- Contract number
- CN327
- Issued by
- Florida
About this file
This is a Task Assignment Change Order Form (Change Order No. 02) issued by the Florida Department of Environmental Protection (FDEP) under Professional Services Agreement CN327 with Aptim Environmental & Infrastructure, Inc. The change order modifies a task assignment for the Long Key State Park Beach Stabilization project located in Long Key, Florida. The document is dated March 21, 2018, and was approved on March 27-28, 2018. Key personnel include FDEP Contract Manager Philip Stone, Project Manager Brian Miller, and FDEP Budget Representative Greg Turral, with Aptim represented by consultant Douglas Mann, P.E.
The change order authorizes additional supplemental engineering services for storm-related damage assessment, surveying, and permitting activities related to Hurricane Irma impacts. Three subtasks comprise the scope: Subtask 9 provides topographic survey updates at a fixed cost of $12,183.60 plus $1,524.38 in reimbursable expenses; Subtask 10 delivers a 60% living shoreline and road stabilization design at $8,471.31 plus $126.38 in reimbursable costs; and Subtask 11 covers resubmission of the FDEP Coastal Control Line permit application at $4,216.50 with no reimbursable expenses. The total change order value is $26,522.17, increasing the cumulative contract amount from $47,501.77 to $74,023.94. Project execution extends from October 10, 2016, through September 30, 2018, with the change order adding 183 calendar days to the original completion date.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .