Bid Documents Part 5.pdf
PDF 20 MB Posted
- Attached to
- Y1DA--590-210 Construct Prosthetics Facility (VA-23-00044335) Federal contract opportunity
- Solicitation number
- 36C77623R0166_1
About this file
This document provides details on a federal contract opportunity to construct a prosthetics facility for the Department of Veterans Affairs. The solicitation number is 36C77623R0166_1 for the project named "Y1DA--590-210 Construct Prosthetics Facility (VA-23-00044335)" issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The opportunity type is for solicitation to construct a prosthetics facility. The bid documents are contained in a 20MB PDF file. No further information is provided on pricing terms, response dates, set asides, incumbent contractors, or work requirements.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
DN
UP
AE201-B45
AE201-B45
AE201-B45
AE301-B45
AE302-B45
FLAT ROOF
BELOW
31 4 6 8 10 11 12 13 14 15 17 18
A
B
E
G
201-45
OPEN
OFFICE
202-45
CONFERENCE
S200-45
STAIR 1
203A-45
LOCKERS
203-45
STAFF
LOUNGE
204-45
CHIEF
OFFICE205-45
ASSIST
CHIEF
OFFICE
206-45
PROSTHETICS
REP OFFICE
207-45
COPY/
WORK/MAILING
227-45
ELECTRICAL
208-45
STAFF
TOILET
C200-45
CORRIDOR
226-45
DME ACTIVE
STORAGE
222-45
ELEVATOR
EQUIP
220-45
MECHANICAL
221-45
TELECOM
225-45
WHEELCHAIR
PARTS
STORAGE
S202-45
STAIR 2
OPEN TO
BELOW
AE303-B45
228-45
PROSTHETICS/
ORTHOTICS
MAINTENANCE
224-45
SHOE
MODIFICATION
STORAGE
223-45
PARTS
STORAGE
10'-0"
'-0
AE411-B45
AE303-B45
AE301-B45
AE303-B45
AE302-B45
AE315-B45
F
H
C
D
FEC
FEC
AE411-B45 7
AE417-B45
AE411-B45
224-45
S202-45 223-45
2-
5-
6-
220A-45
1-
8-
7-
8-
220B-45
6-
5-
4-
3B
-4
203A-45
S201-45
2-
AE212-B45
AE211-B45
AE211-B45
AE320-B45
AE320-B45
AE325-B45
AE315-B45
AE323-B45
CO2 FECCR
C200-45
CORRIDOR
AE322-B45
AE314-B45
AE313-B45
AE322-B45
AE322-B45
AE312-B45
AE502
TYP
AE501
TYP AE502
AE501
TYP
AE502
TYP
AE530
AE311-B45
AE502
TYP/SIM
NOTE:
SEE EQUIPMENT PLAN FOR ADDITIONAL INFORMATION.
SEE SHEET GI003 FOR NOTES, SYMBOLS AND KEYNOTES.
FIELD VERIFY ALL EXISTING MASONRY OPENINGS
AE541
AE541
SIM
SIM
AE541
SIM
AE541
SIM
AE502
SIMAE541
TYP
AE502
AE542
SIM/MIR
AE540
AE542
AE111.1-B45
AE111.1-B45
AE111.2-B45
FL2
AE313-B45
AE502
TYP
AE502
SIM
AE503
AE541
AE541
SIMAE541
SIM/MIR
AE542
AE542
SIM
AE542
TYP
CRICKET
RO3
SEE SHEET AE131-B45
FOR ADDITIONAL
WORK IN THIS AREA
PROVIDE PRECAST CONCRETE
SPLASH BLOCK SET ON
WALKWAY PAVER PAD
PROVIDE PRECAST CONCRETE
SPLASH BLOCK SET ON
WALKWAY PAVER PAD
SIM
AE502
SIM
AE541
TYP
AE542
AE501
AE503
AE503
AE502
SIM
AE543
3 AE543
AE543
AE543
AE540
RO7
RO7
PROVIDE PRECAST CONCRETE
SPLASH BLOCK SET ON
WALKWAY PAVER PAD
PROVIDE PRECAST CONCRETE
SPLASH BLOCK SET ON
WALKWAY PAVER PAD
DEDUCT ALTERNATE
DEDUCT ALTERNATE
AE312-B45
AE551
AE503
SIM
AE501
SIM
FL13
FL13
FL13
FL13
SEE SHEET AE131-B45 FOR
ADDITIONAL WORK IN THIS
AREA
RO8
RO8
RO8
RO8RO8
RO8
RO8
AE530
FL6
FL6
AE312-B45
DEDUCT ALTERNATE
AE313-B45
MIR/SIM
AE313-B45
AE313-B45
AE541
TYP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/8
/2
:1
:5
A
M
AE121-B45
SECOND LEVEL FLOOR PLAN -
BUILDING 45
CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
09/02/2022 LA GJB16149
3/16" = 1'-0"1 SECOND LEVEL FLOOR PLAN - BUILDING 45
0 8' 16'4'
Revisions: Date: 09/12/2022
I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name: Steve Schlotthauer
Signature:_________________
Date:__________ License# 42138
ALIGN
AE301-B45
AE302-B45
31 4 6 8 10 11 12 13 14 15 17 18
A
B
E
G
AE303-B45
AE303-B45
AE301-B45
AE303-B45
AE302-B45
AD311-B50
AE315-B45
F
H
C
D
224-45
SHOE
MODIFICATION
STORAGE
223-45
PARTS
STORAGE
220-45
MECHANICAL
220-45
MECHANICAL
221-45
TELECOM
E-1
ELEVATOR
222-45
ELEVATOR
EQUIP
C200-45
CORRIDOR
225-45
WHEELCHAIR
PARTS
STORAGE 226-45
DME ACTIVE
STORAGE 227-45
ELECTRICAL
228-45
PROSTHETICS/
ORTHOTICS
MAINTENANCE
201-45
OPEN
OFFICE 202-45
CONFERENCE
S200-45
STAIR 1
203A-45
LOCKERS203-45
STAFF
LOUNGE
204-45
CHIEF
OFFICE
205-45
ASSIST
CHIEF
OFFICE206-45
PROSTHETICS
REP OFFICE
207-45
COPY/
WORK/MAILING
208-45
STAFF
TOILET
S202-45
STAIR 2
224-45
S202-45
223-45
220B-45 S201-45
203A-45
3B
-4
4-
5-
6-
8-
2-
8-
7-
6-
5-
220A-45
2-
1-
9'-6" 11'-10 7/8" 9'-11" 10'-6" 13'-9 5/8" 9 7/8"
9 7/8"
18'-1 1/8" 11'-1 3/8" 10'-3 3/8" 6'-11" 8'-5" 1'-6"
5'- 0"
7' -1
/2
7'
-1
1/ 8"
4' -9
/2
10'-4 1/4"
25'-2 3/8" 18'-0" 6'-0" 12'-2 1/4"
'-0
5'
-1
/8
9'-11 3/8"
'-0
1'-4 1/2" 9'-0 3/8" 25'-11 1/4" 4 5/8"
8'-4"
AE315-B45
AE314-B45
12'-0" 14'-0" 12'-5" 5'-7" 11'-2 1/2" 18'-0 1/2" 14'-0" 10'-1" 14'-0" 18'-7" 21'-6" 21'-0" 12'-2"
2'-9"
'-3
/8
'-2
'-2
8'-
0"
'-9
6'-
1'- 4"
6'- 9"
AE320-B45
AE323-B45
AE325-B45
AE417-B45
AE411-B45
AE320-B45
1'- 6"
14'-1"
5'-1" 3'-8"MO 7'-4" 3'-8"MO 7'-4" 3'-8" MO 7'-4"
3'-8" MO
8'-5" 3'-8" MO 3'-8" MO 7'-0" 3'-8"MO 7'-8" 3'-8" MO 10'-0" 3'-8" MO 5'-0" 3'-8" MO 4'-3 1/2"
AE313-B45
AE312-B45
XN3
XN6
XN6
5'- 0"
1'- 6"
B3bsB3bs B3bs
B6bs
XN10
XN10
XN6
9'-1"
1'- 6"
10"
1'- 6"
5 5/8" 10 1/2"
1' -5
/8
10"10"
OPEN TO
BELOW
AE311-B45
MA12
XN3
XN3
MA12
XN3
XP3
NOTE:
SEE EQUIPMENT PLAN FOR ADDITIONAL INFORMATION.
SEE SHEET GI003 FOR NOTES, SYMBOLS AND KEYNOTES.
FIELD VERIFY ALL EXISTING MASONRY OPENINGS
AE313-B45
PRECAST SPLASH BLOCK(TYP). SEE
ROOF PLAN FOR ADDITIONAL
INFORMATION
AE502
AE312-B45
AE551
AE312-B45
AE313-B45
AE313-B45
AE502
TYP
AE502
TYPAE541
TYP
AE541
SIM
AE503
SIM
AE501
SIM
AE502
TYP
AE502
TYP/SIM
AE541
SIM
AE541
SIM
AE502
SIM
AE542
AE503
AE541
SIM
SIM
AE502
SIM
AE502
AE542
AE501
TYP
AE542
SIM
AE501
TYP
AE542
SIM/MIR
AE502
SIM
AE543
4 AE543
AE543
AE543
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/8
/2
:1
:0
A
M
AE122-B45
SECOND LEVEL DIMENSION PLAN
- BUILDING 45
CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
09/02/2022 LA GJB16149
3/16" = 1'-0"1 SECOND LEVEL DIMENSION PLAN - BUILDING 45
Revisions: Date: 09/12/2022
I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name: Steve Schlotthauer
AE301-B45
AE302-B45
31 4 6 8 10 11 12 13 14 15 17 18
A
B
E
G
AE303-B45
AE303-B45
AE301-B45
AE303-B45
AE302-B45
SL
O
PE
SL
O
PE
SL
O
PE
SLO
PE SLOPE
SLOPE
SLOPE
SLOPE
SLOPE
SLOPE
COPPER ROOFING AND SIDEWALL
MEMBRANE ROOF ON TAPERED
INSULATION
SLOPE
1/4" PER 1'-0" MIN
AE315-B45
F
H
C
D
AE315-B45
RIDGE
+2"+8.75" +8.5"
+5"
SL
O
PE
SL
O
PE
RIDGE
RIDGE
RIDGE
VALLEY
VALLEY
SLOPE
SLO
PE
SLOPE
REINSTALL SALVAGED ROOF
VENT OVER PRE-
MANUFACTURED INSULATED
CURB (TYP). SEE ELEVATIONS
AE314-B45
SLOPE
+2"
+5"
RO1
RO2
RO2
AE311-B45
AE313-B45
AE312-B45
SLOPE
SLOPE
AE530
AE530 RO5
RO5
RO5
RO5
RO5
RO5
RO5
AE311-B45
+8.75"
AE313-B45
SLOPESLOPESLOPE
SL
O
PE
SL
O
PE
SL
O
PE
SL
O
PE
SEE SHEET AE121-B45 FOR
ADDITIONAL WORK IN THIS
AREA
RIDGE
RO6RO6
RO7
RO7
AE312-B45
SEE SHEET AE121-B45 FOR
ADDITIONAL WORK IN THIS
AREA
AE312-B45
AE313-B45
AE313-B45
AE530
AE530
ROOF KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
RO1 PREP AREA FOR REROOFING. REPLACE DAMAGED ROOF SHEATHING AS
REQUIRED. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
RO2 PRIMARY AND OVERFLOW ROOF DRAIN SEE DETAIL
RO3 SEE MECHANICAL FOR ROOF CURB AND ROOF VENT
RO4 REINSTALL SALVAGED ROOF VENT OVER ROOF CURB AND VENT. SEE
MECHANICAL FOR ADDITIONAL INFORMATION
RO5 PREFINISHED METAL GUTTER AND DOWNSPOUT SYSTEM. SEE
ELEVATIONS FOR ADDITIONAL INFORMATION
RO6 PROVIDE PRECAST CONCRETE SPLASH BLOCK SET ON WALKWAY PAVER
PAD
RO7 PROVIDE ROOF WALK WAY PAD. MIN 3'-0" WIDE. COORDINATE LOCATIONS
WITH COR
RO8 PATCH ROOF DECK AS REQUIRED FROM STEEL BRACING INSTALLATION
AND REMOVAL. SEE STRUCTURAL FOR BRACING LOCATIONS.
/1 AE530
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/8
/2
:1
:1
A
M
AE131-B45
ROOF PLAN - BUILDING 45 CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
09/02/2022 LA GJB16149
3/16" = 1'-0"1 ROOF PLAN - BUILDING 45
Revisions: Date: 09/12/2022
I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name: Steve Schlotthauer
8 10 11 12 13 14
A
B
E
G
F
H
C
D
SL
O
PE
SL
O
PE
SL
O
PE
SLO
PE SLOPE
SLOPE
DEDUCT ALTERNATE 4 - ELIMINATE DORMER
SLOPE
1/4" PER 1'-0" MIN
RIDGE
+8.75"
SL
O
PE
SL
O
PE
RIDGE
RIDGE
SLOPE
+2"
+5"
SLOPE
SLOPE
RO5
+8.75"
AE111.2-B45
FIRST LEVEL
0"
SECOND LEVEL
14'-0"
TOP OF EXISTING MASONRY
25'-10 3/8"
TO MASONRY @ ADDITION
12'-0"
DEDUCT ALTERNATE 4 - ELIMINATE DORMER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/8
/2
:1
:1
A
M
AE131.1-B45
DEDUCT ALT. - ROOF PLAN AND
EXTERIOR ELEVATIONS -BUILDING
CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
09/02/2022 LA GJB/JT16149
3/16" = 1'-0"1 DEDUCT ALTERNATE 4 - PARTIAL ROOF PLAN - BUILDING 45
1/8" = 1'-0"2 DEDUCT ALTERNATE 4 - EAST ELEVATION - BUILDING 45
Revisions: Date: 09/12/2022
I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name: Steve Schlotthauer
AL
IG
N
ALIGN
AE301-B45
AE302-B45
31 4 6 8 10 11 12 13 14 15 17 18
A
B
E
G
AE303-B45
AE303-B45
AE301-B452
AE303-B45
AE302-B45
AE315-B45
S100-45
STAIR 1
101-45
RECEPTION
111-45
STAFF
TOILET
C102-45
CORRIDOR
C100-45
CORRIDOR
C103-45
CORRIDOR
126-45
ORTHO
SUPERVISOR
OFFICE
S102-45
STAIR 2
122-45
STAFF
TOILET 151-45
TELECOM
120-45
TEAM
EVALUATION
130D-45
CAD/ CAM
130E-45
TRASH
150-45
ELECTRICAL
108-45
FITTING /
EXAM SOFT
GOODS
110-45
HAC
115-45
EQUIPMENT
STORAGE
113-45
DYNAMIC
ALIGNMENT
114-45
CAST
109-45
FACIAL/
BODY
FITTING
STUDIO
116-45
FITTING /
EXAM SOFT
GOODS
112-45
SOILED
HOLDING
107-45
FITTING /
EXAM SOFT
GOODS
117-45
FITTING /
EXAM
CUSTOM
FAB
106-45
FITTING /
EXAM SOFT
GOODS
105-45
FITTING /
EXAM SOFT
GOODS
104-45
FITTING /
EXAM SOFT
GOODS
103-45
FITTING /
EXAM SOFT
GOODS
102-45
PATIENT
TOILET
130-45
PROSTHETICS
LAB
125-45
MECHANICAL
FIRE/H20 124-45
ELECTRICAL
119-45
PATIENT /
PUBLIC
TOILET
118-45
PATIENT /
PUBLIC
TOILET
100-45
LOBBY
123-45
OPEN
OFFICE
130C-45
PROSTHETICS/
ORTHOTICS
FUME
130A-45
LAB
RESTORATION130B-45
LAB DUST
ROOM
E-1-45
ELEVATOR
F
H
C
D
PENDANT LIGHT (TYP)
AFF8'-6"
AFF9'-0"
AFF9'-0"
AFF9'-0"
AFF9'-0"
AFF9'-0"
AFF9'-0"
AFF9'-0"
AFF9'-0"
AFF9'-0"
AFF9'-0"
AFF8'-6"
AFF9'-0"
AFF9'-0"
AFF9'-0"
AFF9'-0"
AFF9'-0"
AFF9'-0"
AFF9'-0"
AFF9'-0"
AFF9'-0"
AFF9'-0"
AFF9'-0"
AFF9'-0"
AFF9'-0"
AFF8'-6"
AFF8'-6"
AE315-B45
AFF9'-0"
AFF9'-0"
AE314-B45
AE412-B45
AE413-B45
AE414-B45
AE415-B45
AE560
AE560
AFF8'-6"
AE560
2'- 0"
AE313-B45
AE312-B45
RC2
RC1
AE560
AE560
RC1RC1
RC1RC1
CL CL CL CL CLCL CL CLCL
6'- 0"
8'- 0"
2'- 0"
AFF9'-0"
C101-45
CORRIDOR
6'-7 1/4"
2'-4 1/2"
4'-2 5/8"
AFF10'-10"
AFF10'-10"
1'-
3'-
6" 2'-
8"
2'-6"
2'-
2'-
6" 3'
-3
/2
8"
AE560
A1200
EXPOSED
EXPOSED
EXPOSED
CCT-3
CCT-2
CCT-2
1'-6"1'-1"
CCT-2
6"
CCT-5
RC1
CCT-7
CCT-7
AE560
NOTE:
SEE EQUIPMENT PLAN FOR ADDITIONAL INFORMATION.
SEE SHEET GI003 FOR NOTES, SYMBOLS AND KEYNOTES.
RECESSED LIGHT
FIXTURE (TYP)
GRAIN
DIRECTION
GRAIN DIRECTION
RC6
RC6
AE313-B45
RC7
AFF8'-6"
2'- 0"
AFF9'-0"
AFF9'-0"
RC8
RC8
OPEN TO ABOVE
OPEN TO
ABOVE
AFF8'-10"
AFF10'-9"
AE523
TYP AT EXAM
AE523
TYP AT
OPEN
OFFICE
AFF8'-10"
AFF10'-9"
AFF8'-10"
AFF10'-9"
AFF10'-9"
AFF8'-10"
AFF10'-9" AFF8'-10"
AFF8'-10"
AFF10'-9"
AFF8'-10"
AFF10'-9"
AFF9'-0"
RS-1 RS-1
RS-2
RS-1
RS-1
RS-1
RS-1 RS-1 RS-1
RS-1
RS-1 RS-1
RS-1
RS-1 RS-1 RS-1
RS-1
RS-1
RS-1
RS-1
RS-1
RS-1
RS-1
RS-1
RS-1
RS-1RS-1
RS-1
RS-2
RS-1
AE312-B45
AE551
AE560
TYP AT RS-2
AE313-B45
RS-1 RS-1
AE313-B45
2' -3
5/
8"
1'- 2"
DEDUCT ALTERNATE 14
5'-2"
1' -3
/8
1'- 0"
1' -3
/8
1' -9
/8
1'-5 1/8" 1'-5 1/8"
PLAM JOINT (TYP)EXPOSED
AE560
RCP GENERAL NOTES
1. GENERAL CONTRACTOR TO COORDINATE ALL CEILING MOUNTED EQUIPMENT SUPPORT
REQUIREMENTS, LOCATIONS, DIMENSIONS, ETC WITH EQUIPMENT SUPPLIER AND OWNER,
PRIOR TO INSTALLATION.
2. ALL CEILING MOUNTED ITEMS SUCH AS LIGHT FIXTURES, GRILLES, DIFFUSERS, SPEAKERS, EXIT LIGHTS, ETC SHALL BE LOCATED IN THE CENTER OF ACT PANELS, GYP BD SOFFITS
AND/OR PLASTER SOFFIT BAYS, UNLESS NOTED OTHERWISE. COORDINATE WITH
MECHANICAL AND ELECTRICAL DRAWINGS.
3. FINISHED GYP BD SOFFITS SHALL EXTEND 1" BEYOND FACE AND EXPOSED ENDS OF WALL
CABINETS, FULL-HEIGHT CABINETS, ETC UNLESS NOTED OTHERWISE. COORDINATE CABINET
DIMENSIONS WITH SUPPLIER. GYP BD FASCIA/SOFFIT DETAILS ARE REFERENCED FROM THE
REFLECTED CEILING PLAN.
4. SEE MECHANICAL DRAWINGS FOR SPRINKLER HEAD TYPES AND LOCATIONS. CENTER ALL
HEADS IN ACT UNLESS NOTED OTHERWISE.
REFLECTED CEILING PLAN SYMBOLS
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
GYP BD
CEILING /
SOFFIT
ACT CEILING
SYSTEM
EXISTING
ACT CEILING
SYSTEM
IV TRACK
CUBICLE
CURTAIN
TRACK
ACCESS
PANEL
2'-0" x 4'-0"
LIGHT FIXTURE
2'-0" x 2'-0"
LIGHT FIXTURE
PENDANT STRIP
LIGHT FIXTURE
SUSPENDED
LIGHT FIXTURE
RECESSED LIGHT
FIXTURE OR
PENDANT LIGHT -
SEE PLAN
MECHANICAL
SUPPLY GRILL
MECHANICAL
RETURN GRILL
WALL SCONCE
LIGHT FIXTURE
MECHANICAL
LINEAR SUPPLY
GRILL
CEILING
ELEVATION AND
FINISH
9'-0" AFF
ACT
REFLECTED CEILING KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
RC1 CUBICAL CURTAIN TRACK. SEE SHEET AE560 FOR TYPES
RC2 VENT HOOD. SEE MECHANICAL
RC3 SPLIT CEILING GRID AT THIS LOCATION
RC4 PATIENT LIFT. SEE STRUCTURAL FOR ADDITIONAL INFORMATION.
RC5 PROVIDE 24" X 24" MINIMUM ACCESS PANELS AS NEEDED PER
SPECIFICATIONS SECTION 08 31 13
RC6 ACCESS PANEL, MIN 2'-0" x 2'-0". COORDINATE SIZE AND LOCATION WITH
SPEC SECTION 08 31 13 AND MEP. AT RECEPTION DESK PLAM SOFFIT
ACCESS PANELS TO BE ON THE TOP OF SOFFIT.
RC7 CENTER RECESSED LIGHT FIXTURE ON CENTERLINE OF EXISTING WDW
OPENING TYP
RC8 PAINT PORCH CEILING P-10
RC9 PAINT GYP BD CEILING P-4
RC10 PATIENT FALL PROTECTION RAIL. SEE STRUCTURAL FOR ADDITIONAL
INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/8
/2
:1
:3
A
M
AC111-B45
FIRST LEVEL REFLECTED CEILING
PLAN - BUILDING 45
CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
09/02/2022 LA GJB16149
3/16" = 1'-0"1 FIRST LEVEL REFLECTED CEILING PLAN - BUILDING 45
Revisions: Date: 09/12/2022
I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name: Steve Schlotthauer
N
AL
IG
N
ALIGN
AL
IG
N
ALIGN
AE301-B45
AE302-B45
31 4 6 8 10 11 12 13 14 15 17 18
B
E
G
AE303-B45
AE303-B45
AE303-B45
AE302-B45
AD311-B50
AE315-B45
224-45
SHOE
MODIFICATION
STORAGE
223-45
PARTS
STORAGE
228-45
PROSTHETICS/
ORTHOTICS
MAINTENANCE
201-45
OPEN
OFFICE
202-45
CONFERENCE
S200-45
STAIR 1
203A-45
LOCKERS
203-45
STAFF
LOUNGE
204-45
CHIEF
OFFICE
205-45
ASSIST
CHIEF
OFFICE
206-45
PROSTHETICS
REP OFFICE
207-45
COPY/
WORK/MAILING
227-45
ELECTRICAL
208-45
STAFF
TOILET
C200-45
CORRIDOR
226-45
DME ACTIVE
STORAGE
222-45
ELEVATOR
EQUIP
220-45
MECHANICAL
221-45
TELECOM
225-45
WHEELCHAIR
PARTS
STORAGE
S202-45
STAIR 2
E-1
ELEVATOR
F
H
C
D
AFF8'-6" AFF8'-6"AFF8'-6"AFF8'-6"AFF9'-0"AFF9'-0"
AFF8'-6"
AFF8'-6"
AFF8'-6"
AFF8'-6"
AFF8'-6"
AFF10'-0"
AFF8'-6"
OPENING
AFF8'-6"AFF8'-6"
AFF10'-0"
AFF8'-6"
AFF8'-4"
AE560
AE313-B45
AE312-B45
AE560
1'- 2"
2'-6" 6"
AE560
AFF8'-4"
AFF10'-1"
AE560
2'-
0" AFF10'-1"
AFF8'-4"
AE560
41'-1"
NOTE:
SEE EQUIPMENT PLAN FOR ADDITIONAL INFORMATION.
SEE SHEET GI003 FOR NOTES, SYMBOLS AND KEYNOTES.
AE313-B45
EXPOSED
EXPOSED
EXPOSED
AFF10'-0"
AFF8'-4"
AFF8'-4"
AFF10'-0"
/8
10 7/8"
AFF8'-4"
AFF10'-1"
1' -0
/8
AFF8'-4"
AFF10'-1"
/8
AFF8'-4"AFF10'-1"AFF8'-4"
AFF10'-1"
AFF8'-4"
AFF10'-1"
AE523
SIM
2'- 0"
AL
IG
N (T
YP
RS-1
AFF8'-4"
AFF10'-0"
AFF8'-4"
AFF10'-0"
AFF8'-4"
AFF10'-0"
AFF8'-4"
AFF10'-0"
AFF8'-4"
AFF10'-0"
AFF8'-4"
AFF10'-0"
AE523TYP AT 225-45,
226-45 & 228-45
AE523
SIM
AFF8'-4"
AFF10'-0"
SIM
AE523
AE524
TYP
AE560
RS-1
RS-1
RS-1
RS-1 RS-1
RS-1
RS-4RS-1RS-1RS-1RS-1
AE312-B45
AE560
AE312-B45
AFF8'-4"
7/
8"
AE313-B45
AE313-B45
AFF9'-0"
100-45
LOBBY101-45
RECEPTION
AE418-B45
EXPOSED
CJ CJ
1' -2
/8
1' -2
/8
ALIGN
1' -2
/8
/8
1'-2 7/8"
/8
RCP GENERAL NOTES
1. GENERAL CONTRACTOR TO COORDINATE ALL CEILING MOUNTED EQUIPMENT SUPPORT
REQUIREMENTS, LOCATIONS, DIMENSIONS, ETC WITH EQUIPMENT SUPPLIER AND OWNER,
PRIOR TO INSTALLATION.
2. ALL CEILING MOUNTED ITEMS SUCH AS LIGHT FIXTURES, GRILLES, DIFFUSERS, SPEAKERS, EXIT LIGHTS, ETC SHALL BE LOCATED IN THE CENTER OF ACT PANELS, GYP BD SOFFITS
AND/OR PLASTER SOFFIT BAYS, UNLESS NOTED OTHERWISE. COORDINATE WITH
MECHANICAL AND ELECTRICAL DRAWINGS.
3. FINISHED GYP BD SOFFITS SHALL EXTEND 1" BEYOND FACE AND EXPOSED ENDS OF WALL
CABINETS, FULL-HEIGHT CABINETS, ETC UNLESS NOTED OTHERWISE. COORDINATE CABINET
DIMENSIONS WITH SUPPLIER. GYP BD FASCIA/SOFFIT DETAILS ARE REFERENCED FROM THE
REFLECTED CEILING PLAN.
4. SEE MECHANICAL DRAWINGS FOR SPRINKLER HEAD TYPES AND LOCATIONS. CENTER ALL
HEADS IN ACT UNLESS NOTED OTHERWISE.
REFLECTED CEILING PLAN SYMBOLS
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
GYP BD
CEILING /
SOFFIT
ACT CEILING
SYSTEM
EXISTING
ACT CEILING
SYSTEM
IV TRACK
CUBICLE
CURTAIN
TRACK
ACCESS
PANEL
2'-0" x 4'-0"
LIGHT FIXTURE
2'-0" x 2'-0"
LIGHT FIXTURE
PENDANT STRIP
LIGHT FIXTURE
SUSPENDED
LIGHT FIXTURE
RECESSED LIGHT
FIXTURE OR
PENDANT LIGHT -
SEE PLAN
MECHANICAL
SUPPLY GRILL
MECHANICAL
RETURN GRILL
WALL SCONCE
LIGHT FIXTURE
MECHANICAL
LINEAR SUPPLY
GRILL
CEILING
ELEVATION AND
FINISH
9'-0" AFF
ACT
REFLECTED CEILING KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
RC1 CUBICAL CURTAIN TRACK. SEE SHEET AE560 FOR TYPES
RC2 VENT HOOD. SEE MECHANICAL
RC3 SPLIT CEILING GRID AT THIS LOCATION
RC4 PATIENT LIFT. SEE STRUCTURAL FOR ADDITIONAL INFORMATION.
RC5 PROVIDE 24" X 24" MINIMUM ACCESS PANELS AS NEEDED PER
SPECIFICATIONS SECTION 08 31 13
RC6 ACCESS PANEL, MIN 2'-0" x 2'-0". COORDINATE SIZE AND LOCATION WITH
SPEC SECTION 08 31 13 AND MEP. AT RECEPTION DESK PLAM SOFFIT
ACCESS PANELS TO BE ON THE TOP OF SOFFIT.
RC7 CENTER RECESSED LIGHT FIXTURE ON CENTERLINE OF EXISTING WDW
OPENING TYP
RC8 PAINT PORCH CEILING P-10
RC9 PAINT GYP BD CEILING P-4
RC10 PATIENT FALL PROTECTION RAIL. SEE STRUCTURAL FOR ADDITIONAL
INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/8
/2
:1
:4
A
M
AC121-B45
SECOND LEVEL REFLECTED
CEILING PLAN - BUILDING 45
CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
09/02/2022 LA GJB16149
3/16" = 1'-0"1 SECOND LEVEL REFLECTED CEILING PLAN - BUILDING 45
Revisions: Date: 09/12/2022
I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name: Steve Schlotthauer
LI
M
IT
S
O F
CO
NS
TR
UC
TI
O
N
LI
M
IT
S
O F
CO
NS
TR
UC
TI
O
N
LIMITS OF CONSTRUCTION
B246-110
ET
WORKSHOP
B247-110
TECH
OFFICE
B245-110
TECH
OFFICE
B243-110
BIOMED
PARTS
B244-110
HAC
B242-110
BIOMED
C2B-5-110
CORRIDOR
C2B-1-110
CORRIDOR
B227-110
WORKSTATIONB216-110
TOILET
B227A-110
BREAK
B229-110
OFFICE
B227B-110
FILES
C2B-4-110
CORRIDOR
B214-110
TELECOM
B226-110
COPY
B228-110
OFFICE
B230-110
OFFICE
B230A-110
STORAGE
B232-110
OFFICE
B234-110
OFFICE
B236-110
OFFICE
B238-110
CONFERENCEB239-110
WORKSTATION
B235-110
WORKSTATION
B231-110
WORKSTATION
S2B-5-110
STAIR
B212-110
ELEC
S2B-2-110
STAIR-2
B219
WOMEN'S
TOILET
B22
STORAGEB223
OFFICE
B225
STORAGE
B224
SHARED
OFFICE
B220
BIO
ENGINEERING
E2B-10
ELEVATOR
B209A
CHASE B209
STORAGE
E2B-11 Room
C2B-10
CORRIDOR
XN3
3'-0"
XN3
LIMITS OF CONSTRUCTION
B227-110
FL1
FL1
FL1
FL1
FL1
FL1
FL1
FL1
FL1
FL1
FL1
FL1
FL1
FL1
B3
FL4
FL1
FL1
FL4
FL1
FL1
FL4
B3
FL15
FL1
FL1
FL1
FL5
FL5
FL5
FL5
FL5
FL5
FL1
FL1
FL5
FL5
FL5
FL5
FL5
FL5
FL5
FL5
FL5
FL5
FL5
FL5
XN3
FL9
FL3
APROX 24"X36"
GENERAL NOTES
1. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF
CONSTRUCTION WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT.
INCIDENTAL WORK MAY BE NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURAL
DRAWINGS DUE TO CHANGES AFFECTING ELECTRICAL, MECHANICAL AND PLUMBING
ALONG WITH OTHER SYSTEMS. THIS INCIDENTAL WORK SHALL BE PART OF THIS
CONTRACT, AND ALL TRADES SHALL INSPECT THESE AREAS, ASCERTAIN WORK
REQUIRED AND DO THE WORK IN ACCORDANCE OF CONTRACT REQUIREMENTS AT
NO ADDITIONAL COST.
2. CONTRACTORS SHALL VISIT THE SITE DURING BIDDING TO BECOME FAMILIAR WITH
THE EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL LOCATE, INSPECT
AND FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS PRIOR
TO DEMOLITION AND CONSTRUCTION. NOTIFY ARCHITECT IMMEDIATELY OF ANY
DISCREPANCIES.
3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY
DISCREPANCIES.
4. WHEREVER OPENINGS ARE CUT THROUGH FIRE RATED PARTITIONS, IT SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR FOR WHOM THE HOLE IS CUT TO PATCH
AND REPAIR ANY OPENING TO MAINTAIN THE INTEGRITY OF THE FIRE RATING.
5. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES
AND DUCTS FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL
CONTRACTOR PRIOR TO PROCEEDING WITH REMODELING.
6. FIREPROOFING SHALL BE UNPIERCED. ANY SUBCONTRACTOR PENETRATING THE
FIREPROOFING SHALL BE REQUIRED TO REPLACE FIREPROOFING TO THE ORIGINAL
CONDITION AND FIRE RATING, AT THE SUBCONTRACTORS EXPENSE.
7. EQUIPMENT UNIT DIMENSIONS ARE FOR PRODUCT DESCRIPTION ONLY, VERIFY SIZE
WITH MANUFACTURER.
8. ALL DIMENSIONS PERTAINING TO MECHANICAL OR ELECTRICAL SERVICES OR
EQUIPMENT SHALL BE VERIFIED WITH THE RESPECTIVE TRADE.
9. ALL CONTRACTORS THAT PENETRATE AND/OR DISTURB ANY AREAS AT EXISTING
CONDITIONS SHALL PATCH AREA TO MATCH EXISTING ADJACENT AREA OR
SURFACE AND PREPARE FOR SCHEDULED FINISH APPLICATION. COORDINATE WORK
WITH GENERAL CONTRACTOR PRIOR TO PROCEEDING.
10. VERIFY HEIGHTS AND LOCATIONS OF ACCESS PANELS (AP) AND COORDINATE
TYPES WITH TRADES WHICH REQUIRE THEM.
11. PROVIDE LINTELS AND FRAMING FOR GRILLES, LOUVERS, AND ROOF VENTS AS
REQUIRED BY MECHANICAL CONTRACTOR, VERIFY SIZE AND LOCATION.
12. STRUCTURAL, MECHANICAL, AND ELECTRICAL ABBREVIATIONS AND SYMBOLS MAY
DIFFER FROM ARCHITECTURAL. SEE RESPECTIVE SECTIONS AND/OR DRAWINGS FOR
DEFINITIONS.
13. AT MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, PROVIDE 3/4" FRT
PLYWOOD BACKING BEHIND ALL SURFACE MOUNTED FIXTURES AND EQUIPMENT,
UNLESS NOTED OTHERWISE.
14. CONTRACTOR SHALL EVALUATE INTEGRITY OF ALL PARTITIONS INDICATED BY
SYMBOLS ON THE LIFE SAFETY PLAN(S) WITHIN THE PROJECT SCOPE AND UPGRADE
AS REQUIRED. ALL FIRE RESISTIVE RATED WALLS SHALL BE CONSTRUCTED OF
MATERIALS / ASSEMBLIES MEETING THE RATING INDICATED, TERMINATE AT THE
DECK ABOVE WITH A TESTED HEAD OF WALL ASSEMBLY AND ALL PENETRATIONS
SHALL BE SEALED WITH A TESTED ASSEMBLY. ALL SMOKE PARTITIONS SHALL BE
CONSTRUCTED OF MATERIALS THAT RESIST THE PASSAGE OF SMOKE, TERMINATE
AT THE DECK ABOVE WITH A JOINT SEALED WITH FIRE CAULK AND ALL
PENETRATIONS SHALL BE SEALED WITH FIRE CAULK.
FLOOR PLAN SYMBOLS
EXISTING WALL TO
REMAIN
WALL
EXISTING DOOR
AND FRAME TO
REMAIN
DOOR
INTERIOR
BORROWED LIGHT
101B
101A
8'-0" DIMENSION LINE,
NOMINAL
8'-0" EXTENDED
DIMENSION LINE,
NOMINAL
AE2111A
INTERIOR
ELEVATION
INDICATOR TAG
2B
AE2O1
EXTERIOR
ELEVATION
INDICATOR TAG
1A
203 EQUIPMENT TAG
100 FLOOR SPOT
ELEVATIONWALL TAG
OFFICE
ROOM NAME AND
NUMBER AE501
1A
DETAIL REFERENCE
TAG
AE2O1
EXTERIOR SECTION
REFERENCE TAG
1A
AE2O1
INTERIOR SECTION
REFERENCE TAG
1A
KEY NOTE
A
GRIDLINE
REVISION TAG
PR01
REVISION CLOUD
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
FP10
B3
FLOOR PLAN KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
FL1 PATCH PARTITION, WITH MATERIALS TO MATCH EXISTING ADJACENT
SURFACES, AS REQUIRED FROM DEMOLITION. WHERE EXISTING FINISHES
ARE DISTURBED PAINT TO MATCH ADJACENT FINISH, PAINT ENTIRE
PARTITION WHERE PATCHING OCCURS.
FL2 PROVIDE FIRE RETARDANT PLYWOOD 3 SIDES OF ROOM. SEE TYPICAL
ELEVATIONS SHEET AE211
FL3 AT AREAS OF ELECTRICAL, TECHNOLOGY OR MED GAS WORK. SAW CUT
OPENING IN CLAY TILE PARTITION FOR ELECTRICAL OR MED GAS BOX AND
GRIND VERTICAL CHANNEL FROM ABOVE CEILING TO BOX FOR CONDUIT.
INSTALL CONDUIT / PIPE IN CHANNEL AND PATCH PLASTER. PAINT ENTIRE
PARTITION WHERE PATCHING OCCURS. - SEE ELECTRICAL & TECHNOLOGY
OR MED GAS PLANS FOR ADDITIONAL INFORMATION
FL4 INFILL OPENING AND PATCH PARTITION, WITH MATERIALS TO MATCH
EXISTING ADJACENT SURFACES, AS REQUIRED FROM DEMOLITION. WHERE
EXISTING FINISHES ARE DISTURBED PAINT TO MATCH ADJACENT FINISH,
PAINT ENTIRE PARTITION, BOTH SIDES AS REQUIRED, WHERE PATCHING
OCCURS.
FL5 PATCH PARTITION, WITH MATERIALS TO MATCH EXISTING ADJACENT
SURFACES, AS REQUIRED FROM WATER DAMAGE AND REMOVAL OF
WALLCOVERING. PAINT TO MATCH ADJACENT FINISH, PAINT ENTIRE
PARTITION / WALL WHERE PATCHING OCCURS.
FL6 REPAIR, REFINISH, MODIFY AND REINSTALL SALVAGED RAILING IN SAME
LOCATION. SEE DETAILS AND ELEVATIONS FOR ADDITIONAL WORK.
FL7 SEE CIVIL FOR RAMP, STOOP AND STAIR AT DOOR
FL8 PATCH / INFILL OPENINGS IN BRICK VENT. USE SALVAGED BRICK AS
REQUIRED TO FILL GAPS. SIZE OF BRICK VENT AREAS VARIES. FIELD
VERIFY
FL9 PATCH FLOOR SUBSTRATE
FL10 PROVIDE SPANDREL GLASS SPANDREL INSULATION AT THIS LOCATION.
SEAL INSULATION VAPOR TIGHT TO WINDOW FRAME.
FL11 PATCH OPENING IN CONCRETE FLOOR AT REMOVED DOWNSPOUT
FL12 PATCH ALL OPENINGS IN CONCRETE STAIRS AT REMOVED RAILINGS
FL13 EXPOSED STRUCTURE PAINT
FL14 PROVIDE PRECAST CONCRETE SPLASH BLOCK, 24" x 16" MIN
FL15 INFILL OPENING WITH XN3 OR PROVIDE RATED SHAFT WALL PARTITION AS
REQUIRED AND PATCH PARTITION, WITH MATERIALS TO MATCH EXISTING
ADJACENT SURFACES, AS REQUIRED FROM DEMOLITION. WHERE EXISTING
FINISHES ARE DISTURBED PAINT TO MATCH ADJACENT FINISH, PAINT
ENTIRE PARTITION, BOTH SIDES AS REQUIRED, WHERE PATCHING
OCCURS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/8
/2
:1
:0
A
M
AE122-B110
SECOND LEVEL FLOOR PLAN -
BUILDING 110
CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
09/02/2022 LA GJB16149
1/8" = 1'-0"1 SECOND LEVEL FLOOR PLAN - BUILDING 110 (DEDUCT ALTERNATE 1)
Revisions: Date: 09/12/2022
I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name: Steve Schlotthauer
LI
M
IT
S
O F
CO
NS
TR
UC
TI
O
N
LI
M
IT
S
O F
CO
NS
TR
UC
TI
O
N
LIMITS OF CONSTRUCTION
B246-110
ET
WORKSHOP
B247-110
TECH
OFFICE
B245-110
TECH
OFFICE
B243-110
BIOMED
PARTS
S2B-2-110
STAIR-2
B244-110
HAC
B242-110
BIOMED
C2B-5-110
CORRIDOR
C2B-1-110
CORRIDOR
B227-110
WORKSTATION
B216-110
TOILET
B227A-110
BREAK
B229-110
OFFICE
B227B-110
FILES
C2B-4-110
CORRIDOR
B214-110
TELECOM
B226-110
COPY
B228-110
OFFICE
B230-110
OFFICE
B230A-110
STORAGE
B232-110
OFFICE
B234-110
OFFICE
B236-110
OFFICE
B238-110
CONFERENCE
B239-110
WORKSTATION
B235-110
WORKSTATION
B231-110
WORKSTATION
S2B-5-110
STAIR
B212-110
ELEC
B219
WOMEN'S
TOILET
B22
STORAGEB223
OFFICE
B225
STORAGE
B224
SHARED
OFFICE
B220
BIO
ENGINEERING
E2B-10
ELEVATOR
B209A
CHASE B209
STORAGE
E2B-11 Room
C2B-10
CORRIDOR
LINE OF GYP BD SOFFIT BELOW ACT
CEILING. PAINT
EXISTING CEILING TO REMAIN
LIMITS OF CONSTRUCTION
NOTE:
ACT CEILING TILE AND GRID TO MATCH HEIGHT OF
REMOVED ACT CEILING SYSTEM
EXISTING SOFFIT PAINT
ALIGN NEW
CEILING GRID
WITH EXISTING
RCP GENERAL NOTES
1. GENERAL CONTRACTOR TO COORDINATE ALL CEILING MOUNTED EQUIPMENT SUPPORT
REQUIREMENTS, LOCATIONS, DIMENSIONS, ETC WITH EQUIPMENT SUPPLIER AND OWNER,
PRIOR TO INSTALLATION.
2. ALL CEILING MOUNTED ITEMS SUCH AS LIGHT FIXTURES, GRILLES, DIFFUSERS, SPEAKERS, EXIT LIGHTS, ETC SHALL BE LOCATED IN THE CENTER OF ACT PANELS, GYP BD SOFFITS
AND/OR PLASTER SOFFIT BAYS, UNLESS NOTED OTHERWISE. COORDINATE WITH
MECHANICAL AND ELECTRICAL DRAWINGS.
3. FINISHED GYP BD SOFFITS SHALL EXTEND 1" BEYOND FACE AND EXPOSED ENDS OF WALL
CABINETS, FULL-HEIGHT CABINETS, ETC UNLESS NOTED OTHERWISE. COORDINATE CABINET
DIMENSIONS WITH SUPPLIER. GYP BD FASCIA/SOFFIT DETAILS ARE REFERENCED FROM THE
REFLECTED CEILING PLAN.
4. SEE MECHANICAL DRAWINGS FOR SPRINKLER HEAD TYPES AND LOCATIONS. CENTER ALL
HEADS IN ACT UNLESS NOTED OTHERWISE.
REFLECTED CEILING PLAN SYMBOLS
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
GYP BD
CEILING /
SOFFIT
ACT CEILING
SYSTEM
EXISTING
ACT CEILING
SYSTEM
IV TRACK
CUBICLE
CURTAIN
TRACK
ACCESS
PANEL
2'-0" x 4'-0"
LIGHT FIXTURE
2'-0" x 2'-0"
LIGHT FIXTURE
PENDANT STRIP
LIGHT FIXTURE
SUSPENDED
LIGHT FIXTURE
RECESSED LIGHT
FIXTURE OR
PENDANT LIGHT -
SEE PLAN
MECHANICAL
SUPPLY GRILL
MECHANICAL
RETURN GRILL
WALL SCONCE
LIGHT FIXTURE
MECHANICAL
LINEAR SUPPLY
GRILL
CEILING
ELEVATION AND
FINISH
9'-0" AFF
ACT
REFLECTED CEILING KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
RC1 CUBICAL CURTAIN TRACK. SEE SHEET AE560 FOR TYPES
RC2 VENT HOOD. SEE MECHANICAL
RC3 SPLIT CEILING GRID AT THIS LOCATION
RC4 PATIENT LIFT. SEE STRUCTURAL FOR ADDITIONAL INFORMATION.
RC5 PROVIDE 24" X 24" MINIMUM ACCESS PANELS AS NEEDED PER
SPECIFICATIONS SECTION 08 31 13
RC6 ACCESS PANEL, MIN 2'-0" x 2'-0". COORDINATE SIZE AND LOCATION WITH
SPEC SECTION 08 31 13 AND MEP. AT RECEPTION DESK PLAM SOFFIT
ACCESS PANELS TO BE ON THE TOP OF SOFFIT.
RC7 CENTER RECESSED LIGHT FIXTURE ON CENTERLINE OF EXISTING WDW
OPENING TYP
RC8 PAINT PORCH CEILING P-10
RC9 PAINT GYP BD CEILING P-4
RC10 PATIENT FALL PROTECTION RAIL. SEE STRUCTURAL FOR ADDITIONAL
INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/8
/2
:1
:4
A
M
AC121-B110
SECOND LEVEL REFLECTED
CEILING PLAN - BUILDING 110
CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
09/02/2022 LA GJB16149
1/8" = 1'-0"1 SECOND LEVEL REFLECTED CEILING PLAN - BUILDING 110 (DEDUCT ALTERNATE 1)
Revisions: Date: 09/12/2022
I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name: Steve Schlotthauer
FIRST LEVEL
0"
SECOND LEVEL
14'-0"
TOP OF EXISTING MASONRY
25'-10 3/8"
TO MASONRY @ ADDITION
12'-0"
NEW EXISTING
STOOP/STEPS - SEE STRUCTURAL
FIBER CEMENT FASCIA AND TRIM
EXISTING STAIR AND SIDEWALK
NOTE:
AT EXISTING BRICK. PROVIDE 60% MASONRY TUCKPOINTING. SEE DETAIL
PATCH ALL EXTERIOR WALLS AT LOCATIONS OF REMOVED EXTERIOR WALL STEEL BRACING. SEE STRUCTURAL FOR ADDITIONAL INFORMATION
W15W15W15
W6W6W6 W6
W10
W2
/3 AE501
CJ
PROVIDE PRECAST CONCRETE SPLASH
BLOCK. SEE PLAN FOR ADDITIONAL
INFORMATION
PATCH / INFILL OPENINGS IN BRICK VENT. USE
SALVAGED BRICK AS REQUIRED TO FILL GAPS
FIRE DEPARTMENT
CONNECTION AND ALARM
BELL. SEE FIRE PROTECTION
DRAWINGS
DOWNSPOUT TO TIE INTO EXISTING
UNDERGROUND SYSTEM. SEE CIVIL
DOWNSPOUT TO TIE INTO EXISTING
UNDERGROUND SYSTEM. SEE CIVIL
DOWNSPOUT TO TIE INTO EXISTING
UNDERGROUND SYSTEM. SEE CIVIL
DEDUCT ALTERNATE 5
SEE SPECIFICATIONS
DEDUCT ALTERNATE 4
SEE SPECIFICATIONS
DEDUCT ALTERNATE 9 SEE SPECIFICATIONS
COMPOSITE RUBBER
ROOFING SHINGLES.
DEDUCT ALTERNATE 6
STANDING SEAM METAL ROOF AND SIDEWALL
STANDING SEAM
METAL ROOF AND
SIDEWALL
FIRST LEVEL
0"
SECOND LEVEL
14'-0"
TOP OF EXISTING MASONRY
25'-10 3/8"
TO MASONRY @ ADDITION
12'-0"
EXISTING BRICK. PATCH
AND TUCKPOINT.
CAST STONE BAND
PREFINISHED METAL CAP FLASHING
COMPOSITE RUBBER ROOFING SHINGLES. DEDUCT ALTERNATE 6
12" 7 1/2"
NEWEXISTING
PREFINISHED METAL DOWNSPOUT AND GUTTER (TYP)
STOOP/STEPS - SEE STRUCTURAL
PREFINISHED METAL DOWNSPOUT AND GUTTER (TYP)
DEDUCT ALTERNATE 9 SEE SPECIFICATIONS
REINSTALL SALVAGED VENT OVER INSULATED CURB
RAMP - SEE CIVIL
EXISTING STAIR AND SIDEWALK - SEE CIVIL
12" 9 3/4"
NOTE:
AT EXISTING BRICK. PROVIDE 60% MASONRY TUCKPOINTING. SEE DETAIL
PATCH ALL EXTERIOR WALLS AT LOCATIONS OF REMOVED EXTERIOR WALL STEEL BRACING. SEE STRUCTURAL FOR ADDITIONAL INFORMATION
CW1W6W6W6W6
W15W15W10
W2
W15
/3 AE501
CJ
CJ AT INSIDE CORNER
DOWNSPOUT TO TIE INTO EXISTING
UNDERGROUND SYSTEM. SEE CIVILDOWNSPOUT TO TIE INTO EXISTING
UNDERGROUND SYSTEM. SEE CIVIL
PROVIDE PRECAST CONCRETE SPLASH BLOCK. SEE
PLAN FOR ADDITIONAL INFORMATION
DEDUCT ALTERNATE SEE SPECIFICATIONS
DEDUCT ALTERNATE 5 SEE SPECIFICATIONS
WALL HYDRANT. SEE PLUMBING (TYP)
STANDING SEAM METAL ROOF AND SIDEWALL
STANDING SEAM METAL ROOF AND SIDEWALL
FIRST LEVEL
0"
SECOND LEVEL
14'-0"
TOP OF EXISTING MASONRY
25'-10 3/8"
PREFINISHED METAL GUTTER AND
DOWNSPOUT
PREFINISHED METAL GUTTER
AND DOWNSPOUT
COMPOSITE RUBBER
ROOFING SHINGLES.
DEDUCT ALTERNATE 6
EXISTING BRICK. PATCH
AND TUCKPOINT.
EXISTING BRICK. PATCH AND
TUCKPOINT
REINSTALL SALVAGED METAL VENT OVER
INSULATED CURB
RAMP -SEE CIVIL AND STRUCTURAL.
PROVIDE RAILINGS TO MATCH
PORCH RAILING SYSTEM
DOWNSPOUT TO TIE INTO EXISTING
UNDERGROUND SYSTEM. SEE CIVIL
12" 7 1/2"
12" 9 3/4"
NOTE:
AT EXISTING BRICK. PROVIDE 60% MASONRY TUCKPOINTING. SEE DETAIL
PATCH ALL EXTERIOR WALLS AT LOCATIONS OF REMOVED EXTERIOR WALL STEEL BRACING. SEE STRUCTURAL FOR ADDITIONAL INFORMATION
CW2
W14
W12
W5 W4 W4 W4 W4 W4 W1 W1 W1 W1 W1 W1 W4 W4 W4 W4 W4 W5
W14
W12W12W12W12W12W9W9W9W9W9W9W12W12W12W12
CW3
/3 AE501
PATCH / INFILL OPENINGS IN BRICK
VENT. USE SALVAGED BRICK AS
REQUIRED TO FILL GAPSPROVIDE PRECAST CONCRETE
SPLASH BLOCK. SEE PLAN FOR
ADDITIONAL INFORMATION DOWNSPOUT TO TIE INTO EXISTING
UNDERGROUND SYSTEM. SEE CIVIL
DOWNSPOUT TO TIE INTO EXISTING
UNDERGROUND SYSTEM. SEE CIVIL
RU
NN
IN
G
B O
ND
CO
UR
SE
S
AL
TE
RN
A T
E
HE
AD
B
RI
CK
CO
UR
SE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/8
/2
:1
:3
A
M
AE201-B45
EXTERIOR ELEVATIONS -
BUILDING 45
CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
09/02/2022 LA GJB16149
1/8" = 1'-0"1 NORTH ELEVATION - BUILDING 45
1/8" = 1'-0"2 SOUTH ELEVATION - BUILDING 45
1/8" = 1'-0"3 WEST ELEVATION - BUILDING 45
1" = 1'-0"4 BRICK PATTERN (TYP)
Revisions: Date: 09/12/2022
I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name: Steve Schlotthauer
SECOND LEVEL
14'-0"
TOP OF EXISTING MASONRY
25'-10 3/8"
TO MASONRY @ ADDITION
12'-0"
EXISTINGNEW
EXISTING NEW
PREFINISHED METAL
GUTTER AND
DOWNSPOUT
PREFINISHED METAL GUTTER AND DOWNSPOUT
CJ AT INSIDE CORNER
PATCH / INFILL OPENING. USE SALVAGED BRICK AS
REQUIRED
RAMP, STOOP AND STAIRS. -SEE CIVIL AND
STRUCTURAL. PROVIDE RAILINGS TO MATCH PORCH
RAILING SYSTEM
NOTE:
AT EXISTING BRICK. PROVIDE 60% MASONRY TUCKPOINTING. SEE DETAIL
PATCH ALL EXTERIOR WALLS AT LOCATIONS OF REMOVED EXTERIOR WALL STEEL BRACING. SEE STRUCTURAL FOR ADDITIONAL INFORMATION
CW1
W20
W21W21W21W21W21W21W21W21
W20 W20 W20 W20 W20 W20 W20 W20 W20 W16
W8 W8
W16
CW18
/3 AE501
AE202-B45
CJ AT INSIDE CORNER
CJ
CJ AT INSIDE CORNER
CJCJCJCJ
CJ CJ CJ CJCJ
CJ
PATCH / INFILL OPENINGS IN
BRICK VENT. USE SALVAGED
BRICK AS REQUIRED TO FILL
GAPS
DOWNSPOUT TO TIE INTO EXISTING
UNDERGROUND SYSTEM. SEE CIVIL
DOWNSPOUT TO TIE INTO EXISTING
UNDERGROUND SYSTEM. SEE CIVIL
DOWNSPOUT TO TIE INTO EXISTING
UNDERGROUND SYSTEM. SEE CIVIL
DEDUCT ALTERNATE 4 SEE SPECIFICATIONS
DEDUCT ALTERNATE 5 - SEE SPECIFICATIONS AND ENLARGED PLANS
EXTERIOR LIGHTING. SEE
ELECTRICALWALL HYDRANT. SEE
PLUMBING (TYP)
SECONDARY STORM
OVERFLOW. SEE
PLUMBING (TYP)
COMPOSITE RUBBER ROOFING SHINGLES. DEDUCT
ALTERNATE 6
1'-2" 2'-5 1/2" 2'-4" 2'-5 1/2" 1'-2"
2' -2
/8
3/ 8"
CONTROL JOINT (TYP)
CAST STONE PARAPET CAP. SEE AE601 FOR PROFILE
CW18
AE524
AE315-B45
1"1"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/8
/2
:1
:3
A
M
AE202-B45
EXTERIOR ELEVATIONS -
BUILDING 45
CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
09/02/2022 LA GJB16149
1/8" = 1'-0"1 EAST ELEVATION - BUILDING 45
1/2" = 1'-0"2 ENLARGED EXTERIOR ELEVATION - CAST STONE PARAPET CAP AT DORMER DEDUCT ALTERNATE 4
TYP
Revisions: Date: 09/12/2022
I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name: Steve Schlotthauer
CASEWORK GENERAL NOTES
1. FULL HEIGHT STORAGE CABINETS (UNO)
- SHALL BE 2'-0" DEEP
- 2'-0" MAX DOOR WIDTH
- WARDROBE CABINETS TO BE 2'-0" DEEP
- PROVIDE (5) FIVE ADJ PLAM SHELVES
2. BASE AND WALL CABINETS (UNO)
- WALL CABINETS 1'-0" DEEP CLEAR INSIDE MINIMUM
- BASE CABINETS 2'-0" DEEP
- (1) ADJ PLAM SHELF AT 2'-0" HIGH WALL CABINETS
- (2) ADJ PLAM SHELVES AT 2'-6" HIGH WALL CABINETS, AND
- (3) ADJ PLAM SHELVES AT 3'-0" HIGH WALL CABINETS
3. SEE INTERIOR ELEVATIONS FOR PLAM FILLERS AND SLOPED TOPS.
4. WHERE FILLER STRIPS ARE REQUIRED, THEY SHALL BE EQUAL IN SIZE AT BOTH
ENDS OF CASEWORK (UNO).
5. PROVIDE LOCKS ON INDIVIDUAL DOORS AND DRAWERS TYPICAL ALL LOCATIONS.
6. PROVIDE CONTINUOUS SEALANT AT TOP OF BACKSPLASH/SIDESPLASHES.
7. PROVIDE 1" THICK SHELVES WHERE CABINETS ARE OVER 3'-0" WIDE.
8. PROVIDE GROMMETS AT WORKSTATIONS, INCLUDING NURSE STATIONS, RECEPTION
DESKS AND OTHER WORK COUNTERS. CUT IN FIELD-PROVIDE ONE PER ELECTRICAL
DEVICE BELOW COUNTER-COORDINATE LOCATIONS WITH OWNER. COLOR TO BE
SELECTED BY ARCHITECT. SEE SPECIFICATION FOR GROMMET TYPES AND SIZES.
9. PROVIDE A 2" RADIUSED EDGE (IN PLAN) AT ALL OUTSIDE, EXPOSED COUNTERTOP
CORNERS (UNO). ALL PLAM COUNTERTOPS SHALL HAVE A 1 1/4" THICK (MIN) PLAM
SQUARE EDGE NOSING (UNO)
10. ALL COUNTERTOPS ARE 2'-1" DEEP (UNO)
11. PROVIDE PLYWOOD BACKING AT ALL SOLID SURFACE COUNTERTOPS.
12. COUNTERTOP SUPPORT BRACKETS ARE PROVIDED BY THE CASEWORK SUPPLIER.
PROVIDE WALL BLOCKING AT EACH SUPPORT. SPACE AT 3'-0" OC MAX.
13. COORDINATE LOCATION OF ALL UNDERCOUNTER SUPPORT WITH OWNER
FURNISHED/OWNER INSTALLED EQUIPMENT.
14. NO EXPOSED FASTENERS ON CASEWORK (UNO)
15. ALL EXPOSED METAL CLIP ANGLES AND BRACKETS TO BE PAINTED TO MATCH
CASEWORK.
16. ALL EXPOSED AND SEMI-EXPOSED SURFACES OF CASEWORK, SHELVING, BASE,
FULL HEIGHT AND UPPER WALL CABINETS, AND FINISHED END PANELS ARE PLAM
(UNO)
17. FIELD VERIFY SPACE AVAILABLE AT CABINET LOCATIONS PRIOR TO CASEWORK
FABRICATION.
18. RETURN BACKSPLASH AT SIDEWALLS (UNO).
19. TUCK WALL COVERING BEHIND ALL BACKSPLASHES.
20. ALL CABINETS TO RECEIVE BASE SCHEDULED FOR ROOM (UNO).
21. COORDINATE ALL SWITCHES, UNDER-CABINET LIGHT FIXTURES AND
UNDERCOUNTER RECEPTACLES WITH THE ELECTRICAL CONTRACTOR.
22. PROVIDE HANGING FILE EDGE/HARDWARE WHERE FILE DRAWERS ARE INDICATED
23. PROVIDE A 1/4" GAP BETWEEN BOTTOM EDGE OF COUNTERTOP AND TOP EDGE OF
DOOR FRONTS/DOORS OF CABINETS
24. REFER TO FINISH PLAN GENERAL NOTES FOR CASEWORK FINISHES (UNO)
25. BASE AS SCHEDULED (UNO)
26. NUMBERS SHOWN BELOW BASE CABINETS AND ABOVE WALL CABINETS REFER TO
NOMINAL WIDTH DIMENSIONS, IN INCHES, FOR THAT CABINET. SEE REFERENCE
DETAILS FOR ADDITIONAL INFORMATION.
CASEWORK ELEVATION REFERENCE DIAGRAM
WALL HUNG CABINETS
OPEN FILE
EQFILE
EQ
EQ
EQ6"
EQ
EQ
243015 24211836
ACCESSIBLE
SINK
36 36 24 27 42
MICRO (NIC)
SD
PTD
4"
TO
E
SP
AC
E
AT
" D
EE
P
UN
O
SE
E
EL
EV
AT
IO
NS
30 36
OPEN
SE
E
EL
EV
AT
IO
NS
BASE CABINETS
4" BACKSPLASH TO MATCH
COUNTERTOP
SIDESPLASH WHEN REQUIRED
ADJUSTABLE SHELVES (UNO)
ACCESSIBLE SINK
OPEN BASE SHELVING CABINET. SEE
ELEVATION FOR NUMBER OF
SHELVES
SINK CABINET WITH HINGED DOOR
LOCK
SE
E
EL
EV
AT
IO
NS
SP
AC
E U N
O 4"
TO
E
EL
EV
SE
E
BASE CABINET WITH HINGED DOORS
BASE UNIT WIDTH
FILE CABINET (2) DRAWERS
DRAWER FRONT HEIGHT INFORMATION
DRAWER CABINET UNIT. SEE ELEVATIONS FOR NUMBER
OF DRAWERS
APRON WITH COUNTERTOP
OPEN DRAWER WITH COUNTERTOP
OPEN COUNTERTOP
CABINET UNIT WITH - SEE ELEVATIONS
AT GYP BD SOFFITS: 1" OVERHANG FROM CABINET AT
SIDE AND FRONT OF CABINET
AT PLAM SOFFITS: NO OVERHANG. SOFFITS ARE FLUSH
WITH SIDE AND FRONT OF CABINET DOORS
INDICATES REQUIRED CLEAR SPACE FOR VALANCE
- SEE ELEVATIONS
CABINET WITH HINGED DOORS AND VALANCE
CABINET WITH HINGED DOORS
OPEN CABINET WITH ADJUSTABLE SHELVES
HE
IG
HT
CA
BI
NE
T
TY
PI
CA
L
1"
SC
RI
BE
/ FILLER PANEL
1"MIN SCRIBE
CABINET WITH HINGED DOORS
AND MAIL SLOTS
CABINET WITH HINGED DOORS AND
OPEN MICROWAVE SHELF. 18"
CABINET SHELF DEPTH, VERIFY
WITH EQUIPMENT SCHEDULE
SOILED LINEN
CABINET
FULL HEIGHT STORAGE WITH (5)
ADJUSTABLE SHELVES (UNO)
FIXED CENTER SHELF AT
FULL HEIGHT CABINETS
CABINET UNIT
WIDTH
8'- 0"
1'- 0"
9'- 0"
4'-0" x 8'-0" x 3/4" FIRE RETARDANT
AC GRADE PLYWOOD. TWO
COATS FIRE RESISTANT PAINT ALL
SIDES. FINISH WITH FP-1 .
FINISH ALL OTHER WALL SURFACES P-5
DOOR. SEE PLANS FOR LOCATION
NO PLYWOOD ON THIS PARTITION
P-5
WALL MOUNT SINK,
INSULATE EXPOSED
PIPES
A5082
A5075
F2020
L8285
AE602
TYP
2'- 0"
1'- 8"
3'- 6"
7'- 2"
PLAM-1 CASEWORK
PLAM-2 COUNTERTOP
M1840
33" 33"
30" 30" 21"
AE550
AE550
SIM
AE550
SIM
3'- 0"
30" 15"PLAM-1 CASEWORK
A5075
A5082
T9901
T9900
AE550
AE550
7'- 6"
PAINT EXPOSED STRUCTURE P-6
AE560
PAINT EXPOSED STRUCTURE FLAT BLACK
FROM 2" ABOVE CEILING LINE TO UNDERSIDE
OF DECK / FLOOR ABOVE.
8'-3"
PAINT EXPOSED STRUCTURE P-6
AE560
PAINT EXPOSED STRUCTURE FLAT BLACK
FROM 2" ABOVE CEILING LINE TO UNDERSIDE
OF DECK / FLOOR ABOVE.
7'- 6"
5'-5 1/2"
6' -1
/4
AE602
TYP
PAINT EXPOSED STRUCTURE P-6
AE560
PAINT EXPOSED STRUCTURE FLAT BLACK
FROM 2" ABOVE CEILING LINE TO UNDERSIDE
OF DECK / FLOOR ABOVE.
7'- 6"
2'-11 5/8"
2'-11 5/8"
AE560
TYP
1"
2'- 7"
WP-1
HANDRAIL
RB-2
P-1
VWC-2
VWC-2
PAINT EXPOSED STRUCTURAL STEEL P-6 PAINT EXPOSED STRUCTURAL STEEL P-6
VWC-2 IN RECESS BEHINDVWC-2 IN RECESS BEHIND
AF600
AE560
PAINT EXPOSED STRUCTURAL STEEL FLAT BLACK FROM
2" ABOVE CEILING LINE TO UNDERSIDE OF DECK / FLOOR
ABOVE.
AE602
TYP
AE602
TYP
INTERIOR ELEVATION GENERAL NOTES
1. SEE RCP FOR SOFFIT AND BULKHEAD LOCATIONS AND DETAILS
2. INSTALL CERAMIC TILE (CT) BEHIND ALL WALL MOUNTED ITEMS WHERE CT IS CALLED OUT IN FINISH PLAN AND SCHEDULE.
WHERE ANY TOILET ACCESSORY OVERLAPS OR EXTENDS BEYOND A CT WAINSCOT AND PROJECTS ONTO THE ADJACENT WALL, INSTALL A HARDBOARD BACKER FULL SIZE OF THE OVERLAP AREA AND OF A THICKNESS TO ALIGN FLUSH WITH THE FACE OF THE CT. HOLD FACE OF HARDBOARD BACK 3/8" FROM THE FACE OF THE ACCESSORY ON ALL SIDES. PROVIDE SANITARY SEALANT AROUND ALL EDGES OF HARDBOARD BACKING PIECE. COORDINATE LOCATIONS AND DIMENSIONS
WITH OWNER PROVIDED/ OWNER INSTALL (V V) EQUIPMENT.
3. COORDINATE ALL PLUMBING FIXTURES, CONTROLS AND VENTILATION REQUIREMENTS WITH MECHANICAL CONTRACTOR
4. COORDINATE ALL ELECTRICAL FIXTURES, OUTLETS, SWITCHES AND POWER REQUIREMENTS WITH ELECTRICAL
CONTRACTOR
5. VERIFY OPENING SIZES AND LOCATIONS OF OWNER FURNISHED, OWNER INSTALLED EQUIPMENT AND FURNISHINGS TO
ASSURE NO INTERFERENCE WITH COUNTER SUPPORT BRACKETS, APRONS, ETC.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/8
/2
:1
:4
A
M
AE211-B45
INTERIOR ELEVATIONS -
BUILDING 45
CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
09/02/2022 LA GJB16149
1/4" = 1'-0"1 INTERIOR ELEVATION - TYPICAL TELECOM ROOM 3 SIDES
1/4" = 1'-0"2 INTERIOR ELEVATION - TYPICAL TELECOM ROOM - DOOR PARTITION
1/4" = 1'-0"4 ELEVATION - PROSTHETICS/ ORTHOTICS FUME 130C-45 - WEST
1/4" = 1'-0"5 ELEVATION - COPY /WORK 121-45 - NORTH
1/4" = 1'-0"3 ELEVATION - CAD/ CAM 130D-45 - NORTH
1/4" = 1'-0"6 ELEVATION - STEEL CROSS BRACE @ CORRIDOR C103-45
1/4" = 1'-0"7 ELEVATION - STEEL CROSS BRACE @ CORRIDOR C200-45
1/4" = 1'-0"8 ELEVATION - STEEL CROSS BRACE @ OPEN OFFICE 201-45
1/4" = 1'-0"9 ELEVATION - CORRIDOR C102-45 - WEST
Revisions: Date: 09/12/2022
I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name: Steve Schlotthauer
N
M0500
HANDRAIL BEYOND
BLAST RESISTANT ALUMINUM
CURTAIN WALL WITH
DECORATIVE FILM
COMPOSITE PLANKING - CP-1
P-1
WP-1
CW19
SOFFIT. SEE REFLECTED
CEILING PLANS
AE551
AE212-B45
VERIFY
3'-8"
VERIFY
2'-8"
VE
RI
FY
1'- 4"
6'- 0"
DASHED LINE INDICATES A
VOID IN COMPOSITE
PLANKING - CP-1 FOR TV
BRACKET PLACEMENT
AE542
AE551
AE551
RB-2
AE542
AE551
M0500
9'- 3"
3/4" X 5" MDO TRIM PAINT P-6
P-1
VWC-1
RB-2
MDO TRIM AT WINDOWS. SEE DETAILS
(TYP AT LOBBY)
MDO TRIM AT WINDOWS. SEE DETAILS
(TYP AT LOBBY)
SUSPENDED LIGHTING FIXTURE.
SEE ELECTRICAL
SOLID SURFACE SILL (TYP)
M1890
PLAM SOFFIT. SEE REFLECTED
CEILING PLAN
SUSPENDED LIGHTING FIXTURE
3/4" X 5" MDO TRIM PAINT P-6
MDO TRIM.
PAINT PT-6
VWC-1
9'- 3"
RB-2
WINDOW SHADE TYPICAL. SEE DETAILS
2" TYP
4" TYP
AE523
AE523
AE522 TYP
AE530
AE522 TYP
AE523SIM
AE523
AE312-B45
VERIFY WITH BRACKET SIZE
2'-8"
VE
RI
FY
W
IT
H
BR
AC
KE
T
SI
ZE
1'- 4"
3/4" TYP
1x HARDWOOD
TRIM STAINED TO
MATCH COMPOSITE
PLANKING, CP-1
AE212-B45
TELEVISION
MOUNTING
BRACKET (V V)
DASHED LINE TO
INDICATE OUTLINE
OF PROPOSED
TELEVISION (V V)
COMPOSITE PLANK CP-1
1X HARDWOOD TRIM
STAINED TO MATCH
COMPOSITE PLANK
BLOCKING AS
REQUIRED FOR
BRACKET CLEARANCE
OF COMPOSITE PLANK
TELEVISION BRACKET
(V V)
BLOCKING AS
REQUIRED FOR
BRACKET SUPPORT
M0500
1X HARDWOOD TRIM
STAINED TO MATCH
COMPOSITE PLANK
SEE PLAN FOR
PARTITION TYPE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/8
/2
:1
:4
A
M
AE212-B45
INTERIOR ELEVATIONS -
BUILDING 45
CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
09/02/2022 LA GJB16149
1/4" = 1'-0"1 ELEVATION - LOBBY 100-45 - EAST
1/4" = 1'-0"2 ELEVATION - LOBBY 100-45 - SOUTH
1/4" = 1'-0"3 ELEVATION - LOBBY 100-45 - WEST
1 1/2" = 1'-0"4 DETAIL @ TV BRACKET LOCATION AT COMPOSITE PLANKING
1 1/2" = 1'-0"5
SECTION @ TV BRACKET AT
COMPOSITE PLANKING
Revisions: Date: 09/12/2022
I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name: Steve Schlotthauer
SECOND LEVEL
14'-0"
TOP OF EXISTING MASONRY
25'-10 3/8"
AE302-B45
31 4 6 8 10 11 12 13 14 15 17 18
AE303-B45
AE303-B45
AE303-B45
AE313-B45
S100-45
STAIR 1
C102-45
CORRIDOR
C100-45
CORRIDOR
C103-45
CORRIDOR
S102-45
STAIR 2
122-45
STAFF
TOILET
151-45
TELECOM
120-45
TEAM
EVALUATION
130E-45
TRASH
115-45
EQUIPMENT
STORAGE
113-45
DYNAMIC
ALIGNMENT
116-45
FITTING /
EXAM SOFT
GOODS
112-45
SOILED
HOLDING
117-45
FITTING /
EXAM
CUSTOM
FAB
130-45
PROSTHETICS
LAB
S200-45
STAIR 1
C200-45
CORRIDOR
222-45
ELEVATOR
EQUIP
220-45
MECHANICAL
221-45
TELECOM
S202-45
STAIR 2
E-1
ELEVATOR
E-1-45
ELEVATOR
AE324-B45
AE323-B45
DEDUCT 2
ALTERNATE
AE313-B45
SIM/MIR
130-45
PROSTHETICS
LAB
FLOOR/ CEILING ASSEMBLY EQUIVALENT TO
1 HOUR (MIN) RATING AT TELECOM ROOMS
FIRST LEVEL
0"
SECOND LEVEL
14'-0"
AE302-B458 10 11 12 13 14 15 17
AE303-B45
AE314-B45
AE314-B45
TO MASONRY @ ADDITION
12'-0"
AE315-B45
C100-45
CORRIDOR
130D-45
CAD/ CAM
114-45
CAST
109-45
FACIAL/
BODY
FITTING
STUDIO
130C-45
PROSTHETICS/
ORTHOTICS
FUME
130A-45
LAB
RESTORATION
130B-45
LAB DUST
ROOM
AE314-B45
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/8
/2
:1
:5
A
M
AE301-B45
BUILDING SECTIONS - BUILDING
CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
09/02/2022 LA GJB16149
3/16" = 1'-0"1 BUILDING SECTION - NORTH / SOUTH
3/16" = 1'-0"2 BUILDING SECTION - NORTH / SOUTH @ ADDITION
Revisions: Date: 09/12/2022
I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name: Steve Schlotthauer
SECOND LEVEL
14'-0"
TOP OF EXISTING MASONRY
25'-10 3/8"
AE301-B45
A E
AE301-B45
AE302-B45AE315-B45
AE311-B45
TO MASONRY @ ADDITION
12'-0"
HC D
220-45
MECHANICAL
130C-45
PROSTHETICS/
ORTHOTICS
FUME 130-45
PROSTHETICS
LAB
C100-45
CORRIDOR
100-45
LOBBY
C200-45
CORRIDOR
AE314-B45
'-1
3/
8"
'-0
AE321-B45
AE551
FIRST LEVEL
0"
SECOND LEVEL
14'-0"
TOP OF EXISTING MASONRY
25'-10 3/8"
AE302-B45
8 10 11 12 13
101-45
RECEPTION
100-45
LOBBY
AE311-B45
MIR/SIM
AE312-B45
AE312-B45
AE312-B45
6 1/4"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
C U s e rs
\P u b lic \D o c u m e n ts \R e v it P ro je c ts
\1
-R g b a rb a ri a e -m n .c o m
.r v t
/8
/2
:1
:5
A
M
AE302-B45
BUILDING SECTIONS - BUILDING
CONSTRUCT
PROSTHETICS FACILITY
HAMPTON, VA.
590-210
09/02/2022 LA GJB16149
3/16" = 1'-0"1 BUILDING SECTION - EAST / WEST @ LOBBY
3/16" = 1'-0"2 BUILDING SECTION - NORTH / SOUTH @ LOBBY
Revisions: Date: 09/12/2022
I hereby certify that this plan, specification, or report was prepared by me, or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota.
Name: Steve Schlotthauer
SECOND LEVEL
14'-0"
TOP OF EXISTING MASONRY
25'-10 3/8"
AE301-B45
E GC D
TOP OF FOOTING
-3'-0"
C103-45
CORRIDOR
124-45
ELECTRICAL
123-45
OPEN
OFFICE
C200-45
CORRIDOR
220-45
MECHANICAL
225-45
WHEELCHAIR
PARTS
STORAGE
E-1
ELEVATOR
E-1-45
ELEVATOR
AE315-B45
AE311-B45
FIRST LEVEL
0"
SECOND LEVEL
14'-0"
TOP OF EXISTING MASONRY
25'-10 3/8"
AE301-B45
E G
AE315-B45
C D
TOP OF FOOTING
-3'-0"
C103-45
CORRIDOR
120-45
TEAM
EVALUATION
123-45
OPEN
OFFICE
C200-45
CORRIDOR
226-45
DME ACTIVE
STORAGE
220-45
MECHANICAL
'-1
3/
8"
AE311-B45
FIRST LEVEL
0"
SECOND LEVEL
14'-0"
TOP OF EXISTING MASONRY
25'-10 3/8"
AE301-B45
A E G
AE301-B45
AE311-B45
AE314-B45
AE315-B45
TO MASONRY @ ADDITION
12'-0"
C D
TOP OF FOOTING
-3'-0"
111-45
STAFF
TOILET
C102-45
CORRIDOR
110-45
HAC
109-45
FACIAL/
BODY
FITTING
STUDIO
112-45
SOILED
HOLDING
106-45
FITTING /
EXAM SOFT
GOODS
201-45
OPEN
OFFICE
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .