Construction Plans for West Building Access Control System Replacement

This document comprises construction plans for the West Building Access Control System Replacement project (Y26-727) at the Orange County Convention Center in Orange County, Florida. The project involves the replacement, upgrade, and expansion of the existing door access control systems, specifically converting the West Building from a Pegasys access control system to a Lenel system while maintaining existing Lenel infrastructure. The scope encompasses electrical rooms, IDF rooms, mechanical rooms, catwalks, gates, and select perimeter doors throughout the facility, including installation of card readers, door hardware, electronic locks, surveillance integration, fire detection and alarm equipment, and structured cabling systems with Category 6 UTP and fiber optic backbone. A non-mandatory pre-bid conference and site visit are scheduled for March 10, 2026, from 9:00 a.m. to 1:00 p.m. at the Orange County Convention Center, West Concourse, Conference Room W323. Sealed bids are due by 4:00 p.m. EST with multiple submission deadline dates listed (April 2, 9, 16, and 23, 2026) submitted electronically through the OpenGov e-Procurement Platform. Questions must be submitted by Wednesday, March 18 or March 25, 2026, at 5:00 p.m. EST through the OpenGov question and answer module. Contractors must achieve Substantial Completion within 1,065 consecutive calendar days and Final Completion within 1,095 consecutive calendar days from the Official Notice to Proceed.

The estimated project cost is $14,775,652.00 on a lump sum basis, with mobilization costs capped at 5 percent of the estimated base bid total. Bids exceeding $100,000 require a bid bond of at least 10 percent of the estimated contract amount. Progress payments will be made at 95 percent of earned amounts with 5 percent retainage until completion exceeds 50 percent of the contract value, at which point retainage may be reduced at the Project Manager's discretion. Service Disabled Veteran businesses may receive a preference of 3 percent to 8 percent depending on bid amount; however, the contract will be awarded to the lowest responsive and responsible bidder. Respondents must demonstrate a minimum of three similar projects completed within the last twenty years involving access control systems in commercial facilities of at least 30,000 square feet, with at least one project in an active operational building, one including ADA-compliant door integration, and one with Fire Alarm System integration. All respondents must comply with E-Verify employment verification requirements, provide proof of applicable Florida contractor licenses, and submit various compliance certifications. Contractors and subcontractors must maintain appropriate state licensing (electrical, low-voltage, and fire alarm certification) and hold manufacturer certifications for Siemon communications cabling, Lenel access control systems, and Simplex fire alarms. Work is available seven days per week with contractor hours from 6:00 p.m. to 6:00 a.m., and the contractor must comply with strict fire protection and sprinkler system protocols, including 24/7 fire watch during any fire system shutdowns and 72-hour advance notice for service interruptions. The contractor must utilize the County's e-Builder program for all project communications and submittals at a cost of approximately $2,050 per year per license.

View the file

Other files for this state and local contract opportunity

Other files attached to West Building Access Control System Replacement, newest first.
File Type Posted
West_Building_Access_Control_System_Replacement_(Addendum_#6_Revision).pdf PDF
West_Building_Access_Control_System_Replacement_(Addendum_#4_Revision).pdf PDF
West_Building_Access_Control_System_Replacement_(Addendum_#3_Revision).pdf PDF
West_Building_Access_Control_System_Replacement_(Addendum_#1_Revision).pdf PDF
West_Building_Access_Control_System_Replacement_(Addendum_#1_Revision).pdf PDF
OCCC_West_Building_to_Pre-Con_Room_W323_Map_Contract_Y26-727-_Pre-Bid_031026.pdf PDF
OCCC_West_Building_to_Pre-Con_Room_W323_Map_Contract_Y26-727-_Pre-Bid_031026.pdf PDF
OCCC_West_Building_to_Pre-Con_Room_W323_Map_Contract_Y26-727-_Pre-Bid_031026.pdf PDF
OCCC_West_Building_to_Pre-Con_Room_W323_Map_Contract_Y26-727-_Pre-Bid_031026.pdf PDF
OCCC_West_Building_to_Pre-Con_Room_W323_Map_Contract_Y26-727-_Pre-Bid_031026.pdf PDF
Constr_Plans_-_Level_2_Combined.pdf PDF
0966-44_COMM2-00001_ReBID_Combined_Specifications.pdf PDF
Constr_Plans_-_Level_2_Combined.pdf PDF
Constr_Plans_-_Level_3_Combined.pdf PDF
Constr_Plans_-_Level_4_Combined.pdf PDF
0966-44_COMM2-00001_ReBID_OCCC_Fire_Protection.pdf PDF
Constr_Plans_-_Level_3_Combined.pdf PDF
Constr_Plans_-_Level_1_Combined.pdf PDF
Constr_Plans_-_Level_4_Combined.pdf PDF
0966-44_COMM2-00001_ReBID_Combined_Specifications.pdf PDF
0966-44_COMM2-00001_ReBID_OCCC_Fire_Protection.pdf PDF
03._OCCC_Special_Terms_Part_C.pdf PDF
Constr_Plans_-_Level_3_Combined.pdf PDF
0966-44_COMM2-00001_ReBID_Combined_Specifications.pdf PDF
0966-44_COMM2-00001_ReBID_OCCC_Fire_Protection.pdf PDF
Constr_Plans_-_Level_1_Combined.pdf PDF
Constr_Plans_-_Level_3_Combined.pdf PDF
04A._0966-44_ReBID_Layout_West_Building_Exterior_Doors.pdf PDF
Constr_Plans_-_Level_1_Combined.pdf PDF
03._OCCC_Special_Terms_Part_C.pdf PDF
Constr_Plans_-_Level_1_Combined.pdf PDF
Constr_Plans_-_Level_4_Combined.pdf PDF
0966-44_COMM2-00001_ReBID_OCCC_Fire_Protection.pdf PDF
03._OCCC_Special_Terms_Part_C.pdf PDF
Constr_Plans_-_Level_2_Combined.pdf PDF
Constr_Plans_-_Level_3_Combined.pdf PDF
0966-44_COMM2-00001_ReBID_Combined_Specifications.pdf PDF
Constr_Plans_-_Level_2_Combined.pdf PDF
03._OCCC_Special_Terms_Part_C.pdf PDF
04A._0966-44_ReBID_Layout_West_Building_Exterior_Doors.pdf PDF
Constr_Plans_-_Level_2_Combined.pdf PDF
Constr_Plans_-_Level_3_Combined.pdf PDF
03._OCCC_Special_Terms_Part_C.pdf PDF
0966-44_COMM2-00001_ReBID_Combined_Specifications.pdf PDF
0966-44_COMM2-00001_ReBID_OCCC_Fire_Protection.pdf PDF
04A._0966-44_ReBID_Layout_West_Building_Exterior_Doors.pdf PDF
04A._0966-44_ReBID_Layout_West_Building_Exterior_Doors.pdf PDF
0966-44_COMM2-00001_ReBID_Combined_Specifications.pdf PDF
04A._0966-44_ReBID_Layout_West_Building_Exterior_Doors.pdf PDF
Constr_Plans_-_Level_4_Combined.pdf PDF
Show all 50

West Building Access Control System Replacement has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .