CM_RELATED_PROJECT_EXPERIENCE_FORM_4.10.2021FILLABLE.pdf
PDF 205 KB Posted
- Attached to
- CONSTRUCTION MANAGEMENT AT RISK LAKEWOOD RANCH HIGH SCHOOL HVAC RENOVATION, SDMC NO. 2026-02
- Solicitation number
- 2026-02
- Issued by
- Manatee County, Florida
About this file
CM Related Project Experience Form Summary
This is a fillable CM, CMR, and PM Related Project Experience Form issued by the School District of Manatee County to be completed by proposers responding to construction management solicitations. The form is designed to document comparable project experience and will be scored under Short List Criteria 4, factors a and b. Proposers must submit one form for each relevant project and indicate the project delivery method (CM, Design-Build, PM, CMR with or without GMP, Traditional Design-Bid-Build, or other), along with the contractual relationship to the owner. The form requires detailed project information including title, location, completion date, construction cost, and project size in gross square feet, as well as current project status (punch list, closeout, warranty, or post-warranty phase). Proposers must identify key project professionals involved and indicate which professionals they intend to assign to the proposed SDMC project. The form includes sections for owner and architect/engineer contact information and requires attachment of photos representing work performed by the firm.
This form is specifically applicable to proposals for Lakewood Ranch High School HVAC Renovation (SDMC No. 2026-02), a campus-wide HVAC equipment replacement and modernization project in Manatee County, Florida. Proposers responding to this construction management at risk solicitation must demonstrate prior experience on comparable projects in Florida public school systems (K-12) or other similar projects to qualify for the short list evaluation. The form serves as documentation of the firm's relevant project experience and the qualifications of assigned key personnel for this major HVAC renovation project, which includes replacement of chillers, pumps, boilers, air handling units, terminal units, and controls, with interior painting and flooring repairs as required.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The School District of Manatee County CM, CMR and PM
RELATED PROJECT EXPERIENCE FORM
(Submit one form for each comparable project – to be scored under Short List Criteria 4, factors a and b)
PROJECT TITLE: RFQ #:
PROPOSER (PRIME): RFQ Response Due Date:
Joint Venture
PROJECT TITLE: RELATED Project EXP: (check only one box) ❑ a. Florida Public School Systems (K-12) ❑ b. Other PROJECT LOCATION:
PROJECT DELIVERY METHOD: (check only one box) ❑ CM Design-Build PM CMR Misc. (w/GMP) ❑ CMR (w/GMP) Traditional (D/B/B) Other:
FIRM’S CONTRACTUAL RELATIONSHIP TO
OWNER ON THIS PROJECT:
OWNER (project user / agency’s representative)
Name:
Address: City: State: Zip:
Current Phone Number: Current Fax Number:
E-mail Address:
ARCHITECT OR ENGINEER (project owner’s representative)
Name:
Address: City: State: Zip:
Current Phone Number: Current Fax Number:
E-mail Address:
DESCRIPTION OF THE PROJECT AND SERVICES: (attach photos that represent the work performed by the firm)
PROJECT COMPLETION DATE:
month / day / year
CONSTRUCTION COST: $
SIZE OF PROJECT: (gsf of construction)
CURRENT STATUS OF THIS PROJECT: ❑ Punch List ❑ Closeout Warranty Post Warranty
PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT:
(check box only if proposer intends to assign this professional to the proposed SDMC project)
NAME: PROJECT RESPONSIBILITIES:
| CM, CMR and PM |
| RELATED PROJECT EXPERIENCE FORM |
| PROJECT TITLE: |
| RFQ: |
| PROPOSER PRIME: |
| RFQ Response Due Date: |
| PROJECT TITLE_2: |
| a F: Off |
| b Other: Off |
| PROJECT LOCATION: |
| fill_1: |
| FIRMS CONTRACTUAL RELATIONSHIP TO OWNER ON THIS PROJECT: |
| OWNER project user agency s representat ve Name: |
| Address: |
| C ty: |
| State: |
| Z p: |
| Current Phone Number: |
| Current Fax Number: |
| Ema Address: |
| ARCHITECT OR ENGINEER pro ect owner s representat ve Name: |
| Address_2: |
| C ty_2: |
| State_2: |
| Z p_2: |
| Current Phone Number_2: |
| Current Fax Number_2: |
| Ema Address_2: |
| DESCRIPTION OF THE PROJECT AND SERVICES attach photos that represent the work performed by the f rm: |
| PROJECT COMPLETION DATE: |
| CONSTRUCTION COST: |
| PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow1: |
| PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow1_2: |
| PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow2: |
| PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow2_2: |
| PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow3: |
| PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow3_2: |
| PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow4: |
| PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow4_2: |
| PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow5: |
| PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow5_2: |
| PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow6: |
| PROJECT MANAGER AND OTHER KEY PROFESSIONALS INVOLVED ON THE LISTED PROJECT check box only if proposer ntends to assign this profess ona to the proposed SDMC pro ect NAME PROJECT RESPONSIBILITIESRow6_2: |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Text8: |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box8: Off |
File details come from the government source that posted it. Updated .