CMa Transmittal Letter 3-12-24.pdf
PDF 172 KB Posted
- Solicitation number
- LBNF-342884-BWQ
About this file
This request for proposal solicits proposals for construction manager as advisor services for an upcoming near site construction project. Fermi Research Alliance, LLC seeks a construction manager as advisor to function as a collaborative member of the project team and provide guidance and expertise throughout construction phases for the Long-Baseline Neutrino Facility Near Site Conventional Facilities project. Mandatory pre-proposal conferences will be held on April 10, 2024, and proposals are due by May 8, 2024. The construction manager as advisor contract is expected to have a period of performance from January 2025 through April 2031. Proposals will be evaluated based on technical merit and cost, and the award will be made to the offeror providing the best value to the government.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LBNF-342884-BWQ Addendum 5.pdf | ||
| LBNF-342884-BWQ Addendum 4.pdf | ||
| CMa_Proposal_Q15_Response.zip | ZIP file | |
| LBNF-342884-BWQ Addendum 3.pdf | ||
| LBNF-342884-BWQ Addendum 2.pdf | ||
| LBNF-342884-BWQ Addendum 1.pdf | ||
| CMa Checklist 3-12-24.pdf | ||
| Sections J-x Documents.zip | ZIP file | |
| CMa RFP and Sample Subcontract 3-12-24.pdf | ||
| Forms for Submission.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FRA RFP No. LBNF-342884-BWQ LBNF NSCF CMa Services
Fermi National Accelerator Laboratory Batavia, Illinois 1
RFP LETTER
March 12, 2024
Subject: Request for Proposal (RFP) No. LBNF-342884-BWQ
Proposal Due Date: May 8, 2024.
Fermi Research Alliance, LLC (FRA) requests a proposal for the Long-Baseline Neutrino Facility (LBNF) Near Site Conventional Facilities (NSCF) Construction Manager as Advisor (CMa) Services in accordance with this RFP and the enclosed Proposal Preparation Instructions, Sample Subcontract, and other enclosures.
There will be a mandatory Pre-Proposal Conference (see the Proposal Preparation Instructions).
SCHEDULE
It is expected that the CMa Services will be performed over a period of 80 months. FRA anticipates an award date of January of 2025, with a period of performance through April 30, 2031.
SUMMARY OF SUBCONTRACT WORK
The CMa will function as a collaborative member of the combined project team consisting of FRA, Construction Subcontractors (Beamline Complex and Near Detector Complex), Architect/Engineer, Commissioning Agent, and other project participant personnel, and shall provide guidance and expertise throughout the Construction Phases. The CMa shall have full understanding of the project requirements and goals, of its participants, and interested parties. The CMa shall effectively monitor, access, and coordinate management efforts, and provide oversight of the Construction Subcontractors’ work on behalf of FRA.
SUBMITTAL OF PROPOSALS
Complete written proposals must be submitted electronically to the undersigned Procurement Specialist listed below no later than 3:00 pm Central Time on Wednesday, May 8, 2024. FRA reserves the right to extend the due date for proposals and to accept late proposals if it is in the best interest of FRA and the U.S. Department of Energy (DOE).
Brian Quinn Email: bquinn@fnal.gov Phone: (630) 840-5777
The proposals shall be valid for a period of 180 days from the proposal due date. FRA reserves the right to reject any and all proposals, to waive any minor irregularities in any proposal, or to cancel this RFP at any time prior to award without cost to FRA. FRA will not reimburse any firm for any preparation costs or any other costs related to the participation in or preparation of this RFP.
mailto:bquinn@fnal.gov
Batavia, Illinois 2
EVALUATION AND SELECTION
FRA will evaluate each proposal to ensure that it meets the Mandatory Requirements as identified in the RFP. Offeror will be required to provide evidence (along with its proposal) indicating the Mandatory Requirements identified have been met. Those proposals not meeting the Mandatory Requirements may be eliminated from further consideration for award of a Subcontract. Proposals that meet all the Mandatory Requirements in the solicitation will be further evaluated based on the Technical Evaluation criteria stated in the RFP.
FRA will make a selection for award based on the principles of best value. Best value is expected to result from selection of the highest technically acceptable proposal with the lowest evaluated proposed cost. However, it may be in the best interest of FRA and DOE to consider award to other than the Offeror with the lowest evaluated proposed cost if the perceived technical advantages of a higher evaluated proposed cost proposal merit the additional higher proposed cost.
Offerors are cautioned that any proposal may be rejected as nonresponsive if it is materially unbalanced as to the costs. FRA may determine that a proposal is materially unbalanced when it is based on costs that are significantly less than cost for some work and costs that are significantly overstated for other work.
More information about the selection criteria and process is provided in the Proposal Preparation Instructions document.
FUNDING AVAILABILITY
FRA’s obligation under this Subcontract is contingent upon the availability of appropriated funds from which payment for Subcontract purposes can be made. No legal liability on the part of FRA for any payment may arise until funds are made available to FRA for this Subcontract and until the Subcontractor receives notice of such availability, to be confirmed in writing by the Procurement Specialist. See FRA General Terms & Conditions for Time and Materials or Labor-Hour Subcontracts (Attachment J-3).
PRE-PROPOSAL CONFERENCE
Offerors must attend a Pre-Proposal Conference on Wednesday, April 10, 2024, starting at 10:00 AM Central Time. FRA will present additional information about the project, which should be of interest to all Offerors. The conference will be held in the IARC Lecture Hall and/or via a teleconference solution that FRA will facilitate. FRA will provide further information on the Pre-Proposal Conference via an RFP Addendum issued at a later date. Offerors that do not attend the Pre-Proposal Conference will not be eligible for award and any submissions provided will not be evaluated.
Offerors shall inform the FRA Procurement Specialist (bquinn@fnal.gov) no later than Wednesday, March 27, 2024, by 12:00 PM Central Time of the number of persons who will attend the Pre-Proposal Conference, including any lower-tier Subcontractors, and the company they will be representing.
FRA FORMS FOR SUBMISSION
The Offeror shall complete the following forms referenced within the Request for Proposal Submittals Checklist and submit them with the proposal:
• Cost Proposal Form
• PUR-466 Proposal Certifications
• Exhibit A Environment, Safety, and Health Certification (ESHC)
Batavia, Illinois 3
• SARC Subcontractor Annual Representations and Certifications
• Subcontractor Injury and Illness Data Questionnaire, including OSHA 300A logs and
Experience Modification Rating (EMR) documents
• Organizational Conflicts of Interest Form (FL-11)
• Representations Regarding Proprietary Data (FL-105)
• Rights to Proposal Data (FL-107)
• Pre-award Survey of Prospective Subcontractor Accounting System for Time and
Material or Labor Hour Subcontracts (PF-16)
• Small Business Subcontracting Plan, in accordance with FAR Clause 52.215-9, Small
Business Subcontracting Plan (Aug. 2018). Small businesses are exempt from this requirement. See attached FL-55 form.
OTHER SUBMISSION REQUIREMENTS
In addition to the items above provided by FRA for the Offeror to utilize in their response, the following items must also be submitted with the proposal:
• Quality Assurance Program
• Corporate Environment, Safety, and Health Plan
FRA has included the RFP Submittals Checklist for use by Offerors to aid in their preparation of proposals, attached to this letter.
This solicitation is governed by procurement policies and procedures established under FRA’s Prime Contract with the U.S. Government, represented by the Department of Energy (“DOE”), for management and operation of Fermi National Accelerator Laboratory (FNAL/Fermilab). Proposals submitted will be treated as offers, and any resulting award(s) will be a Subcontract under the Prime Contract between the selected Offeror and FRA; such a relationship shall not create a contractual relationship between the Subcontractor and the DOE.
If there are any questions, please contact me by phone at (630) 840-5777, or by email at bquinn@fnal.gov.
Sincerely, Brian Quinn LBNF Procurement Specialist mailto:bquinn@fnal.gov.
| RFP LETTER |
| Subject: Request for Proposal (RFP) No. LBNF-342884-BWQ Proposal Due Date: May 8, 2024. |
| SCHEDULE |
| SUMMARY OF SUBCONTRACT WORK |
| SUBMITTAL OF PROPOSALS |
| Brian Quinn |
| EVALUATION AND SELECTION |
| FUNDING AVAILABILITY |
| PRE-PROPOSAL CONFERENCE |
| FRA FORMS FOR SUBMISSION |
| OTHER SUBMISSION REQUIREMENTS |