CM_PROPOSED_STAFF_FORMFILLABLE.pdf
PDF 168 KB Posted
- Attached to
- CONSTRUCTION MANAGEMENT AT RISK LAKEWOOD RANCH HIGH SCHOOL HVAC RENOVATION, SDMC NO. 2026-02
- Solicitation number
- 2026-02
- Issued by
- Manatee County, Florida
About this file
This is a Proposed Staff Form used by the School District of Manatee County (SDMC) for construction management at-risk (CMAR) and program management (PM) project selections, specifically for the Lakewood Ranch High School HVAC Renovation project (SDMC No. 2026-02). The form is designed to document the qualifications and project experience of proposed key personnel assigned to the project. Proposers must submit one completed form for each employee being proposed as on-site staff, including their name, title, classification (professional/technical or office staff), percentage of time allocated to the project, and years of experience both with the proposing firm and other firms. The form captures the employee's educational background, professional registrations and licenses, and prior project involvement across multiple delivery methods including CM, Design-Build, CM at-Risk, Traditional Design-Bid-Build, and Program Management.
The form includes a comprehensive checklist of professional abilities and qualifications relevant to construction and project management, including option analysis, design review, budget estimating, value engineering, constructability analysis, life cycle cost analysis, construction scheduling, quality control (both design and construction phases), cost control, fast-track techniques, construction supervision, building code inspection, and project closeout/warranty management. This document is a fillable PDF template intended to standardize the submission of staffing information for evaluation against the RFQ shortlist criteria, with the proposal submission deadline of July 16, 2026 having already passed as of the opportunity's posting date.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The School District of Manatee County CM/CM at-Risk/PM Selection Procedures
PROPOSED STAFF FORM
(Make copies of this form for use for Shortlist Criteria 5, Factors a and b – Submit one form for each employee)
SDMC PROJECT TITLE: RFQ #:
PROPOSER (PRIME): RFQ Response Due Date:
Joint Venture
EMPLOYEE NAME: TITLE: CHECK ONLY ONE:
❑ Professional/Tech Office Staff ❑ Proposed On-Site Staff
% of time to be assigned to the proposed project: Years with firm: Years with other firms:
DE
LI
VE
RY
ME
TH
OD
Delivery Method Codes: CM = Construction Management DB = Design-Build OT = Others CMR = CM at-Risk TR = Traditional (D/B/B) CMR(M) = CM at-Risk Miscellaneous PM = Program Management
PROJECT TITLE DOLLAR
VALUE
GSF EMPLOYEE’S
INVOLVEMENT
EDUCATION: (highest level achieved, degree earned, school & year)
REGISTRATION(S) & LICENSE(S):
OTHER QUALIFICATIONS:
EMPLOYEE'S
ABILITIES
(check all that apply):
❑ Option analysis ❑ Design review ❑ Budget estimating ❑ Value engineering ❑ Constructability analysis
❑ Life cycle cost analysis ❑ Construction scheduling ❑ Quality control (Design) ❑ Quality control (Construction) ❑ Cost control
❑ Fast-track techniques ❑ Construction supervision ❑ Building code inspection ❑ Project closeout/warranty ❑ Other:
The School District of Manatee County
| SDMC PROJECT TITLE: |
| RFQ: |
| PROPOSER PRIME: |
| RFQ Response Due Date: |
| EMPLOYEE NAME: |
| TITLE: |
| Profess: Off |
| Proposed OnS: Off |
| Years with firm: |
| Years with other firms: |
| of time to be assigned to the proposed projectRow2: |
| PROJECT TITLERow1: |
| DOLLAR VALUERow1: |
| GSFRow1: |
| EMPLOYEES INVOLVEMENTRow1: |
| EDUCATION highest eve achieved degree earned school year: |
| REGISTRATIONS LICENSES: |
| OTHER QUALIFICATIONS: |
| Option analysis: Off |
| Design review: Off |
| Budget estimating: Off |
| Va: Off |
| Constructabi: Off |
| L: Off |
| Construct: Off |
| Qual: Off |
| Qual_2: Off |
| Cost control: Off |
| Fasttrack techn: Off |
| Construct_2: Off |
| Bu: Off |
| Pro: Off |
| Other: On |
| ect closeoutwarranty: |
| Text2: |
| Text3: |
| Text4: |
| Text5: |
| Text6: |
| Text7: |
| Text8: |
| Text9: |
| Text10: |
| Text11: |
| Text12: |
| Text13: |
| Text14: |
| Text15: |
| Text16: |
| Text17: |
| Text18: |
| Text19: |
| Text20: |
| Text21: |
| Text22: |
| Text23: |
| Text24: |
| Text25: |
| Text26: |
| Text27: |
| Text28: |
| Text29: |
| Text30: |
| Text31: |
| Text32: |
| Text33: |
| Text34: |
| Text35: |
| Text36: |
| Text37: |
| Text38: |
| Check Box1: Off |
File details come from the government source that posted it. Updated .