This document is a Task Assignment Change Order Form (Change Order No. 02) issued by the Florida Department of Environmental Protection (FDEP) for Contract No. CN327, Task Assignment No. TA05. The parties involved are FDEP and APTIM Environmental & Infrastructure, LLC, with Douglas W. Mann, P.E., D.CE. serving as the consultant representative and Ralph Perkins as the FDEP Contract Manager. The project is located at St. Lucie Inlet State Park and involves the development of additional boat slips for a proposed floating dock facility.
The change order authorizes APTIM to provide additional surveying services in response to South Florida Water Management District (SFWMD) regulatory requirements for the permit application. Specifically, Subtask 8 requires a Mean High Water Survey to field locate the mean high water line at two locations along the shoreline east of the dock. The scope includes survey control establishment, mean high water identification using procedures approved by the Bureau of Surveying and Mapping, and delivery of a certified survey map. The work is budgeted at a fixed price of $3,485.10 with no reimbursable costs, totaling $49,092.28 when combined with the original task amount of $45,607.18. The original task execution date was February 15, 2022, with an original end date of January 1, 2023, extended to May 31, 2024 under this change order. Performance measures require that deliverables be complete, accurate, and timely, with payment issued upon FDEP approval.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Department of Environmental Protection
TASK ASSIGNMENT CHANGE ORDER FORM
(Revised 9-26-2018) Page 1 of 1
Required Signatures: Adobe Signature
FDEP Contract No.: Task Assignment No.: Change Order No.: Project No.:
Project Location: Project Name:
Consultant Name:
Consultant Representative: Phone: Email:
FDEP Contract Manager: Phone: Email:
Description and Justification of Change:
Change in Task Amount:
Item Reimbursement Fixed Fee Total
Original Task Amount:
Task amount including all previous Change Orders:
Net increase/decrease in task amount for this Change Order:
Total Amounts with all Change Orders:
Change in Task Time:
Original Task Execution Date:
Original Task End Date:
Present Task End Date:
Net Change in Days:
New Task End Date:
Approval Signatures:
Budget Representative, FDEP Signature Date
Project Manager, FDEP Signature Date
Contract Manager, FDEP Signature Date
Consultant Signature Date
Contract Authority, FDEP Signature Date
Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount
29 Digit FLAIR Code: Total:
CN327 TA05 02 61395C
St. Lucie Inlet State Park Additional 10 Boat Slips
APTIM Environmental & Infrastructure, LLC
Douglas W. Mann, P.E.,D.CE. (561) 361-3148 Douglas.Mann@aptim.com
Ralph Perkins (850) 245-2460 Ralph.Perkins@FloridaDEP.gov
To provide additional surveying services in support of the proposed dock at St. Lucie Inlet State Park. This is a request from SFWM upon application review. Please see attached proposal dated 2/10/23.
$ 45,607.18 $ 45,607.18 $ 45,607.18 $ 45,607.18 $ 3,485.10 $ 3,485.10
$ 0.00 $ 49,092.28 $ 49,092.28
02/15/2022
01/01/2023
5/31/2024
5/31/2024
Tamika Bass Tamika Bass Digitally signed by Tamika Bass Date: 2023.02.15 14:36:13 -05'00'
Jim McGuire Jim McGuire Digitally signed by Jim McGuire Date: 2023.02.15 15:40:43 -05'00'
Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2023.02.16 10:27:53 -05'00'
Douglas W. Mann P.E., D.CE. Douglas W Mann Digitally signed by Douglas W Mann Date: 2023.02.16 11:32:59 -05'00'
Michael W. Foster Jr., P.E. Michael W. Foster Jr., P.E.
Digitally signed by Michael W.
Foster Jr., P.E.
Date: 2023.02.27 09:17:57 -05'00'
61395C 37505000070 080039/21 675002 U3200 131500 XR $ 3,485.10
$ 3,485.10
Douglas Mann, P.E., D.CE.
Lead Coastal Engineer
Coastal Restoration Team
APTIM
6401 Congress Avenue, Suite 140
Boca Raton FL 33487 Tel: +1 561 361 3148 Fax: +1 561 391 9116
Douglas.Mann@aptim.com
631022587
February 10, 2023
Jim McGuire Florida Department of Environmental Protection Bureau of Design and Construction 3800 Commonwealth Boulevard Tallahassee, FL 32399
RE: Contract No. CN327 TA05 St. Lucie Inlet Preserve State Park Floating Dock Project Request for Change Order 2
Dear Mr. McGuire:
Aptim Environmental & Infrastructure, LLC (APTIM) is submitting this proposal in response to the need to provide additional surveying services in support of the proposed floating dock at St. Lucie Inlet Preserve State Park (Park). A scope of services with cost breakdown is included in Appendix A.
The proposed subtasks identified herein will be performed under, and governed by, the terms and conditions of the Professional Services Agreement between APTIM and the Florida Department of Environmental Protection (FDEP), titled DEP CN327 for a lump sum total of $3,485.10. A cost breakdown is included in Appendix A. Please authorize us to begin by executing a change order to the Task Assignment TA05 to perform the requested services in the name of our licensed contracting entity Aptim Environmental & Infrastructure, LLC.
If you have any questions, please call me.
Very truly yours, Douglas W. Mann, P.E., D.CE.
Lead Coastal Engineer Aptim Environmental & Infrastructure, LLC
Appendix A
Scope of Services and Cost Breakdown St. Lucie Inlet Preserve State Park Floating Dock
The following subtask is proposed:
Subtask 8:
Description: Subtask 8 Mean High Water Survey. The South Florida Water Management District (SFWMD) is reviewing the State’s permit application for the proposed dock. To address specific regulatory requirements, they are requiring that the mean high water line be field located at two locations along the shoreline, east of the dock. This will likely occur within the mangrove stand east of the dock.
APTIM surveyors will establish survey control on the island and then locate the mean high water using procedures approved by the Bureau of Surveying and Mapping. The two locations will be immediately north and south of the timber dock and walkway; thereby facilitating the dock/walkway’s use as an accessway. No walking or climbing through the mangroves will be performed.
All survey and hydrographic work shall be conducted under the direct supervision of a Florida Professional Surveyor and Mapper as well as an American Congress of Surveying and Mapping Certified Hydrographer and will be in accordance with Chapter 5J-17 Florida Administrative Code (F.A.C.)
pursuant to Chapter 472 of the Florida Statutes (FS).
Prior to the start of the survey, reconnaissance of published National Geodetic Survey (NGS) and/or FDEP survey control monuments will be conducted using Global Navigation Satellite System (GNSS) receivers relative to the Florida Permanent Reference Network (FPRN). GNSS and/or Static GNSS techniques will be used to locate and confirm survey control for this project. Static GNSS methods will be utilized to establish temporary benchmarks (TBMs) if the existing survey control is disturbed or insufficient to cover the entire survey area. Horizontal and vertical positioning checks will be conducted at the beginning and end of each survey day. All positions will be collected in US survey feet relative to the North American Datum of 1983/2011 (NAD 83/11). All vertical data will be collected in US survey feet relative to the North American Vertical Datum of 1988 (NAVD 88), Geoid 18.
Survey Methods:
All data will be collected using GNSS receivers relative to the Florida Permanent Reference Network (FPRN). Upon completion of the field work, data will be processed using APTIM’s internal software programs, Trimble Business Center, and HYPACK, as appropriate.
Deliverable: The final deliverable will include a mean high water survey map, certified by a registered Florida Surveyor and Mapper for the surveying efforts.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
Fixed Price Cost:
Subtask 8
Firm Name Position Classification Hourly Rate
Hours Total Fixed Price Cost
APTIM Professional Surveyor & Mapper
$138.48 6
$830.88
APTIM Surveyor $79.95 14 $1,119.30
APTIM Survey Technician $68.31 12 $819.72
APTIM CAD Operator $98.07 4 $392.28
APTIM Sr. Coastal Engineer $161.46 2 $322.92
Fixed Price Cost: $3,485.10
Reimbursable Cost: $0.00
Total for Subtask 8: (Fixed Price Cost + Reimbursable) $3,485.10
Project Schedule:
Activity Duration (Calendar Days) Dates
Subtask 8: 21 days from Notice to Proceed
To be scheduled
Summary of Fees:
Subtask Subtask Fixed Price Cost Subtask Reimbursable
Subtask 8: $3,485.10 $ 0.00
Total Fixed Price Cost: $3,485.10
Total Reimbursable Cost: $ 0.00
Overall Total Cost: $3,485.10
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified. (Please do not alter this language)
File details come from the government source that posted it. Updated .