52.212-1 Addendum - HOO.pdf
PDF 103 KB Posted
- Attached to
- Fort Hood Tank Inspection
- Solicitation number
- W9128F25QA101
About this file
This document is a Request for Quote (RFQ) from the U.S. Army Corps of Engineers for a tank-related service involving fuel management and inspection. The solicitation requires quoters to submit a 5-page proposal including technical capability (inspector's certification and resume), experience (three previous projects demonstrating specific capabilities like draining fuel, disposing of unacceptable fuel, cleaning tanks, and performing API 653 inspections), and separate pricing documentation. Quoters must submit electronically to the Contract Specialist and Contracting Officer, with quotes valid for 60 calendar days. Key requirements include providing references with project details, points of contact, and evidence of comparable work complexity. The document notes that funds are not currently available, and no award will be made until funding is secured. Contractors are advised that while the U.S. Army Corps of Engineers is exempt from state and local taxes, contractors are not exempt in transactions with vendors or subcontractors.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please provide the following information with your proposal:
Company’s Name as it appears on SAM:
Company’s Address as it appears on SAM:
CAGE CODE:
DUNS:
TIN:
(b) Submission of quotes. Submit signed and dated quotes to the office specified in this solicitation at or before the exact time specified in this solicitation. Quotes may be submitted on the SF1449, letterhead stationery, or as otherwise specified in the solicitation. Quotes must be submitted electronically, unless other arrangements have been made. Send completed quotes to the Contract Specialist at CS EMAIL and the Contracting Officer at KO EMAIL. The proposal shall consist of one (1) pdf document not to exceed 5 pages. The price worksheet, cover page, amendment acknowledgements, and/or any representations or certifications will not count towards the 5-page limit. The Government may not review any additional pages after 5. As a minimum, quotes must include with their proposal:
(1) The solicitation number;
(2) The name, address, federal tax identification, email, and telephone number of the quoter;
(3) Names, title, email, and telephone number of persons authorize to negotiate and sign the proposal;
(4) All required technical, past performance, and price factor information stated in FAR 52.212-1 Addendum and FAR 52.212-2, Evaluation – Commercial Items;
(5) A statement specifying agreement will all terms, conditions, and provisions included in the solicitation. Quotes that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration;
(6) Acknowledgement of Solicitation Amendments, if applicable;
(c) Period for acceptance of quotes. The quoter agrees to hold the prices in its quote firm for 60 calendar days from the date specified for receipt of quotes.
(m) Questions. All questions pertaining to this combined synopsis and solicitation shall be in writing, directed to the attention of the Contract Specialist and Contracting Officer at the above listed email addresses in paragraph (b). All questions shall be submitted not later than seven (7) calendar days prior to the proposal due date, in order to ensure adequate time is allotted for form an appropriate response and if needed, amend the solicitation. Quoters are requested to review the solicitation in its entirety for answers to questions, prior to submitting a new question.
(n) State and Local Taxes:
The U.S. Army Corps of Engineers is exempt from paying state and local taxes per Title 4 United States Code 104- 107. The U.S. Army Corps of Engineers Tax ID Number is 62-1642142. Contractors performing services for the U.S. Army Corps of Engineers are not exempt from state and local taxes in transactions with vendors, suppliers or subcontractors.
(o) Instructions for quoters for evaluation purposes:
1. Technical Capability – The quoter shall provide the inspector’s certification, and one page resume for the inspector proposed to perform the work.
2. Experience – The quoter shall provide three previous projects completed as experiential references of projects completed within the past five (5) years. Experience consists of projects completed as a prime contractor or projects complete as a qualified subcontractor that have the capabilities to perform this work. If performance of any work is to be completed by a subcontractor, the quoter shall identify the work to be completed and the experience of the subcontractor. Unfinished projects or projects awarded, but where work has not yet commenced, will not be considered. These references shall be equal to or similar in scope and complexity of this requirement. Example projects shall contain evidence of the quoter’s experience in:
1. _X___ draining fuel
2. _X___ disposing of unacceptable fuel
3. _X___ cleaning the tank
4. ____ the performance of an STI inspection
5. __X_ the performance of an API 653 inspection
6. ____ the performance of an API 570 inspection
7. __X_ the installation of new wiper seals
8. ____ the creation of a strapping chart
The contractor shall provide dates of performance and pertinent information to demonstrate how they are comparable to this requirement in size and complexity. The contractor shall include points of contact, titles, telephone numbers, and email addresses (if available) for all references.
3. Price – The quote shall be inclusive of all costs to perform the work specified in the PWS. In the event of an arithmetic discrepancy between the unit price and the CLIN subtotal, or contract total, the unit price will prevail. Pricing must be submitted separate from the experience and technical capability submissions.
4. Funds are not presently available for the award of this action. No award will be made until funds are available.
File details come from the government source that posted it. Updated .