Clarksburg CH Phase 1 Drawings - Volume 2 Conformed Set.pdf
PDF 23 MB Posted
- Solicitation number
- 47PD0224R0048
About this file
This document is a solicitation (Solicitation Number: 47PD0224R0048) issued by the General Services Administration (GSA) Public Buildings Service Region 3 for Construction Manager as Constructor (CMc) Services for the Phases 2-5 Repairs and Alterations Prospectus for the U.S. Courthouse in Clarksburg, West Virginia. The project scope includes major renovations to the interior finishes, mechanical, electrical, and plumbing (MEP) systems, stairs, elevators, courtrooms, judges' chambers, clerk's space, and U.S. Marshals Service (USMS) space. The government intends to deliver this requirement using the CMc project delivery method with a Guaranteed Maximum Price (GMP) contract, Construction Contingency Allowance (CCA), and shared savings. The solicitation is subject to the mandatory use of a Project Labor Agreement. The technical evaluation factors are listed in descending order of importance and are significantly more important than price. The submission includes two phases, with Phase I technical proposals due on August 30, 2024, and Phase II price proposals due on a date to be announced. The estimated total construction cost for the project falls within the range of $40,000,000.00 to $50,000,000.00.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FI
LE
N
AM
E:
OU
R
RE
F:
PL
OT
D
AT
E:
1/1
7/2
4 2 :18
:24 P
M
4.5
FA
1.D W
G
CONFORMED CONSTRUCTION SET
SUMMER
CONSULTANTS
I N C O R P O R A T E D
SUMMER
CONSULTANTS
ABBREVIATIONSSYMBOLS
MANUAL PULL STATIONF
WATERFLOW SWITCHWF
TAMPER SWITCHTS
AIM ADDRESSABLE INPUT MODULE/MONITOR MODULE
AOM ADDRESSABLE OUTPUT MODULE/CONTROL MODULE
NAP NOTIFICATION APPLIANCE POWER PANEL
DIGITAL ALARM COMMUNICATION TRANSMITTERDACT
SMOKE DETECTOR; CEILING MOUNT
SPEAKER; CEILING MOUNTS
SPEAKER / STROBE; CEILING MOUNT
CD = CANDELA RATING
CD
LCD LIQUID CRYSTAL DISPLAY ANNUNCIATOR
BATT BATTERY CABINET
AREA OF WORK
A AMPERES
AC ABOVE CEILING
AS ASPIRATING SMOKE
ADS ACOUSTICALLY DISTINGUISHABLE SPACE
AFF ABOVE FINISHED FLOOR
AHJ AUTHORITY HAVING JURISDICTION
AMP AMPLIFIER
AWG AMERICAN WIRE GAUGE
C CEILING MOUNT
CL CEILING LEVEL
D DRAIN
DN DOWN
ELEV. ELEVATOR
EMT ELECTRICAL METALLIC TUBING
ETR EXISTING TO REMAIN
(E) EXISTING
F FIRE LINE
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FATC FIRE ALARM TERMINAL CABINET
LOC LOCAL OPERATING CONSOLE
MNS MASS NOTIFICATION SYSTEM
NAC NOTIFICATION APPLIANCE CIRCUIT
N.I.C. NOT IN CONTRACT
NICET NATIONAL INSTITUTE FOR
CERTIFICATION IN ENGINEERING
TECHNOLOGIES
P PHOTOELECTRIC
SLC SIGNALING LINE CIRCUIT
SP SPRINKLER PIPING
TR TAMPER-RESISTANT
TYP. TYPICAL
U UNDER FLOOR
WP WEATHERPROOF
MODIFICATION OF THE FIRE ALARM SYSTEM IN
THIS AREA IS NOT IN CONTRACT (N.I.C.)
FACP FIRE ALARM CONTROL PANEL
SURGE PROTECTORSPD
DUCT DETECTOR
GENERAL SYMBOLS
FA101
N
8'0 1/8"=1'-0"
UNIQUE PLAN OR
DETAIL NUMBER
ON THIS DRAWING NORTH ARROW
NAME OF PLAN OR DETAIL
ALL DRAWINGS WHERE
THIS DETAIL IS
REFERENCED FROM
GRAPHIC SCALE OF
THIS PLAN OR DETAIL
SECTION IDENTIFICATION
INDICATES DIRECTION
OF CUTTING PLANE
NUMBER INDICATES SECTION
SHEET NUMBER WHERE
SECTION IS DRAWN
2-PART REFERENCE DETAIL IDENTIFICATION:
SHEET NUMBER WHERE
DETAIL/SECTION IS DRAWN
NUMBER INDICATES
DETAIL/SECTION
FLOOR PLAN
FA101,FA1022
FLOOR PLAN AND DETAIL TITLES:
FA101
N
(E)
REVISION CLOUD WITH REVISION
NUMBER DESIGNATION
BREAKLINE
MATCHLINE DESIGNATIONM A T C H L I N E A-A
EXISTING
POINT OF CONNECTION TO EXISTING
POINT OF TERMINATION OF REMOVAL
NOTE NUMBER#
ARROW INDICATES TRUE NORTH
AND/OR PROJECT NORTH.
ROOM NUMBER
COLUMN LINE NUMBER
NORTH ARROW
FIRE ALARM ZONE
ELECTRONIC ALARM BELL
SPRINKLER ZONE CONTROL ASSEMBLYZCA
STROBE; CEILING MOUNT
CD = CANDELA RATING
CD
DH DOOR HOLD
FIRE ALARM REQUIREMENTS
1. PROVIDE VOICE FIRE ALARM AND DETECTION SYSTEM AS INDICATED ON THE FLOOR PLANS. PROVIDE SYSTEM IN
ACCORDANCE WITH 2018 EDITION P100 FIRE PROTECTION FOR FACILITIES AND 2019 EDITION OF NFPA 72 FIRE
ALARM AND SIGNALING CODE.
2. RETAIN THE EXISTING SIEMENS FIREFINDER XLS FIRE ALARM CONTROL PANEL IN THE BASEMENT TO SERVE
EXISTING FIRE ALARM EQUIPMENT OUTSIDE THE SCOPE OF WORK.
3. PROVIDE CLASS X WIRING FOR RISER AND CLASS B WIRING FOR SLC, NAC, AND AMP CIRCUIT. PROVIDE TWO DISTINCT NAC AND AMP CIRCUITS ON THE FIRST FLOOR. PROVIDE DEDICATED SLC FOR THE FIRST FLOOR. PROVIDE MINIMUM 18 AWG FOR SLC, MINIMUM 16 FOR NAC, AND FOLLOW MANUFACTURER GUIDELINES FOR AMPLIFIER
CIRCUIT SIZE.
4. INSTALL FIRE ALARM CONDUCTORS IN MINIMUM 3/4-INCH DIAMETER EMT CONDUIT. CONDUIT MUST BE RED AND
MUST NOT EXCEED THE NATIONAL ELECTRICAL CODE MAXIMUM FILL CAPACITY.
5. PROVIDE CONDUCTORS IN EMT. EXPOSED WIRING WILL NOT BE PERMITTED IN ANY PORTION OF THE BUILDING.
FLEXIBLE METALLIC CONDUIT NOT EXCEEDING 6 FEET IS PERMITTED FOR TERMINATIONS AT DEVICES. ROUTE EMT
CONDUIT TIGHT TO STRUCTURE.
6. PLACE EQUIPMENT AT CENTER OF ACOUSTICAL CEILINGS TILES. SEE ARCHITECTURAL DRAWINGS FOR REFLECTED
CEILING PLAN PATTERN DESIGNATIONS.
7. DRAWINGS ARE DIAGRAMMATIC IN NATURE AND ARE NOT INTENDED TO BE USED FOR COMPLETE SYSTEM DESIGN.
COORDINATE SYSTEM COMPONENTS WITH ALL OTHER DISCIPLINES AND TRADES.
8. PROVIDE A FIRE ALARM SYSTEM DESIGNER WITH A MINIMUM NICET LEVEL III CERTIFICATION IN FIRE ALARM SYSTEM TECHNOLOGY OR A LICENSED PROFESSIONAL FIRE PROTECTION ENGINEER RESPONSIBLE FOR THE FIRE ALARM
SYSTEM DESIGN.
9. CHANGES TO THE DESIGN AND EQUIPMENT INSTALLATION IS THE RESPONSIBILITY OF CONTRACTOR. PROVIDE
DESIGN SERVICES OF A LICENSED PROFESSIONAL FIRE PROTECTION ENGINEER.
10. EXPOSED WIRING WILL NOT BE PERMITTED IN ANY PORTION OF THE BUILDING. FLEXIBLE METALLIC CONDUIT NOT EXCEEDING 6 FEET IS PERMITTED FOR TERMINATIONS AT DEVICES. ROUTE EMT CONDUIT TIGHT TO STRUCTURE.
11. T-TAPS ARE NOT PERMITTED. CONDUIT TERMINATIONS MUST BE ON SCREW TERMINALS OF SYSTEM COMPONENT.
WIRE NUTS ARE PROHIBITED.
12. PROVIDE A LABEL FOR EACH WIRE/CIRCUIT (WITHIN ALL PANELS, CABINETS AND JUNCTION BOXES) INDICATING IT'S PURPOSE AND LOCATION. LABELS MUST BE A MINIMUM FONT SIZE OF 1/4" AND ARIAL NARROW. EXAMPLE OF A
FIRST FLOOR SIGNALING LINE CIRCUIT ONE OF TWO IS SLC-CIR1-FL1.
13. PROVIDE 25% ADDITIONAL CIRCUIT CAPACITY FOR STROBES AND SPEAKERS.
14. VISUAL NOTIFICATION WILL BE STROBES. AUDIBLE NOTIFICATION WILL BE SPEAKERS. EQUIPMENT WILL BE WHITE, VISUAL DEVICES WILL HAVE "ALERT" LETTERING.
15. PROVIDE TAMPER-RESISTANT STROBES IN PRISONER SPACES PER USMS PUBLICATION 64. DO NOT PROVIDE FIRE
ALARM NOTIFICATION DEVICES IN DETENTION CELLS.
16. PANELS MUST BE FACTORY PAINTED RED.
17. SEAL WALL AND FLOOR PENETRATIONS WITH A UL LISTED FIRESTOPPING ASSEMBLY. FIRESTOPPING SYSTEM MUST
MATCH THE RATING OF THE PENETRATED WALL/FLOOR.
18. ALL REQUIRED OUTAGES OF THE FIRE ALARM SYSTEM SHALL BE COORDINATED THROUGH THE CONTRACTING OFFICER NOT LESS THAN 15 WORKING DAYS IN ADVANCE. THE GOVERNMENT WILL PROVIDE THE REQUESTED OUTAGE AND ASSOCIATED RESTORATION OF THE FIRE ALARM SYSTEM. THE GOVERNMENT WILL IDENTIFY TO THE CONTRACTOR WHAT CIRCUITS/DEVICES HAVE BEEN TAKEN OUT OF SERVICE ONCE THE OUTAGE HAS BEEN MADE.
THIS WORK SHALL BE PERFORMED BY THE CONTRACTOR. OUTAGES DO NOT INCLUDE CONNECTION OF NEW FIRE ALARM DEVICES, AND/OR WIRING TO EXISTING SYSTEMS, OR PROGRAMMING CHANGES NECESSARY TO
ACCOMMODATE NEW WORK.
19. AN EXCLUSIVE GOVERNMENT CONTRACTOR/VENDOR RESPONSIBLE FOR MAINTAINING GOVERNMENT FIRE ALARM SYSTEMS SHALL BE OBTAINED FOR TIE IN OF NEW WORK AND/OR REPROGRAMMING OF OPERATING, EXISTING FIRE
ALARM, AT CONTRACTORS COST.
12. A FIRE WATCH, AT CONTRACTOR'S COST, WILL BE CONDUCTED CONTINUOUSLY THROUGHOUT THE DURATION OF THE OUTAGE IN ALL AREAS AFFECTED BY THE OUTAGE. FINDINGS/COMMENTS WILL BE DOCUMENTED HOURLY ON FIRE WATCH FORMS. DOCUMENTATION OF FINDINGS WILL BE MADE AVAILABLE TO THE AUTHORITY UPON THEIR REQUEST. IN THE EVENT OF ANY FIRE/SMOKE EMERGENCIES DISCOVERED DURING THE FIRE WATCH, EMERGENCY
NOTIFICATION WILL BE PROVIDED TO THE PREDETERMINED POINT OF CONTACT.
13. OUTAGES WILL NOT BE PERMITTED TO TAKE PLACE FOR THE ENTIRE DURATION OF THE PROJECT. OVERNIGHT OUTAGES WILL NOT BE PERMITTED UNLESS WORK IS BEING DONE DURING THAT TIME PERIOD AND THE FIRE ALARM SYSTEM IS PUT BACK INTO SERVICE WITHIN AN HOUR FROM COMPLETION OF WORK. OUTAGES SHALL BE LIMITED
TO 8 HOURS.
14. THE FIRE ALARM SYSTEMS IS NOT PERMITTED TO HAVE AN OUTAGE FOR MORE THAN AN HOUR BEFORE STARTING WORK. THE FIRE ALARM SYSTEM SHALL BE RESTORED WITHIN AN HOUR OF COMPLETION OF WORK. THE
CONTRACTOR CANNOT LEAVE THE CONSTRUCTION SITE UNPROTECTED.
15. ALL WORK ON THE FIRE ALARM SYSTEM CAN ONLY OCCUR THE FOLLOWING DATES/TIMES WHEN THE BUILDING IS
OCCUPIED:
15.1. MONDAY-FRIDAY: 6:00 PM-6:00 AM.
15.2. WEEKENDS: ANY TIME.
15.3. FEDERAL HOLIDAY: ANY TIME.
16. UNLESS OTHERWISE NOTED, CEILINGS ARE 10' OR LESS. CEILING HEIGHT IN EXCESS OF 10' IS IDENTIFIED WITH
CEILING HEIGHT AFF.
DD - DUCT DETECTOR
DR - DOOR RELEASE
ST - ELEVATOR SHUNT TRIP
PR - PRIMARY ELEVATOR RECALL
SR - SECONDARY ELEVATOR RECALL
FH - FIREMAN'S HAT
WF - WATER FLOW
TS - TAMPER SWITCH
EP - ELEVATOR POWER MONITOR
FACP (E)
N
8'0 16' 1/8"=1'-0"
BASEMENT FLOOR PLAN - DEMOLITION1
MAINTENANCE
SHOP
OFFICES USPSBREAK
ROOM
LOCKER/STORAGE
ROOM
MARINE
RECRUIT
CORRIDOR STAIR 1
CORRIDOR
CORRIDOR
SUPPORT
ENGINEER
PLANT
ENGINEER
MEN'S
TOILET
WOMEN'S
TOILET
NAVY
RECRUIT
TELEPHONE
ROOM BUILDING
NAVY
RECRUIT
CORR.
VEST.
CORRIDOR
STORAGE
MACHINE
ROOM
MACHINE
SHOP
MACHINE
ROOM
US MARSHAL
VAULT
US DISTRICT
COURT VAULT
CONFERENCE
ROOM
POSTAL
EQUIPMENT
CUSTODIAL
SHOP
JANITOR
CORRIDOR
CORRIDOR
CORRIDOR
ELEV. 1
CORRIDOR JANITOR
SUPPLIES
MAINTENANCE
ENGINEER
USPS STORAGE
ROOM CLOSET
COURT STORAGE
AREA
AREAWAYAREAWAY
BOILER
CHIMNEY
FITNESS ROOM
BOILER AND
MECHANICAL ROOM
CRAWL SPACE
AIM
AIM
B
BATT (E)
CONFORMED CONSTRUCTION SET
FI
LE
N
RE
F:
PL
OT
D
AT
E:
4/2
/20
3:
:21 P
M
4.5
FD
1- B1
.D W
G
SUMMER
CONSULTANTS
I N C O R P O R A T E D
SUMMER
CONSULTANTS
NOTES
GENERAL NOTES
G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND
COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.
G2. DEMOLITION DEFINITION: DISCONNECT AND REMOVAL OF ASSOCIATED
CONDUCTORS SHALL CONSIST OF THE REMOVAL OF THE CONDUCTORS
BACK TO THE NEXT EXISTING DEVICE TO REMAIN. NEW CONDUIT AND
CONDUCTORS SHALL BE PROVIDED TO RECONNECT ANY EXISTING TO
REMAIN DEVICES INTERRUPTED BY THE DEMOLITION UNDER THIS
PROJECT.
1. DISCONNECT AND REMOVE FIRE ALARM EQUIPMENT INCLUDING BUT NOT
LIMITED TO NOTIFICATION APPLIANCES, PULL STATIONS, AND SMOKE
DETECTORS.
8'0 16' 1/8"=1'-0"
FIRST FLOOR PLAN - DEMOLITION1
CLOSET
CORRIDOR
CORRIDOR
MAILING
VESTIBULE
CELLBLOCK
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
VESTIBULE
SUPPLY CLOSET
TELEPHONE
VESTIBULE
WOMENS
MENS
JANITOR
COPY ROOM
BREAKROOM
CONFERENCE
SQUAD ROOM
FIT ROOM
MENS LOCKER
WOMENS
LOCKER
WARRANTS PRIVATE OFFICE
ADMINISTRATION
ADMIN OFFICER
ELEVATOR MECH
STORAGE
ELEC.
CLOSET
STORAGE
RECEPTION
BUILDING AND
GROUNDS
TRASH
LOADING DOCK
OFFICE
MARSHAL
PRIVATE OFFICE
TOILET
SECURE
STORAGE
VAULT
INTERVIEW
INTERVIEW
DATA
CELLBLOCK
CONTROL
VEHICLE SALLY
PORT
CORRIDOR
STAIR 1
ELEV 1
STAIR 3
PRISONER
ELEV
OFFICE
TOILET
INTERVIEW
INTERVIEW
SCREENING
EQUIPMENT AREA
WORK ROOM
LUNCH ROOM AND
VENDING AREA
MEN'S LOCKER
ROOM
PROCESSING
EXISTING
ELEV 3 ELEVATOR
VESTIBULE
CORRIDOR
WOMEN'S TOILET VAULT
POST OFFICE /
MAILROOM
SCHEME ROOM
CONFERENCE /
TRAINING
WOMEN'S TLT
MEN'S TOILET
PRIVATE
TOILET
CORRIDOR
F
F
F
B
F
FI
LE
N
RE
F:
PL
OT
D
AT
E:
1/1
7/2
4 2 :18
:30 P
M
4.5
FD
2-
.D W
G
CONFORMED CONSTRUCTION SET
SUMMER
CONSULTANTS
I N C O R P O R A T E D
SUMMER
CONSULTANTS
NOTES
1. DISCONNECT AND REMOVE FIRE ALARM EQUIPMENT INCLUDING BUT NOT
LIMITED TO NOTIFICATION APPLIANCES, PULL STATIONS, AND SMOKE
DETECTORS.
GENERAL NOTES
G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND
COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.
G2. DEMOLITION DEFINITION: DISCONNECT AND REMOVAL OF ASSOCIATED
CONDUCTORS SHALL CONSIST OF THE REMOVAL OF THE CONDUCTORS
BACK TO THE NEXT EXISTING DEVICE TO REMAIN. NEW CONDUIT AND
CONDUCTORS SHALL BE PROVIDED TO RECONNECT ANY EXISTING TO
REMAIN DEVICES INTERRUPTED BY THE DEMOLITION UNDER THIS
PROJECT.
OS
OS
OS
OS OS
N
8'0 16' 1/8"=1'-0"
BASEMENT FLOOR PLAN1
FACP FACP
NAP
AIM
AIM
15 15
S
S
AIM
AIM
AOM
AOM
AOM
AIM
NAP
AIMAIM
AOM
AHU-2
AHU-5
AHU-1
AHU-3
BATT(E)
(E)
JUDGES' EL.
EL 1
OFFICES USPS
BREAK ROOM
MARINE RECRUIT
CORRIDOR
STAIR 1
SUPPORT ENGINEER
PLANT ENGINEER
MEN'S TOILET
WOMEN'S TOILET
NAVY
RECRUIT
NAVY
RECRUIT
CORRIDOR
US MARSHAL
VAULT
US DISTRICT
COURT VAULT
POSTAL EQUIPMENT
CORRIDOR
ELEV 01
JANITOR SUPPLIES
COURT STORAGE
AREA
AREAWAY
AREAWAY
BOILER
CHIMNEY
CRAWL SPACE
MECHANICAL ROOM
STAIR 2
SECURE CORRIDOR
ELECTRICAL ROOM
FITNESS ROOM
CORRIDOR
STORAGE
MAINTENANCE SHOP
CONFERENCE ROOM
CUSTODIAL SHOP
CORRIDOR
EMR
SALLY
PORT
TELEPHONE ROOM
BUILDING
ELEVATOR
EL 04
PRISONER
S S S
S S S
S S S
S
S
ELEV
AOMAOM
AOM
AOM
AIM
TS
WF
TS
WF
DD
DD
WFTS TS
ST
EP
FH
SR
PR
DD
DD
AIM
TS
EMR
PIT
TR
FI
LE
N
RE
F:
PL
OT
D
AT
E:
4/2
/20
3:
:30 P
M
4.5
FA
1- B1
.D W
G
CONFORMED CONSTRUCTION SET
SUMMER
CONSULTANTS
I N C O R P O R A T E D
SUMMER
CONSULTANTS
GENERAL NOTES
G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND
COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.
G2. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS CONTRACT UNLESS
SPECIFICALLY MARKED "EXISTING", "EXIST", OR "(E)".
G3. WHERE CONDUIT PENETRATES PARTITIONS WITH A SPECIFIED STC RATING,
SEAL PENETRATIONS TO MEET STC RATING SPECIFIED. SEE
ARCHITECTURAL PARTITION DETAILS FOR ADDITIONAL INFORMATION.
NOTES
1. PROVIDE FIRE ALARM SYSTEM IN ACCORDANCE WITH NFPA 72 AND P100.
2. PROVIDE ADDRESSABLE FACP WITH VOICE CAPABILITY AND ADDITIONAL
NAP(S) TO SERVE FIRE ALARM NOTIFICATION IN AREAS OF WORK. RETAIN
EXISTING FACP TO SERVE AREAS OUTSIDE SCOPE OF WORK. EXISTING
FACP TO BE MONITORED BY THE NEW FACP.
3. PROVIDE MONITOR MODULES FOR SPRINKLER SYSTEM WATER FLOW AND
TAMPER SWITCHES.
4. NOT USED.
5. PROVIDE CONTROL MODULE FOR AHU SHUTDOWN. PROVIDE DUCT
DETECTOR ON SUPPLY SIDE OF AHU.
6. PROVIDE FOUR (4) CONTROL MODULES FOR ELEVATOR SHUNT TRIP,
PRIMARY RECALL, SECONDARY RECALL, AND FIREMAN'S HAT. PROVIDE
ONE (1) MONITOR MODULE FOR ELEVATOR POWER MONITORING.
8'0 16' 1/8"=1'-0"
FIRST FLOOR PLAN1
F
F
AIM
AIM
S S S
S
S
S S
S S15
15 15 15
15 15
S
SS
S
FIRE ALARM ZONE 1
FA
CP
FATC
LC
D
ELEV
S
S
CLO.
CORR.
MAIN CORRIDOR/
PRE-FUNCTION
101A
SOUND
LOCK
115 EXHIBITS
TRIAL JURY
ROOM
JURY CORRIDOR
MAIN
CORRIDOR
COURTROOM
EQUIP. STORAGE
PRISONER
PROCESSING
SALLY
PORT
145C CORRIDOR
143B
RESTRICTED CORRIDOR
RESTRICTED
CORRIDOR
DISTRICT
COURTROOM
JURY
TLT. RM.
JURY
TLT. RM.
TLT RM
132B
VESTIBULE
132A
ROOM
COPY/
WORKROOM
JUDGE'S
OFFICE
LAW
CLERK
LAW
CLERK
JUDICIAL
ASSISTANT
RECEPTION
BREAK
ROOM
COURT
REPORTER
COURT
REPORTER
CORRIDOR
STAIR 2
120B
STO.
123A
VESTIBULE
STO.
120A
TELECOM
CLOSET
SOUND
LOCK
SALLY
PORT
122C
HOLD.
CELL
122D
RESTR.
CONFERENCE
SCREENING
VESTIBULE
100A
ENTRANCE
LOBBY
EXIT
LOBBY
VACANT
(FUTURE
COURTROOM)
VACANT
(FUTURE JUDGES'
CHAMBERS)
MAIN
LOBBY
VACANT
VACANT (FUTURE
JURY ASSEMBLY) VACANT
(FUTURE
CLERK'S
OFFICE)
MENS
VEHICLE SALLY
PORT
LOADING DOCK
CORRIDOR CONFERENCE WARRANTS PRIVATE OFFICE
OFFICE
COPY ROOM
CORRIDOR
BREAKROOM
MARSHAL
PRIVATE OFFICE ADMINISTRATION
RECEPTION
ADMIN OFFICER
CORRIDOR
SECURE
STORAGE
SQUAD ROOM
TRASH
BUILDING AND
GROUNDS
CORRIDOR
MENS LOCKER
WOMENS LOCKER
FIT ROOM
CORRIDOR
VAULT INTERVIEW INTERVIEW
INTERVIEW
INTERVIEW
STORAGE
ELEVATOR
MECH
STAIR 3
CELLBLOCK
PRISONER
ELEV 03
CL.
STAIR 1
ELEV 01
PRISONER
ELEVATOR
122B
EL 04
15 15
F
WF
TS
S S
S
16'-7"AFF
16'-7"AFF
16'-7"AFF
16'-7"AFF
16'-7"AFF
15'-7"AFF
15'-7"AFF
14'AFF
11'-8"AFF
13'-2"AFF (TYP)
TR
TR
TR
TR
TR
TR
TR
TR
TR
15'-7"AFF
ATTORN./WIT.
ATTORN./WIT.
ROOM 2
ROOM 1
FI
LE
N
RE
F:
PL
OT
D
AT
E:
4/2
/20
3:
:19 P
M
4.5
FA
2-
.D W
G
CONFORMED CONSTRUCTION SET
SUMMER
CONSULTANTS
I N C O R P O R A T E D
SUMMER
CONSULTANTS
GENERAL NOTES
G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND
COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.
G2. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS CONTRACT UNLESS
SPECIFICALLY MARKED "EXISTING", "EXIST", OR "(E)".
G3. WHERE CONDUIT PENETRATES PARTITIONS WITH A SPECIFIED STC RATING,
SEAL PENETRATIONS TO MEET STC RATING SPECIFIED. SEE
ARCHITECTURAL PARTITION DETAILS FOR ADDITIONAL INFORMATION.
NOTES
1. PROVIDE FIRE ALARM SYSTEM IN ACCORDANCE WITH NFPA 72 AND P100.
2. PROVIDE MONITOR MODULES FOR SPRINKLER ZONE CONTROL ASSEMBLY.
3. PROVIDE FIRE ALARM TERMINAL CABINET FOR ADDITION OF FIRST FLOOR
FIRE ALARM DEVICES.
4. PROVIDE ELECTRONIC WATER FLOW ALARM BELL.
5. PROVIDE LCD ANNUNCIATOR PANEL IN COMMON AREA NEAR MAIN LOBBY.
6. DETENTION AREA FACP WILL BE CONSTANTLY MONITORED FOR
NOTIFICATION / EVACUATION. PROVIDE TAMPER-RESISTANT STROBES IN
PRISONER SPACES.
7. PROVIDE A DEDICATED FACP FOR DETENTION & CORRECTIONAL AREA.
8. NOT USED.
S
AIM AOM
N
8'0 16' 1/8"=1'-0"
SECOND FLOOR PLAN1
AHU-6
AIM
MECHANICAL PLATFORM
MECHANICAL PENTHOUSE
JURY ROOM
IT OFFICE
CORRIDOR
CORRIDOR
TLT RM
WOMEN'S TLT
MEN'S TLT
CORRIDOR
TLT RM TLT RM CLOSET
CORRIDOR
MAGISTRATE MAGISTRATE ATTORNEY/
WITNESS
CONFERENCE
CELL
CELL
CORR
CSO OFFICE CONFERENCE ROOM CORRIDOR
OFFICE
CORR
CONFERENCE ROOM
JUDICIAL ASSISTANT
OFFICE
JUDGE'S
CHAMBERS
COURTROOM COURTS OFFICE SPACE
DEPUTY
CLERK
COURTROOM
ATTORNEY
CONFERENCE
ROOM
RECEPTION
LOBBY
CORRIDOR
COURTROOM
BELOW
COURTROOM
BELOW
STAIR 1
STAIR 2
CL.
PRISONER
ELEV
WF
TS
DDS
CONFORMED CONSTRUCTION SET
FI
LE
N
RE
F:
PL
OT
D
AT
E:
4/2
/20
3:
:01 P
M
4.5
FA
3-
.D W
G
SUMMER
CONSULTANTS
I N C O R P O R A T E D
SUMMER
CONSULTANTS
GENERAL NOTES
G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND
COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.
G2. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS CONTRACT UNLESS
SPECIFICALLY MARKED "EXISTING", "EXIST", OR "(E)".
G3. WHERE CONDUIT PENETRATES PARTITIONS WITH A SPECIFIED STC RATING,
SEAL PENETRATIONS TO MEET STC RATING SPECIFIED. SEE
ARCHITECTURAL PARTITION DETAILS FOR ADDITIONAL INFORMATION.
NOTES
1. PROVIDE FIRE ALARM SYSTEM IN ACCORDANCE WITH NFPA 72 AND P100.
2. PROVIDE MONITOR MODULES FOR SPRINKLER SYSTEM WATER FLOW AND
TAMPER SWITCHES.
3. PROVIDE CONTROL MODULE FOR AHU SHUTDOWN.
1/8"=1'-0"
THIRD FLOOR PLAN1
MEN'S TLT
WOMEN'S TLT
TLT RM
CORRIDOR
CORRIDOR
CORRIDOR
VESTIBULE
CORRIDOR
CORRIDOR
UPPER PART OF
COURTROOM OPEN
TO BELOW
UPPER PART OF
LIBRARY OPEN TO
BELOW
UPPER PART
OF OFFICES
OPEN TO
BELOW
UPPER PART
OF OFFICES
OPEN TO
BELOW
JANITOR
CLOSET
STAIR 4
LAW CLERK
TLT RM
CLOSET
CLOSET
TLT RM
TLT RM BREAK ROOM
CLOSET
JURY
CONFERENCE
ROOM
STAIR 3
STAIR 1
ELEV 1
CHIEF DEPUTY CONFERENCE ROOM
BREAK ROOM
WORK/COPY AREA
CLERKS OFFICE
OFFICE
US ATTORNEY
OFFICE
OFFICE/
CONFERENCE ROOM
OFFICE/PANTRY
OFFICE
COURTROOM
CLOSET
EXISTING FIRST
FLOOR ROOF
BEYOND
EXISTING MAILING
PLATFORM ROOF
BEYOND
STAIR 2 ROOF
NEW MECHANICAL
PENTHOUSE ROOF
FIRST FLOOR ROOF
BELOW
VEST.
FI
LE
N
RE
F:
PL
OT
D
AT
E:
4/2
/20
3:
:10 P
M
4.5
FA
4-
.D W
G
CONFORMED CONSTRUCTION SET
SUMMER
CONSULTANTS
I N C O R P O R A T E D
SUMMER
CONSULTANTS
GENERAL NOTES
G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND
COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.
G2. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS CONTRACT UNLESS
SPECIFICALLY MARKED "EXISTING", "EXIST", OR "(E)".
G3. WHERE CONDUIT PENETRATES PARTITIONS WITH A SPECIFIED STC RATING,
SEAL PENETRATIONS TO MEET STC RATING SPECIFIED. SEE
ARCHITECTURAL PARTITION DETAILS FOR ADDITIONAL INFORMATION.
N
RE
F:
PL
OT
D
AT
E:
4/2
/20
3:
:18 P
M
4.5
FA
1.D W
G
CONFORMED CONSTRUCTION SET
SUMMER
CONSULTANTS
I N C O R P O R A T E D
SUMMER
CONSULTANTS
ANNUNCIATION NOTIFICATION CONTROL
AL
AR
M
AN
NU
NC
IA
TI
ON
A
T
FA
CP
/F
AA
P
AN
D
SE
ND
S
TA
TU
S
TO
CE
NT
RA
L S
TA
TI
ON
SU
PE
R
VI
SO
R
Y
AN
N U
N C
IA
TI
O N
A T
FA
C
P/
FA
AP
AN
D S
EN
D
S
TA
TU
S
TO
C
EN
TR
AL
S
TA
TI
O N
TR
O
U
BL
E
AN
N U
N C
IA
TI
O N
A T
FA
C
P/
FA
AP
AN
D S
EN
D
S
TA
TU
S
TO
C
EN
TR
AL
S
TA
TI
O N
AC
TI
VA
TE
V
IS
U
AL
A N
D A
U D
IB
LE
N O
TI
FI
C
AT
IO
N
G
EN
ER
AL
E
VA
C
U
AT
IO
N
FI
R
ST
L
EV
EL
E
LE
VA
TO
R R
EC
AL
L
SE
C O
N D
L
EV
EL
E
LE
VA
TO
R
R
EC
AL
L
FI
R
E H
AT
L
IG
H
T
ST
EA
D
Y O
N
EL
EV
AT
O
R P
O W
ER
S
H U
N T
TR
IP
(E )N
AC
B
E- 3E
BASEMENT
FIRST FLOOR
(E)
FACP
FIREFINDER
SECOND FLOOR
THIRD FLOOR
ATTIC
NO SCALE
FIRE ALARM RISER DIAGRAM1 FIRE ALARM MATRIX
MANUAL PULL STATION
FACP
MAINTENANCE ENGINEER ROOM
AIM AIM
WFTS
(E )S
LC
B
E- 3E
(E)WIRE
TROUGH(E)NAC BE
(E)SLC BE
EXISTING APPLIANCES
EXISTING DEVICES
CTRL
CT
RL
SL
C
B-
AM
P
B-
AN
N
WIRE
TROUGH
SPD
PROVIDE DEDICATED 120V 20A CIRCUIT
NAP
SPD
PROVIDE DEDICATED 120V 20A CIRCUIT
NAC B
AMP B
SLC B
NAC 1
AOM
FATCCTRLFACP
CELLBLOCK CONTROL
SPD
PROVIDE DEDICATED
120V 20A CIRCUIT
BASEMENT
(E)NAC 1E
(E)SLC 1E
EXISTING APPLIANCES
EXISTING DEVICES
(E)NAC 2E
(E)SLC 2E
EXISTING APPLIANCES
EXISTING DEVICES
(E)NAC 3E
(E)SLC 3E
EXISTING APPLIANCES
EXISTING DEVICES
LCDANN
AMP 1
SLC 1
AIM AIM
WFTS
F
FIRST FLOOR
TELECOM CLOSET 124
PROVIDE CLASS A WIRING AS
REQUIRED FOR NEW CIRCUIT
S
SECOND FLOOR
THIRD FLOOR
ROOF
ATTIC
EL
EC
R O
O M
P O
W
ER
S H
U N
T
TR
IP
SH
U
T D
O W
N A
SS
O
C
IA
TE
D
A H
U
AOM AOM
AOM
DH
NAP
SPD
PROVIDE
DEDICATED 120V
20A CIRCUIT
GENERAL NOTES
G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND
COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.
G2. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS CONTRACT UNLESS
SPECIFICALLY MARKED "EXISTING", "EXIST", OR "(E)".
NOTES
1. PROVIDE FIRE ALARM SYSTEM IN ACCORDANCE WITH NFPA 72 AND P100.
REFER TO FLOOR PLANS FOR LOCATIONS OF INDIVIDUAL EQUIPMENT.
2. PROVIDE INFRASTRUCTURE AS NECESSARY FOR EXTENSION OF SYSTEM
TO REMAINDER OF THE BUILDING IN FUTURE PHASES.
SMOKE DETECTOR
SMOKE DETECTOR - ELEVATOR LOBBY - FIRST FLOOR
SMOKE DETECTOR - ELEVATOR LOBBY - ALL BUT FIRST FLOOR
SMOKE DETECTOR - ELEVATOR MACHINE ROOM
DUCT SMOKE DETECTOR
WATER FLOW SWITCH
WATER FLOW SWITCH - E.M.R. SPRINKLER ZONE
WATER FLOW SWITCH - ELECTRICAL ROOM SPRINKLER ZONE
HEAT DETECTOR - ELEVATOR MACHINE ROOM
TAMPER SWITCH
FACP POWER FAILURE
LOW BATTERY
OPEN CIRCUIT
GROUND FAULT
MECHANICAL
PENTHOUSE 203
AM
P
B
AMP B
NA
C
AIM AIM
S
S
AOM
WFTS AHU
AMP 1
AM
P
NA
C
NAC 1
NAC 1
AHU ELEV
AIM
ELEV
MONITOR
NAP
FI
R
E H
AT
L
IG
H
T
FL
AS
H
IN
G
HEAT DETECTOR - ELEVATOR PIT
N
RE
F:
PL
OT
D
AT
E:
1/1
7/2
4 2 :19
:08 P
M
4.5
FX
1.D W
G
CONFORMED CONSTRUCTION SET
SUMMER
CONSULTANTS
I N C O R P O R A T E D
SUMMER
CONSULTANTS
ABBREVIATIONS
A AMPERES
AC ABOVE CEILING
AFF ABOVE FINISHED FLOOR
AHJ AUTHORITY HAVING JURISDICTION
ATC ACOUSTIC TILE CEILING
AWG AMERICAN WIRE GAUGE
C/CL CEILING LEVEL
D DRAIN
DN DOWN
ELEV. ELEVATOR
EMT ELECTRICAL METALLIC TUBING
ETR EXISTING TO REMAIN
(E) EXISTING
F FIRE LINE
FDC FIRE DEPARTMENT CONNECTION
FH FIRE HYDRANT
FHV 2-1/2" FIRE HOSE VALVE
N.I.C. NOT IN CONTRACT
SP SPRINKLER PIPING
TYP. TYPICAL
SYMBOLS
LIGHT HAZARD
DISCHARGE DENSITY 0.1 GPM/SF
REMOTE AREA 1500SF
ORDINARY HAZARD GROUP 1
DISCHARGE DENSITY 0.15 GPM/SF
REMOTE AREA 1500SF
RISER VALVE
CHECK VALVE
WATER FLOW SWITCH
SPRINKLER PIPE
MODIFICATION OF THE SPRINKLER SYSTEM
IN THIS AREA IS NOT IN CONTRACT (N.I.C.)
TAMPER SWITCH
SPRINKLER
ZCA SPRINKLER ZONE CONTROL ASSEMBLY
WF
TS
AREA OF WORK
INSPECTORS TEST CONNECTION
GENERAL SYMBOLS
FA101
N
8'0 1/8"=1'-0"
UNIQUE PLAN OR
DETAIL NUMBER
ON THIS DRAWING NORTH ARROW
NAME OF PLAN OR DETAIL
ALL DRAWINGS WHERE
THIS DETAIL IS
REFERENCED FROM
GRAPHIC SCALE OF
THIS PLAN OR DETAIL
SECTION IDENTIFICATION
INDICATES DIRECTION
OF CUTTING PLANE
NUMBER INDICATES SECTION
SHEET NUMBER WHERE
SECTION IS DRAWN
2-PART REFERENCE DETAIL IDENTIFICATION:
SHEET NUMBER WHERE
DETAIL/SECTION IS DRAWN
NUMBER INDICATES
DETAIL/SECTION
FLOOR PLAN
FA101,FA1022
FLOOR PLAN AND DETAIL TITLES:
FA101
N
(E)
REVISION CLOUD WITH REVISION
NUMBER DESIGNATION
BREAKLINE
MATCHLINE DESIGNATIONM A T C H L I N E A-A
EXISTING
POINT OF CONNECTION TO EXISTING
POINT OF TERMINATION OF REMOVAL
NOTE NUMBER#
ARROW INDICATES TRUE NORTH
AND/OR PROJECT NORTH.
ROOM NUMBER
COLUMN LINE NUMBER
NORTH ARROW
SPRINKLER ZONE
F
WATER FLOW TEST REPORTWATER FLOW TEST MAP
CLARKSBURG COURTHOUSE
HYDRANT 27-149-A
HYDRANT 27-451-B
SPRINKLER
ELECTRONIC ALARM BELL
FIRE SUPPRESSION REQUIREMENTS
1. MODIFY THE EXISTING WET-PIPE SPRINKLER SYSTEM AND PROVIDE DESIGN, EQUIPMENT, INSTALLATION, AND
TESTING TO MAKE A COMPLETE WET PIPE SPRINKLER SYSTEM WITH INTEGRATED CLASS 1 WET-PIPE STANDPIPE.
DESIGN AND INSTALL PER 2018 EDITION OF P100 FIRE PROTECTION FOR FACILITIES, THE 2019 EDITION OF NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, AND THE 2019 EDITION OF NFPA 14, STANDARD FOR
THE INSTALLATION OF STANDPIPES.
2. UNLESS OTHERWISE NOTED, PROVIDE SPRINKLER SYSTEM DESIGN IN ACCORDANCE WITH LIGHT HAZARD CRITERIA.
3. CONTACT THE CLARKSBURG WEST VIRGINIA WATER AUTHORITY AT 304-623-3711 TO OBTAIN FIRE HYDRANT WATER
FLOW TEST DATA.
4. PROVIDE CONCEALED QUICK RESPONSE WHITE SPRINKLERS IN AREAS WITH FINISHED CEILINGS. PROVIDE QUICK RESPONSE BRASS UPRIGHT SPRINKLERS IN AREAS WITHOUT FINISHED CEILINGS. PROVIDE A MINIMUM SPRINKLER
TEMPERATURE OF 155 FAHRENHEIT OR HIGHER FOR ORDINARY TEMPERATURE SPRINKLERS.
5. PROVIDE SPRINKLERS HEADS WITH LISTED GUARDS WITHIN ELEVATOR MACHINE ROOM, ELEVATOR PITS, AND
ELECTRICAL ROOMS AS REQUIRED BY P100.
6. PROVIDE SPRINKLERS IN CENTER OF ACOUSTIC CEILING TILES.
7. PROVIDE BLACK STEEL SPRINKLER PIPE. PIPE 2-INCH AND BELOW MUST BE SCHEDULE 40, PIPE 2.5-INCHES AND
GREATER MUST BE MINIMUM SCHEDULE 10.
8. PAINT SPRINKLER PIPE RED. PROVIDE WHITE STENCILING INDICATING SYSTEM AND PIPE DIAMETER.
9. DO NOT PROVIDE SPRINKLER VALVES ABOVE HARD CEILINGS. DO NOT PROVIDE SPRINKLERS BELOW RAISED FLOOR. PROVIDE IDENTIFICATION SIGNAGE FOR ALL VALVES LOCATED ABOVE SUSPENDED CEILINGS.
10. FIRE SUPPRESSION SYSTEMS MUST REMAIN ACTIVE OUTSIDE THE AREA OF WORK.
11. ALL REQUIRED OUTAGES OF THE SPRINKLER SYSTEM SHALL BE COORDINATED THROUGH THE CONTRACTING OFFICER NOT LESS THAN 15 WORKING DAYS IN ADVANCE. THE GOVERNMENT WILL PROVIDE THE REQUESTED OUTAGE AND ASSOCIATED RESTORATION OF THE SPRINKLER SYSTEM. THE GOVERNMENT WILL IDENTIFY TO THE CONTRACTOR WHAT PIPING/EQUIPMENT HAVE BEEN TAKEN OUT OF SERVICE ONCE THE OUTAGE HAS BEEN MADE.
THE GOVERNMENT WILL NOT DRAIN OR REFILL SPRINKLER PIPING AS PART OF AN OUTAGE. THIS WORK SHALL BE PERFORMED BY THE CONTRACTOR. OUTAGES DO NOT INCLUDE CONNECTION OF NEW WORK TO EXISTING
SPRINKLER PIPING.
12. AN EXCLUSIVE GOVERNMENT CONTRACTOR/VENDOR RESPONSIBLE FOR MAINTAINING GOVERNMENT FIRE PROTECTION SYSTEMS SHALL BE OBTAINED FOR TIE IN OF NEW WORK AND/OR MODIFICATION OF OPERATING, EXISTING SPRINKLER SYSTEMS, AT CONTRACTORS COST.
13. A FIRE WATCH, AT CONTRACTOR'S COST, WILL BE CONDUCTED CONTINUOUSLY THROUGHOUT THE DURATION OF THE OUTAGE IN ALL AREAS AFFECTED BY THE OUTAGE. FINDINGS/COMMENTS WILL BE DOCUMENTED HOURLY ON FIRE WATCH FORMS. DOCUMENTATION OF FINDINGS WILL BE MADE AVAILABLE TO THE AUTHORITY UPON THEIR REQUEST. IN THE EVENT OF ANY FIRE/SMOKE EMERGENCIES DISCOVERED DURING THE FIRE WATCH, EMERGENCY
NOTIFICATION WILL BE PROVIDED TO THE PREDETERMINED POINT OF CONTACT.
14. OUTAGES WILL NOT BE PERMITTED TO TAKE PLACE FOR THE ENTIRE DURATION OF THE PROJECT.
15. OVERNIGHT OUTAGES WILL NOT BE PERMITTED UNLESS WORK IS BEING DONE DURING THAT TIME PERIOD AND THE SPRINKLER SYSTEM IS PUT BACK INTO SERVICE WITHIN AN HOUR FROM COMPLETION OF WORK. OUTAGES SHALL
BE LIMITED TO 8 HOURS INCLUDING TIME FOR DRAINING AND REFILLING.
16. THE SPRINKLER SYSTEM IS NOT PERMITTED TO HAVE AN OUTAGE FOR MORE THAN AN HOUR BEFORE STARTING WORK. THE SPRINKLER SYSTEM SHALL BE RESTORED WITHIN AN HOUR OF COMPLETION OF WORK. THE CONTRACTOR CANNOT LEAVE THE CONSTRUCTION SITE UNPROTECTED. THE SPRINKLER SYSTEM SHALL BE FILLED
WITHIN AN HOUR OF COMPLETION OF WORK
17. ALL WORK ON THE FIRE SPRINKLER SYSTEM CAN ONLY OCCUR THE FOLLOWING DATES/TIMES WHEN THE BUILDING
IS OCCUPIED:
17.1. MONDAY-FRIDAY: 6:00 PM-6:00 AM.
17.2. WEEKENDS: ANY TIME.
17.3. FEDERAL HOLIDAY: ANY TIME.
18. THE FIRE DEPARTMENT CONNECTION MUST BE A MAXIMUM OF 100 FEET FROM A FIRE HYDRANT IN ACCORDANCE
WITH NFPA 14-2019 EDITION SECTION 6.4.5.4.
7/8/2020
ORDINARY HAZARD GROUP 1
DISCHARGE DENSITY 0.15 GPM/SF
REMOTE AREA 1500SF
OH2
UNLESS
OTHERWISE
NOTED
DOUBLE CHECK BACKFLOW PREVENTERDBC
SPRINKLER ZONE CONTROL ASSEMBLY
INCLUDING WATERFLOW SWITCH, GATE
VALVE AND TAMPER SWITCH, AND
INSPECTOR'S TEST CONNECTION
ZCA
OH1
SPRINKLER ARMOVER
1/8"=1'-0"
BASEMENT FLOOR PLAN - DEMOLITION1
DBC
(E)6"F INCOMING
WATER SUPPLY
6"F
3"F
WF 2"F UP
3"F UP
3"F
MAINTENANCE
SHOP
CORRIDOR
STORAGE
MACHINE
ROOM
MACHINE
ROOM
CONFERENCE
ROOM
POSTAL
EQUIPMENT
CUSTODIAL
SHOP
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
JANITOR
SUPPLIES MAINTENANCE
ENGINEER
USPS STORAGE
ROOM CLOSET
COURT STORAGE
AREA
AREAWAYAREAWAY
BOILER
CHIMNEY
FITNESS ROOM
BOILER AND
MECHANICAL ROOM
(E)6" COLT
300-BF DCDA
FX501
(E)1-1/4"F(E)1"F(E)1"F
(E)1-1/4"F(E)1"F(E)1"F
(E)1"F
(E)1"F
(E )1
"F
2"F 2"F
(E )2
"F 2-
1/2 "F
1"F1"F
1"F1"F
(E)1"F(E)1"F
(E)1"F(E)1"F
(E)
3"F
(E)3"F
(E)
(E)
(E)2-1/2"F UP
(E)3"F
(E )3
"F (E
)3 "F
2-1/2"F
2-1/2"F
2-1/2"F
3" F
2-1/2"F
FI
LE
N
RE
F:
PL
OT
D
AT
E:
1/1
7/2
4 2 :19
:11 P
M
4.5
FD
1- B1
.D W
G
CONFORMED CONSTRUCTION SET
SUMMER
CONSULTANTS
I N C O R P O R A T E D
SUMMER
CONSULTANTS
NOTES
1. DISCONNECT AND REMOVE 6-INCH RISER TO FIRST FLOOR. CAP PIPE
BELOW FIRST FLOOR.
2. DISCONNECT AND REMOVE 4-INCH RISER TO FDC. CAP PIPE BELOW
FIRST FLOOR.
3. DISCONNECT AND REMOVE ALL SPRINKLER PIPE, FITTINGS,
SUPPORT, AND SPRINKLER HEADS BETWEEN POINTS INDICATED.
GENERAL NOTES
G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND
COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.
G2. EQUIPMENT INDICATED AS (E) IS EXISTING TO REMAIN.
1/8"=1'-0"
FIRST FLOOR PLAN - DEMOLITION1
6"F FROM BASEMENT
1-1/4"F
1-1/4"F
1-1/4"F
1"F
1" F
1- 1/2
"F 2"
F 1-
1/2 "F
2" F
2" F
2" F
1- 1/4
"F 1-
1/2 "F
1" F
1" F
2" F
1- 1/4
"F 1-
1/2 "F
1" F
1" F
2" F
1- 1/4
"F 1-
1/2 "F
1" F
1" F
2" F
1- 1/4
"F 1-
1/2 "F
1" F
1" F
2" F
1- 1/4
"F 1-
1/2 "F
1" F
1" F
2" F
1- 1/4
"F 1-
1/2 "F
1" F
1" F
2" F
1- 1/4
"F 1-
1/2 "F
1" F
1" F
2" F
1- 1/4
"F 1-
1/2 "F
1" F
1" F
2" F
1- 1/4
"F 1-
1/2 "F
1" F
1" F
1- 1/4
"F 1-
1/2 "F
1" F
1" F
1- 1/4
"F 1-
1/2 "F
1" F
1" F
1- 1/4
"F 1-
1/2 "F
1" F
1" F
1" F
1" F
1" F
2" F
1- 1/2
"F
1- 1/2
"F
1- 1/2
"F
1" F
1- 1/4
"F
2" F
1- 1/2
"F
1"F
6" F
6" F
6"F 6"F6"F5"F5"F5"F5"F4"F4"F3-1/2"F3-1/2"F3"F3"F2-1/2"F 4"F 3-1/2"F 3-1/2"F 3"F
1- 1/4
"F 1-
1/2 "F
1" F
1" F
1- 1/4
"F 1-
1/2 "F
1" F
1" F
1- 1/4
"F 1-
1/2 "F
1" F
1" F
1- 1/4
"F 1-
1/2 "F
1" F
1" F
2" F
2" F
2" F
1- 1/2
"F 1-
1/2 "F
2" F
2" F
2" F
1- 1/4
"F 2" F
2" F
2" F
2" F
1- 1/2
"F
1- 1/2
"F
1- 1/2
"F
1- 1/2
"F
1- 1/2
"F
1- 1/4
"F
1- 1/4
"F
1- 1/2
"F 1-
1/4 "F
1" F
1" F
1" F
1" F
1" F
1" F
3" F
2-1/2"F 2"F
2" F
2" F
2" F
1"F
1- 1/4
"F
1- 1/2
"F
1"F
1"F
1"F
1"F
1" F1"
F 1"
F
1"F 1"F
1- 1/2
"F 1-
1/2 "F
1.5"F1.5"F
2" F
1- 1/2
"F 1-
1/2 "F
1-1/4"F1"F 1"F
(E )1
"F
(E )1
"F
(E )1
"F
(E )1
"F
(E )2
"F
(E)1-1/2"F
(E )2
"F
(E )2
"F
(E )2
"F
(E )2
"F
(E )2
"F
(E )2
"F
(E )2
"F
(E)1-1/2"F (E)1-1/2"F
2 (TYP)
(E) (E) (E) (E)
SPRINKLER DRAIN
SPRINKLER DRAIN
FI
LE
N
RE
F:
PL
OT
D
AT
E:
1/1
7/2
4 2 :19
:14 P
M
4.5
FD
2-
.D W
G
CONFORMED CONSTRUCTION SET
SUMMER
CONSULTANTS
I N C O R P O R A T E D
SUMMER
CONSULTANTS
NOTES
1. DISCONNECT AND REMOVE ALL FIRE SUPPRESSION PIPE, FITTINGS,
SUPPORTS, AND SPRINKLERS INSIDE AREA OF WORK.
2. DISCONNECT AND CAP PIPE SERVING AREAS OUTSIDE SCOPE OF WORK AT
LOCATION INDICATED.
3. DISCONNECT AND REMOVE EXISTING FDC AND ASSOCIATED PIPE/FITTINGS
BACK TO BASEMENT LEVEL. DISCONNECT AND REMOVE EXISTING WATER
MOTOR GONG.
GENERAL NOTES
G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND
6"F
FX401
1-1/2"F
N
8'0 16' 1/8"=1'-0"
BASEMENT FLOOR PLAN - SPRINKLER1
OFFICES USPS
BREAK ROOM
MARINE RECRUIT
CORRIDOR
STAIR 1
SUPPORT ENGINEER
PLANT ENGINEER
MEN'S TOILET
WOMEN'S TOILET
NAVY
RECRUIT
NAVY
RECRUIT
CORRIDOR
US MARSHAL
VAULT
US DISTRICT
COURT VAULT
CORRIDOR
ELEV 01
JANITOR SUPPLIES
COURT STORAGE
AREA
AREAWAY
AREAWAY
BOILER
CHIMNEY
CRAWL SPACE
MECHANICAL ROOM
STAIR 2
SECURE CORRIDOR
ELECTRICAL ROOM
FITNESS ROOM
CORRIDOR
STORAGE
MAINTENANCE ENGINEER
CONFERENCE ROOM
CUSTODIAL SHOP
CORRIDOR
EMR SALLY
PORT
TELEPHONE ROOM
BUILDING
ELEVATOR
EL 04
PRISONER
USPS STORAGE
ROOM CLOSET
(E)
(E)3"F
(E)
ZC
A
4" F
1-1/2"F 1"F
MAINTENANCE
SHOP
MACHINE
ROOM
BOILER
CHIMNEY
(E)1"F(E)1"F
(E)1"F
(E)1"F
(E )1
"F
(E)
POSTAL
EQUIPMENT(E
)2 "F
(E)1"F(E)1"F
(E)1"F(E)1"F
(E)1-1/4"F
(E)1"F
3"F
(E)3"F
OH2
OH2
OH2
OH2
(E)2-1/2"F UP
4" F
WF
OH1
OH1
OH1
2- 1/2
"F
4" F
4"F
4" F
WF
(E)2-1/2"F UP
4"F
4" F
2-1/2"F
2- 1/2
"F 2-
1/2 "F
2-1/2"F
2- 1/2
"F
2- 1/2
"F
2-1/2"F
4"F
2-1/2"F
2-1/2"F 4"F
TS
TS
ZC
A TS
WF
OH2
OH1
OH1
OH2 ELEV.
EMR
(E)1"F(E)1"F
1 1
FI
LE
N
RE
F:
PL
OT
D
AT
E:
4/2
/20
3:
:28 P
M
4.5
FX
1- B1
.D W
G
CONFORMED CONSTRUCTION SET
SUMMER
CONSULTANTS
I N C O R P O R A T E D
SUMMER
CONSULTANTS
GENERAL NOTES
G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND
COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.
G2. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS CONTRACT UNLESS
SPECIFICALLY MARKED "EXISTING", "EXIST", OR "(E)".
G3. WHERE PIPING PENETRATES PARTITIONS WITH A SPECIFIED STC RATING,
SEAL PENETRATIONS TO MEET STC RATING SPECIFIED. SEE
ARCHITECTURAL PARTITION DETAILS FOR ADDITIONAL INFORMATION.
NOTES
1. PROVIDE SPRINKLER COVERAGE THROUGHOUT SPACE IN ACCORDANCE
WITH NFPA 13 AND P100.
2. PROVIDE 6 INCH PIPE UP TO FIRST FLOOR.
3. PROVIDE ELEVATOR PIT SIDEWALL SPRINKLER WITH LISTED GUARD. SEE
FX401 FOR LOCATION OF ISOLATION VALVE. SPRINKLERS MUST BE
LOCATED BELOW ELECTRICAL EQUIPMENT IN ACCORDANCE WITH ASME
17.1. SPRINKLERS MUST BE INSTALLED MORE THAN 2 FEET ABOVE THE
FLOOR OF THE PIT PER NFPA 13.
4. NOT USED.
5. PROVIDE BASEMENT ZONE CONTROL ASSEMBLY.
6. PROVIDE 4 INCH PIPE UP TO EXTERIOR FREE STANDING FIRE DEPARTMENT
CONNECTION.
7. NOT USED.
8. NOT USED.
9. PROVIDE ISOLATION VALVE, TAMPER SWITCH, AND WATER FLOW SWITCH
FOR STANDPIPE CONNECTION SPRINKLER ISOLATION VALVE.
DISTRICT
COURTROOM
2-1/2" F
N
8'0 16' 1/8"=1'-0"
FIRST FLOOR PLAN - SPRINKLER1
ZCA
6" F
SPRINKLER ZONE 1
(E )1
"F
(E )1
"F
(E )1
"F
(E )1
"F
(E )2
"F
(E )2
"F
(E )2
"F
(E )2
"F
(E )2
"F
(E )2
"F
(E )2
"F
(E )2
"F
(TYP)
(E)1-1/2"F
(E)1-1/2"F (E)1-1/2"F
(E) (E) (E) (E)
4" F
4" F
4" F
3" F
3" F
3" F
3" F
3" F3" F3" F3" F3" F3" F
3" F
CLO.
CORR.
MAIN CORRIDOR/
PRE-FUNCTION
101A
SOUND
LOCK
115 EXHIBITS
TRIAL JURY
ROOM
JURY CORRIDOR
MAIN
CORRIDOR
COURTROOM
EQUIP. STORAGE
PRISONER
PROCESSING
SALLY
PORT
145C
CORRIDOR
143B
RESTRICTED
CORRIDOR
JURY
TLT. RM.
JURY
TLT. RM.
TLT RM
132B
VESTIBULE
132A
ROOM
COPY/
WORKROOM
JUDGE'S
OFFICE
LAW
CLERK
LAW
CLERK
JUDICIAL
ASSISTANT
RECEPTION
BREAK
ROOM
128 COURT
REPORTER
COURT
REPORTER
CORRIDOR
STAIR 2
120B
STO.
123A
VESTIBULE
STO.
120A
TELECOM
CLOSET
SOUND
LOCK
SALLY
PORT
122C
HOLD.
CELL
122D
RESTR.
CONFERENCE
SCREENING
VESTIBULE
100A
ENTRANCE
LOBBY
EXIT
LOBBY
VACANT
(FUTURE
COURTROOM)
VACANT
(FUTURE
JUDGES'
CHAMBERS)
MAIN
LOBBY
VACANT
VACANT
(FUTURE
JURY
ASSEMBLY)
VACANT
(FUTURE
CLERK'S
OFFICE)
LOADING DOCK
TRASH
BUILDING AND
GROUNDS
CELLBLOCK
STAIR 1
ELEV 01
PRISONER
ELEVATOR
122B
EL 04
OH1
OH2OH2
OH2
OH2
OH2
OH2
ATTORN./WIT.
ROOM 1
ATTORN./WIT.
ROOM 2
OH2
OH2
OH2
CONTROL ROOM
2-1/2" F
2- 1/2
"F
TS
WF
1-1/4"F 2-1/2" F
1-1/2" F1-1/4" F 1-1/2" F
1-1/4" F
(TYP)
1-1/4" F
(TYP)
1- 1/4
" F
1-1/4" F
(TYP)
1-1/4" F
(TYP)
1-1/4" F
(TYP)
1- 1/4
" F 1-
1/4 " F
2-1/2" F
2-1/2" F 2-1/2" F 2-1/2" F2-1/2" F
2-1/2" F 2-1/2" F 2-1/2" F 2-1/2" F
1" F
OH2
OH2
2-1/2" F
FI
LE
N
RE
F:
PL
OT
D
AT
E:
4/2
/20
3:
:38 P
M
4.5
FX
2-
.D W
G
CONFORMED CONSTRUCTION SET
SUMMER
CONSULTANTS
I N C O R P O R A T E D
SUMMER
CONSULTANTS
GENERAL NOTES
G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND
COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.
G2. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS CONTRACT UNLESS
SPECIFICALLY MARKED "EXISTING", "EXIST", OR "(E)".
G3. WHERE PIPING PENETRATES PARTITIONS WITH A SPECIFIED STC RATING,
SEAL PENETRATIONS TO MEET STC RATING SPECIFIED. SEE
ARCHITECTURAL PARTITION DETAILS FOR ADDITIONAL INFORMATION.
NOTES
1. PROVIDE SPRINKLER COVERAGE THROUGHOUT SPACE PER NFPA 13.
2. PROVIDE 6 INCH ZONE CONTROL ASSEMBLY TO SERVE FIRST FLOOR AREA
OF WORK. PROVIDE BUTTERFLY VALVE WITH TAMPER SWITCH, CHECK
VALVE, PRESSURE GAUGES, INSPECTORS TEST CONNECTION, AND WATER
FLOW SWITCH.
3. CONNECT SPRINKLER SYSTEM TO EXISTING BRANCHLINE SERVING AREA
OUTSIDE SCOPE OF WORK.
4. PROVIDE FREE-STANDING FIRE DEPARTMENT CONNECTION.
5. PROVIDE UPRIGHT SPRINKLERS TO TEMPORARILY PROTECT FUTURE PHASE
SPACE.
6. PROVIDE 6 INCH PIPE UP FROM BASEMENT.
7. PROVIDE INTERMEDIATE TEMPERATURE SIDEWALL HEADS TO PROTECT
CLERESTORY. ROUTE BRANCH LINE ABOVE WINDOWS.
NOTES
8. NOT USED.
9. PROVIDE 2 INCH PIPE UP TO MECHANICAL PENTHOUSE. REFER TO
SHEET FX103 FOR CONTINUATION.
10. PROVIDE INSTITUTIONAL SPRINKLER HEADS FOR DETENTION AND
CORRECTIONAL AREA.
1/8"=1'-0"
SECOND FLOOR PLAN1
ZCA
2"F2"F
2" F
MECHANICAL PLATFORM
MECHANICAL PENTHOUSE
JURY ROOM
IT OFFICE
CORRIDOR
CORRIDOR
TLT RM
WOMEN'S TLT
MEN'S TLT
CORRIDOR
TLT RM TLT RM CLOSET
CORRIDOR
MAGISTRATE MAGISTRATE ATTORNEY/
WITNESS
CONFERENCE
CELL
CELL
CORR
CSO OFFICE CONFERENCE ROOM CORRIDOR
OFFICE
CORR
CONFERENCE ROOM
JUDICIAL ASSISTANT
OFFICE
JUDGE'S
CHAMBERS
COURTROOM COURTS OFFICE SPACE
DEPUTY
CLERK
COURTROOM
ATTORNEY
CONFERENCE
ROOM
RECEPTION
LOBBY
CORRIDOR
COURTROOM
BELOW
COURTROOM
BELOW
STAIR 1
STAIR 2
CL.
PRISONER
ELEV
BREAK ROOM
VAULT
OFFICE
(E)
(E)
OH1
TS
WF
CONFORMED CONSTRUCTION SET
FI
LE
N
RE
F:
PL
OT
D
AT
E:
4/2
/20
3:
:47 P
M
4.5
FX
3-
.D W
G
SUMMER
CONSULTANTS
I N C O R P O R A T E D
SUMMER
CONSULTANTS
GENERAL NOTES
G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND
COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.
G2. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS CONTRACT UNLESS
SPECIFICALLY MARKED "EXISTING", "EXIST", OR "(E)".
G3. WHERE PIPING PENETRATES PARTITIONS WITH A SPECIFIED STC RATING,
SEAL PENETRATIONS TO MEET STC RATING SPECIFIED. SEE
ARCHITECTURAL PARTITION DETAILS FOR ADDITIONAL INFORMATION.
NOTES
1. PROVIDE SPRINKLER COVERAGE THROUGHOUT SPACE IN ACCORDANCE
WITH NFPA 13 AND P100.
2. NOT USED.
3. PROVIDE 2 INCH PIPE FROM 1ST FLOOR AND DEDICATED ZONE CONTROL
ASSEMBLY TO SERVE MECHANICAL PENTHOUSE SPRINKLERS.
1/8"=1'-0"
THIRD FLOOR PLAN1
MEN'S TLT
WOMEN'S TLT
TLT RM
CORRIDOR
CORRIDOR
CORRIDOR
VESTIBULE CORRIDOR
CORRIDOR
UPPER PART
OF
COURTROOM
OPEN TO
BELOW
UPPER PART
OF LIBRARY
OPEN TO
BELOW
UPPER
PART OF
OFFICES
OPEN TO
BELOW
UPPER
PART OF
OFFICES
OPEN TO
BELOW
JANITOR
CLOSET
STAIR 4
LAW CLERK
TLT RM
CLOSET
CLOSET
TLT RM TLT RM BREAK ROOM
CLOSET
JURY
CONFERENCE
ROOM
STAIR 3
STAIR
ELEV
CHIEF DEPUTY CONFERENCE
ROOM
BREAK ROOM
WORK/COPY
AREA
CLERKS
OFFICE
OFFICE
US ATTORNEY
OFFICE
OFFICE/
CONFERENCE
ROOM
OFFICE/PANTRY
OFFICE
COURTROOM
CLOSET
EXISTING
FIRST FLOOR
ROOF BEYOND
EXISTING
MAILING
PLATFORM
ROOF BEYOND
STAIR 2 ROOF
NEW
MECHANICAL
PENTHOUSE
ROOF
FIRST FLOOR
ROOF BELOW
VEST.
(E)
(E)
FI
LE
N
RE
F:
PL
OT
D
AT
E:
4/2
/20
3:
:56 P
M
4.5
FX
4-
.D W
G
CONFORMED CONSTRUCTION SET
SUMMER
CONSULTANTS
I N C O R P O R A T E D
SUMMER
CONSULTANTS
GENERAL NOTES
G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND
COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.
G2. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS CONTRACT UNLESS
SPECIFICALLY MARKED "EXISTING", "EXIST", OR "(E)".
G3. WHERE PIPING PENETRATES PARTITIONS WITH A SPECIFIED STC RATING,
SEAL PENETRATIONS TO MEET STC RATING SPECIFIED. SEE
ARCHITECTURAL PARTITION DETAILS FOR ADDITIONAL INFORMATION.
6'0 2' 4' 3/8"=1'-0"
BASEMENT MECHANICAL ROOM
ENLARGED PLAN
FX1011
7 9 10
N'
K
AREAWAY
AREAWAY
(E)6" COLT
300-BF DCDA
4" F
BFP
(E)6" INCOMING WATER
FX501
1-1/2"F
4"F 6"F
4" F
4" F
1"F
1-1/2"FWF
WF
TS
TS
6"F
TS
4" F
4"F 4"F4"F
2-1/2"F2-1/2"F
2- 1/2
"F
CONFORMED CONSTRUCTION SET
FI
LE
N
RE
F:
PL
OT
D
AT
E:
4/2
/20
3:
:05 P
M
4.5
FX
1- B1
.D W
G
SUMMER
CONSULTANTS
I N C O R P O R A T E D
SUMMER
CONSULTANTS
GENERAL NOTES
G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND
COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.
G2. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS CONTRACT UNLESS
SPECIFICALLY MARKED "EXISTING", "EXIST", OR "(E)".
NOTES
1. PROVIDE SPRINKLER COVERAGE THROUGHOUT SPACE PER NFPA 13.
2. PROVIDE 1-1/2 INCH ZONE CONTROL ASSEMBLY TO SERVE ELECTRICAL
ROOM 002. PROVIDE 1-1/2 INCH ZONE CONTROL ASSEMBLY TO SERVE
ELEVATOR ROOM. PROVIDE ISOLATION VALVE FOR ELEVATOR PIT.
3. PROVIDE 6 INCH WATER SUPPLY TO STANDPIPE AND SPRINKLER RISER IN
STAIR.
4. NOT USED.
5. PROVIDE 4-INCH CONNECTION TO FREE-STANDING FDC LOCATED ON
EXTERIOR.
FI
LE
N
RE
F:
PL
OT
D
AT
E:
1/1
7/2
4 2 :20
:02 P
M
4.5
FX
1.D W
G
CONFORMED CONSTRUCTION SET
SUMMER
CONSULTANTS
I N C O R P O R A T E D
SUMMER
CONSULTANTS
N
24"12"0 36" 3/4"=1'-0"
SPRINKLER RISER - DEMOLITION
SECTION
FD-1111
(E)6" INCOMING WATER SUPPLY
(E)6" COLT 300-BF
DOUBLE CHECK
BACKFLOW PREVENTER (E)6"F
4"F
(E)6"F TO BASEMENT & FIRST
FLOOR SPRINKLER SYSTEMS
4"F TO FIRE DEPARTMENT CONNECTION
(E)2" DRAIN
NOT TO SCALE
SPRINKLER ARMOVER
TYPICAL
THREADED CONNECTION
TEE
MAIN
SPRINKLER HEAD CEILING GRID
1"SPRINKLER PIPE
1"SPRINKLER PIPE
1"SPRINKLER PIPE
N
24"12"0 36" 3/4"=1'-0"
SPRINKLER RISER - NEW WORK
SECTION
FX4012
GENERAL NOTES
G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND
COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.
G2. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS CONTRACT UNLESS
SPECIFICALLY MARKED "EXISTING", "EXIST", OR "(E)".
NOTES
1. DISCONNECT AND REMOVE EXISTING FDC AND ASSOCIATED PIPE/FITTINGS
BACK TO BASEMENT LEVEL. DISCONNECT AND REMOVE EXISTING MOTOR
GONG.
2. CONNECT FREE-STANDING FDC AND ASSOCIATED PIPE/FITTINGS TO
EXISTING BASEMENT FEED. PROVIDE CHECK VALVE WITH BALL DRIP.
3. CONNECT NEW 6-INCH PIPING FOR BASEMENT AND FIRST FLOOR
SPRINKLER SYSTEMS IN LOCATION INDICATED.
(E)6" INCOMING
WATER SUPPLY
(E)6" COLT 300-BF
DOUBLE CHECK
BACKFLOW PREVENTER (E)6"F
6"F TO FIRST FLOOR
SPRINKLER SYSTEMS
(E)2" DRAIN
4" CHECK VALVE
W/ BALL DRIP
4"F TO
FREE-STANDING FDC
6"F
4"F TO STANDPIPES
AND ZONE CONTROL
ASSEMBLIES
BASEMENT
FIRST
SECOND
THIRD
ATTIC
GRADE
ROOF PENTHOUSE
ZCA
4"F
4"F
WF
COURTROOM
4"F 4"F
WF
TS
TS
ZCA
ZCA
(E )B
FP
TS TS
WFWF
TS
ZCA
WF TS
4"F 4"F
6" F
(E )2
-1 /2"
F
(E )2
-1 /2"
F (E
)2 -1
/2" F
(E )2
-1 /2"
F
(E) 2-1/2"F (E) 2-1/2"F
(E)2-1/2" HOSE (E) 2-1/2" HOSE
(E) 2-1/2" HOSE(E) 2-1/2" HOSE
TS
9 9
TS
11 12
GRADE
ZCA
TSWF7
CONFORMED CONSTRUCTION SET
FI
LE
N
RE
F:
PL
OT
D
AT
E:
4/2
/20
3:
:10 P
M
4.5
FX
1.D W
G
SUMMER
CONSULTANTS
I N C O R P O R A T E D
SUMMER
CONSULTANTS
NOT TO SCALE
SPRINKLER RISER1
G1. VERIFY LOCATION AND DIMENSIONS OF EXISTING EQUIPMENT AND
COORDINATE ALL WORK PRIOR TO THE START OF CONSTRUCTION.
G2. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS CONTRACT UNLESS
SPECIFICALLY MARKED "EXISTING", "EXIST", OR "(E)".
NOTES
1. DISCONNECT AND REMOVE EXISTING FDC AND ASSOCIATED PIPE/FITTINGS
BACK TO BASEMENT LEVEL. DISCONNECT AND REMOVE EXISTING MOTOR
GONG.
2. EXISTING TO REMAIN INCOMING 6 INCH WATER LINE.
3. PROVIDE 4 INCH ZONE CONTROL ASSEMBLY FOR BASEMENT. PROVIDE
ISOLATION VALVE, CHECK VALVE, WATER FLOW SWITCH, TAMPER SWITCH,
PRESSURE GAUGE, INSPECTORS TEST CONNECTION AND DRAIN.
4. PROVIDE 6 INCH STANDPIPE ISOLATION VALVE AND TAMPER SWITCH.
5. PROVIDE 1-1/2 INCH ZONE CONTROL ASSEMBLY FOR ELECTRICAL ROOM.
PROVIDE ISOLATION VALVE, CHECK VALVE, WATER FLOW SWITCH, TAMPER
SWITCH, PRESSURE GAUGE, INSPECTORS TEST CONNECTION AND DRAIN.
6. PROVIDE 1-1/2 INCH ZONE CONTROL ASSEMBLY FOR ELEVATOR MACHINE
ROOM ROOM. PROVIDE ISOLATION VALVE, CHECK VALVE, WATER FLOW
SWITCH, TAMPER SWITCH, PRESSURE GAUGE, INSPECTORS TEST
CONNECTION AND DRAIN.
7. PROVIDE 2 INCH ZONE CONTROL ASSEMBLY FOR MECHANICAL
PENTHOUSE. PROVIDE ISOLATION VALVE, CHECK VALVE, WATER FLOW
SWITCH, TAMPER SWITCH, PRESSURE GAUGE, INSPECTORS TEST
CONNECTION AND DRAIN.
8. NOT USED.
9. PROVIDE 4 INCH STANDPIPE ISOLATION VALVE AND TAMPER SWITCH,
CONNECT TO EXISTING RISER. RISER TO BE REPLACED IN FOLLOWING
PHASE.
10. PROVIDE 4 INCH ZONE CONTROL ASSEMBLY FOR FIRST FLOOR. PROVIDE
ISOLATION VALVE, CHECK VALVE, WATER FLOW SWITCH, TAMPER SWITCH,
PRESSURE GAUGE, INSPECTORS TEST CONNECTION AND DRAIN..
11. PROVIDE SPRINKLER RISER IN COORDINATED LOCATION FOR
CLEARSTORY.
12. PROVIDE 2-1/2 INCH SPRINKLER RISER UP TO PENTHOUSE. PENTHOUSE
WILL BE PART OF SPRINKLER ZONE 1.
13. NOT USED.
14. NOT USED.
15. PROVIDE (TYP) NEW CONNECTIONS TO EXISTING SPRINKLER ON FIRST
FLOOR.
16. PROVIDE 4 INCH SPRINKLER PIPE TO EXTERIOR FIRE DEPARTMENT
CONNECTION.
17. PROVIDE 1 INCH ISOLATION VALVE AND TAMPER SWITCH TO ELEVATOR PIT.
GENERAL NOTES
(E)
LC
SYMBOLS
RISER IDENTIFICATION
P
NORTH ARROW
COLUMN BUBBLE
DESIGNATION
BREAKLINE
MATCHLINE DESIGNATIONM A T C H L I N E A-A
CENTERLINE
CENTERLINE SYMBOL
EXISTING
POINT OF CONNECTION
TO EXISTING
POINT OF TERMINATION
OF REMOVAL
NOTE NUMBER
P-101 P-401
SHEET NUMBER WHERE
DETAIL IS TAKEN
SHEET NUMBER WHERE
DETAIL IS DRAWN
NUMBER INDICATES
DETAIL
N
ARROW INDICATES
TRUE NORTH AND/OR
PROJECT NORTH
NUMBER INDICATES
SYSTEM RISER NUMBER
LETTER INDICATES
SYSTEM:
P - WASTE/SANITARY
W - DOMESTIC WATER
ST - STORM
DOMESTIC COLD WATER
CONDENSATE DRAIN PIPING
CW
D
GAS PIPING
DOMESTIC HOT WATER
DOMESTIC HOT WATER
CIRCULATION
G
HW
HWC
ST
W WASTE/SANITARY PIPE
STORM PIPE
PIPE TURN UP
PIPE TURN DOWN
STRAINER
GATE VALVE
TMV THERMOSTATIC
MIXING VALVE
O.S.&Y VALVE
BALL VALVE
GLOBE VALVE
CHECK VALVE
REDUCED PRESSURE
BACKFLOW PREVENTER
PRESSURE REDUCING VALVE
UNION
RELIEF VALVE
BALANCING VALVE
GAS COCK
CONCENTRIC REDUCER
ECCENTRIC REDUCER
DIRECTION OF FLOW
PRESSURE GAUGE
THERMOMETER AND WELL
VERTICAL IN-LINE
CIRCULATING PUMP
H.B.
C.O.
W.C.O.
F.C.O.
FL.D. FLOOR DRAIN
FLOOR CLEANOUT
WALL PIPE CLEANOUT
PIPE CLEANOUT
PIPE CAP
WALL HYDRANT,
NON FREEZE/HOSE BIBB
DOUBLE LINE PIPE TURN UP
DOUBLE LINE PIPE TURN DOWN
PIPE CAP
ADA AMERICANS WITH DISABILITIES ACT
ABBREVIATIONS
THERMOSTATIC MIXING VALVETMV
TPV
TYP.
TRAP PRIMING VALVE
TEMPERED WATER
TYPICAL
TW
PVC
PRV
O.C.
PSIA
P.D.
PSIG
SAN
RPM REVOLUTIONS PER MINUTE
SANITARY
SERVICE SINK
PUMPEDDRAIN
PLOYVINYL CHLORIDE
PRESSURE RELIEF VALVE
POUNDS PER SQUARE INCH ABSOLUTE
POUNDS PER SQUARE INCH
POUNDS PER SQUARE INCH GAUGE
PSI
ON CENTER
PRESSURE DROP
HWC
JAN.
LVG.
LBS.
MIN.
M.E.R.
MECH.
MAX.
M.A.V.
MECHANICAL EQUIPMENT ROOM
MANUAL AIR VENT
MECHANICAL
MAXIMUM
MINIMUM
LEAVING
POUNDS
DOMESTIC HOT WATER CIRCULATING
DOMESTIC HOT WATER
JANITOR
HERTZ
INCH(ES)
JUNCTION BOX
HZ
IN.
J-BOX
HW
WALL CLEANOUT
WATER HAMMER ARRESTOR
WALL HYDRANT, NON-FREEZE
WATER GAUGE
WHA
W.C.O.
W.G.
W.H.
DOMESTIC WATER HEATERDWH
ETPV
F.C.O.
GAL.
FLA.
FLR.
FL.D.
ENT.
EXIST.
GPM
GPH
GALLONS PER MINUTE
GALLONS PER HOUR
FULL LOAD AMPS
GALLON
FEET
FLOOR
FLOOR DRAIN
FT.
ELECTRONIC TRAP PRIMING VALVE
DEGREES FAHRENHEIT
EXISTING
FLOOR CLEANOUT
°F
EXISTING
ENTERING
(E)
C.O.
BFP
CONC.
CIRC.
DIA.
CIRCULATING
DOMESTIC COLD WATER
D DRAIN
DISHWASHER
DOWN
DIAMETER
DW
DN.
CLEANOUT
CONCRETE
CW
BACKFLOW PREVENTOR
REDUCED PRESSURE
VENT THRU ROOF
WASTE OR WIDTH
VENT OR VOLTS
WITH
VTR
A.P.
A.D.
ABV.
A.F.F.
ACCESS DOOR
ABOVE FINISHED FLOOR
ABOVE
ACCESS PANEL
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
UNDERWRITER LABORATORIESUL
LENGTHL
DEMOLITION LINETYPE
M MOTOR OPERATED
BUTTERFLY VALVE
V VENT PIPE
CONT. CONTINUATION
Cu COPPER
VERTICALVERT.
PLUMBING FIXTURE SCHEDULE
WATER CLOSETP-1 2"
V
CONNECTION SIZE, INCHES
4"
W
1"
CW
HW
FLOOR MOUNTED, BOTTOM OUTLET, SIPHON JET FLUSHING ACTION, VITREOUS CHINA, HIGH EFFICIENCY TOILET W/ ELONGATED BOWL, TOP SPUD WITH OPEN FRONT TOILET SEAT LESS COVER WITH STAINLESS STEEL CHECK HINGE.
PROVIDE WITH MANUALLY OPERATED, EXPOSED, DUAL FLUSH, FLUSHOMETER VALVE, SLOAN WES 111 UPPERCUT
OR APPROVED EQUAL.
TW
WATER CLOSETP-2 2"4" 1" - -
URINALP-3A 1-1/2"2" 3/4" - ABAAS COMPLIANT, WALL MOUNTED, 0.125 GPF, VITREOUS CHINA, HIGH EFFICIENCY, TOP SPUD, WASHDOWN URINAL. PROVIDE WITH MANUALLY OPERATED, POLISHED CHROME, EXPOSED, 0.125 GPF FLUSHOMETER VALVE.
LAVATORYP-4 1-1/2"1-1/2" 1/2" 1/2"
ABAAS COMPLIANT, VITREOUS CHINA UNDERMOUNT LAVATORY, SLOAN SS-3001 OR APPROVED EQUAL. PROVIDE WITH SINGLE HOLE FAUCET WITH POP-UP DRAIN, 0.5 GPM. MAX., HANSGROHE JOLEENA 100 FAUCET WITH SLOAN ETF-460A DRAIN OR APPROVED EQUAL. PROVIDE LAVATORY WITH OATLEY DEARBORN SAFETY SERIES SINK TRAP
(OR APPROVED EQUAL) AND PLASTIC TUBULAR P-TRAP COVERS AT EXPOSED PIPING.
LAVATORYP-5 1-1/2"1-1/2" 1/2" 1/2" ABAAS COMPLIANT, WALL-HUNG, LEDGEBACK, VITREOUS CHINA LAVATORY WITH OVERFLOW. PROVIDE SLOAN SS-3106 LAVATORY OR APPROVED EQUAL. PROVIDE WITH SINGLE HOLE FAUCET WITH POP-UP DRAIN, 0.5 GPM. MAX., HANSGROHE JOLEENA 100 FAUCET WITH SLOAN ETF-460A DRAIN OR APPROVED EQUAL. PROVIDE LAVATORY WITH OATLEY DEARBORN SAFETY SERIES SINK TRAP (OR APPROVED EQUAL) AND PLASTIC TUBULAR P-TRAP COVERS AT
EXPOSED PIPING.
WATER CLOSET / LAVATORY
COMBINATION UNIT
P-6 2"4" 1" 1/2" ABAAS COMPLIANT, FLOOR MOUNTED, OFFSET, 14 GAUGE 304 S.S., 1.28 GPF HIGH EFFICIENCY HYDRAULIC FLUSH VALVE, BLOWOUT TYPE TOILET WITH INTEGRAL LAVATORY WITH DUAL TEMP. ELECTRONIC METERING FAUCET.
PROVIDE UNIT WITH INTEGRAL TOILET PAPER HOLDER AND REAR SERVICE ACCESS.
USMS SERVICE SINKP-7 1-1/2"2" 1/2" 1/2"
ABAAS COMPLIANT, SINGLE BOWL 304 STAINLESS STEEL SINK BUILT INTO STAINLESS STEEL CASEWORK. PROVIDE WITH DECK MOUNTED, SWING DOWN EYE/FACE WASH. PROVIDE SINK WITH 1.5 GPM DECK MOUNTED GOOSENECK FAUCET AND VANDAL PROOF LEVER HANDLES. PROVIDE SINK WITH OATLEY DEARBORN SAFETY SERIES SINK TRAP (OR APPROVED EQUAL) AND PLASTIC TUBULAR P-TRAP COVERS AT EXPOSED PIPING. PROVIDE ANSI Z358.1 COMPLIANT PULL-DOWN PLUMBED EYE/FACE WASH TO DELIVER 3.0 GPM AT 30 PSI. PROVIDE ASSE 1071 CERTIFIED EMERGENCY MIXING VALVE CAPABLE OF DELIVERING A MIN. OF 4 GPM AT 30 PSI. SET TEMP. TO DELIVER 80° F TEPID
WATER.
1/2"
DESIG. FIXTURE REMARKS 1
NOTES:
1 ALL ABAAS RIM MOUNTING HEIGHTS IN ACCORDANCE WITH THE
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD AND IPC
REQUIREMENTS.
2CONTRACTOR TO INSTALL ALL FIXTURES AND EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. PROVIDE PIPING CONNECTIONS PER FIXTURE CONNECTION SCHEDULE. PROVIDE
PLUMBING FIXTURES, VALVES AND APPURTENANCES LABELED UNDER THE U.S. ENVIRONMENTAL
PROTECTION AGENCY WATERSENSE PROGRAM.
EXPANSION TANK SCHEDULE
UNIT
NO.
TANK VOL.
(GALLONS)
ACCEPT. VOL.
(GALLONS)
INITIAL CHARGE
(PSIG) TANK SIZE SERVICE
ET-1 20 82 32"Hx16"Ø WATER SYSTEM5
PROVIDE 3/4" DRAIN, VALVE, HOSE CONNECTION AND CAP.
DOMESTIC HOT
BASIS OF DESIGN
PROVIDE EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
AMTROL, MODEL: ST-42VC
THERM-X-TROL
115V/1Ø/60Hz
CHARACTERISTICS
ELECTRICAL
PUMP SCHEDULE
WATERCP-3
DESIG.
INLINE
FLUIDTYPE GPM (FT. W.G.)
HEAD RPM SERVICE LOCATION
DOM. WATER MER 0044 15 3300
MOTOR
1/6 HP
REMARKS
NOTES:
1 BASIS OF DESIGN: B & G MODEL: PL-30
2 REFER TO DETAIL 2/P-001/P-001 FOR INSTALLATION.
VERTICAL IN-LINE
CIRCULATION PUMP
0-30 PSI
PRESSURE GAUGE
ISOLATORS.(TYP.)
PROVIDE VIBRATION
3 PROVIDE EQUIPMENT IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS.
1 2
NO SCALE
IN-LINE PUMP
DETAIL
P-001,P-1012
1/2"CW TRAP PRIMER SUPPLY
DOMESTIC COLD WATER
(DCW) LINE
TRAP PRIMER VALVE
DISTRIBUTION UNIT AVAILABLE
FOR 5 ADDITIONAL LINES)
1/2"CW TRAP PRIMER LINE
FLOOR DRAIN
FLOOR SLAB
WASTE
SEALANT
BACKING
MATERIAL
SLEEVE
THRU SLAB
WATERPROOF
SEALANT
SUPPLY RISER
TYPICAL BRANCH LINE
WATER HAMMER
ARRESTOR
PDI "A"
PDI SYMBOL
NOTES:
1. PREFERRED INSTALL WATER HAMMER ARRESTORS AT THE
END OF BRANCH LINE BETWEEN THE LAST TWO FIXTURES SERVED.
2. ONE WATER HAMMER ARRESTOR PER 20' LINE, AND ANOTHER FOR
BRANCHES OVER 20' IN LENGTH.
3. THE SUM OF FIXTURE UNIT RATING OF UNITS OVER 20' IN LENGTH
SHALL BE EQUAL TO OR GREATER THAN THE DEMAND OF THE
BRANCHES.
WATER HAMMER ARRESTOR SCHEDULE
PDI SYMBOL A B C D E F
FIXTURE UNIT
RATING 1-11 12-32 33-60 61-113 114-154 155-330
THERMOSTATIC MIXING
VALVE SET TO BLEND 140°F
HW WITH CW TO 110°F
1"Ø 140F HOT
WATER
1-1/4"Ø TEMPERED
WATER OUTLET
GATE VALVE
1"Ø
2"Ø COLD WATER
THERMOSTATIC MIXING VALVE SCHEDULE
MARK LOCATION TYPE
MINIMUM
FLOW (GPM)
MAXIMUM
PRESSURE LOSS
PSI
FLOW AT
MAX. P.D. (GPM)
TMV-1 BASEMENT
MER ASSE 1017 0.5 10.0 39.0
NO SCALE
TRAP PRIMER (TPV-1)
DETAIL
P-4017
NO SCALE
WATER HAMMER ARRESTOR
DETAIL
P-6015
NO SCALE
THERMOSTATIC MIXING VALVE
DETAIL
P-001,P-4014
3/4" DOMESTIC COLD
WATER INLET
UNION
ANCHOR CLIP
SCREWDRIVER STOP
REMOVABLE WHEEL
HANDLE
REMOVABLE KEY
HOSE
CONNECTION
18 GAGE, TYPE 304 S.S.
RECESSED BOX
16 GAGE, TYPE 304 S.S.
WALL FLANGE
DETAIL
RECESSED BOX TYPE
WALL HYDRANT (WH-1)
P-001 NO SCALE6
SERVICE SINKP-8 1-1/2"3" 1/2" 1/2"
ONE PIECE, CORNER FLOOR MOUNTED, PRECAST TERRAZZO MOP SERVICE BASIN WITH STAINLESS STEEL CAP ON THRESHOLD. PROVIDE WITH EXPOSED, WALL MOUNTED, ROUGH CHROME PLATED FINISH JANITOR SINK FAUCET
WITH VACUUM BREAKER, PAIL HOOK AND WALL BRACE.
WATER FOUNTAINP-9 1-1/2"1-1/2" 1/2"
ABAAS COMPLIANT, BI-LEVEL DOUBLE BUBBLER, REFRIGERATED, FILTERED, DRINKING FOUNTAIN WITH BOTTLE FILLING STATION. WATER CHILLING CAPACITY OF 8 GPH OF 50°F DRINKING WATER BASED UPON 80°F INLET WATER AND 90°F AMBIENT AIR TEMPERATURE. PROVIDE ELKAY MODEL LZWS-LRPBM28K OR APPROVED EQUAL.
KITCHEN/PANTRY SINKP-10 1-1/2"1-1/2" 1/2" 1/2"
ABAAS COMPLIANT, QUARTZ, SINGLE BOWL, UNDERMOUNT SINK WITH REAR CENTER DRAIN PLACEMENT, ELKAY ELGUAD2519PD OR APPROVED EQUAL. PROVIDE WITH SINGLE HOLE, DECK MOUNTED, SINGLE LEVER HANDLE HIGH ARC PULL-OUT KITCHEN FAUCET WITH 1.75 GPM AERATOR, HANSGROHE FOCUS OR APPROVED EQUAL. PROVIDE SINK WITH OATLEY DEARBORN SAFETY SERIES SINK TRAP (OR APPROVED EQUAL) AND PLASTIC TUBULAR P-TRAP
COVERS AT EXPOSED PIPING. PROVIDE 1/2 HP CONTINUOUS FEED GARBAGE DISPOSAL.
RUNNING TRAP
URINALP-3 1-1/2"2" 3/4" - WALL MOUNTED, 0.125 GPF, VITREOUS CHINA, HIGH EFFICIENCY, TOP SPUD, WASHDOWN URINAL. PROVIDE WITH
MANUALLY OPERATED, POLISHED CHROME, EXPOSED, 0.125 GPF FLUSHOMETER VALVE.
REMOVE PIPE
PROVIDE NON-SHRINK GROUT
FLUSH WITH EXISTING SURFACE
APPLY BONDING AGENT
TO EXISTING SURFACE
CHIP CONCRETE SURFACE (E)CONCRETE
16 GAUGE SHEET
METAL COVER
6"x6"x1/4" STEEL
PLATE
(4)3/8"Ø DRILLED CONCRETE
ANCHORS. MIN. 3" EMBEDDMENT
TYP. ALL 4 LEGS
WELD CONTINUOUSLY
MANUFACTURER'S
TANK SADDLE
200 GALLON DOMESTIC
HOT WATER STORAGE TANK
MANUFACTURERS FACTORY
FABRICATED SUPPORTS
DWST-1
3/4"DRAIN VALVE W/
HOSE CONNECTION
P&T RELIEF VALVE SIZED
BY MANUFACTURER
UNION (TYP.)
AQUASTAT. SETTING
FOR 110°F SYSTEM:
ON AT 95°F
OFF AT 105°F
12" MIN.
"M
IN
AQUASTAT. SETTING
FOR 110°F SYSTEM:
ON AT 95°F
OFF AT 105°F
3/4"HWC TO (E)DWH
3/4"HW-140°F FROM (E)DWH
(E)DWH
THERMOSTATIC
MIXING VALVE TMV-1
SET @ 110°F L.W.T.
(E)CP-1. PUMP SHALL
RUN CONTINUOUSLY
NO SCALE
DOMESTIC WATER HEATING SYSTEM
DETAIL
P-4011
(E)BASEMENT. FLR.
CP-3
P-0012"HW-140°F2"HW-120°F
SEE P-401 FOR
CONTINUATION
1-1/4"HWC
2"CW
2"CW SEE P-401
FOR CONTINUATION
3/4"HWC
1"CW
THERMOMETER & WELL
RANGE: 30°-180°F
P-001
THERMOMETER
3 1/2" MIN
EXTENSION NECK TO MATCH
INSULATION THICKNESS
SEPARABLE
THERMOMETER WELL
2x2 REDUCING TEE
SEE PLANS AND
DETAILS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .