This document appears to be a pricing schedule or line item breakdown for tank inspection and maintenance services across multiple facilities. The contract includes five primary line items: API Internal Tank Inspection Services for Facilities 88071, 88045, and 88072, a Wiper Seal Replacement service for Facility 88071, and an API External Tank Inspection Service for Facility 88044. Each item is listed as a Firm Fixed Price (FFP) with a quantity of 1 job or tank, and delivery specified as FOB: Destination.

The detailed scope of work for the internal tank inspections involves conducting kick-off meetings, fuel transfer and disposal, tank cleaning, performing ultrasonic testing (UT) and roundness surveys, completing out-of-service aboveground storage tank (AST) internal inspections, containment testing, and generating draft and final reports. The wiper seal replacement involves replacing wiper seals and pan penetration seals in accordance with the Performance Work Statement (PWS). The external tank inspection includes a kick-off meeting, external tank inspection, containment testing, UT scanning, and report preparation. All services are to be completed at specific facility locations, with each line item having a unique Product Service Code (PSC CD: XXXX).

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job API Internal Tank Inspection Service –Facility 88071

FFP

All work to conduct Kick-Off Meeting, transfer of fuel, disposal of remaining fuel, tank cleaning, performing UT and roundness survey, complete API Out-of-Service aboveground storage tank (AST) Internal tank inspection, complete containment testing, and complete DRAFT and FINAL reports.

FOB: Destination

PSC CD: XXXX

0002 1 Tank Wiper Seal Replacement Facility – 88071

FFP

All work to replace wiper seal and pan penetration seals accordance with the

PWS.

0003 1 Job API Internal Tank Inspection Service –Facility 88045

FFP

All work to conduct Kick-Off Meeting, transfer of fuel, disposal of remaining fuel, tank cleaning, performing UT and roundness survey, complete API Out-of-Service aboveground storage tank (AST) Internal tank inspection, complete containment testing, and complete DRAFT and FINAL reports.

0005 1 Job API Internal Tank Inspection Service –Facility 88072

FFP

All work to conduct Kick-Off Meeting, transfer of fuel, disposal of remaining fuel, tank cleaning, performing UT and roundness survey, complete API Out-of-Service aboveground storage tank (AST) Internal tank inspection, complete containment testing, and complete DRAFT and FINAL reports.

0005 1 Job API External Tank Inspection Service –Facility 88044

FFP

All work to conduct Kick-Off Meeting, Complete API external tank inspection, complete containment testing, UT scan, and complete DRAFT and FINAL reports.