This document comprises OCCC Capital Planning Operating Protocols for the Orange County Convention Center in Florida, providing standardized procedures for fire protection system work during capital projects. The protocols establish four distinct procedures for fire alarm company technicians: system installation, program downloading, pretesting, and final testing with the Authority Having Jurisdiction (AHJ). Each procedure requires OCCC Project Management Team approval and mandates coordination between the designated fire alarm company, prime contract holders, OCCC Capital Planning, and OCCC Security/Life Safety personnel. All procedures necessitate technician check-in with the prime contract holder, notification of OCCC Capital Planning prior to work commencement, confirmation of system status at the Technical Services Workshop (TSW) command center, placement of the system in test mode, documentation of disabled points, verification that system status remains equal to or better than pre-work conditions, and submission of signed debrief reports to OCCC Capital Planning. The protocols also address sprinkler system drain and refill procedures, requiring contractors to submit email requests with at least 48-hour notice specifying date, time, duration, affected locations, and associated riser points for disabling, with scheduling preference for Tuesday through Thursday to accommodate Life Safety staffing.
The sprinkler system protocols mandate contractor verification of point accuracy to prevent false alarms, Project Manager coordination to confirm no event conflicts, and potential meetings between contractors and OCCC Life Safety Representatives for large-area zones. Prior to work commencement, the Project Manager or Project Coordinator must contact OCCC Security to confirm point disabling and OCCC Life Safety to verify line drainage. A Fire Watch must be maintained throughout the system impairment period in accordance with Supplemental Condition No. 9. Upon work completion, contractors must pressure test the system for a minimum of one hour using air to check for leaks, notify the Project Manager or Coordinator, and remain onsite until Life Safety clearance is received confirming work completion and system restoration.
View the file
Other files for this state and local contract opportunity
Show all 50
West Building Access Control System Replacement has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
V e r s i o n 1 - 8 / 1 9 / 2 0 2 4 P a g e 1 | 3
OCCC Fire Protection System Protocol for Capital Planning Projects
Location: Orange County Convention Center
Procedure for installing:
1. After approval from OCCC Project Management Team, the OCCC designated Fire Alarm
Company technicians arrive onsite.
2. The OCCC designated Fire Alarm Company technician checks in with prime contract holder.
3. The prime contract holder is to notify OCCC Capital Planning prior to the work being performed. Capital Planning staff will inform OCCC Security/Life safety.
4. The OCCC Designated Fire Alarm Company technician arrives at the TSW in command and confirms number of existing alarms, troubles, supervisory, and bypasses on the system and documents in a debrief report.
5. The OCCC Designated Fire Alarm Company technician notifies OCCC Security to put the system in test until X:XX as needed.
6. The OCCC Designated Fire Alarm Company technician disables any points needed and document disabled points.
7. The OCCC Designated Fire Alarm Company technician starts installation of scope.
8. The OCCC Designated Fire Alarm Company technician will reenable any disabled points disabled by
The OCCC Designated Fire Alarm Company.
9. Once the scope of work is complete The OCCC Designated Fire Alarm Company technician will verify the system is left with the same or lesser number of alarms, troubles, supervisory, or bypasses on the system then when started and documents them on a debrief report.
10. The OCCC Designated Fire Alarm Company technician notifies OCCC Security to take the system off test prior to leaving site.
11. A debrief report that includes the system status will be signed and a copy left with the prime contract holder to be submitted to OCCC Capital Planning.
12. The Prime contract holder is responsible for notifying OCCC Capital Planning that the work is complete.
Procedure for downloading a program:
1. After approval from OCCC Project Management Team, the OCCC designated Fire Alarm Company technicians arrive onsite.
2. The OCCC Designated Fire Alarm Company must provide at least two technicians, one technician must remain at the TSW and one or more technician(s) performing the download at the specific node(s).
3. The OCCC Designated Fire Alarm Company technician checks in with prime contract holder.
4. The prime contract holder is to notify OCCC Capital Planning prior to the work being performed.
Capital Planning staff will inform OCCC Security/Life safety.
5. The OCCC Designated Fire Alarm Company technician arrives at the TSW in command and confirms number of existing alarms, troubles, supervisory, and bypasses on the system and documents on a debrief report.
6. The OCCC Designated Fire Alarm Company technician also confirms all panels being downloaded are communicating with the network and no known troubles are found that will hinder the ability to download.
7. The OCCC Designated Fire Alarm Company technician notifies OCCC Security to put the system in test until X;XX as needed.
8. The OCCC Designated Firm Alarm Company technician turns on any bypasses as needed.
V e r s i o n 1 - 8 / 1 9 / 2 0 2 4 P a g e 2 | 3
9. The OCCC Designated Fire Alarm Company technician completes the download at each panel and does not move on to the next until the panel is completely back up on the network.
10. Once the scope of work is complete The OCCC Designated Fire Alarm Company technician will check the system is left with the same or lesser number of alarms, troubles, supervisory, or bypasses on the system then when started and documents them on a debrief report.
11. The OCCC Designated Fire Alarm Company technician will turn off any bypasses.
12. The OCCC Designated Fire Alarm Company technician notifies OCCC Security to take the system off test prior to leaving site.
13. A debrief report that includes the system status will be signed and a copy left with the prime contract
14. The Prime contract holder is responsible for notifying OCCC Capital Planning that the work is complete.
Procedure for the OCCC Designated Fire Alarm Company pretesting:
Company technicians arrive onsite.
2. The OCCC Designated Fire Alarm Company must provide at least two technicians, one technician must remain at the TSW and one or more technician(s) performing the testing of the device(s).
3. The OCCC Designated Fire Alarm Company technician checks in with prime contract holder.
4. The prime contract holder is to notify OCCC Capital Planning prior to the work being performed. Capital
Planning staff will inform OCCC Security/Life safety.
5. The OCCC Designated Fire Alarm Company technicians arrive at the TSW in command and confirm the number of existing alarms, troubles, supervisory, and bypasses on the system and documents on a debrief report.
6. The OCCC Designated Fire Alarm Company technician notifies OCCC Security to put the system in test until X:XX as needed.
7. The OCCC Designated Fire Alarm Company technician turns on any bypasses as needed.
8. The OCCC Designated Fire Alarm Company technician starts required testing.
9. When testing the OCCC Designated Fire Alarm Company technician confirms points triggered are received at the TSW in command center.
10. Once the scope of work is complete the OCCC Designated Fire Alarm Company technician will check the system is left with the same or lesser number of alarms, troubles, supervisory, or bypasses on the system then when started and documents them on a debrief report.
11. The OCCC Designated Fire Alarm Company technician will turn off any bypasses.
12. The OCCC Designated Fire Alarm Company technician notifies OCCC Security to take the system off test prior to leaving site.
13. A debrief report that includes the system status will be signed and a copy left with the prime contract
14. The Prime contract holder is responsible for notifying OCCC Capital Planning that the work is complete.
Procedure for final testing with the AHJ:
Company technicians arrive onsite.
2. The OCCC Designated Fire Alarm Company must provide at least two technicians, one technician must remain at the TSW and one or more technician(s) performing the testing of the device(s).
3. The OCCC Designated Fire Alarm Company technician checks in with prime contract holder.
4. The prime contract holder is to notify OCCC Capital Planning prior to the work being performed. Capital
Planning staff will inform OCCC Security/Life safety.
5. The OCCC Designated Fire Alarm Company technicians arrive at the TSW in command and confirm the number of existing alarms, troubles, supervisory, and bypasses on the system and documents on a debrief report.
6. The OCCC Designated Fire Alarm Company technician notifies OCCC Security to put the system in test until X:XX as needed.
7. The OCCC Designated Fire Alarm Company technician turns on any bypasses as needed.
8. The OCCC Designated Fire Alarm Company technician starts required testing with AHJ.
9. When testing the OCCC Designated Fire Alarm Company technician confirms points triggered are received at the TSW in command center.
10. Once the scope of work is complete the OCCC Designated Fire Alarm Company technician will check
V e r s i o n 1 - 8 / 1 9 / 2 0 2 4 P a g e 3 | 3 the system is left with the same or lesser number of alarms, troubles, supervisory, or bypasses on the system then when started and documents them on a debrief report.
11. The OCCC Designated Fire Alarm Company technician will turn off any bypasses.
12. The OCCC Designated Fire Alarm Company technician notifies OCCC Security to take the system off test prior to leaving site.
13. A debrief report that includes the system status will be signed and a copy left with the prime contract
14. The Prime contract holder is responsible for notifying OCCC Capital Planning that the work is complete.
1. Summary
2. Procedure
OCCC-CIP
CAPITAL PLANNING OPERATING PROTOCOLS
Version V 1.02
Approval Date 06.16.25
Review Date
6/16/25
Title Protocol for Sprinkler System Drains & Refills
• The protocols below provide details for requesting Sprinkler System Drains & Refills at the Orange County Convention Center Campus. The protocol applies for fire suppression work.
• Contractor/vendor provides an email request (at least 48-hour notice) to the Capital Planning Project Manager/Assistant Project Manager for a fire system sprinkler shut-down/refill. The email should include the following details:
a. Subject line should read, “REQUEST FOR SPRINKLER SYSTEM DRAIN & REFILL”.
b. Date, time and duration of the drain-down and time of system refill.
c. Location and areas affected by the drain-down.
d. Specify the associated points at the riser for disabling. (Contractor must thoroughly vet the points provided to ensure they accurately reflect the zone covered to prevent triggering the alarms. The same information provided will be used by Life Safety/ Security for each shut-down and therefore, accuracy is key).
• The Capital Planning Project Manager/Assistant Project Manager (PM/APM) should verify there are no conflicts with event activity on the date(s) requested. Please consider scheduling Tuesday thru Thursday as there is only one OCCC Life Safety Representative available on the Mondays and Fridays.
• Once the date(s)/times are cleared, the PM/APM should email a formal request for system shutdown/refill.
• If the zone requested covers a large area, it may be helpful for the Project Manager to schedule a meeting with the Contractor and OCCC Life Safety Representative to review the points requested for disabling.
• On the day of the shutdown, prior to any work commencing, the PM/APM/Project Coordinator must contact OCCC Security to ensure all applicable points have been disabled.
Contact the OCCC Life Safety Representative to verify the lines are fully drained. Once clearance is provided, the Contractor will be notified by the PM/APM/Project Coordinator that you have been cleared to start work.
• A Fire Watch must be provided in accordance with Supplemental Condition No. 9 while the system is impaired.
• When the work is completed, the Contractor must pressure test the system for a minimum of one hour, using either air to check for possible leaks.
• After the Contractor testing is completed, the contractor will notify the PM/APM/Coordinator. The CIP Representative follows up with the Life Safety Representative to confirm the work is completed (including pressure testing) and a system refill will be initiated, completed and building systems fully restored. The Contractor and Fire Watch Rep. must remain on-site until clearance is received from Life Safety Representative via the PM/APM/Coordinator.
OCCC CIP Operating Protocols for Sprinkler System Drains and Refills v1.01 02/10/202