Constr_Plans_-_Level_3_Combined.pdf

PDF 167 MB Posted

Attached to
West Building Access Control System Replacement
Solicitation number
Y26-727
Issued by
Orange County, Orlando City, Florida

About this file

This is a construction plans document for Orange County, Florida's West Building Access Control System Replacement project (Y26-727) at the Orange County Convention Center. The project scope encompasses the replacement, upgrade, and expansion of the existing door access control systems throughout the West Building, converting from a Pegasys access control system to a Lenel system while maintaining existing Lenel infrastructure. Work includes installation of card readers, door hardware, electronic locks, surveillance integration, fire detection and alarm equipment, and structured cabling systems with Category 6 UTP and fiber optic backbone across electrical rooms, IDF rooms, mechanical rooms, catwalks, gates, and select perimeter doors. The sealed bid submission deadline is 4:00 p.m. EST on Thursday, April 16, 2026, through the OpenGov e-Procurement Platform. A non-mandatory pre-bid conference and site visit is scheduled for March 10, 2026, from 9:00 a.m. to 1:00 p.m. at the Orange County Convention Center, West Concourse, Conference Room W323. Questions must be submitted by Wednesday, March 25, 2026, at 5:00 p.m. EST. Contractors must achieve Substantial Completion within 1,065 consecutive calendar days and Final Completion within 1,095 consecutive calendar days from the Official Notice to Proceed. Work is available seven days per week with contractor hours from 6:00 p.m. to 6:00 a.m.

The estimated project cost is $14,775,652.00, with bids required on a lump sum basis. Mobilization costs are capped at 5 percent of the estimated base bid total. Bids exceeding $100,000 require a bid bond of at least 10 percent of the estimated contract amount. Progress payments will be made at 95 percent of earned amounts with 5 percent retainage until completion exceeds 50 percent of the contract value, at which point retainage may be reduced at the Project Manager's discretion. Respondents must demonstrate a minimum of three similar projects completed within the last twenty years involving access control systems in commercial facilities of at least 30,000 square feet, with at least one project in an active operational building, one including ADA-compliant door integration, and one with Fire Alarm System integration. Service Disabled Veteran businesses may receive a preference of 3 percent to 8 percent depending on bid amount; however, the contract will be awarded to the lowest responsive and responsible bidder. Contractors must comply with E-Verify employment verification, provide proof of applicable Florida contractor licenses, and maintain manufacturer certifications for Siemon communications cabling, Lenel access control systems, and Simplex fire alarms. The contractor must utilize the County's e-Builder program for all project communications and submittals at a cost of approximately $2,050 per year per license and must comply with strict fire protection and sprinkler system protocols, including 24/7 fire watch during any fire system shutdowns and 72-hour advance notice for service interruptions.

View the file

Other files

File Type Posted
West_Building_Access_Control_System_Replacement_(Addendum_#7_Revision).pdf PDF
West_Building_Access_Control_System_Replacement_(Addendum_#6_Revision).pdf PDF
West_Building_Access_Control_System_Replacement_(Addendum_#4_Revision).pdf PDF
West_Building_Access_Control_System_Replacement_(Addendum_#3_Revision).pdf PDF
West_Building_Access_Control_System_Replacement_(Addendum_#1_Revision).pdf PDF
West_Building_Access_Control_System_Replacement_(Addendum_#1_Revision).pdf PDF
OCCC_West_Building_to_Pre-Con_Room_W323_Map_Contract_Y26-727-_Pre-Bid_031026.pdf PDF
OCCC_West_Building_to_Pre-Con_Room_W323_Map_Contract_Y26-727-_Pre-Bid_031026.pdf PDF
OCCC_West_Building_to_Pre-Con_Room_W323_Map_Contract_Y26-727-_Pre-Bid_031026.pdf PDF
OCCC_West_Building_to_Pre-Con_Room_W323_Map_Contract_Y26-727-_Pre-Bid_031026.pdf PDF
OCCC_West_Building_to_Pre-Con_Room_W323_Map_Contract_Y26-727-_Pre-Bid_031026.pdf PDF
03._OCCC_Special_Terms_Part_C.pdf PDF
04A._0966-44_ReBID_Layout_West_Building_Exterior_Doors.pdf PDF
Constr_Plans_-_Level_2_Combined.pdf PDF
Constr_Plans_-_Level_3_Combined.pdf PDF
03._OCCC_Special_Terms_Part_C.pdf PDF
0966-44_COMM2-00001_ReBID_Combined_Specifications.pdf PDF
0966-44_COMM2-00001_ReBID_OCCC_Fire_Protection.pdf PDF
04A._0966-44_ReBID_Layout_West_Building_Exterior_Doors.pdf PDF
04A._0966-44_ReBID_Layout_West_Building_Exterior_Doors.pdf PDF
0966-44_COMM2-00001_ReBID_Combined_Specifications.pdf PDF
04A._0966-44_ReBID_Layout_West_Building_Exterior_Doors.pdf PDF
Constr_Plans_-_Level_1_Combined.pdf PDF
Constr_Plans_-_Level_4_Combined.pdf PDF
Constr_Plans_-_Level_2_Combined.pdf PDF
0966-44_COMM2-00001_ReBID_Combined_Specifications.pdf PDF
Constr_Plans_-_Level_2_Combined.pdf PDF
Constr_Plans_-_Level_3_Combined.pdf PDF
Constr_Plans_-_Level_4_Combined.pdf PDF
0966-44_COMM2-00001_ReBID_OCCC_Fire_Protection.pdf PDF
Constr_Plans_-_Level_3_Combined.pdf PDF
Constr_Plans_-_Level_1_Combined.pdf PDF
Constr_Plans_-_Level_4_Combined.pdf PDF
0966-44_COMM2-00001_ReBID_Combined_Specifications.pdf PDF
0966-44_COMM2-00001_ReBID_OCCC_Fire_Protection.pdf PDF
03._OCCC_Special_Terms_Part_C.pdf PDF
Constr_Plans_-_Level_3_Combined.pdf PDF
0966-44_COMM2-00001_ReBID_Combined_Specifications.pdf PDF
0966-44_COMM2-00001_ReBID_OCCC_Fire_Protection.pdf PDF
Constr_Plans_-_Level_1_Combined.pdf PDF
Constr_Plans_-_Level_3_Combined.pdf PDF
04A._0966-44_ReBID_Layout_West_Building_Exterior_Doors.pdf PDF
Constr_Plans_-_Level_1_Combined.pdf PDF
03._OCCC_Special_Terms_Part_C.pdf PDF
Constr_Plans_-_Level_1_Combined.pdf PDF
Constr_Plans_-_Level_4_Combined.pdf PDF
0966-44_COMM2-00001_ReBID_OCCC_Fire_Protection.pdf PDF
03._OCCC_Special_Terms_Part_C.pdf PDF
Constr_Plans_-_Level_2_Combined.pdf PDF
Constr_Plans_-_Level_3_Combined.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .