CN-370000-CN327-T4.pdf

PDF 2 MB Posted

Attached to
Master Agreement FL|CN327|6c97b7161f161a37db7ae49905c19554
Contract number
CN327
Issued by
Florida

About this file

Task Assignment Notification and Scope of Work Summary

This document is a Task Assignment Notification Form (TA04) issued by the Florida Department of Environmental Protection (FDEP) to APTIM Environmental & Infrastructure, LLC for work at John D. MacArthur Beach State Park on Munyon Island. The task assignment operates under FDEP Contract No. CN327 and is authorized under a Professional Services Agreement between FDEP and APTIM. The project is managed by Jim McGuire (Project Manager, FDEP) and Douglas Mann (Consultant Representative, APTIM) and is scheduled from execution through December 30, 2023.

The contract authorizes APTIM to develop a comprehensive shoreline stabilization master plan for approximately 1,220 feet of impacted shoreline on Munyon Island's west side, which has suffered erosion from hurricanes and large boat traffic. The scope comprises six subtasks: (1) topographic and hydrographic surveying ($21,034.68); (2) benthic resource survey ($6,118.92); (3) engineering inspection ($2,277.60); (4) alternatives analysis for erosion mitigation ($9,888.66); (5) master plan development with cost estimates and phasing recommendations ($6,828.96); and (6) stakeholder meeting ($968.76). All work is fixed-price with no reimbursable costs. The total contract amount is $47,117.58, funded through FDEP grant FD073 with 29-digit FLAIR code 61392C FD073 37505000140 080039/22 423001 U3200 131500 QK. Payment is contingent upon FDEP approval of deliverables for each subtask.

View the file

Other files

File Type Posted
CN-370000-CN327-CMC1.pdf PDF
CN-370000-CN327-CMC3.pdf PDF
CN-370000-CN327-CMC4.pdf PDF
CN-370000-CN327-T1CO1.pdf PDF
CN-370000-CN327-T1CO3.pdf PDF
CN-370000-CN327-T4CO3.pdf PDF
CN-370000-CN327-A1.pdf PDF
CN-370000-CN327-A2.pdf PDF
CN-370000-CN327-CMC5.pdf PDF
CN-370000-CN327-T5CO2.pdf PDF
CN-370000-CN327-T6.pdf PDF
CN-370000-CN327-T7.pdf PDF
CN-370000-CN327-T9.pdf PDF
CN-370000-CN327.pdf PDF
CN-370000-CN327-CMC2.pdf PDF
CN-370000-CN327-T1.pdf PDF
CN-370000-CN327-T1CO2.pdf PDF
CN-370000-CN327-T1CO4.pdf PDF
CN-370000-CN327-T2CO1.pdf PDF
CN-370000-CN327-T3.pdf PDF
CN-370000-CN327-T3CO1.pdf PDF
CN-370000-CN327-T3CO2.pdf PDF
CN-370000-CN327-T4CO1.pdf.crdownload CRDOWNLOAD file
CN-370000-CN327-T4CO2.pdf PDF
CN-370000-CN327-T8.pdf PDF
CN-370000-CN327-T2.pdf PDF
CN-370000-CN327-T4CO1.pdf PDF
CN-370000-CN327-T5.pdf PDF
CN-370000-CN327-T5CO1.pdf PDF
CN-370000-CN327-T9CO1.pdf PDF
CN-370000-CN327-T9CO2.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

TASK ASSIGNMENT NOTIFICATION FORM

Required Signatures: Adobe Signature

FDEP Contract No.: Task Assignment No.: Owner’s Name: Project No.:

Project Location: Project Name:

Consultant Name:

Consultant Representative: Phone: Email:

FDEP Contract Manager: Phone: Email:

Description of Task:

Project Manager:

Schedule Start Date: Fixed Price Cost:

Completion Date: Cost Reimbursement not to exceed:

Total Task Amount:

Approval Signatures:

Budget Representative, FDEP Signature Date

Project Manager, FDEP Signature Date

Contract Manager, FDEP Signature Date

Consultant Signature Date

Contract Authority, FDEP Signature Date

Project # Grant # Org Code Cat/Year Fund Module Object Code EO Amount

29 digit FLAIR Code: Total:

CN327 TA04 FDEP-BDC 61392C

John D. MacArthur Beach State Park Munyon Island BDW Replacement. Shoreline Restoration

APTIM Environmental & Infrastructure, LLC

Douglas Mann 561-361-3148 douglas.mann@aptim.com

Ralph Perkins 850-245-2460 ralph.perkins@floridadep.gov approximately 1220' of shoreline has been impacted due to Hurricanes and large boat traffic. Master plan for beach nourishment and rock revetment. Amenities on the island for public use has been limited due to access issues, per attached dated 11/1/2021.

Jim McGuire

Upon Execution $ 47,117.58 12/30/2023 $ 0.00

$ 47,117.58

Diane Langston Diane Langston Digitally signed by Diane Langston Date: 2022.08.16 08:36:41 -04'00'

Jeffrey Whitfield Jeffrey Whitfield Digitally signed by Jeffrey Whitfield Date: 2022.08.16 09:46:09 -04'00'

Ralph Perkins Ralph M Perkins Digitally signed by Ralph M Perkins Date: 2022.08.16 10:51:38 -04'00'

Douglas Mann Douglas W Mann Digitally signed by Douglas W Mann Date: 2022.08.25 11:18:03 -04'00'

Michael W. Foster Jr,. P.E. Michael W. Foster Jr., P.E.

Digitally signed by Michael W.

Foster Jr., P.E.

Date: 2022.08.26 15:34:44 -04'00'

61392C FD073 37505000140 080039/22 423001 U3200 131500 QK $ 47,117.58

$ 47,117.58

Douglas Mann, P.E., D.CE.

Lead Coastal Engineer

Coastal Restoration Team

APTIM

2481 NW Boca Raton Blvd

Boca Raton FL 33431 Tel: +1 561 361 3148 Fax: +1 561 391 9116

Douglas.Mann@aptim.com

November 1, 2021

Jim McGuire Florida Department of Environmental Protection Bureau of Design and Construction 3800 Commonwealth Boulevard Tallahassee, FL 32399

RE: Contract No. CN327 TA04 MacArthur Beach State Park Big Munyon Island Shoreline Stabilization Master Plan

Dear Mr. McGuire:

Aptim Environmental & Infrastructure, LLC (APTIM) is submitting this proposal in response to your request for a master plan to address erosional conditions on the west shoreline of Munyon Island located within John D. MacArthur Beach State Park. A scope of services with cost breakdown is included in Appendix A.

The proposed subtasks identified herein will be performed under and governed by the terms and conditions of the Professional Services Agreement between APTIM and the Florida Department of Environmental Protection (FDEP), titled DEP CN327 for a lump sum total of $47,117.58. A cost breakdown is included in Appendix A. Please authorize us to begin by executing a Task Assignment to perform the requested services in the name of our licensed contracting entity Aptim Environmental & Infrastructure, LLC.

If you have any questions, please call me.

Very truly yours, Douglas W. Mann, P.E., D.CE.

Lead Coastal Engineer Aptim Environmental & Infrastructure, LLC

Appendix A.

Scope of Services and Cost Breakdown

Big Munyon Island West Shoreline Masterplan

Introduction

The Big Munyon Island shoreline has been experiencing erosion along its western shoreline as a result of storm activity, and boat wakes. The wave energy is also interacting with the marina basin breakwater and the exposed shoreline, resulting in shoreline conditions that are not desired by the State Park.

Erosion has impacted some of the upland infrastructure which has resulting in closure of access to the some of the park facilities. As discussed in the field, some funding exists to improve the shoreline and marina basin conditions, but is likely insufficient to address the entire 1225 feet of unarmored shoreline.

The following subtasks are provided to address the need to collect additional data and information to support future stabilization efforts (Subtask 1 ,2, and 3), and the development of a master plan (Subtasks 4, 5, and 6), which the State can implement as funding becomes available. The following subtasks are proposed:

Subtask 1:

Description: Subtask 1 Topographic and Hydrographic Surveying. Topographic and bathymetric data will be collected from the marina dock south to the existing rock revetment (approx. 1225 feet) and west 300 feet from existing shoreline.

All survey and hydrographic work shall be conducted under the direct supervision of a Florida Professional Surveyor and Mapper as well as an American Congress of Surveying and Mapping Certified Hydrographer and will be in accordance with Chapter 5J-17 Florida Administrative Code (F.A.C.)

pursuant to Chapter 472 of the Florida Statutes (FS).

Prior to the start of the survey, reconnaissance of published National Geodetic Survey (NGS) and/or FDEP survey control monuments will be conducted using Global Navigation Satellite System (GNSS) receivers relative to the Florida Permanent Reference Network (FPRN). GNSS and/or Static GNSS techniques will be used to locate and confirm survey control for this project. Static GNSS methods will be utilized to establish temporary benchmarks (TBMs) if the existing survey control is disturbed or insufficient to cover the entire survey area. Horizontal and vertical positioning checks will be conducted at the beginning and end of each survey day. All positions will be collected in US survey feet relative to the North American Datum of 1983/2011 (NAD 83/11). All vertical data will be collected in US survey feet relative to the North American Vertical Datum of 1988 (NAVD 88), Geoid 18.

Survey services will include:

1. Topographic and bathymetric data collection from the marina dock south to the existing rock revetment (approx. 1225 feet) and west 300 feet from the existing shoreline.

2. Upland topographic collection from boardwalk to shoreline. Additional topography will be collected in areas of boardwalk collapse/failure to assist with redesign of structure (up to 100 feet landward of the structure).

3. Topographic survey of the existing bridge and adjacent ground/water over easterly mangrove channel. It is understood that the bridge is closed to the public due to safety concerns but will be accessible to APTIM surveyors.

4. The existing stairs next to west bridge abutment will be located.

5. Locate limits of marina dock breakwater system.

6. Locate IWW channel edge/ navigation markers (to support future permitting efforts).

7. Locate the Mean High-Water line (Tidal Water Survey) pursuant to Florida statues. This survey will be submitted to FDEP Division of State Lands.

8. Locate remnant stairs/structures.

Survey Methods:

APTIM will collect topographic data along transects spaced at 100’ from the Mean High-Water line to approximately 300’ offshore of Munyon island. Transects will be collected from the existing docks to the existing rock revetment. All data will be collected using GNSS receivers relative to the Florida Permanent Reference Network (FPRN) If hydrographic (sounding data) is required, data will be collected along transects using an Odom E20 sounder with digitizer on APTIM's 24-foot survey vessel or equivalent, with a centrally located hull-mounted transducer.

Infrastructure, as described in the survey task summary, will be collected using a combination of GNSS receivers and conventional means (total stations/rod and level). A mean high water line survey will be collected along the shorelines of all islands. APTIM will coordinate with the FDEP Department of State Lands for the Tidal Water Survey Approval as required by statute. Certified Mean High Water Line survey drawings will be submitted to the FDEP within 90 days of survey.

Upon completion of the field work, data will be processed using APTIM’s internal software programs, Trimble Business Center, and HYPACK. The offshore data will be processed using HYPACK and an ASCII XYZ file will be created and exported for plan view map and planning purposes.

Deliverable: The final deliverable will include a topographic and bathymetric survey map, certified by a registered Florida Surveyor and Mapper, digital data files (XYZ and AutoCAD (.dwg)) and field notes as deliverables for the surveying efforts. A mean high water survey drawing will be prepared and submitted in pdf format.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 1

Firm Name Position Classification Hourly Rate

Hours Total Fixed Price Cost

APTIM Professional Surveyor & Mapper

$138.48 36 $4,985.28

APTIM Surveyor $79.95 104 $8,314.80 APTIM Survey Technician $68.31 96 $6,557.76 APTIM CAD Operator $98.07 12 $1,176.84

Fixed Price Cost: $21,034.68

Reimbursable Cost: $0.00

Total for Subtask 1: (Fixed Price Cost + Reimbursable) $21,034.68

Subtask 2:

Description: Benthic Survey APTIM biologists will review existing benthic mapping of the marina dock area (provided by FDEP) and will conduct a benthic resource survey from the marina dock south to existing rock revetment (approx.

1225 feet) and west 300 feet from existing shoreline to identify and map any benthic resources that may be present. The location of any resources, if found, will be documented using a Differential GPS antenna linked to a laptop computer running HYPACK navigational software. (APTIM marine biologists will be supported by APTIM surveyors in this subtask.) The location and extent of any Submerged aquatic vegetation (SAV) verified in situ shall be recorded and the community structure shall be qualitatively described to include species and approximate abundance, as well as notes on general condition of the vegetation. For this purpose, abundance will be noted as sparse (<25% cover), moderate (25‐50% cover), or dense (50‐100% cover). Site conditions, such as sediment type and water depth will be noted. This survey is not meant to provide the level of data required for mitigation planning as it is assumed that any areas with SAV will be avoided in the design of any shoreline stabilization efforts. With avoiding impacts, this mapping should be sufficient to obtain State and Federal environmental permits. Representative photographs and/or video will be taken of any observed resources.

Deliverable: The final deliverables will include an observation report (in pdf) with map overlaid on recent aerial imagery. If benthic resources are documented during the assessment, the report will provide the location/delineation of those resources with a qualitative description and representative photographs.

Digital shapefiles of any SAV and/or hardbottom resources documented during the survey will also be provided.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 2

Firm Name Position Classification Hourly Rate

Hours Total Fixed Price Cost

APTIM Survey Technician $68.31 12 $819.72 APTIM Sr. Marine Biologist $132.48 40 $5,299.20

Fixed Price Cost: $6,118.92

Total for Subtask 2: (Fixed Price Cost + Reimbursable) $6,118.92

Description: Subtask 3 Engineering Inspection. An APTIM coastal engineer will visit the site to identify pertinent existing conditions, identify effects of wave forcing, identify walkway structural repair needs, as-built the bridge structure, and to make general observations of the project site.

Deliverable: Subtask 3: A written field report will be produced in pdf format

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 3

Firm Name Position Classification Hourly Rate

Hours Total Fixed Price Cost

APTIM Coastal Engineer III $142.35 16 $2,277.60

Fixed Price Cost: $2,277.60

Reimbursable Cost: $0.00

Total for Subtask 3: (Fixed Price Cost + Reimbursable) $2,277.60

Description: Subtask 4 Alternatives Analysis. APTIM will develop a minimum of four alternatives to address the erosion conditions along the Big Munyon Island west shoreline. These alternatives will include the following:

a. No action alternative,

b. A small-scale project of rock removal from the breakwater and placement within the unarmored shoreline, and excavation of the shoreline salient with southerly shoreline placement (existing FDEP Parks design concept),

c. A mangrove planter protection plan,

d. A segment breakwater with sandy shoreline alternatives.

e. Combinations of the above will be considered, if appropriate.

Deliverable: Plan view drawings depicting the alternatives will be provided to FDEP as a deliverable (pdf format).

Performance Measure: Deliverables will be reviewed by FDEP to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 4

Firm Name Position Classification Hourly Rate

Hours Total Fixed Price Cost

APTIM Sr. Coastal Engineer $161.46 12 $1,937.52

APTIM Coastal Engineer III $142.35 48 $6,832.80 APTIM CAD Operator $ 98.07 6 $ 588.42 APTIM Sr. Marine Biologist $132.48 4 $ 529.92

Fixed Price Cost: $9,888.66

Total for Subtask 4 (Fixed Price Cost + Reimbursable) $9,888.66

Subtask 5:

Description: Subtask 5 Master Plan. An engineering report, which discusses the alternatives (developed in subtask 4) and recommends a master plan, will be produced. Construction feasibility of the components will be discussed. Cost estimates for the existing FDEP design concept and the recommended alternatives will be presented along with a phasing plan to allow the State to implement the plan in phases (if desired, or if limited by funding).

Deliverable: Subtask 5: Engineering report will be provided in pdf format.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 5

Firm Name Position Classification Hourly Rate

Hours Total Fixed Price Cost

APTIM Sr. Coastal Engineer $161.46 12 $1,937.52

APTIM Coastal Engineer III $142.35 24 $3,416.40 APTIM CAD Operator $98.07 12 $1,176.84 APTIM Clerical $74.55 4 $298.20

Fixed Price Cost: $6,828.96

Reimbursable Cost: $0.00

Total for Subtask 5: (Fixed Price Cost + Reimbursable) $6,828.96

Subtask 6:

Description: Subtask 6. Meeting. APTIM will attend one meeting with Park and District staff to discuss the master plan and solicit comments and input. The meeting will be informal and no formal presentation will be made. The meeting will be at the Park or District office.

Deliverable: Subtask 6: Meeting minutes will be provided in pdf format.

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 6

Firm Name Position Classification Hourly Rate

Hours Total Fixed Price Cost

APTIM Sr. Coastal Engineer $161.46 6 $968.76

Fixed Price Cost: $968.76

Total for Subtask 6: (Fixed Price Cost + Reimbursable) $968.76

Project Schedule:

Activity Duration (Calendar Days) Dates Subtask 1: 45 days from Notice to

Proceed To be scheduled

Subtask 2:

45 days from Notice to Proceed

To be scheduled

Subtask 3: 30 days from Notice to Proceed

To be scheduled

Subtask 4: 75 days from Notice to Proceed

To be scheduled

Subtask 5: 90 days from Notice to Proceed

To be scheduled

Subtask 6: 115 days from receipt of comments

To be scheduled

Summary of Fees:

Subtask Subtask Fixed Price Cost Subtask Reimbursable Subtask 1: $21,034.68 $ 0.00

Subtask 2: $6,118.92 $ 0.00

Subtask 3: $ 2,277.60 $ 0.00

Subtask 4: $ 9,888.66 $ 0.00

Subtask 5: $ 6,828.96

$ 0.00

Subtask 6: $ 968.76 $ 0.00

Total Fixed Price Cost: $47,117.58 Total Reimbursable Cost: $ 0.00

Overall Total Cost: $47,117.58

Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified. (Please do not alter this language)

John D. MacArthur Munyon Island Boardwalk replacement. master shoreline restoration plan.pdf
Munyon Island Boardwalk Replacement. Shoreline Master Plan Proposal 61392C.pdf