0966-44_COMM2-00001_ReBID_Combined_Specifications.pdf
PDF 5 MB Posted
- Attached to
- West Building Access Control System Replacement State and local contract opportunity
- Solicitation number
- Y26-727
- Issued by
- Orange County, Orlando City, Florida
About this file
West Building Access Control System Replacement – Project Summary
This is a specification and bid document package for the West Building Access Control System Replacement project issued by Orange County, Florida. The project encompasses a comprehensive access control system upgrade for the Orange County Convention Center West Building, including electronic access control, addressable fire alarm systems, data communications integration, and related infrastructure. The scope includes installation of card readers, door hardware, electronic locks, surveillance integration, fire detection and alarm equipment, communications cabling (structured cabling systems with Category 6 UTP and fiber optic backbone), and all supporting conduit, wiring, and control systems. Sealed bids are being accepted until April 2, 2026, at 4:00 pm EST via the OpenGov e-Procurement Platform. The estimated project cost is $14,775,652.00. Questions regarding the solicitation must be submitted by March 18, 2026, at 5:00 pm EST. The contract will be awarded to a single prime contractor responsible for coordinating all trades and ensuring system integration with existing building systems, smoke control, HVAC controls, fire alarm systems, and the building's data network infrastructure.
The project specifications require all contractors and subcontractors to maintain appropriate state licensing (electrical, low-voltage, fire alarm certification), hold manufacturer certifications (Siemon for communications cabling, Lenel for access control systems, and Simplex for fire alarms), and comply with Orange County Information Systems and Services security standards, encryption requirements, and infrastructure guidelines. All materials must be new and delivered in original packaging. The contractor is responsible for providing temporary power, coordination with existing occupied facilities, 72-hour advance notice for any service interruptions, and maintaining site cleanliness throughout construction. System testing, documentation, training, one-year maintenance service, and manufacturer warranties are contractual requirements. All work must comply with applicable Florida Building Code, NFPA standards, NEC requirements, and local authority having jurisdiction regulations.
View the file
Other files for this state and local contract opportunity
Show all 50
West Building Access Control System Replacement has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Orange County Convention Center
West Building Access Control Upgrade
April 2025
100% Specifications
Drawing Index Sheet List Table Sheet Num-ber Sheet Title
G000 TITLE SHEET
T001 TITLE SHEET - 2
G001 GENERAL INFORMATION & DRAWING INDEX
A101 EXHIBIT LEVEL 1
A201 EXHIBIT LEVEL 2
A202 EXHIBIT LEVEL 2
A203 EXHIBIT LEVEL 2
A301 EXHIBIT LEVEL 3
A302 EXHIBIT LEVEL 3
A303 EXHIBIT LEVEL 3
A401 EXHIBIT LEVEL 4
A402 EXHIBIT LEVEL 4
A403 EXHIBIT LEVEL 4
A501 EXHIBIT LEVEL 5
A502 EXHIBIT LEVEL 5
A503 EXHIBIT LEVEL 5
A601 DOOR SCHEDULE
A602 DOOR SCHEDULE
A603 DOOR SCHEDULE
A604 DOOR SCHEDULE
A605 DOOR SCHEDULE
A606 DOOR SCHEDULE
A607 DOOR SCHEDULE
A608 DOOR SCHEDULE
A609 DOOR SCHEDULE
A610 DOOR SCHEDULE
A611 DOOR SCHEDULE
A612 DOOR SCHEDULE
A613 DOOR SCHEDULE
A614 DOOR SCHEDULE
A801 SEVERE DOOR DAMAGE- PHOTO
A802 PATCH AND REPAIR DAMAGE- PHOTO
ES001 SYSTEM SYMBOLS SPECIFICATIONS
ES101 SITE SYSTEM PLANS
ES102 LEVEL 1 IDF LOCATIONS AND OVERALL RCP
ES103 LEVEL 2 IDF LOCATIONS AND OVERALL RCP
ES104 LEVEL 3 IDF LOCATIONS AND OVERALL RCP
ES105 LEVEL 4 IDF LOCATIONS AND OVERALL RCP
ES201 SYSTEM PLAN EXHIBIT LEVEL 1
ES202 SYSTEM PLAN EXHIBIT LEVEL 1
ES203 SYSTEM PLAN EXHIBIT LEVEL 1
ES204 SYSTEM PLAN EXHIBIT LEVEL 1
ES205 SYSTEM PLAN EXHIBIT LEVEL 1
ES206 SYSTEM PLAN EXHIBIT LEVEL 1
ES207 SYSTEM PLAN EXHIBIT LEVEL 1
ES208 SYSTEM PLAN EXHIBIT LEVEL 1
ES209 SYSTEM PLAN EXHIBIT LEVEL 1
ES210 SYSTEM PLAN EXHIBIT LEVEL 1
ES211 SYSTEM PLAN EXHIBIT LEVEL 1
ES213 SYSTEM PLAN EXHIBIT LEVEL 1
ES214 SYSTEM PLAN EXHIBIT LEVEL 1
ES215 SYSTEM PLAN EXHIBIT LEVEL 1
ES216 SYSTEM PLAN EXHIBIT LEVEL 1
ES217 SYSTEM PLAN EXHIBIT LEVEL 1
ES218 SYSTEM PLAN EXHIBIT LEVEL 1
ES219 SYSTEM PLAN EXHIBIT LEVEL 1
ES222 SYSTEM PLAN EXHIBIT LEVEL 1
ES225 SYSTEM PLAN EXHIBIT LEVEL 1
ES226 SYSTEM PLAN EXHIBIT LEVEL 1
ES227 SYSTEM PLAN EXHIBIT LEVEL 1
ES228 SYSTEM PLAN EXHIBIT LEVEL 1
ES229 SYSTEM PLAN EXHIBIT LEVEL 1
ES230 SYSTEM PLAN EXHIBIT LEVEL 1
ES231 SYSTEM PLAN EXHIBIT LEVEL 1
ES232 SYSTEM PLAN EXHIBIT LEVEL 1
ES233 SYSTEM PLAN EXHIBIT LEVEL 1
ES234 SYSTEM PLAN EXHIBIT LEVEL 1
ESD202 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD201 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD204 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD203 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD205 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD206 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD207 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD208 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD209 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD210 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD211 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD214 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD215 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD216 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD217 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD218 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD219 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD220 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD224 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD225 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD226 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD227 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD228 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD229 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD230 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD231 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD232 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD233 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ESD234 SYSTEM DEMOLITION EXHIBIT LEVEL 1
ES2201 SYSTEM PLAN EXHIBIT LEVEL 2
ES2202 SYSTEM PLAN EXHIBIT LEVEL 2
ES2203 SYSTEM PLAN EXHIBIT LEVEL 2
ES2204 SYSTEM PLAN EXHIBIT LEVEL 2
ES2205 SYSTEM PLAN EXHIBIT LEVEL 2
ES2206 SYSTEM PLAN EXHIBIT LEVEL 2
ES2207 SYSTEM PLAN EXHIBIT LEVEL 2
ES2208 SYSTEM PLAN EXHIBIT LEVEL 2
ES2209 SYSTEM PLAN EXHIBIT LEVEL 2
ES2210 SYSTEM PLAN EXHIBIT LEVEL 2
ES2211 SYSTEM PLAN EXHIBIT LEVEL 2
ES2212 SYSTEM PLAN EXHIBIT LEVEL 2
ES2213 SYSTEM PLAN EXHIBIT LEVEL 2
ES2214 SYSTEM PLAN EXHIBIT LEVEL 2
ES2215 SYSTEM PLAN EXHIBIT LEVEL 2
ES2216 SYSTEM PLAN EXHIBIT LEVEL 2
ES2217 SYSTEM PLAN EXHIBIT LEVEL 2
ES2218 SYSTEM PLAN EXHIBIT LEVEL 2
ES2219 SYSTEM PLAN EXHIBIT LEVEL 2
ES2220 SYSTEM PLAN EXHIBIT LEVEL 2
ES2221 SYSTEM PLAN EXHIBIT LEVEL 2
ES2222 SYSTEM PLAN EXHIBIT LEVEL 2
ES2223 SYSTEM PLAN EXHIBIT LEVEL 2
ES2238 SYSTEM PLAN EXHIBIT LEVEL 2
ES2235 SYSTEM PLAN EXHIBIT LEVEL 2
ES2236 SYSTEM PLAN EXHIBIT LEVEL 2
ES2237 SYSTEM PLAN EXHIBIT LEVEL 2
ES2239 SYSTEM PLAN EXHIBIT LEVEL 2
ES2240 SYSTEM PLAN EXHIBIT LEVEL 2
ES2241 SYSTEM PLAN EXHIBIT LEVEL 2
ES2242 SYSTEM PLAN EXHIBIT LEVEL 2
ES2243 SYSTEM PLAN EXHIBIT LEVEL 2
ES2244 SYSTEM PLAN EXHIBIT LEVEL 2
ES2245 SYSTEM PLAN EXHIBIT LEVEL 2
ES2252 SYSTEM PLAN EXHIBIT LEVEL 2
ES2253 SYSTEM PLAN EXHIBIT LEVEL 2
ES2254 SYSTEM PLAN EXHIBIT LEVEL 2
ES2255 SYSTEM PLAN EXHIBIT LEVEL 2
ES2256 SYSTEM PLAN EXHIBIT LEVEL 2
ES2257 SYSTEM PLAN EXHIBIT LEVEL 2
ES2258 SYSTEM PLAN EXHIBIT LEVEL 2
ES2259 SYSTEM PLAN EXHIBIT LEVEL 2
ES2260 SYSTEM PLAN EXHIBIT LEVEL 2
ES2261 SYSTEM PLAN EXHIBIT LEVEL 2
ES2262 SYSTEM PLAN EXHIBIT LEVEL 2
ES2263 SYSTEM PLAN EXHIBIT LEVEL 2
ES2264 SYSTEM PLAN EXHIBIT LEVEL 2
ES2265 SYSTEM PLAN EXHIBIT LEVEL 2
ES2266 SYSTEM PLAN EXHIBIT LEVEL 2
ES2267 SYSTEM PLAN EXHIBIT LEVEL 2
ES2268
SYSTEM PLAN EXHIBIT LEVEL
ES2269
SYSTEM PLAN EXHIBIT LEVEL
ES2270
SYSTEM PLAN EXHIBIT LEVEL
ES2271
SYSTEM PLAN EXHIBIT LEVEL
ES2272
SYSTEM PLAN EXHIBIT LEVEL
ES2273
SYSTEM PLAN EXHIBIT LEVEL
ES2275
SYSTEM PLAN EXHIBIT LEVEL
ES2278
SYSTEM PLAN EXHIBIT LEVEL
ES2280
SYSTEM PLAN EXHIBIT LEVEL
ESD2202 SYSTEM DEMO PLAN EXHIBIT LEVEL 2
ESD2201 SYSTEM DEMO PLAN EXHIBIT LEVEL 2
ESD2204 SYSTEM DEMO PLAN EXHIBIT LEVEL 2
ESD2203 SYSTEM DEMO PLAN EXHIBIT LEVEL 2
ESD2205 SYSTEM DEMO PLAN EXHIBIT LEVEL 2
ESD2206 SYSTEM DEMO PLAN EXHIBIT LEVEL 2
ESD2207 SYSTEM DEMO PLAN EXHIBIT LEVEL 2
ESD2208 SYSTEM DEMO PLAN EXHIBIT LEVEL 2
ESD2209 SYSTEM DEMO PLAN EXHIBIT LEVEL 2
ESD2210 SYSTEM DEMO PLAN EXHIBIT LEVEL 2
ESD2211 SYSTEM DEMO PLAN EXHIBIT LEVEL 2
ESD2212 SYSTEM DEMO PLAN EXHIBIT LEVEL 2
ESD2213 SYSTEM DEMO PLAN EXHIBIT LEVEL 2
ESD2214 SYSTEM DEMO PLAN EXHIBIT LEVEL 2
ESD2215 SYSTEM DEMO PLAN EXHIBIT LEVEL 2
ESD2216 SYSTEM DEMO PLAN EXHIBIT LEVEL 2
ESD2217 SYSTEM DEMO PLAN EXHIBIT LEVEL 2
ESD2218 SYSTEM DEMO PLAN EXHIBIT LEVEL 2
ESD2219 SYSTEM DEMO PLAN EXHIBIT LEVEL 2
ESD2220 SYSTEM DEMO PLAN EXHIBIT LEVEL 2
ESD2221 SYSTEM DEMO PLAN EXHIBIT LEVEL 2
ESD2222 SYSTEM DEMO PLAN EXHIBIT LEVEL 2
ESD2223 SYSTEM DEMO PLAN EXHIBIT LEVEL 2
ESD2234 SYSTEM DEMO PLAN EXHIBIT LEVEL 2
ES3234 SYSTEM PLAN EXHIBIT LEVEL 3
ES3235 SYSTEM PLAN EXHIBIT LEVEL 3
ES3236 SYSTEM PLAN EXHIBIT LEVEL 3
ES3237 SYSTEM PLAN EXHIBIT LEVEL 3
ES3238 SYSTEM PLAN EXHIBIT LEVEL 3
ES3239 SYSTEM PLAN EXHIBIT LEVEL 3
ES3241 SYSTEM PLAN EXHIBIT LEVEL 3
ES3242 SYSTEM PLAN EXHIBIT LEVEL 3
ES3243 SYSTEM PLAN EXHIBIT LEVEL 3
ES3244 SYSTEM PLAN EXHIBIT LEVEL 3
ES3245 SYSTEM PLAN EXHIBIT LEVEL 3
ES3246 SYSTEM PLAN EXHIBIT LEVEL 3
ES3252 SYSTEM PLAN EXHIBIT LEVEL 3
ES3253 SYSTEM PLAN EXHIBIT LEVEL 3
ES3254 SYSTEM PLAN EXHIBIT LEVEL 3
ES3255 SYSTEM PLAN EXHIBIT LEVEL 3
ES3256 SYSTEM PLAN EXHIBIT LEVEL 3
ES3257 SYSTEM PLAN EXHIBIT LEVEL 3
ES3258 SYSTEM PLAN EXHIBIT LEVEL 3
ES3259 SYSTEM PLAN EXHIBIT LEVEL 3
ES3260 SYSTEM PLAN EXHIBIT LEVEL 3
ES3261 SYSTEM PLAN EXHIBIT LEVEL 3
ES3262 SYSTEM PLAN EXHIBIT LEVEL 3
ES3265 SYSTEM PLAN EXHIBIT LEVEL 3
ES3266 SYSTEM PLAN EXHIBIT LEVEL 3
ES3267 SYSTEM PLAN EXHIBIT LEVEL 3
ES3268 SYSTEM PLAN EXHIBIT LEVEL 3
ES3269 SYSTEM PLAN EXHIBIT LEVEL 3
ES3270 SYSTEM PLAN EXHIBIT LEVEL 3
ES3271 SYSTEM PLAN EXHIBIT LEVEL 3
ES3272 SYSTEM PLAN EXHIBIT LEVEL 3
ES3273 SYSTEM PLAN EXHIBIT LEVEL 3
ES3274 SYSTEM PLAN EXHIBIT LEVEL 3
ES3275 SYSTEM PLAN EXHIBIT LEVEL 3
ES3276 SYSTEM PLAN EXHIBIT LEVEL 3
ESD3201 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3202 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3204 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3203 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3205 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3206 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3207 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3208 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3209 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3210 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3211 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3212 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3213 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3214 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3215 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3218 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3219 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3220 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3221 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3222 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3223 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3234 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3235 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3237 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3238 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3239 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3241 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3242 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3243 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3244 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3245 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3246 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3247 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3248 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3252 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3253 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3254 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3255 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3256 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3257 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3258 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3259 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3260 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3261 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3262 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3265 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3266 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3267 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3268 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3269 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3270 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3272 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD3276 SYSTEM DEMO PLAN EXHIBIT LEVEL 3
ESD4202 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4201 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4203 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4204 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4205 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4206 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4207 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4208 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4209 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4210 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4211 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4212 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4213 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4214 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4215 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4216 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4217 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4218 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4219 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4220 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4221 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4222 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4223 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4224 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4225 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4226 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4227 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4228 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4229 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4230 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4231 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4232 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4233 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4234 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4235 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4236 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ESD4237 SYSTEM DEMOLITION PLAN EXHIBIT LEVEL 4
ES4201 SYSTEM PLAN EXHIBIT LEVEL 4
ES4202 SYSTEM PLAN EXHIBIT LEVEL 4
ES4203 SYSTEM PLAN EXHIBIT LEVEL 4
ES4204 SYSTEM PLAN EXHIBIT LEVEL 4
ES4205 SYSTEM PLAN EXHIBIT LEVEL 4
ES4206 SYSTEM PLAN EXHIBIT LEVEL 4
ES4207 SYSTEM PLAN EXHIBIT LEVEL 4
ES4208 SYSTEM PLAN EXHIBIT LEVEL 4
ES4209 SYSTEM PLAN EXHIBIT LEVEL 4
ES4210 SYSTEM PLAN EXHIBIT LEVEL 4
ES4211 SYSTEM PLAN EXHIBIT LEVEL 4
ES4212 SYSTEM PLAN EXHIBIT LEVEL 4
ES4213 SYSTEM PLAN EXHIBIT LEVEL 4
ES4214 SYSTEM PLAN EXHIBIT LEVEL 4
ES4215 SYSTEM PLAN EXHIBIT LEVEL 4
ES4216 SYSTEM PLAN EXHIBIT LEVEL 4
ES4217 SYSTEM PLAN EXHIBIT LEVEL 4
ES4218 SYSTEM PLAN EXHIBIT LEVEL 4
ES4219 SYSTEM PLAN EXHIBIT LEVEL 4
ES4220 SYSTEM PLAN EXHIBIT LEVEL 4
ES4221 SYSTEM PLAN EXHIBIT LEVEL 4
ES4222 SYSTEM PLAN EXHIBIT LEVEL 4
ES4223 SYSTEM PLAN EXHIBIT LEVEL 4
ES4224 SYSTEM PLAN EXHIBIT LEVEL 4
ES4225 SYSTEM PLAN EXHIBIT LEVEL 4
ES4226 SYSTEM PLAN EXHIBIT LEVEL 4
ES4227 SYSTEM PLAN EXHIBIT LEVEL 4
ES4228 SYSTEM PLAN EXHIBIT LEVEL 4
ES4229 SYSTEM PLAN EXHIBIT LEVEL 4
ES4230 SYSTEM PLAN EXHIBIT LEVEL 4
ES4231 SYSTEM PLAN EXHIBIT LEVEL 4
ES4232 SYSTEM PLAN EXHIBIT LEVEL 4
ES4233 SYSTEM PLAN EXHIBIT LEVEL 4
ES4234 SYSTEM PLAN EXHIBIT LEVEL 4
ES4235 SYSTEM PLAN EXHIBIT LEVEL 4
ES4236 SYSTEM PLAN EXHIBIT LEVEL 4
ES4237 SYSTEM PLAN EXHIBIT LEVEL 4
ESD501 DEMO SYSTEM BLOCK DIAGRAMS
ES501 SYSTEM RISER DIAGRAM
ES502 SYSTEM RISER DIAGRAM
ES503 SYSTEM RISER DIAGRAM
ES504 SYSTEM RISER DIAGRAM
ES801 SYSTEM DETAILS
ES802 SYSTEM DETAILS
ES803 SYSTEM DETAILS
Division Section Title Pages
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
011000 SUMMARY 4
012300 ALTERNATES 2
013300 SUBMITTAL PROCEDURES 4
014000 QUALITY REQUIREMENTS 6
017329 CUTTING AND PATCHING 4
017823 OPERATION AND MAINTENANCE DATA 6
017839 PROJECT RECORD DOCUMENTS 4
DIVISIONS 2 THRU 6 EXCLUDED
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
078400 PENETRATION FIRESTOPPING 10
DIVISION 08 - OPENINGS
081113
083800
087100
HOLLOW METAL DOORS AND FRAMES
TRAFFIC DOORS
DOOR HARDWARE
DIVISION 09 - PAINTING
099113
099123
EXTERIOR PAINTING
INTERIOR PAINTING
DIVISIONS 10 THRU 25 EXCLUDED
DIVISION 26 - ELECTRICAL
260500 COMMON WORK RESULTS FOR ELECTRICAL 6
260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 8
260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 6
260533 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS 12
260553 IDENTIFICATION OF ELECTRICAL SYSTEMS 8
262726 WIRING DEVICES 6
DIVISION 27 - COMMUNICATIONS
272626 DATA COMMUNICATIONS INTEGRATION 18
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
281310 ELECTRONIC ACCESS CONTROL SYSTEM 46
283111 ADDRESSABLE FIRE ALARM SYSTEM 28
Appendix
Orange County IT Standards
Standards and Guidelines for Door Access Control
END OF TABLE OF CONTENTS
Orange County Convention Center SUMMARY West Building Access Control System Replacement 011000
SUMMARY 011000 - 1
SECTION 011000 - SUMMARY
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes the following:
1. Work covered by the Contract Documents.
2. Use of premises.
3. Owner's occupancy requirements.
4. Work restrictions.
5. Specification formats and conventions.
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. The Work consists of the following:
1. The Work includes providing a complete access control system replacement for the West
Building Complex. Including but not limited to; cabinets, power supplies, card readers, door hardware, and circuiting for a complete operational system.
1.4 TYPE OF CONTRACT
A. Project will be constructed under a single prime contract.
1.5 USE OF PREMISES
A. General: Contractor shall have limited use of premises for construction operations as indicated on Drawings by the Contract limits.
B. Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of
Project site beyond areas in which the Work is indicated.
1. Owner Occupancy: Allow for Owner occupancy of Project site and use by the public.
2. Driveways and Entrances: Keep driveways, parking areas, loading areas, and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.
a. Schedule deliveries to minimize use of driveways and entrances.
SUMMARY 011000 - 2
b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
C. Use of Existing Building: Maintain existing building in a weathertight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.
D. Protect all existing equipment, finishes, etc. throughout construction phase. Ensure site cleanliness is maintained
1.6 OWNER'S OCCUPANCY REQUIREMENTS
A. Full Owner Occupancy: Owner will occupy site and existing building during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations. Maintain existing exits, unless otherwise indicated.
1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and authorities having jurisdiction.
2. Provide not less than 72 hours' notice to Owner of activities that will affect Owner's operations.
1.7 WORK RESTRICTIONS
A. On-Site Work Hours: Work shall be generally performed inside the existing building during normal business working hours of 6p.m. to 6 a.m., except otherwise indicated.
1. Weekend Hours: To be coordinated with Owner as needed to keep from obstructing
Owners occupancy during change out of equipment or any outage requirements.
2. Hours for Utility Shutdowns: to be coordinated with Owners Representative with a minimum of 72 hours required for shut down.
B. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
1. Notify Owner not less than 3 days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without Owner's written permission.
1.8 SPECIFICATION FORMATS AND CONVENTIONS
A. Specification Format: The Specifications are organized into Divisions and Sections using the
50-division format and CSI/CSC's "MasterFormat" numbering system.
1. Section Identification: The Specifications use Section numbers and titles to help cross-referencing in the Contract Documents. Sections in the Project Manual are in numeric sequence; however, the sequence is incomplete because all available Section numbers are
SUMMARY 011000 - 3
not used. Consult the table of contents at the beginning of the Project Manual to determine numbers and names of Sections in the Contract Documents.
2. Division 01: Sections in Division 01 govern the execution of the Work of all Sections in the Specifications.
B. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.
These conventions are as follows:
1. Abbreviated Language: Language used in the Specifications and other Contract
Documents is abbreviated. Words and meanings shall be interpreted as appropriate.
Words implied, but not stated, shall be inferred as the sense requires. Singular words shall be interpreted as plural, and plural words shall be interpreted as singular where applicable as the context of the Contract Documents indicates.
2. Imperative mood and streamlined language are generally used in the Specifications.
Requirements expressed in the imperative mood are to be performed by Contractor.
Occasionally, the indicative or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirectly by Contractor or by others when so noted.
a. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
PART 2 - PRODUCTS (See Drawings)
PART 3 - EXECUTION (See Drawings)
END OF SECTION 01 10 00
SUMMARY 011000 - 4
PAGE INTENTIONALLY LEFT BLANK
Orange County Convention Center ALTERNATES West Building Access Control System Replacement 012300
ALTERNATES 012300 - 1
SECTION 012300 - ALTERNATES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative and procedural requirements for alternates.
1.3 DEFINITIONS
A. Additive: An amount proposed by bidders and stated on the Bid Form for certain work defined in the Bidding Requirements that may be added to or deducted from the Base Bid amount if
Owner decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.
1. The cost or credit for each additive is the net addition to or deduction from the Contract
Sum to incorporate additive into the Work. No other adjustments are made to the
Contract Sum.
1.4 PROCEDURES
A. Coordination: Modify or adjust affected adjacent work as necessary to completely integrate work of the additive into Project.
1. Include as part of each additive, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of additive.
B. Notification: Immediately following award of the Contract, notify each party involved, in writing, of the status of each additive. Indicate if additives have been accepted, rejected, or deferred for later consideration. Include a complete description of negotiated modifications to additives.
C. Execute accepted additives under the same conditions as other work of the Contract.
D. Schedule: A Schedule of Additives is included at the end of this Section. Specification
Sections referenced in schedule contain requirements for materials necessary to achieve the work described under each additive.
Orange County Convention Center ALTERNATES West Building Access Control System Replacement 012300
ALTERNATES 012300 - 2
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 012300
Orange County Convention Center SUBMITTAL PROCEDURES West Building Access Control System Replacement 013300
SUBMITTAL PROCEDURES 013300 - 1
SECTION 013300 - SUBMITTAL PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative and procedural requirements for submitting Shop
Drawings, Product Data, Samples, and other submittals.
1.3 DEFINITIONS
A. Action Submittals: Written and graphic information that requires Owner’s responsive action.
B. Informational Submittals: Written information that does not require Engineer’s and Owner’s responsive action. Submittals may be rejected for not complying with requirements.
1.4 SUBMITTAL PROCEDURES
A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.
2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.
a. Owner and Engineer’s reserve the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
B. Submittals Schedule: All submittals shall be received by the Owner within 14 days of notice to proceed. Submittals shall be approved prior to commencement of work.
C. Processing Time: Allow enough time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Engineers receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.
1. Initial Review: Allow 15 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. The Owner will advise Contractor when a submittal being processed must be delayed for coordination.
SUBMITTAL PROCEDURES 013300 - 2
2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal.
3. Resubmittal Review: Allow 15 days for review of each resubmittal.
4. Sequential Review: Where sequential review of submittals by Architect's consultants, Owner, or other parties is indicated, allow 21 days for initial review of each submittal.
D. Identification: Place a permanent label or title block on each submittal for identification.
1. Indicate name of firm or entity that prepared each submittal on label or title block.
2. Provide a space approximately 6 by 8 inches (150 by 200 mm) on label or beside title block to record Contractor's review and approval markings and action taken by Engineer.
3. Include the following information on label for processing and recording action taken:
a. Project name.
b. Date.
c. Name and address of Engineer.
d. Name and address of Contractor.
e. Name and address of subcontractor.
f. Name and address of supplier.
g. Name of manufacturer.
h. Submittal number or other unique identifier, including revision identifier.
1) Submittal number shall use Specification Section number followed by a decimal point and then a sequential number (e.g., 06100.01). Resubmittals shall include an alphabetic suffix after another decimal point (e.g., 06100.01.A).
E. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.
1. Note date and content of previous submittal.
2. Note date and content of revision in label or title block and clearly indicate extent of revision.
F. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.
PART 2 - PRODUCTS
2.1 ACTION SUBMITTALS
A. General: Prepare and submit Action Submittals required by individual Specification Sections.
B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.
2. Mark each copy of each submittal to show which products and options are applicable.
SUBMITTAL PROCEDURES 013300 - 3
3. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer's installation instructions.
d. Standard color charts.
e. Manufacturer's catalog cuts.
f. Wiring diagrams showing factory-installed wiring.
g. Printed performance curves.
h. Operational range diagrams.
i. Mill reports.
j. Standard product operation and maintenance manuals.
k. Compliance with specified referenced standards.
l. Testing by recognized testing agency.
m. Application of testing agency labels and seals.
n. Notation of coordination requirements.
4. Submit Product Data before or concurrent with Samples.
5. Number of Copies: Submit 7 copies of Product Data, unless otherwise indicated.
Engineer will return 6 copies. Mark up and retain one returned copy as a Project Record
Document.
C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base
Shop Drawings on reproductions of the Contract Documents or standard printed data
1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:
a. Dimensions.
b. Identification of products.
c. Fabrication and installation drawings.
d. Roughing-in and setting diagrams.
e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.
f. Shopwork manufacturing instructions.
g. Templates and patterns.
h. Schedules.
i. Design calculations.
j. Compliance with specified standards.
k. Notation of coordination requirements.
l. Notation of dimensions established by field measurement.
m. Relationship to adjoining construction clearly indicated.
n. Seal and signature of professional engineer if specified.
o. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.
2. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit Shop
Drawings on sheets at least 8-1/2 by 11 inches (215 by 280 mm) but no larger than 30 by
40 inches (750 by 1000 mm).
SUBMITTAL PROCEDURES 013300 - 4
PART 3 - EXECUTION
3.1 CONTRACTOR'S REVIEW
A. Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Engineer.
B. Approval Stamp: Stamp each submittal with a uniform, approval stamp.
3.2 ENGINEER’S ACTION
A. General: Engineer will not review submittals that do not bear Contractor's approval stamp and will return them without action.
B. Action Submittals: Engineer will review each submittal, make marks to indicate corrections or modifications required, and return it.
C. Partial submittals are not acceptable, will be considered nonresponsive, and will be returned without review.
D. Submittals not required by the Contract Documents may not be reviewed and may be discarded.
END OF SECTION 013300
Orange County Convention Center QUALITY REQUIREMENTS West Building Access Control System Replacement 014000
QUALITY REQUIREMENTS 014000 - 1
SECTION 014000 - QUALITY REQUIREMENTS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative and procedural requirements for quality assurance and quality control.
B. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the
Contract Document requirements.
1. Specific quality-assurance and -control requirements for individual construction activities are specified in the Sections that specify those activities. Requirements in those Sections may also cover production of standard products.
2. Specified tests, inspections, and related actions do not limit Contractor's other quality-assurance and -control procedures that facilitate compliance with the Contract Document requirements.
3. Requirements for Contractor to provide quality-assurance and -control services required by Engineer or authorities having jurisdiction are not limited by provisions of this
Section.
1.3 DEFINITIONS
A. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution of the Work to guard against defects and deficiencies and substantiate that proposed construction will comply with requirements.
B. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that actual products incorporated into the Work and completed construction comply with requirements. Services do not include contract enforcement activities performed by Engineer.
C. Product Testing: Tests and inspections that are performed by an NRTL, an NVLAP, or a testing agency qualified to conduct product testing and acceptable to authorities having jurisdiction, to establish product performance and compliance with industry standards.
D. Source Quality-Control Testing: Tests and inspections that are performed at the source, i.e., plant, mill, factory, or shop.
QUALITY REQUIREMENTS 014000 - 2
E. Field Quality-Control Testing: Tests and inspections that are performed on-site for installation of the Work and for completed Work.
F. Testing Agency: An entity engaged to perform specific tests, inspections, or both. Testing laboratory shall mean the same as testing agency.
G. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an employee, Subcontractor, or Sub-subcontractor, to perform a particular construction operation, including installation, erection, application, and similar operations.
1. Using a term such as "carpentry" does not imply that certain construction activities must be performed by accredited or unionized individuals of a corresponding generic name, such as "carpenter." It also does not imply that requirements specified apply exclusively to tradespeople of the corresponding generic name.
1.4 CONFLICTING REQUIREMENTS
A. General: If compliance with two or more standards is specified and the standards establish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement. Refer uncertainties and requirements that are different, but apparently equal, to Architect for a decision before proceeding.
B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits.
To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to Architect for a decision before proceeding.
1.5 SUBMITTALS
A. Schedule of Tests and Inspections: Prepare in tabular form and include the following:
1. Specification Section number and title.
2. Description of test and inspection.
3. Identification of applicable standards.
4. Identification of test and inspection methods.
5. Number of tests and inspections required.
6. Time schedule or time span for tests and inspections.
7. Entity responsible for performing tests and inspections.
8. Requirements for obtaining samples.
9. Unique characteristics of each quality-control service.
B. Reports: Prepare and submit certified written reports that include the following:
1. Date of issue.
2. Project title and number.
3. Name, address, and telephone number of testing agency.
4. Dates and locations of samples and tests or inspections.
QUALITY REQUIREMENTS 014000 - 3
5. Names of individuals making tests and inspections.
6. Description of the Work and test and inspection method.
7. Identification of product and Specification Section.
8. Complete test or inspection data.
9. Test and inspection results and an interpretation of test results.
10. Record of temperature and weather conditions at time of sample taking and testing and inspecting.
11. Comments or professional opinion on whether tested or inspected Work complies with the Contract Document requirements.
12. Name and signature of laboratory inspector.
13. Recommendations on retesting and reinspecting.
C. Permits, Licenses, and Certificates: For Owner's records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of the Work.
1.6 QUALITY ASSURANCE
A. General: Qualifications paragraphs in this Article establish the minimum qualification levels required; individual Specification Sections specify additional requirements.
B. Installer Qualifications: A firm or individual experienced in installing, erecting, or assembling work similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful in-service performance.
C. Manufacturer Qualifications: A firm experienced in manufacturing products or systems similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.
D. Fabricator Qualifications: A firm experienced in producing products similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.
E. Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing engineering services of the kind indicated. Engineering services are defined as those performed for installations of the system, assembly, or product that are similar to those indicated for this
Project in material, design, and extent.
F. Specialists: Certain sections of the Specifications require that specific construction activities shall be performed by entities who are recognized experts in those operations. Specialists shall satisfy qualification requirements indicated and shall be engaged for the activities indicated.
1. Requirement for specialists shall not supersede building codes and regulations governing the Work.
G. Testing Agency Qualifications: An NRTL, an NVLAP, or an independent agency with the experience and capability to conduct testing and inspecting indicated, as documented according
QUALITY REQUIREMENTS 014000 - 4
to ASTM E 548; and with additional qualifications specified in individual Sections; and where required by authorities having jurisdiction, that is acceptable to authorities.
1. NRTL: A nationally recognized testing laboratory according to 29 CFR 1910.7.
2. NVLAP: A testing agency accredited according to NIST's National Voluntary
Laboratory Accreditation Program.
H. Factory-Authorized Service Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to inspect installation of manufacturer's products that are similar in material, design, and extent to those indicated for this
Project.
I. Preconstruction Testing: Where testing agency is indicated to perform preconstruction testing for compliance with specified requirements for performance and test methods, comply with the following:
1. Contractor responsibilities include the following:
a. Provide test specimens representative of proposed products and construction.
b. Submit specimens in a timely manner with sufficient time for testing and analyzing results to prevent delaying the Work.
c. Provide sizes and configurations of test assemblies, mockups, and laboratory mockups to adequately demonstrate capability of products to comply with performance requirements.
d. Build site-assembled test assemblies and mockups using installers who will perform same tasks for Project.
e. Build laboratory mockups at testing facility using personnel, products, and methods of construction indicated for the completed Work.
f. When testing is complete, remove test specimens, assemblies, mockups, and laboratory mockups; do not reuse products on Project.
1.7 QUALITY CONTROL
A. Owner Responsibilities: Where quality-control services are indicated as Owner's responsibility, Owner will engage a qualified testing agency to perform these services.
1. Owner will furnish Contractor with names, addresses, and telephone numbers of testing agencies engaged and a description of types of testing and inspecting they are engaged to perform.
2. Costs for retesting and reinspecting construction that replaces or is necessitated by work that failed to comply with the Contract Documents will be charged to Contractor, and the
Contract Sum will be adjusted by Change Order.
B. Tests and inspections not explicitly assigned to Owner are Contractor's responsibility. Unless otherwise indicated, provide quality-control services specified and those required by authorities having jurisdiction. Perform quality-control services required of Contractor by authorities having jurisdiction, whether specified or not.
1. Where services are indicated as Contractor's responsibility, engage a qualified testing agency to perform these quality-control services.
QUALITY REQUIREMENTS 014000 - 5
a. Contractor shall not employ same entity engaged by Owner, unless agreed to in writing by Owner.
2. Where quality-control services are indicated as Contractor's responsibility, submit a certified written report, in duplicate, of each quality-control service.
3. Testing and inspecting requested by Contractor and not required by the Contract
Documents are Contractor's responsibility.
4. Submit additional copies of each written report directly to authorities having jurisdiction, when they so direct.
C. Manufacturer's Field Services: Where indicated, engage a factory-authorized service representative to inspect field-assembled components and equipment installation, including service connections. Report results in writing as specified in Division 01 Section "Submittal
Procedures."
D. Retesting/Reinspecting: Regardless of whether original tests or inspections were Contractor's responsibility, provide quality-control services, including retesting and reinspecting, for construction that replaced Work that failed to comply with the Contract Documents.
E. Testing Agency Responsibilities: Cooperate with Engineer and Contractor in performance of duties. Provide qualified personnel to perform required tests and inspections.
1. Notify Engineer and Contractor promptly of irregularities or deficiencies observed in the
Work during performance of its services.
2. Determine the location from which test samples will be taken and in which in-situ tests are conducted.
3. Conduct and interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from requirements.
4. Submit a certified written report, in duplicate, of each test, inspection, and similar quality-control service through Contractor.
5. Do not release, revoke, alter, or increase the Contract Document requirements or approve or accept any portion of the Work.
6. Do not perform any duties of Contractor.
F. Associated Services: Cooperate with agencies performing required tests, inspections, and similar quality-control services, and provide reasonable auxiliary services as requested. Notify agency sufficiently in advance of operations to permit assignment of personnel. Provide the following:
1. Access to the Work.
2. Incidental labor and facilities necessary to facilitate tests and inspections.
3. Adequate quantities of representative samples of materials that require testing and inspecting. Assist agency in obtaining samples.
4. Facilities for storage and field curing of test samples.
5. Delivery of samples to testing agencies.
6. Preliminary design mix proposed for use for material mixes that require control by testing agency.
7. Security and protection for samples and for testing and inspecting equipment at Project site.
QUALITY REQUIREMENTS 014000 - 6
G. Coordination: Coordinate sequence of activities to accommodate required quality-assurance and -control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspecting.
1. Schedule times for tests, inspections, obtaining samples, and similar activities.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 REPAIR AND PROTECTION
A. General: On completion of testing, inspecting, sample taking, and similar services, repair damaged construction and restore substrates and finishes.
1. Provide materials and comply with installation requirements specified in other
Specification Sections. Restore patched areas and extend restoration into adjoining areas with durable seams that are as invisible as possible.
B. Protect construction exposed by or for quality-control service activities.
C. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality-control services.
END OF SECTION 014000
Orange County Convention Center CUTTING AND PATCHING West Building Access Control System Replacement 017329
CUTTING AND PATCHING 017329 - 1
SECTION 017329 - CUTTING AND PATCHING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes procedural requirements for cutting and patching.
1.3 DEFINITIONS
A. Cutting: Removal of in-place construction necessary to permit installation or performance of other Work.
B. Patching: Fitting and repair work required to restore surfaces to original conditions after installation of other Work.
1.4 QUALITY ASSURANCE
A. Structural Elements: Do not cut and patch structural elements in a manner that could change their load-carrying capacity or load-deflection ratio.
B. Operational Elements: Do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended or that results in increased maintenance or decreased operational life or safety.
C. Miscellaneous Elements: Do not cut and patch miscellaneous elements or related components in a manner that could change their load-carrying capacity, that results in reducing their capacity to perform as intended, or that results in increased maintenance or decreased operational life or safety
D. Visual Requirements: Do not cut and patch construction in a manner that results in visual evidence of cutting and patching. Do not cut and patch construction exposed on the exterior or in occupied spaces in a manner that would, in Architect's opinion, reduce the building's aesthetic qualities. Remove and replace construction that has been cut and patched in a visually unsatisfactory manner.
E. Cutting and Patching Conference: Before proceeding, meet at Project site with parties involved in cutting and patching, including mechanical and electrical trades. Review areas of potential interference and conflict. Coordinate procedures and resolve potential conflicts before proceeding.
CUTTING AND PATCHING 017329 - 2
1.5 WARRANTY
A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during cutting and patching operations, by methods and with materials so as not to void existing warranties.
PART 2 - PRODUCTS
2.1 MATERIALS
A. General: Comply with requirements specified in other Sections.
B. In-Place Materials: Use materials identical to in-place materials. For exposed surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent possible.
1. If identical materials are unavailable or cannot be used, use materials that, when installed, will match the visual and functional performance of in-place materials.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine surfaces to be cut and patched and conditions under which cutting and patching are to be performed.
1. Compatibility: Before patching, verify compatibility with and suitability of substrates, including compatibility with in-place finishes or primers.
2. Proceed with installation only after unsafe or unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Temporary Support: Provide temporary support of Work to be cut.
B. Protection: Protect in-place construction during cutting and patching to prevent damage.
Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations.
C. Adjoining Areas: Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas.
D. Existing Utility Services and Mechanical/Electrical Systems: Where existing services/systems are required to be removed, relocated, or abandoned, bypass such services/systems before cutting to prevent interruption to occupied areas.
CUTTING AND PATCHING 017329 - 3
3.3 PERFORMANCE
A. General: Employ skilled workers to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time, and complete without delay.
1. Cut in-place construction to provide for installation of other components or performance of other construction, and subsequently patch as required to restore surfaces to their original condition.
B. Cutting: Cut in-place construction by sawing, drilling, breaking, chipping, grinding, and similar operations, including excavation, using methods least likely to damage elements retained or adjoining construction. If possible, review proposed procedures with original Installer; comply with original Installer's written recommendations.
1. In general, use hand or small power tools designed for sawing and grinding, not hammering and chopping. Cut holes and slots as small as possible, neatly to size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.
2. Finished Surfaces: Cut or drill from the exposed or finished side into concealed surfaces.
3. Concrete and Masonry: Cut using a cutting machine, such as an abrasive saw or a diamond-core drill.
4. Excavating and Backfilling: Comply with requirements in applicable Division 31
Sections where required by cutting and patching operations.
5. Mechanical and Electrical Services: Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after cutting.
6. Proceed with patching after construction operations requiring cutting are complete.
C. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations following performance of other Work. Patch with durable seams that are as invisible as possible. Provide materials and comply with installation requirements specified in other
Sections.
1. Inspection: Where feasible, test and inspect patched areas after completion to demonstrate integrity of installation.
2. Exposed Finishes: Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing.
a. Clean piping, conduit, and similar features before applying paint or other finishing materials.
b. Restore damaged pipe covering to its original condition.
3. Floors and Walls: Where walls or partitions that are removed extend one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform finish, color, texture, and appearance. Remove in-place floor and wall coverings and replace with new materials, if necessary, to achieve uniform color and appearance.
a. Where patching occurs in a painted…
This is the start of the file's text. The full file is on GovTribe.