

KO

KPL

LAB

LAD

LAM

LAM GL

LAU

LAV

LBR

LBS

LCS

LD BRG

LDR

LED

LF

LIB

LIN

LIQ

LKR

LKR RM

LL

LMST

LRG

LRV

LS

LT

LT GA

LT WT

LTG

LTNG

LVD

LVR

LWC

LWIC

LYR

MACH

MACH RM

MAINT

MAN

MATL

MATV

MAX

MBD

MCB

MD

MDF

MDO

ME

MEAS

MECH

MECH RM

MED

MEK

MEMB

MEMO

MEZZ

MF

MFD

MFG

MFR

MFR REC

MGT

MIC

MID

MIL STD

MIN

MIR

MISC

MIT

MKR

ML

MLDG

MLWK

mm

MO

MOD

MOD BIT

MON

MOPR

MR

MS

MTD

MTG

MTL

MULL

MW

MWP

HOIST

HOLLOW STRUCTURAL STEEL

HEIGHT

HEATING, VENTILATING, AND AIR CONDITIONING

HEAVY

HOT WATER

HYDRANT

HYDRAULIC

INDOOR AIR QUALITY

INTERNATIONAL BUILDING CODE

INFECTION CONTROL

INFECTION CONTROL WALL

INSIDE DIAMETER

IDENTIFICATION NUMBER

ILLUMINATION

INCLUDED

INDEPENDENT OR INDUSTRIAL

INFORMATION

INSULATION

INTERIOR

INTERNATIONAL

INSTANTANEOUS WATER HEATER

JANITOR

KILN DRIED OR KNOCKED DOWN

KITCHEN

KNOCKOUT

KICKPLATE

ANGLE

LABORATORY

LADDER

LAMINATE

LAMINATED GLASS

LAUNDRY

LAVATORY

LUMBER

POUND

LOCKABLE CHARTING STATION/MED CABINET

LOAD-BEARING

LEADER

LIGHT EMITTING DIODE

LINEAR FEET (FOOT)

LIBRARY

LINEAR

LIQUID

LOCKER

LOCKER ROOM

LEAD LINED

LIMESTONE

LARGE

LOUVERED ROOF VENT

LIGHT SWITCH

LIGHT

LIGHT GAGE

LIGHTWEIGHT

LIGHTING

LIGHTNING

LOUVERED

LOUVER

LIGHTWEIGHT CONCRETE

LIGHTWEIGHT INSULATING CONCRETE

LAYER

MACHINE

MACHINE ROOM

MAINTENANCE

MANUAL

MATERIAL

MASTER ANTENNA TELEVISION SYSTEM

MAXIMUM

MARKER BOARD

METAL CORNER BEAD

DECK

MEDIUM DENSITY FIBERBOARD

MEDIUM DENSITY OVERLAY

MECHANICAL ENGINEER

MEASURE

MECHANICAL

MECHANICAL ROOM

MEDICAL, MEDIUM

METHYL ETHYL KETONE

MEMBRANE

MEMORANDUM

MEZZANINE

MILL FINISH

MANUFACTURED

MANUFACTURING

MANUFACTURER

MANUFACTURER'S RECOMMENDATION

MANAGEMENT

MICROPHONE

MIDDLE

MILITARY STANDARD

MINIMUM

MIRROR

MISCELLANEOUS

MITER

MARKER

METAL LATH

MOLDING (MOULDING)

MILLWORK

MILLIMETER

MASONRY OPENING

MODEL, MODIFY OR MODULE

MODIFIED BITUMEN

MONITOR

MOP RACK

MOISTURE RESISTANT

MOP SINK

MOUNTED

MOUNTING

METAL

MULLION

MICROWAVE

MEMBRANE WATERPROOFING

N

NA

NAT

NATL

NC

NCOMBL

NEC

NEG

NEMA

NEUT

NFC

NFPA

NIC

NO

NOM

NR

NRC

NRCA

NRP

NS

NUM

O/O O

OA

OC

OCC

OCT

OD

OD

OF/CI

OFD

OFF

OF/OI

OH

OH DR

OPH

OPNG

OPP

OPR

OPT

OR

ORD

ORG

ORIG

ORN

OSHA

OUT

OZ

P

PAR

PARA

PART

PAT

PB

PBD

PC

PCA

PCC

PCCP

PCD

PCF

PCP

PCT

PED

PEN

PEND

PERF

PERIM

PERP

PHAR

PHOTO

PKG

PL

PL GL

PLAM

PLAS

PLBG

PLYWD

PMTL

PNEU

PNL

PO

POLY

PP

PR

PRCST

PREFAB

PREFIN

PRELIM

PREP

PRESS

PREV

PRKG

PRMLD

PROJ

PROP

PSF

PSI

PT

PTD

PTN

PTS

PVC

PVG

PWR

QA

QC

QRY

QTR

QTY

QUAD

QUAL

R

RA

RAD

RBM

RBR

NORTH

NOT APPLICABLE

NATURAL

NATIONAL

NOISE CRITERIA OR NURSE CALL

NONCOMBUSTIBLE

NATIONAL ELECTRICAL CODE

NEGATIVE

NATIONAL ELECTRICAL MANUFACTURERS ASSN

NEUTRAL

NATIONAL FIRE CODE

NATIONAL FIRE PROTECTION ASSOCIATION

NOT IN CONTRACT

NUMBER

NOMINAL

NOISE REDUCTION

NOISE REDUCTION COEFFICIENT

NATIONAL ROOFING CONTRACTORS ASSOCIATION

NONREMOVABLE

NARROW STILE

NUMERAL

OUT TO OUT

OXYGEN

OUTSIDE AIR OR OVERALL

ON CENTER

OCCUPY

OCTAGON

OUTSIDE DIAMETER, OUTSIDE DIMENSION

OUTSIDE DIAMETER/OUTSIDE DIMENSION

OWNER FURNISHED/CONTRACTOR INSTALLED

OVERFLOW DRAIN

OFFICE

OWNER FURNISHED/OWNER INSTALLED

OVERHANG

OVERHEAD (COILING) DOOR

OPPOSITE HAND

OPENING

OPPOSITE

OPERABLE

OPTIONAL

OPERATING ROOM OR OUTSIDE RADIUS

ORDNANCE OR OVERFLOW ROOF DRAIN

ORGANIC

ORIGINAL

ORNAMENTAL

OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION

OUTLET

OUNCE

PAINT

PARALLEL OR PARAPET

PARAGRAPH

PARTIAL

PATTERN

PUSHBUTTON

PARTICLEBOARD

PIECE, POLYCARBONATE OR PORTLAND CEMENT

PORTLAND CEMENT ASSOCIATION

PRECAST CONCRETE

CONCRETE PAVEMENT

PAPER CUP DISPENSER

POUNDS PER CUBIC FOOT

PORTLAND CEMENT PLASTER

PRIVACY CURTAIN TRACK

PEDESTAL

PENETRATE

PENDANT

PERFORATED

PERIMETER

PERPENDICULAR

PHARMACY

PHOTOGRAPH

PACKAGE

PROPERTY LINE

PLATE GLASS

PLASTIC LAMINATE

PLASTER OR PLASTIC

PLUMBING

PLYWOOD

PAINTED METAL

PNEUMATIC

PANEL

POST OFFICE, PURCHASE ORDER

POLYETHYLENE (PLASTIC)

PUSH PLATE

PAIR

PRECAST

PREFABRICATE

PREFINISH

PRELIMINARY

PREPARATION

PRESSURE

PREVIOUS

PARKING

PREMOLDED

PROJECT

PROPERTY

POUNDS PER SQUARE FOOT

POUNDS PER SQUARE INCH

PORCELAIN TILE OR PRESSURE TREATED

PAPER TOWEL DISPENSER

PARTITION

PNEUMATIC TUBE STATION

POLYVINYL CHLORIDE (PLASTIC)

PAVING

POWER

QUALITY ASSURANCE

QUALITY CONTROL

QUARRY

QUARTER

QUANTITY

QUADRANT

QUALITY

RADIUS OR RISER

RETURN AIR

RADIATOR

REINFORCED BRICK MASONRY

RUBBER

RC

RCP

RCVR

RD

REC

RECD

RECPT

RECT

REF

REFR

REG

REINF

REP

REPL

REQ

REQD

RET

REV

RFG

RFI

RFP

RFS

RL

RLG

RM

RM LT

RND

RO

ROW

RS

RSV

RT

RV

RVS

RWL

S

SA

SALV

SAMP

SAN

SB

SBS

SBSTR

SC

SCH

SCHED

SCHEM

SCP

SCRN

SCT

SCWD

SD

SDG

SECT

SEG

SEL

SEP

SF

SFTWD

SGD

SGL

SHR

SHR HD

SHRD

SHT

SHTHG

SHV

SIM

SJ

SJI

SK

SKLT

SLDG

SLNT

SM

SMK

SND INS

SPEC

SPKLR

SPKR

SPLY

SPR

SQ

SQ IN

SQ YD

SST

ST

STC

STD

STIF

STL JST

STL LNTL

STL PL

STL RF DK

STL TB

STL TR

STNLS

STOR

STR

STRUCT

STRUCT STL

SUB

SURF

SUSP

SUSP CLG

SW

SWDR

SYM

SYNTH

SYS

REMOTE CONTROL

REFLECTED CEILING PLAN

RECEIVER

ROAD OR ROOF DRAIN

RECESSED

RECEIVED

RECEPTACLE

RECTANGLE

REFERENCE OR REFRIGERATOR

REFRACTORY, REFRIGERATION

REGISTER

REINFORCE

REPAIR

REPLACE

REQUIRE

REQUIRED

RETURN

REVISION

ROOFING

REQUEST FOR INFORMATION

REQUEST FOR PROPOSAL

ROOM FINISH SCHEDULE

ROOF LEADER

RAILING

ROOM

NURSE CALL LIGHT/ROOM LIGHT

ROUND

ROUGH OPENING

RIGHT OF WAY

ROUGH SAWN

RESILIENT SHEET VINYL

RIGHT

ROOF VENT

REVERSE

RAIN WATER LEADER

SOLID SURFACE

SUPPLY AIR

SALVAGE

SAMPLE

SANITARY

SPLASH BLOCK

STYRENE BUTADIEN STYRENE

SUBSTRATE

SHARPS CONTAINER

SCHOOL

SCHEDULE

SCHEMATIC

SCUPPER

SCREEN

SHOWER CURTAIN TRACK

SOLID CORE WOOD DOOR

SMOKE DETECTOR/SOAP DISPENSER

SIDING

SECTION

SEGMENT

SELECT

SEPARATE

SQUARE FOOT (FEET)

SOFTWOOD

SLIDING GLASS DOOR

SINGLE

SHOWER

SHOWER HEAD

SHOWER DRAIN

SHEET

SHEATHING

SHELVING

SIMILAR

SCORED JOINT

STEEL JOIST INSTITUTE

SKETCH

SKYLIGHT

SLIDING

SEALANT

SHEET METAL

SMOKE

SOUND INSULATION

SPECIFICATION

SPRINKLER

SPEAKER

SUPPLY

SINGLE PLY ROOF SYSTEM

SQUARE

SQUARE INCH

SQUARE YARD

STAINLESS STEEL

STAIRS OR STREET

SOUND TRANSMISSION CLASS

STANDARD

STIFFENER

STEEL JOIST

STEEL LINTEL

STEEL PLATE

STEEL ROOF DECK

STEEL TUBE

STEEL TRUSS

STAINLESS

STORAGE

STRINGERS

STRUCTURAL

STRUCTURAL STEEL

SUBSTITUTE

SURFACE

SUSPEND

SUSPENDED CEILING

SWITCH

SWING DOOR

SYMBOL

SYNTHETIC

SYSTEM

T T&M

TB

TBD

TECH

TEL

TEMP

THERM

THK

THRES

THRU

THRUOUT

TMPD

TMPD GL

TN

TO

TO FDN

TOB

TOM

TOP

TOS

TOW

TPD

TRANS

TRTD

TS

TSTAT

TV

TYP

U

UC

UGND

UL

ULT

UNFIN

UNO

UPS

UR

UTIL

UV

VAC

VAR

VEH

VENT

VERT

VEST

VFD

VIC

VID

VIF

VNR

VOC

VOL

VR

VTR

VWC

W/ W/O

WBL

WC

WD

WDW

WF

WFR

WFS

WH

WHSE

WP

WPM

WR

WS

WSCT

WT

X BRACE

XPS

YD

TREAD OR THERMOSTAT

TIME AND MATERIALS

TOWEL BAR

TACK BOARD

TECHNICAL

TELEPHONE

TEMPERATURE OR TEMPORARY

THERMAL

THICKNESS

THRESHOLD

THROUGH

THROUGHOUT

TEMPERED

TEMPERED GLASS

TRUE NORTH

TOP OF ___

TOP OF FOUNDATION

TOP OF BEAM

TOP OF MASONRY

TOP OF PARAPET

TOP OF STEEL

TOP OF WALL

TOILET PAPER DISPENSER

TRANSOM

TREATED

TUBE STEEL

THERMOSTAT

TELEVISION

TYPICAL

HEAT TRANSFER COEFFICIENT

UNDERCUT

UNDERGROUND

UNDERWRITERS LABORATORIES

ULTIMATE

UNFINISH

UNLESS NOTED OTHERWISE

UNINTERRUPTIBLE POWER SUPPLY

URINAL

UTILITY

ULTRAVIOLET

VACUUM

VARIES

VEHICLE

VENTILATION

VERTICAL

VESTIBULE

VARIABLE FREQUENCY DRIVE

VICINITY

VIDEO

VERIFY IN FIELD

VENEER

VOLATILE ORGANIC COMPOUND

VOLUME

VAPOR RETARDER

VENT THROUGH ROOF

VINYL WALL COVERING

WITH

WITHOUT

WOOD BLOCKING

WATER CLOSET

WOOD

WINDOW

WIDE FLANGE

WOOD FRAME

WOOD FURRING STRIPS

WATER HEATER

WAREHOUSE

WATERPROOFING

WATERPROOF MEMBRANE

WEATHER RESISTANT

WEATHERSTRIP OR WALL SCONCE

WAINSCOT

WEIGHT OR WINDOW TREATMENT

CROSS BRACE

EXTRUDED POLYSTYRENE BOARD

YARD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs

\P u b lic \D o c u m e n ts \R e v it P ro je c ts

\1

-R g b a rb a ri a e -m n .c o m

.r v t

/8

/2

:2

:3

A

M

GI002

ABBREVIATIONS CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

09/02/2022 LA GJB16149Revisions: Date: 09/12/2022

I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.

Name: Steve Schlotthauer

GENERAL NOTES

1. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF

CONSTRUCTION WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT.

INCIDENTAL WORK MAY BE NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURAL

DRAWINGS DUE TO CHANGES AFFECTING ELECTRICAL, MECHANICAL AND PLUMBING

ALONG WITH OTHER SYSTEMS. THIS INCIDENTAL WORK SHALL BE PART OF THIS

CONTRACT, AND ALL TRADES SHALL INSPECT THESE AREAS, ASCERTAIN WORK

REQUIRED AND DO THE WORK IN ACCORDANCE OF CONTRACT REQUIREMENTS AT

NO ADDITIONAL COST.

2. CONTRACTORS SHALL VISIT THE SITE DURING BIDDING TO BECOME FAMILIAR WITH

THE EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL LOCATE, INSPECT

AND FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS PRIOR

TO DEMOLITION AND CONSTRUCTION. NOTIFY ARCHITECT IMMEDIATELY OF ANY

DISCREPANCIES.

3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY

DISCREPANCIES.

4. WHEREVER OPENINGS ARE CUT THROUGH FIRE RATED PARTITIONS, IT SHALL BE

THE RESPONSIBILITY OF THE CONTRACTOR FOR WHOM THE HOLE IS CUT TO PATCH

AND REPAIR ANY OPENING TO MAINTAIN THE INTEGRITY OF THE FIRE RATING.

5. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES

AND DUCTS FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL

CONTRACTOR PRIOR TO PROCEEDING WITH REMODELING.

6. FIREPROOFING SHALL BE UNPIERCED. ANY SUBCONTRACTOR PENETRATING THE

FIREPROOFING SHALL BE REQUIRED TO REPLACE FIREPROOFING TO THE ORIGINAL

CONDITION AND FIRE RATING, AT THE SUBCONTRACTORS EXPENSE.

7. EQUIPMENT UNIT DIMENSIONS ARE FOR PRODUCT DESCRIPTION ONLY, VERIFY SIZE

WITH MANUFACTURER.

8. ALL DIMENSIONS PERTAINING TO MECHANICAL OR ELECTRICAL SERVICES OR

EQUIPMENT SHALL BE VERIFIED WITH THE RESPECTIVE TRADE.

9. ALL CONTRACTORS THAT PENETRATE AND/OR DISTURB ANY AREAS AT EXISTING

CONDITIONS SHALL PATCH AREA TO MATCH EXISTING ADJACENT AREA OR

SURFACE AND PREPARE FOR SCHEDULED FINISH APPLICATION. COORDINATE WORK

WITH GENERAL CONTRACTOR PRIOR TO PROCEEDING.

10. VERIFY HEIGHTS AND LOCATIONS OF ACCESS PANELS (AP) AND COORDINATE

TYPES WITH TRADES WHICH REQUIRE THEM.

11. PROVIDE LINTELS AND FRAMING FOR GRILLES, LOUVERS, AND ROOF VENTS AS

REQUIRED BY MECHANICAL CONTRACTOR, VERIFY SIZE AND LOCATION.

12. STRUCTURAL, MECHANICAL, AND ELECTRICAL ABBREVIATIONS AND SYMBOLS MAY

DIFFER FROM ARCHITECTURAL. SEE RESPECTIVE SECTIONS AND/OR DRAWINGS FOR

DEFINITIONS.

13. AT MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, PROVIDE 3/4" FRT

PLYWOOD BACKING BEHIND ALL SURFACE MOUNTED FIXTURES AND EQUIPMENT,

UNLESS NOTED OTHERWISE.

14. CONTRACTOR SHALL EVALUATE INTEGRITY OF ALL PARTITIONS INDICATED BY

SYMBOLS ON THE LIFE SAFETY PLAN(S) WITHIN THE PROJECT SCOPE AND UPGRADE

AS REQUIRED. ALL FIRE RESISTIVE RATED WALLS SHALL BE CONSTRUCTED OF

MATERIALS / ASSEMBLIES MEETING THE RATING INDICATED, TERMINATE AT THE

DECK ABOVE WITH A TESTED HEAD OF WALL ASSEMBLY AND ALL PENETRATIONS

SHALL BE SEALED WITH A TESTED ASSEMBLY. ALL SMOKE PARTITIONS SHALL BE

CONSTRUCTED OF MATERIALS THAT RESIST THE PASSAGE OF SMOKE, TERMINATE

AT THE DECK ABOVE WITH A JOINT SEALED WITH FIRE CAULK AND ALL

PENETRATIONS SHALL BE SEALED WITH FIRE CAULK.

DEMOLITION GENERAL NOTES

1. GENERAL CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK, PHASING

AND SEQUENCING WITH THE OWNER. ANY INFORMATION REGARDING SEQUENCING

PROVIDED IN THESE DOCUMENTS IS FOR ARCHITECT - OWNER PLANNING

PURPOSES ONLY, UNLESS NOTED OTHERWISE.

2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH ALL

TRADES FOR THE DEMOLITION WORK REQUIRED FOR THIS PROJECT.

3. WHERE PARTITIONS ARE INDICATED TO BE REMOVED, REMOVE PARTITION ALONG

WITH ALL ITEMS CONTAINED WITHIN, INCLUDING DOORS, FRAMES, HARDWARE,

SIDELIGHTS, WINDOWS, MECHANICAL AND ELECTRICAL EQUIPMENT, ETC. TO

STRUCTURE ABOVE, UNLESS NOTED OTHERWISE.

4. WHERE CEILING IS INDICATED TO BE DEMOLISHED, REMOVE CEILING SUSPENSION

SYSTEM ALONG WITH ALL ASSOCIATED MECHANICAL AND ELECTRICAL ITEMS,

UNLESS NOTED OTHERWISE. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR

EXTENT OF CONDUIT, PIPING AND DUCTWORK DEMOLITION WITHIN AREA TO BE

REMODELED.

5. WHERE INDICATED, REMOVE ALL WALL/PARTITION EXISTING FINISHES AND

PREPARE THE SURFACES FOR SCHEDULED FINISHES, SEE FINISH SCHEDULE FOR

FINISHES.

6. ALL DISTURBED AREAS, WALLS, PARTITIONS, FLOORS, ETC, DAMAGED BY

DEMOLITION WORK SHALL BE PATCHED TO MATCH ADJACENT AREA.

7. OWNER RESERVES THE RIGHT OF FIRST REFUSAL OF ALL SALVAGED ITEMS SUCH

AS: DOORS, LIGHT FIXTURES, PLUMBING FIXTURES ETC.

8. SALVAGED ITEMS SCHEDULED FOR REUSE SHALL BE CLEANED, RESTORED AND/OR

REFINISHED TO LIKE NEW CONDITION, UNLESS NOTED OTHERWISE.

9. DO NOT REMOVE ANY EXISTING STRUCTURAL SUPPORT MEMBERS SUCH AS

COLUMNS, BEAMS, JOISTS, LOAD-BEARING PARTITIONS ETC, UNTIL ADEQUATE

PERMANENT OR TEMPORARY SUPPORT IS IN PLACE. ALL EXISTING STRUCTURAL

MEMBERS SHALL BE ADEQUATELY PROTECTED, COORDINATE WITH STRUCTURAL

ENGINEER.

10. SEE HAZARDOUS MATERIALS, STRUCTURAL, MECHANICAL AND ELECTRICAL

DRAWINGS FOR RELATED DEMOLITION AND PREP WORK.

11. WALL AND CEILING MOUNTED ITEMS SHOWN DASHED, SUCH AS WALL CABINETS,

SHELVING, CUBICLE CURTAIN TRACKS, PROJECTION SCREENS ETC, SHALL BE

REMOVED, UNLESS NOTED OTHERWISE.

1. FIELD FINISH VENTS, GRILLES, ACCESS PANELS, PLUG STRIP, BASEBOARD RADIATION

ENCLOSURES, ELECTRICAL PANEL BOARDS (IN FINISHED SPACES AS THEY OCCUR) TO MATCH

SURFACE ON WHICH THEY OCCUR UNLESS OTHERWISE INDICATED. EXCEPTION: ITEMS WITH

FACTORY WHITE FINISH, OCCURRING ON WHITE ACT OR WHITE GYPSUM BOARD CEILING

SHALL NOT BE PAINTED. STAINLESS STEEL ITEMS SHALL NOT BE PAINTED

2. FIELD VERIFY ALL NEW CONDITIONS. NOTIFY ARCHITECT OF ANY DISCREPANCIES PRIOR TO

INSTALLATION

3. LOCATE CHANGES IN FLOOR FINISH MATERIAL UNDER CENTERLINE OF CLOSED DOOR

UNLESS OTHERWISE INDICATED

4. PROVIDE CLEAR SILICONE SEALANT AT PERIMETER OF PLUMBING FLOOR DRAINS, CLEAN

OUTS, ETC IN RESILIENT AND CERAMIC TILE FLOORS

5. PROVIDE SEALANT TO HORIZONTAL AND VERTICAL INTERIOR CERAMIC TILE CORNERS,

COLOR TO MATCH GROUT COLOR

6. PROVIDE SEALANT AT JOINT BETWEEN COUNTER TOP, BACK OR SIDE SPLASH AND WALLS

7. PROVIDE CLEAR SILICONE SEALANT AT THE BASE OF DOOR FRAME TO RESILIENT AND CT

FLOORING, TYP. SEE PLANS AND ROOM FINISH SCHEDULE FOR FLOOR FINISH LOCATIONS

8. HOLLOW METAL DOORS AND FRAMES TO BE PAINTED AS NOTED IN THE FINISH SCHEDULE

9. WOOD: PRE-FINISHED TO MATCH BUILDING STANDARD, REFER TO SPECIFICATION

10. CEILING HEIGHTS AND MATERIALS/FINISHES CALLED OUT IN ROOM FINISH SCHEDULE ARE

FOR ENTIRE CEILING OR MAJORITY OF THAT ROOM, UNLESS OTHERWISE INDICATED. SEE

REFLECTED CEILING PLAN FOR CHANGES IN CEILING MATERIAL AND CEILING HEIGHT. PAINT

ALL SURFACES OF SOFFIT SAME COLOR AS INDICATED

11. COLOR SELECTIONS ARE BASED ON USE OF PRODUCTS INDICATED IN THE PROJECT

MANUAL SPECIFICATION. IF MANUFACTURERS OTHER THAN THOSE INDICATED ARE USED,

ARCHITECT MAY REVISE COLOR SELECTIONS OF OTHER FINISHES TO ENSURE PROPER

COORDINATION

12. PAINT ALL FIRE EXTINGUISHER CABINETS TO MATCH COLOR OF THE ADJACENT WALLS

13. CEILING HEIGHTS ARE MEASURED FROM FINISH FLOOR

14. FOR FLOOR FINISH MATERIALS AND PATTERN, SEE FINISH PLAN

15. SEE INTERIOR ELEVATIONS FOR MORE FINISH INFO

FINISH PLAN GENERAL NOTES

RCP GENERAL NOTES

1. GENERAL CONTRACTOR TO COORDINATE ALL CEILING MOUNTED EQUIPMENT SUPPORT

REQUIREMENTS, LOCATIONS, DIMENSIONS, ETC WITH EQUIPMENT SUPPLIER AND OWNER,

PRIOR TO INSTALLATION.

2. ALL CEILING MOUNTED ITEMS SUCH AS LIGHT FIXTURES, GRILLES, DIFFUSERS, SPEAKERS, EXIT LIGHTS, ETC SHALL BE LOCATED IN THE CENTER OF ACT PANELS, GYP BD SOFFITS

AND/OR PLASTER SOFFIT BAYS, UNLESS NOTED OTHERWISE. COORDINATE WITH

MECHANICAL AND ELECTRICAL DRAWINGS.

3. FINISHED GYP BD SOFFITS SHALL EXTEND 1" BEYOND FACE AND EXPOSED ENDS OF WALL

CABINETS, FULL-HEIGHT CABINETS, ETC UNLESS NOTED OTHERWISE. COORDINATE CABINET

DIMENSIONS WITH SUPPLIER. GYP BD FASCIA/SOFFIT DETAILS ARE REFERENCED FROM THE

REFLECTED CEILING PLAN.

4. SEE MECHANICAL DRAWINGS FOR SPRINKLER HEAD TYPES AND LOCATIONS. CENTER ALL

HEADS IN ACT UNLESS NOTED OTHERWISE.

DEMOLITION PLAN KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

DE1 REMOVE CEILING AND ALL CEILING MOUNTED EQUIPMENT AND

ACCESSORIES, IN ITS ENTIRETY, INCLUDING ALL MECHANICAL AND

ELECTRICAL. SEE MECHANICAL AND ELECTRICAL FOR ADDITIONAL

INFORMATION

DE2 REMOVE PLUMBING FIXTURES AND ACCESSORIES. SEE MECHANICAL AND

FLOOR PLAN FOR ADDITIONAL INFORMATION

DE3 REMOVE GYP BD ONE SIDE OF PARTITION AS REQUIRED FOR MECHANICAL

/ ELECTRICAL. - SEE MECHANICAL / ELECTRICAL PLANS FOR ADDITIONAL

INFORMATION.

DE4 REMOVE HOLLOW METAL WINDOW SYSTEM IN ITS ENTIRETY.

DE5 REMOVE VCT OR LVT FLOORING IN ITS ENTIRETY. PATCH & PREP FLOOR

FOR SCHEDULED FINISH. SEE SPECIFICATIONS SECTION 09 05 16

SUBSURFACE PREPARATION FOR FLOOR FINISHES.

DE6 CUT OPENING IN CLAY TILE AS REQUIRED FOR MECHANICAL WORK. SEE

MEP DRAWINGS FOR ADDITIONAL INFORMATION.

DE7 REMOVE WINDOW / DOOR SYSTEM IN ITS ENTIRETY INCLUDING TRANSOM

WINDOW, ALL ASSOCIATED HARDWARE AND INTERIOR WOOD TRIM ALL

SIDES OF OPENING.

DE8 REMOVE CONCRETE STAIR, LANDING AND METAL RAILING SYSTEM IN ITS

ENTIRETY. SAW CUT CONCRETE FLUSH AT BRICK AS REQUIRED

DE9 REMOVE METAL RAILING SYSTEM. SAW CUT FLUSH AT CONCRETE.

REMOVE EMBEDDED PIPE RAILING MOUNT IN CONCRETE. PREP FOR

PATCHING. SEE PLANS FOR ADDITIONAL INFORMATION

DE10 REMOVE BREAK METAL TRIM, METAL CEILING SOFFIT AND BACKUP

MATERIAL AT PORCH CEILING, BEAMS AND BRICK WALLS ALL SIDES.

DE11 REMOVE WALL COVERING AND J CHANNEL. PREP PARTITION FOR FINISHES

AS SCHEDULED.

DE12 REMOVE CERAMIC WALL TILE. PREP PARTITION FOR FINISHES AS

SCHEDULED.

DE13 REMOVE WINDOW BLINDS AND ALL ASSOCIATED MOUNTING HARDWARE.

DE14 REMOVE SURFACE MOUNTED VERTICAL PATIENT HEADWALL SYSTEM IN

ITS ENTIRETY. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR

ADDITIONAL INFORMATION.

DE15 REMOVE PAINTED FABRIC BACKED WALL COVERING AND ALL ASSOCIATED

FINISH TRIM, ON ALL PARTITIONS, TO 6" ABOVE CEILING MINIMUM. PATCH

AND PREP SURFACES AS REQUIRED FOR SCHEDULED FINISH.

DE16 SAW CUT BULLNOSE GLAZED BRICK (MID HEIGHT OF WALL) AND COVED

GLAZED BRICK (AT BASE OF WALL/FLOOR) ALONG ENTIRE WALL, FOR

STRUCTURAL STEEL BRACING AND COLD FORMED METAL STUD

INSTALLATION. SEE PLANS AND STRUCTURAL FOR ADDITIONAL

INFORMATION.

DE17 REMOVE GYP BD AND STUD FURRING SYSTEM AT EXTERIOR WALL. SEE

PLANS FOR ADDITIONAL INFORMATION.

DE18 SAW CUT AND GRIND BRICK FLUSH AS REQUIRED FOR DEMOLITION. SEE

PLANS FOR ADDITIONAL INFORMATION

DE19 REMOVE WOOD COLUMN AND/OR GYP BD FURRING - SEE STRUCTURAL

FOR ADDITIONAL INFORMATION

DE20 REMOVE WOOD JOIST AND FLOOR SYSTEM IN ITS ENTIRETY

DE21 SAW CUT AND REMOVE CONCRETE FLOOR AS REQUIRED. SEE PLANS FOR

ADDITIONAL INFORMATION.

DE22 REMOVE WOOD JOIST, WOOD PLANK CATWALK SYSTEM AND ENTIRE ROOF

SYSTEM ABOVE

DE23 REMOVE METAL GUTTER, DOWNSPOUTS AND BREAK METAL FASCIA AND

SOFFIT SYSTEM AND BACKUP MATERIAL AT ROOF/ WALL ALL SIDES (TYP).

DE24 REMOVE MEMBRANE ROOF SYSTEM IN ITS ENTIRETY, INCLUDING ROOF

SLOPING MATERIAL, PITCH POCKETS AND ALL FLASHING. REMOVE

DAMAGED ROOF SUBSTRATE AS REQUIRED, APPROXIMATELY 35%

DE25 REMOVE BREAK METAL FASCIA (INCLUDING MEAT AT DOOR AND WINDOW

HEAD AT PORCH), SOFFIT AND METAL PORCH CEILING SYSTEM. REMOVE

SUBSTRATE THAT METAL IS MOUNTED TOO. PORCH STRUCTURE TO

REMAIN. FIELD VERIFY.

DE26 REMOVE CERAMIC FLOOR TILE. PREP FLOOR FOR SCHEDULED FINISHES.

SEE PLAN FOR ADDITIONAL INFORMATION

DE27 REMOVE STAINLESS STEEL ACCESS HOPPER

DE28 CUT HOLES IN ROOF DECK FOR STRUCTURAL BRACING. -SEE STRUCTURAL

DE29 REMOVE RAILING SYSTEM AND SALVAGE FOR RESTORATION, REFINISHING

AND REINSTALLATION. SEE FLOOR PLAN, SECTIONS AND DETAILS FOR

ADDITIONAL INFORMATION

FINISH PLAN KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

FN1 INSTALL HANDRAIL

FN2 NOT USED

FN3 NOT USED

FN4 NOT USED

FN5 INSTALL TS-5 AT TRANSITION FROM NEW FINISH FLOOR TO EXISTING

FLOORING OUTSIDE THE LIMITS OF CONSTRUCTION.

FN6

FN7

FN8

REFLECTED CEILING KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

RC1 CUBICAL CURTAIN TRACK. SEE SHEET AE560 FOR TYPES

RC2 VENT HOOD. SEE MECHANICAL

RC3 SPLIT CEILING GRID AT THIS LOCATION

RC4 PATIENT LIFT. SEE STRUCTURAL FOR ADDITIONAL INFORMATION.

RC5 PROVIDE 24" X 24" MINIMUM ACCESS PANELS AS NEEDED PER

SPECIFICATIONS SECTION 08 31 13

RC6 ACCESS PANEL, MIN 2'-0" x 2'-0". COORDINATE SIZE AND LOCATION WITH

SPEC SECTION 08 31 13 AND MEP. AT RECEPTION DESK PLAM SOFFIT

ACCESS PANELS TO BE ON THE TOP OF SOFFIT.

RC7 CENTER RECESSED LIGHT FIXTURE ON CENTERLINE OF EXISTING WDW

OPENING TYP

RC8 PAINT PORCH CEILING P-10

RC9 PAINT GYP BD CEILING P-4

RC10 PATIENT FALL PROTECTION RAIL. SEE STRUCTURAL FOR ADDITIONAL

INFORMATION.

FLOOR PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL

EXISTING DOOR

AND FRAME TO

REMAIN

DOOR

INTERIOR

BORROWED LIGHT

101B

101A

8'-0" DIMENSION LINE,

NOMINAL

8'-0" EXTENDED

DIMENSION LINE,

NOMINAL

AE2111A

INTERIOR

ELEVATION

INDICATOR TAG

2B

AE2O1

EXTERIOR

ELEVATION

INDICATOR TAG

1A

203 EQUIPMENT TAG

100 FLOOR SPOT

ELEVATIONWALL TAG

OFFICE

ROOM NAME AND

NUMBER AE501

1A

DETAIL REFERENCE

TAG

AE2O1

EXTERIOR SECTION

REFERENCE TAG

1A

AE2O1

INTERIOR SECTION

REFERENCE TAG

1A

KEY NOTE

A

GRIDLINE

REVISION TAG

PR01

REVISION CLOUD

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

FP10

B3

REFLECTED CEILING PLAN SYMBOLS

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

GYP BD

CEILING /

SOFFIT

ACT CEILING

SYSTEM

EXISTING

ACT CEILING

SYSTEM

IV TRACK

CUBICLE

CURTAIN

TRACK

ACCESS

PANEL

2'-0" x 4'-0"

LIGHT FIXTURE

2'-0" x 2'-0"

LIGHT FIXTURE

PENDANT STRIP

LIGHT FIXTURE

SUSPENDED

LIGHT FIXTURE

RECESSED LIGHT

FIXTURE OR

PENDANT LIGHT -

SEE PLAN

MECHANICAL

SUPPLY GRILL

MECHANICAL

RETURN GRILL

WALL SCONCE

LIGHT FIXTURE

MECHANICAL

LINEAR SUPPLY

GRILL

CEILING

ELEVATION AND

FINISH

9'-0" AFF

ACT

DEMOLITION PLAN SYMBOLS

EXISTING WALL TO

REMAIN

WALL OR

PARTITION TO BE

REMOVED

EXISTING DOOR

AND FRAME TO

REMAIN

KEY NOTE

A

GRIDLINE

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

EXISTING DOOR

AND FRAME TO BE

DEMOLISHED

DASHED LINE

INDICATES ITEM TO

BE REMOVED (UNO)

DE10

ACT ACOUSTICAL CEILING TILE

CPT MODULAR CARPET TILE

CT CERAMIC TILE

EPY EPOXY FLOORING

GWB (SC) GYPSUM WALLBACK SYSTEMS (SPECIAL COATING)

LVT LUXURY VINYL TILE

P PAINT

PT PORCELAIN TILE (FLOOR AND BASE)

RB RESILIENT BASE

RES RESINOUS EPOXY FLOORING

RES-W RESINOUS/EPOXY WALL/CEILING

RF RUBBER FLOORING

RWC RIGID VINYL WALL COVERING

S SOLID SURFACE

SC SPECIAL COATING

SD STATIC DISSIPATIVE

SP SPECIAL FACED

VWC VINYL WALL COVERING

WP WALL PROTECTION

WSF WELDED SEAM SHEET FLOORING (HEAT WELDED WITH ROD)

ROOM FINISH LEGEND &

ABBREVIATIONS

MATERIAL INSTALL

DIRECTION

KEYNOTECORNER GUARD

WALL PROTECTION

AS INDICATED

NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN

CG

AF10

WALLCOVERING AS

INDICATED

FLOOR PLAN KEYED NOTES

NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN

FL1 PATCH PARTITION, WITH MATERIALS TO MATCH EXISTING ADJACENT

SURFACES, AS REQUIRED FROM DEMOLITION. WHERE EXISTING FINISHES

ARE DISTURBED PAINT TO MATCH ADJACENT FINISH, PAINT ENTIRE

PARTITION WHERE PATCHING OCCURS.

FL2 PROVIDE FIRE RETARDANT PLYWOOD 3 SIDES OF ROOM. SEE TYPICAL

ELEVATIONS SHEET AE211

FL3 AT AREAS OF ELECTRICAL, TECHNOLOGY OR MED GAS WORK. SAW CUT

OPENING IN CLAY TILE PARTITION FOR ELECTRICAL OR MED GAS BOX AND

GRIND VERTICAL CHANNEL FROM ABOVE CEILING TO BOX FOR CONDUIT.

INSTALL CONDUIT / PIPE IN CHANNEL AND PATCH PLASTER. PAINT ENTIRE

PARTITION WHERE PATCHING OCCURS. - SEE ELECTRICAL & TECHNOLOGY

OR MED GAS PLANS FOR ADDITIONAL INFORMATION

FL4 INFILL OPENING AND PATCH PARTITION, WITH MATERIALS TO MATCH

EXISTING ADJACENT SURFACES, AS REQUIRED FROM DEMOLITION. WHERE

EXISTING FINISHES ARE DISTURBED PAINT TO MATCH ADJACENT FINISH,

PAINT ENTIRE PARTITION, BOTH SIDES AS REQUIRED, WHERE PATCHING

OCCURS.

FL5 PATCH PARTITION, WITH MATERIALS TO MATCH EXISTING ADJACENT

SURFACES, AS REQUIRED FROM WATER DAMAGE AND REMOVAL OF

WALLCOVERING. PAINT TO MATCH ADJACENT FINISH, PAINT ENTIRE

PARTITION / WALL WHERE PATCHING OCCURS.

FL6 REPAIR, REFINISH, MODIFY AND REINSTALL SALVAGED RAILING IN SAME

LOCATION. SEE DETAILS AND ELEVATIONS FOR ADDITIONAL WORK.

FL7 SEE CIVIL FOR RAMP, STOOP AND STAIR AT DOOR

FL8 PATCH / INFILL OPENINGS IN BRICK VENT. USE SALVAGED BRICK AS

REQUIRED TO FILL GAPS. SIZE OF BRICK VENT AREAS VARIES. FIELD

VERIFY

FL9 PATCH FLOOR SUBSTRATE

FL10 PROVIDE SPANDREL GLASS SPANDREL INSULATION AT THIS LOCATION.

SEAL INSULATION VAPOR TIGHT TO WINDOW FRAME.

FL11 PATCH OPENING IN CONCRETE FLOOR AT REMOVED DOWNSPOUT

FL12 PATCH ALL OPENINGS IN CONCRETE STAIRS AT REMOVED RAILINGS

FL13 EXPOSED STRUCTURE PAINT

FL14 PROVIDE PRECAST CONCRETE SPLASH BLOCK, 24" x 16" MIN

FL15 INFILL OPENING WITH XN3 OR PROVIDE RATED SHAFT WALL PARTITION AS

REQUIRED AND PATCH PARTITION, WITH MATERIALS TO MATCH EXISTING

ADJACENT SURFACES, AS REQUIRED FROM DEMOLITION. WHERE EXISTING

FINISHES ARE DISTURBED PAINT TO MATCH ADJACENT FINISH, PAINT

ENTIRE PARTITION, BOTH SIDES AS REQUIRED, WHERE PATCHING

OCCURS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

C U s e rs

\P u b lic \D o c u m e n ts \R e v it P ro je c ts

\1

-R g b a rb a ri a e -m n .c o m

.r v t

/8

/2

:2

:4

A

M

GI003

GENERAL NOTES AND SYMBOLS CONSTRUCT

PROSTHETICS FACILITY

HAMPTON, VA.

590-210

09/02/2022 LA GJB16149Revisions: Date: 09/12/2022

I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.

Name: Steve Schlotthauer

NOYES

APPLICABLE REGULATIONS

GENERAL TYPE OF PROJECT

NFPA NATIONAL FIRE CODES (EXCEPTION: NFPA 5000 & 900)

2018 FGI GUIDELINES

2021 NFPA 101 (LIFE SAFETY CODE)

ABA STANDARDS (2015) (ABAAS)

2021 IBC

REMODEL

ADDITION

NEW BUILDING

PROJECT DESCRIPTION

CODE SUMMARY

PRESERVATION OF PORTION OF FRONT FACADE. NEW

CONSTRUCTION FOR PROSTHETICS DEPARTMENT.

VA BARRIER FREE DESIGN STANDARD (PG-18-13)

NOYESAUTHORITIES HAVING JURISDICTION (AHJ's)

THE JOINT COMMISSION (TJC)

TESTRATING (HRS)

ACTUAL

TOTAL

EXTERIOR DOORS AND WINDOWS

SHAFTS AND EXIT PASSAGEWAYS

OTHER

ROOF CONSTRUCTION

PRIME & SEC. FLOOR BEAMS, JOISTS

FLOOR/CEILING ASSEMBLY

FLOOR CONSTRUCTION

INTERIOR

NON-BEARING WALLS AND PARTITIONS

BEARING WALLS

COLUMNS

GIRDERS

TRUSSES

ROOF/CEILING ASSEMBLY

PRIME & SEC. ROOF BEAMS, JOISTS

EXTERIOR

INTERIOR BEARING WALLS

EXTERIOR BEARING WALLS

STRUCTURAL FRAME

AREA SEPARATIONS / FIRE WALLS

FIRE-RESISTIVE REQUIREMENTS

TYPE(S) OF CONSTRUCTION

ACTUAL AREA PER FLOOR

CONSTRUCTION TYPE(S)

SECOND FLOOR

FIRST FLOOR

ADDITIONAL NOTES

SEE LIFE SAFETY PLANS

See Life Safety Plans

VA PSRDM LIFE SAFETY PROTECTED BUILDING.

PLUMBING FIXTURES

TOILETS

LAVATORIES

DRINKING FOUNTAINS

SERVICE SINKS

PROVIDED RQD FACTOR

6 3 1/25 for first 50 occupants, then 1/50

6 2 1/40 for first 80 occupants, then 1/80 1/100 occupants. 50% may be vending

URINALS 0 -- --

OCCUPANT LOAD OF BUILDING

SF/OCCUPANT OCCUPANTS

TOTAL BUILDING OCCUPANT LOAD:

ACTUAL AREAAREA LOCATION

FIRST LEVEL

SECOND LEVEL

9,236 SF

7,011 SF

16,247 SF

9,236 SF

7,012SF 150SF 108

E136

(IBC CH 29)

(NAPA 220 TABLE 4.1.1)

OSHA STANDARDS

VA SEISMIC DESIGN REQUIREMENTS H-18-8

NATIONAL ELECTRIC CODE (NEC)

ASME BOILER AND PRESSURE VESSEL CODE

ASME CODE FOR PRESSURE PIPING

BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,

AMERICAN CONCRETE INSTITUTE AND COMETARY (ACI 318)

MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE

FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL

BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

ENERGY POLICY ACT OF 2005 (EPAct)

DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS

FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE

RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL

BUILDINGS, 10 CFR PARTS 433,434 AND 435

FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE

BU…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .