This document contains a checklist and related solicitation for construction manager as advisor services. Fermi National Accelerator Laboratory requests proposals to provide construction management advisory services for the upcoming Long-Baseline Neutrino Facility Near Site Conventional Facilities project. The selected contractor will function as part of the project team and provide guidance throughout the construction phases. Respondents must meet minimum annual revenue, safety, and quality requirements, and submit resumes for key roles including project manager and environmental health and safety manager. Proposals will be evaluated based on the project approach, demonstrated experience, project management capabilities, and corporate execution. The mandatory pre-proposal conference was scheduled for an unspecified date. The solicitation number is LBNF-342884-BWQ.

View the file

Other files

File Type Posted
LBNF-342884-BWQ Addendum 5.pdf PDF
LBNF-342884-BWQ Addendum 4.pdf PDF
CMa_Proposal_Q15_Response.zip ZIP file
LBNF-342884-BWQ Addendum 3.pdf PDF
LBNF-342884-BWQ Addendum 2.pdf PDF
LBNF-342884-BWQ Addendum 1.pdf PDF
Sections J-x Documents.zip ZIP file
CMa RFP and Sample Subcontract 3-12-24.pdf PDF
Forms for Submission.zip ZIP file
CMa Transmittal Letter 3-12-24.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No. LBNF‐342884‐BWQ LBNF NSCF CMa Services

Fermi National Accelerator Laboratory Batavia, Illinois 1

Request for Proposal Submittals Checklist Construction Manager as Advisor (CMa) Services

Date:

To: Brian Quinn

Procurement Specialist IV LBNF Procurement bquinn@fnal.gov

Project: LBNF Construction Manager as Advisor (CMa) Services

Item Description if Submitted

1. RFP Letter listed Enclosures/Submittals

A. Cost Proposal Form B. PUR-466 Proposal Certifications

C. Exhibit A Environment, Safety, and Health Certification (ESHC)

D. SARC Subcontractor Annual Representations and Certifications

E. Subcontractor Injury & Illness Data Questionnaire, including OSHA 300A logs and EMR Documents (7010-F1)

F. Organizational Conflicts of Interest Form (FL-57A, FL-57B & FL-11)

G. Representations Regarding Proprietary Data (FL-105)

H. Rights to Proposal Data (FL-107)

I. Pre-award Survey of Prospective Subcontractor Accounting System for Time & Material or Labor Hour Subcontracts (PF-16)

J. Small Business Subcontracting Plan (see FL-55 SMALL BUSINESS SUBCONTRACTING PLAN dated 6/23) mailto:bquinn@fnal.gov

LBNF NSCF CMa Services

Batavia, Illinois 2

2. RFP Section M 2.0 Mandatory Requirements

A. Submittal of all items listed under Enclosures in RFP Cover Letter.

B. Evidence of annual revenues greater than $50 million for each of the past 5 years. If partnering with other firms, show total amount of all firms to demonstrate compliance with this requirement.

C. EMR less than 1.0.

D. Corporate Quality Assurance/Quality Control Plan in accordance with an internationally recognized standard (ISO 9001 or equivalent).

E. Submitted list of potential primary Subcontractors/subconsultants.

F. Submitted list of key personnel with resumes demonstrating requisite knowledge and experience for the following roles: Project Manager, Deputy Project Manager/Project Engineer, Environment, Safety, and Health (ES&H) Manager, Quality Control Coordinator, Cost Manager, and Scheduler.

G. Attendance at mandatory Pre- Proposal Conference.

3. RFP Section M 3.0 Technical Evaluation Factors

Criterion 1: Project Approach and Demonstrated (preferred) Project Experience

Criterion 2: Project Management Criterion 3: Corporate Execution

[END OF CHECKLIST]