About this file

This document is a solicitation for Construction Manager as Constructor (CMc) Services for the Phases 2-5 Repairs and Alterations Prospectus for the U.S. Courthouse in Clarksburg, West Virginia. The project scope consists of major renovations to the interior finishes, mechanical, electrical, and plumbing (MEP) systems, stairs, and elevators, including the renovation/construction of new district courtroom, judges' chambers, grand jury room, and USMS space. The government intends to deliver this requirement through the CMc project delivery method utilizing a Guaranteed Maximum Price (GMP) contract. The solicitation is subject to the mandatory use of a Project Labor Agreement. The technical evaluation factors are listed in descending order of importance and are significantly more important than price. Phase I proposals are due by August 30, 2024 and will be evaluated, with Phase II price proposals to be requested via amendment. The NAICS code is 236220, Commercial and Institutional Building Construction, with an estimated total construction cost between $40-50 million.

View the file

Other files

File Type Posted
47PD0224R0048 Clarksburg Construction Phase 2-5 CMc Amendment 0001 8 26 2024.pdf PDF
47PD0224R0048 Clarksburg Construction Phase 2-5 CMc RFI Log Amendment 0001 8 26 2024.xlsx XLSX spreadsheet
47PD0224R0048 Turn-over Checklist in Standard PDF.pdf PDF
47PD0224R0048 PDRI Participants Guide.pdf PDF
47PD0224R0048 CMc Services for Clarksburg Courthouse Modernization Phases 2-5 Project Form 101 7 24 2024.pdf PDF
47PD0224R0048 CMc Services for Clarksburg Courthouse Modernization Phases 2-5 Project Form 301 7 24 2024.pdf PDF
47PD0224R0048 Partnering_FAQs_Final_06112020.docx DOCX document
47PD0224R0048 Copy of 2 1969 Construction Drawings S.PME.FP.pdf PDF
Clarksburg CH Phase 1 Drawings - Volume 2 Conformed Set.pdf PDF
47PD0224R0048 Terracon geotech report - Clarksburg CH - 2020-09-15.pdf PDF
47PD0224R0048 CMc Services for Clarksburg Courthouse Modernization Phases 2-5 Project Form 201 7 24 2024.pdf PDF
47PD0224R0048 NDWV Courthouse Contractor Form.pdf PDF
47PD0224R0048 PDRI Faciltators Guide.pdf PDF
47PD0224R0048 PDRI Explanation and Implementation Requirements and Recommendations.pdf PDF
47PD0224R0048 Past Performance and Sub Contracting Form.pdf PDF
47PD0224R0048 Site Assessment_2018-10-03_Phase I Report_Clarksburg Courthouse_Final.pdf PDF
47PD0224R0048 Latest Concept Plans.pdf PDF
47PD0224R0048 Copy of 1 1969 Construction Drawings.pdf PDF
47PD0224R0048 Submission 4 - Volume 2.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PDRI Cover

Building Projects
ProjectType of Project (e.g., Office, School, Lab, or Hotel)
Owner/ClientProject Location
Project No.Other Control No.

&R&G &L&8File: &Z&F [&A] Page &P of &N Project Definition Rating Index Score Sheet and Session Report Feasibility Concept Detailed Scope Design and Construction

PDRI 1

PDRI 2

PDRI 2i Select PDRI that best correspond to the current status of your project PDRI Instructions Summary Chart Print PDRI Summaries Print Low Def. Elements Macro Security Settings Reset PDRI Elements

PDRI 3

Construction Industry Institute®

CII Copyright

Version 4.0

Buildings Copyright © 2013 Construction Industry Institute™.

The University of Texas at Austin.

CII members may reproduce and distribute this work internally in any medium at no cost to internal recipients. CII members are permitted to revise and adapt this work for the internal use provided an informational copy is furnished to CII.

Available to non-members by purchase; however, no copies may be made or distributed and no modifications made without prior written permission from CII. Contact CII at https://www.construction-institute.org/catalog.htm to purchase copies. Volume discounts may be available.

All CII Members, current students and faculty at a college or university are eligible to purchase CII products at member prices. Faculty and students at a college or university may reproduce and distribute this work without modification for educational use.

Instructions

Instructions and Utilization Rights
Column1SYSTEM REQUIREMENTS
This tool must be used in EXCEL 2007 or later.
INSTRUCTIONS
Column1Session Assesment Process:
-Introductions: Name, Company, Role (pass attendance sheet around)
-Ask if anyone present has not been through a PDRI. If yes, briefly explain PDRI
-Explain ground rules and scoring.
-Begin PDRI Section I for applicable project stage.
-Repeat process as project progresses to other stages.
Column1Toolkit Security Issue:
-Due to the presence of macros in this toolkit package, ensure that the Macro Security Settings is set to "Enable all Macros" before use and afterwards, re-start the toolkit package. This can be done by using the "Macro Security Settings" button on the PDRI Cover page.to check and/or change present settings.
Column1How to use:
-For new projects reset the PDRI tool by clicking on "Clear and Reset All PDRI Worksheets" button on the PDRI Cover page. You can also clear PDRI's for specific project stages on their specific PDRI Summary pages.
-Start by entering Project name on PDRI Cover Page
-Select project status (i.e., Conceptual, Feasibility, etc.) and then press on the corresponding PDRI button (i.e., PDRI1, PDRI 2, PDRI 2i, or PDRI 3). Pressing different PDRI buttons, will activate different sets of PDRI tabs.
-Make sure you document the participants by completing the Attendance Sheet tab
-Enter basic information on the summary Final Results page for the corresponding PDRI and then press the button for Section I sheet.
-Complete the Review Level and Comments column to score each element.
-After completing the questions for the section proceed to the next section.
NOTE: If you want to see the weights of each element press "Show Element Weights" button.
-In each section, double click anywhere along the row of the element name you want to evaluate and a dialog box with the the official element description will appear. You can use this dialog box for scoring. You can also enter comments to each element. Make sure the comments are entered first before entering the score. The form will change to the next question as soon as you enter a score.
YOU MUST DOUBLE CLICK anywhere along the appropriate element row to get the dialog box with the element description to appear. If the text for the individual element does not fit on the screen, click on the text box and you will be able to scroll and see the rest of the description.
-Click on the Low definition button at any time to see a summary of all elements with a score higher than the one predetermined on the page. By default all elements with a score higher than 3 will be displayed. You can change the Low Definition threshold by selecting the value from the pull-down menu. You will have to press the "Refresh" button to update the page.
-Click on the Low definition button at any time to see a summary of all elements with a score higher than the one predetermined on the page. By default all elements with a score higher than 3 will be displayed. You can change the Low Definition threshold by selecting the value from the pull-down menu. You will have to press the "Refresh" button to update the page.
-Save frequently to insure that you do not lose any information, using the "Save As" button and a file name that is unique to your project.
-To see the results go to the Summary page of the corresponding PDRI.
-You can use the same worksheet to record the results of different PDRI conducted on the same project. The PDRI Score Chart page will graphically display the results of up to four PDRIs conducted on the same project.
Column1ACKNOWLEDGEMENT
-CII would like to acknowledge the contributions of and express appreciation to Eskil Carlsson at CSA Group for the development of this program.

&R&G &L&8File: &Z&F [&A] Page &P of &N

PDRI

Cover Page Print this Page Summary Chart

PDRI 1

PDRI 2

PDRI 2i

PDRI 3

Buildings

PDRI Score Chart

Note: *Typical range of scores are based on experience on PDRI tools since 1996.
Project:Enter on Cover Page
Type of Project:Enter on Cover Page
Project Location:Enter on Cover Page
Owner/Client:Enter on Cover Page
Project No.:Enter on Cover Page
Other Control No.:Enter on Cover Page
StagePDRI 1: FeasibilityPDRI 2: ConceptPDRI 2i: Detailed ScopePDRI 3: Detailed Scope
Normalized ScoreNANANANA
Score- 0- 0- 0- 0
Max Score- 0- 0- 0- 0
Total Max Score1,0001,0001,0001,000
Typical Min *550450300150
Typical Max *800600450250

&R&G &R&8File: &Z&F [&A] Page &P of &N

PDRI Score Chart

Typical Min * Normalized Score Typical Max * Front End Planning Stage Normalized Score PDRI Score Chart Summary

Clear PDRI Templates

Reset PDRI Worksheets

PDRI 1

PDRI 2

PDRI 2i

PDRI 3

PDRI

Cover Page Print Chart Buildings &R&G

PDRI 2

PDRI 1

PDRI 2i

PDRI 3

Careful! Save your work before proceeding!

Processes cannot be reversed. Information will be cleared!

Clear PDRI 1 Attendance Sheet Clear Entire

PDRI 1

Clear Entire

PDRI 2

Clear Entire PDRI 2i Clear Entire

PDRI 3

Clear PDRI 2 Attendance Sheet Clear PDRI 2i Attendance Sheet Clear PDRI 3 Attendance Sheet Return to PDRI 1 Return to PDRI 2 Return to PDRI 2i Return to PDRI 3 Clear PDRI 1 Section I Clear PDRI 2 Section I Clear PDRI 1 Section II Clear PDRI 2i Section I Clear PDRI 3 Section I Clear PDRI 2 Section II Clear PDRI 2i Section II Clear PDRI 3 Section II Clear PDRI 1 Section III Clear PDRI 2 Section III Clear PDRI 2i Section III Clear PDRI 3 Section III Clear PDRI 1 Low Definition Clear PDRI 2 Low Definition Clear PDRI 2i Low Definition Clear PDRI 3 Low Definition Return to PDRI Cover Page Reset All PDRI Worksheets Buildings

PDRI 1 - Summary

PDRI 1 - Summary Results
Project:
Enter on Cover Page
Project Manager:
Facilitator:
Status of Project:
Date:
SectionDescriptionPDRI 1 ScoreMin ScoreMax ScoreDef1 (%)
IBASIS OF PROJECT DECISIONNANANANA
IIBASIS OF DESIGNNANANANA
IIIEXECUTION APPROACHNANANANA
TotalNANANANA
PDRI TOTAL MAXIMUM SCORE = 1000
Normalized Score:NA
CategoryDescriptionPDRI 1 ScoreMin ScoreMax ScoreDef1 (%)
ABUSINESS STRAGEGYNANANANA
BOWNER PHILOSOPHIESNANANANA
CPROJECT REQUIREMENTSNANANANA
DSITE INFORMATIONNANANANA
EBUILDING PROGRAMMINGNANANANA
FBUILDING/PROJECT DESIGN PARAMETERSNANANANA
GEQUIPMENTNANANANA
HPROCUREMENT STRATEGYNANANANA
JDELIVERABLESNANANANA
KPROJECT CONTROLSNANANANA
LPROJECT EXECUTION PLANNANANANA
Total- 0- 00NA
Top ElementsDescriptionPDRI 1 ScoreMin ScoreMax ScoreDef1 (%)
A.1Building Use RequirementNANANANA
A.5Facility RequirementsNANANANA
A.7Site Selection ConsiderationsNANANANA
A.2Business JustificationNANANANA
C.6Project Cost EstimateNANANANA
A.3Business PlanNANANANA
C.2Project Design CriteriaNANANANA
C.3Evaluation of Existing FacilitiesNANANANA
A.6Future Expansion/Alteration ConsiderationsNANANANA
F.2Architectural DesignNANANANA
TotalNA00NA
Notes:
1 - Definition percentage indicates the level of completeness of specific Section, Category and Element.

&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D

PDRI

Cover Page Print

PDRI 1

PDRI 1 Section I Print PDRI 1 Summary PDRI 1 Section II PDRI 1 Section III PDRI 1 Attendance PDRI 1 Low Definition Summary Chart Reset PDRI Elements Buildings

PDRI 2 - Summary

PDRI 2 - Summary Results
Project:
Enter on Cover Page
Project Manager:
Facilitator:
Status of Project:
Date:
SectionDescriptionPDRI 2 ScoreMin ScoreMax ScoreDef1 (%)
IBASIS OF PROJECT DECISIONNANANANA
IIBASIS OF DESIGNNANANANA
IIIEXECUTION APPROACHNANANANA
TotalNANANANA
PDRI TOTAL MAXIMUM SCORE = 1000
Normalized Score:NA
CategoryDescriptionPDRI 2 ScoreMin ScoreMax ScoreDef1 (%)
ABUSINESS STRAGEGYNANANANA
BOWNER PHILOSOPHIESNANANANA
CPROJECT REQUIREMENTSNANANANA
DSITE INFORMATIONNANANANA
EBUILDING PROGRAMMINGNANANANA
FBUILDING/PROJECT DESIGN PARAMETERSNANANANA
GEQUIPMENTNANANANA
HPROCUREMENT STRATEGYNANANANA
JDELIVERABLESNANANANA
KPROJECT CONTROLSNANANANA
LPROJECT EXECUTION PLANNANANANA
TotalNA- 00NA
Top ElementsDescriptionPDRI 2 ScoreMin ScoreMax ScoreDef1 (%)
A.1Building Use RequirementNANANANA
A.5Facility RequirementsNANANANA
A.7Site Selection ConsiderationsNANANANA
A.2Business JustificationNANANANA
C.6Project Cost EstimateNANANANA
A.3Business PlanNANANANA
C.2Project Design CriteriaNANANANA
C.3Evaluation of Existing FacilitiesNANANANA
A.6Future Expansion/Alteration ConsiderationsNANANANA
F.2Architectural DesignNANANANA
TotalNA- 00NA
Notes:
1 - Definition percentage indicates the level of completeness of specific Section, Category and Element.

&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D

PDRI

Cover Page PDRI 2 Attendance Print

PDRI 2

Print PDRI 2 Summary PDRI 2 Section I PDRI 2 Section II PDRI 2 Section III PDRI 2 Low Definition Summary Chart Reset PDRI Elements Buildings

PDRI 2i - Summary

PDRI 2i - Summary Results
Project:
Enter on Cover Page
Project Manager:
Facilitator:
Status of Project:
Date:
SectionDescriptionPDRI 2i ScoreMin ScoreMax ScoreDef1 (%)
IBASIS OF PROJECT DECISIONNANANANA
IIBASIS OF DESIGNNANANANA
IIIEXECUTION APPROACHNANANANA
TotalNANANANA
PDRI TOTAL MAXIMUM SCORE = 1000
Normalized Score:NA
CategoryDescriptionPDRI 2i ScoreMin ScoreMax ScoreDef1 (%)
ABUSINESS STRAGEGYNANANANA
BOWNER PHILOSOPHIESNANANANA
CPROJECT REQUIREMENTSNANANANA
DSITE INFORMATIONNANANANA
EBUILDING PROGRAMMINGNANANANA
FBUILDING/PROJECT DESIGN PARAMETERSNANANANA
GEQUIPMENTNANANANA
HPROCUREMENT STRATEGYNANANANA
JDELIVERABLESNANANANA
KPROJECT CONTROLSNANANANA
LPROJECT EXECUTION PLANNANANANA
TotalNA- 00NA
Top ElementsDescriptionPDRI 2i ScoreMin ScoreMax ScoreDef1 (%)
A.1Building Use RequirementNANANANA
A.5Facility RequirementsNANANANA
A.7Site Selection ConsiderationsNANANANA
A.2Business JustificationNANANANA
C.6Project Cost EstimateNANANANA
A.3Business PlanNANANANA
C.2Project Design CriteriaNANANANA
C.3Evaluation of Existing FacilitiesNANANANA
A.6Future Expansion/Alteration ConsiderationsNANANANA
F.2Architectural DesignNANANANA
TotalNA- 00NA
Notes:
1 - Definition percentage indicates the level of completeness of specific Section, Category and Element.

&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D

PDRI

Cover Page Summary Chart PDRI 2i Attendance Print PDRI 2i Print PDRI 2i Summary PDRI 2i Section I PDRI 2i Section II PDRI 2i Section III PDRI 2i Low Definition Reset PDRI Elements Buildings

PDRI 3 - Summary

PDRI 3 - Summary Results
Project:
Enter on Cover Page
Project Manager:
Facilitator:
Status of Project:
Date:
SectionDescriptionPDRI 3 ScoreMin ScoreMax ScoreDef1 (%)
IBASIS OF PROJECT DECISIONNANANANA
IIBASIS OF DESIGNNANANANA
IIIEXECUTION APPROACHNANANANA
TotalNANANANA
PDRI TOTAL MAXIMUM SCORE = 1000
Normalized Score:NA
CategoryDescriptionPDRI 3 ScoreMin ScoreMax ScoreDef1 (%)
ABUSINESS STRAGEGYNANANANA
BOWNER PHILOSOPHIESNANANANA
CPROJECT REQUIREMENTSNANANANA
DSITE INFORMATIONNANANANA
EBUILDING PROGRAMMINGNANANANA
FBUILDING/PROJECT DESIGN PARAMETERSNANANANA
GEQUIPMENTNANANANA
HPROCUREMENT STRATEGYNANANANA
JDELIVERABLESNANANANA
KPROJECT CONTROLSNANANANA
LPROJECT EXECUTION PLANNANANANA
TotalNA- 00NA
Top ElementsDescriptionPDRI 3 ScoreMin ScoreMax ScoreDef1 (%)
A.1Building Use RequirementNANANANA
A.5Facility RequirementsNANANANA
A.7Site Selection ConsiderationsNANANANA
A.2Business JustificationNANANANA
C.6Project Cost EstimateNANANANA
A.3Business PlanNANANANA
C.2Project Design CriteriaNANANANA
C.3Evaluation of Existing FacilitiesNANANANA
A.6Future Expansion/Alteration ConsiderationsNANANANA
F.2Architectural DesignNANANANA
TotalNA- 00NA
Notes:
1 - Definition percentage indicates the level of completeness of specific Section, Category and Element.

&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D

PDRI

Cover Page Summary Chart PDRI 3 Attendance Print

PDRI 3

Print PDRI 3 Summary PDRI 3 Section I PDRI 3 Section II PDRI 3 Low Definition PDRI 3 Section III Reset PDRI Elements Buildings

PDRI 1 - Attendance Sheet

PDRI 1 - Attendance Sheet
Project:
Enter on Cover Page
Project Manager:
Enter on Summary Page
Facilitator:
Enter on Summary Page
Status of Project:
Enter on Summary Page
Date:
Enter on Summary Page
No.Participants NameOrganizationRoleContact Number
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D PDRI 1 Summary Print this Page Print

PDRI 1

PDRI 1 Section I PDRI 1 Section II PDRI 1 Section III PDRI 1 Low Def.

Reset PDRI Elements Buildings

PDRI 2 - Attendance Sheet

PDRI 2 - Attendance Sheet
Project:
Enter on Cover Page
Project Manager:
Enter on Summary Page
Facilitator:
Enter on Summary Page
Status of Project:
Enter on Summary Page
Date:
Enter on Summary Page
No.Participants NameOrganizationRoleContact Number
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D PDRI 2 Summary PDRI 2 Section I Print

PDRI 2

Print this Page Reset PDRI Elements PDRI 2 Section II PDRI 2 Section III PDRI 1 Low Def.

Buildings

PDRI 2i - Attendance Sheet

PDRI 2i - Attendance Sheet
Project:
Enter on Cover Page
Project Manager:
Enter on Summary Page
Facilitator:
Enter on Summary Page
Status of Project:
Enter on Summary Page
Date:
Enter on Summary Page
No.Participants NameOrganizationRoleContact Number
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D PDRI 2i Summary PDRI 2i Section I PDRI 2i Section II PDRI 2i Section III PDRI 2i Low Def.

Print PDRI 2i Print this Page Reset PDRI Elements Buildings

PDRI 3 - Attendance Sheet

PDRI 3 - Attendance Sheet
Project:
Enter on Cover Page
Project Manager:
Enter on Summary Page
Facilitator:
Enter on Summary Page
Status of Project:
Enter on Summary Page
Date:
Enter on Summary Page
No.Participants NameOrganizationRoleContact Number
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D PDRI 3 Summary PDRI 3 Section I PDRI 3 Section II PDRI 3 Section III PDRI 3 Low Def.

Print

PDRI 3

Print this Page Reset PDRI Elements Buildings

PDRI 1 - Section I

PDRI 1 Section I - Basis of Project Decision
Project:Date:
Enter on Cover PageEnter on Summary Page
PDRI 1 SECTION I - BASIS OF PROJECT DECISION
CATEGORY
ElementDefinition LevelReview LevelCommentsScoreMin ScoreMax ScoreNo.
ABUSINESS STRATEGY012345Review LevelCategory A CommentsScoreMin ScoreMax ScoreNo
A.1Building Use Requirement0112233344NANANA1
A.2Business Justification018142127NANANA1
A.3Business Plan028142026NANANA1
A.4Economic Analysis026111621NANANA1
A.5Facility Requirements029162331NANANA1
A.6Future Expansion/Alteration Considerations017121722NANANA1
A.7Site Selection Considerations018152128NANANA1
A.8Project Objective Statement01481115NANANA3
TotalCategory A (Maximum = 214)01162113162214NA- 0- 0NA
BOWNER PHILOSOPHIES012345Review LevelCategory B CommentsScoreMin ScoreMax ScoreNo
B.1Reliability Philosophy015101418NANANA1
B.2Maintenance Philosophy01591216NANANA1
B.3Operating Philosophy01581215NANANA1
B.4Design Philosophy016101419NANANA3
TotalCATEGORY B (Maximum = 68)0421375268NA- 0- 0NA
CPROJECT REQUIREMENTS012345Review LevelCategory C CommentsScoreMin ScoreMax ScoreNo
C.1Value-Analysis Process016101419NANANA1
C.2Project Design Criteria017131824NANANA1
C.3Evaluation of Existing Facilities027131924NANANA1
C.4Scope of Work Overview01591317NANANA1
C.5Projecct Schedule026111520NANANA1
C.6Project Cost Estimate028152127NANANA0
TotalCATEGORY C (Maximum = 131)093971100131NA- 0- 0NA
TotalSECTION I (Maximum = 413)024122221314413NA- 0- 0NA

&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition PDRI 1 Summary PDRI 1 Section II Print Section I Print

PDRI 1

PDRI 1 Section III PDRI 1 Low Def.

Reset PDRI Elements Double click on selected row to display dialog box Buildings Show Element Weights Hide Element Weights

PDRI 2 - Section I

PDRI 2 Section I - Basis of Project Decision
Project:Date:
Enter on Cover PageEnter on Final Score Page
PDRI 2 SECTION I - BASIS OF PROJECT DECISION
CATEGORY
ElementDefinition LevelReview LevelCommentsScoreMin ScoreMax ScoreNo.
ABUSINESS STRATEGY012345Review LevelCategory A CommentsScoreMin ScoreMax ScoreNo
A.1Building Use Requirement0112233344NANANA1
A.2Business Justification018142127NANANA1
A.3Business Plan028142026NANANA1
A.4Economic Analysis026111621NANANA1
A.5Facility Requirements029162331NANANA1
A.6Future Expansion/Alteration Considerations017121722NANANA1
A.7Site Selection Considerations018152128NANANA1
A.8Project Objective Statement01481115NANANA3
TotalCategory A (Maximum = 214)01162113162214NA- 0- 0NA
BOWNER PHILOSOPHIES012345Review LevelCategory B CommentsScoreMin ScoreMax ScoreNo
B.1Reliability Philosophy015101418NANANA1
B.2Maintenance Philosophy01591216NANANA1
B.3Operating Philosophy01581215NANANA1
B.4Design Philosophy016101419NANANA3
TotalCATEGORY B (Maximum = 68)0421375268NA- 0- 0NA
CPROJECT REQUIREMENTS012345Review LevelCategory C CommentsScoreMin ScoreMax ScoreNo
C.1Value-Analysis Process016101419NANANA1
C.2Project Design Criteria017131824NANANA1
C.3Evaluation of Existing Facilities027131924NANANA1
C.4Scope of Work Overview01591317NANANA1
C.5Projecct Schedule026111520NANANA1
C.6Project Cost Estimate028152127NANANA0
TotalCATEGORY C (Maximum = 131)093971100131NA- 0- 0NA
TotalSECTION I (Maximum = 413)024122221314413NA- 0- 0NA

&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition PDRI 2 Summary PDRI 2 Section II PDRI 2 Section III PDRI 2 Low Def.

Print

PDRI 2

Print Section I Reset PDRI Elements Double click on selected row to display dialog box Buildings Hide Element Weights Show Element Weights

PDRI 2i - Section I

PDRI 2i Section I - Basis of Project Decision
Project:Date:
Enter on Cover PageEnter on Summary Page
PDRI 2i SECTION I - BASIS OF PROJECT DECISION
CATEGORY
ElementDefinition LevelReview LevelCommentsScoreMin ScoreMax ScoreNo.
ABUSINESS STRATEGY012345Review LevelCategory A CommentsScoreMin ScoreMax ScoreNo
A.1Building Use Requirement0112233344NANANA1
A.2Business Justification018142127NANANA1
A.3Business Plan028142026NANANA1
A.4Economic Analysis026111621NANANA1
A.5Facility Requirements029162331NANANA1
A.6Future Expansion/Alteration Considerations017121722NANANA1
A.7Site Selection Considerations018152128NANANA1
A.8Project Objective Statement01481115NANANA3
TotalCategory A (Maximum = 214)01162113162214NA- 0- 0NA
BOWNER PHILOSOPHIES012345Review LevelCategory B CommentsScoreMin ScoreMax ScoreNo
B.1Reliability Philosophy015101418NANANA1
B.2Maintenance Philosophy01591216NANANA1
B.3Operating Philosophy01581215NANANA1
B.4Design Philosophy016101419NANANA3
TotalCATEGORY B (Maximum = 68)0421375268NA- 0- 0NA
CPROJECT REQUIREMENTS012345Review LevelCategory C CommentsScoreMin ScoreMax ScoreNo
C.1Value-Analysis Process016101419NANANA1
C.2Project Design Criteria017131824NANANA1
C.3Evaluation of Existing Facilities027131924NANANA1
C.4Scope of Work Overview01591317NANANA1
C.5Projecct Schedule026111520NANANA1
C.6Project Cost Estimate028152127NANANA0
TotalCATEGORY C (Maximum = 131)093971100131NA- 0- 0NA
TotalSECTION I (Maximum = 413)024122221314413NA- 0- 0NA

&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition PDRI 2i Summary PDRI 2i Section II PDRI 2i Section III PDRI 2i Low Def.

Print PDRI 2i Print Section I Reset PDRI Elements Double click on selected row to display dialog box Buildings Hide Element Weights Show Element Weights

PDRI 3 - Section I

PDRI 3 Section I - Basis of Project Decision
Project:Date:
Enter on Cover PageEnter on Summary Page
PDRI 3 SECTION I - BASIS OF PROJECT DECISION
CATEGORY
ElementDefinition LevelReview LevelCommentsScoreMin ScoreMax ScoreNo.
ABUSINESS STRATEGY012345Review LevelCategory A CommentsScoreMin ScoreMax ScoreNo
A.1Building Use Requirement0112233344NANANA1
A.2Business Justification018142127NANANA1
A.3Business Plan028142026NANANA1
A.4Economic Analysis026111621NANANA1
A.5Facility Requirements029162331NANANA1
A.6Future Expansion/Alteration Considerations017121722NANANA1
A.7Site Selection Considerations018152128NANANA1
A.8Project Objective Statement01481115NANANA3
TotalCategory A (Maximum = 214)01162113162214NA- 0- 0NA
BOWNER PHILOSOPHIES012345Review LevelCategory B CommentsScoreMin ScoreMax ScoreNo
B.1Reliability Philosophy015101418NANANA1
B.2Maintenance Philosophy01591216NANANA1
B.3Operating Philosophy01581215NANANA1
B.4Design Philosophy016101419NANANA3
TotalCATEGORY B (Maximum = 68)0421375268NA- 0- 0NA
CPROJECT REQUIREMENTS012345Review LevelCategory C CommentsScoreMin ScoreMax ScoreNo
C.1Value-Analysis Process016101419NANANA1
C.2Project Design Criteria017131824NANANA1
C.3Evaluation of Existing Facilities027131924NANANA1
C.4Scope of Work Overview01591317NANANA1
C.5Projecct Schedule026111520NANANA1
C.6Project Cost Estimate028152127NANANA0
TotalCATEGORY C (Maximum = 131)093971100131NA- 0- 0NA
TotalSECTION I (Maximum = 413)024122221314413NA- 0- 0NA

&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition PDRI 3 Summary PDRI 3 Section II PDRI 3 Section III PDRI 3 Low Def.

Print

PDRI 3

Print Section I Reset PDRI Elements Double click on selected row to display dialog box Buildings Hide Element Weights Show Element Weights

PDRI 1 - Section II

PDRI 1 Section II - Basis of Design
Project:Date:
Enter on Cover PageEnter on Summary Page
PDRI 1 SECTION II - BASIS OF DESIGN
CATEGORY
ElementDefinition LevelReview LevelCommentsScoreMin ScoreMax ScoreNo
DSITE INFORMATION012345Review LevelCategory D CommentsScoreMin ScoreMax ScoreNo
D.1Site Layout01471014NANANA1
D.2Site Surveys01481114NANANA1
D.3Civil/Geotechnical Information026101419NANANA1
D.4Governing Regulatory Requirements01481114NANANA1
D.5Environmental Assessment01591216NANANA1
D.6Utility Sources with Supply Conditions01471013NANANA1
D.7Site Life Safety Considerations012468NANANA1
D.8Special Water and Waste Treatment Requirements0136811NANANA3
TotalCATEGORY D (Maximum = 109)09325982109NA- 0- 0NA
EBUILDING PROGRAMMING012345Review LevelCategory E CommentsScoreMin ScoreMax ScoreNo
E.1Program Statement01591216NANANA1
E.2Building Summary Space List016111621NANANA1
E.3Overall Adjacency Diagrams0136810NANANA1
E.4Stacking Diagrams01471013NANANA1
E.5Growth and Phase Development01581215NANANA1
E.6Circulation and Open Space Requirements01471013NANANA1
E.7Functional Relationship Diagrams/Room by Room0135810NANANA1
E.8Loading/Unloading/Storage Facilities Requirements012468NANANA1
E.9Transportation Requirements013579NANANA1
E.10Building Finishes01581215NANANA1
E.11Room Data Sheets01471013NANANA1
E.12Furnishings, Equipment, and Built-Ins01481114NANANA1
E.13Window Treatment002345NANANA3
TotalCATEGORY E (Maximum = 162)0125088126162NA- 0- 0NA
FBUILDING/PROJECT DESIGN PARAMETERS012345Review LevelCategory F CommentsScoreMin ScoreMax ScoreNo
F.1Civil/Site Design01471114NANANA1
F.2Architectural Design017121722NANANA1
F.3Structural Design01591418NANANA1
F.4Mechanical Design026111520NANANA1
F.5Electrical Design01581215NANANA1
F.6Building Life Safety Requirements0135810NANANA1
F.7Constructability Analysis01481114NANANA1
F.8Technological Sophistication013579NANANA3
TotalCATEGORY F (Maximum = 122)09376595122NA- 0- 0NA
GEQUIPMENT012345Review LevelCategory G CommentsScoreMin ScoreMax ScoreNo
G.1Equipment List01581215NANANA1
G.2Equipment Location Drawings0135810NANANA1
G.3Equipment Utility Requirements0146911NANANA0
TotalCATEGORY G (Maximum = 36)0312192936NA- 0- 0NA
TotalSECTION II (Maximum = 429)033131231332429NA- 0- 0NA

&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition PDRI 1 Summary PDRI 1 Section I PDRI 1 Section III PDRI 1 Low Def.

Print

PDRI 1

Print Section II Reset PDRI Elements Double click on selected row to display dialog box Buildings Hide Element Weights Show Element Weights

PDRI 2 - Section II

PDRI 2 Section II - Basis of Design
Project:Date:
Enter on Cover PageEnter on Final Score Page
PDRI 2 SECTION II - BASIS OF DESIGN
CATEGORY
ElementDefinition LevelReview LevelCommentsScoreMin ScoreMax ScoreNo
DSITE INFORMATION012345Review LevelCategory D CommentsScoreMin ScoreMax ScoreNo
D.1Site Layout01471014NANANA1
D.2Site Surveys01481114NANANA1
D.3Civil/Geotechnical Information026101419NANANA1
D.4Governing Regulatory Requirements01481114NANANA1
D.5Environmental Assessment01591216NANANA1
D.6Utility Sources with Supply Conditions01471013NANANA1
D.7Site Life Safety Considerations012468NANANA1
D.8Special Water and Waste Treatment Requirements0136811NANANA3
TotalCATEGORY D (Maximum = 109)09325982109NA- 0- 0NA
EBUILDING PROGRAMMING012345Review LevelCategory E CommentsScoreMin ScoreMax ScoreNo
E.1Program Statement01591216NANANA1
E.2Building Summary Space List016111621NANANA1
E.3Overall Adjacency Diagrams0136810NANANA1
E.4Stacking Diagrams01471013NANANA1
E.5Growth and Phase Development01581215NANANA1
E.6Circulation and Open Space Requirements01471013NANANA1
E.7Functional Relationship Diagrams/Room by Room0135810NANANA1
E.8Loading/Unloading/Storage Facilities Requirements012468NANANA1
E.9Transportation Requirements013579NANANA1
E.10Building Finishes01581215NANANA1
E.11Room Data Sheets01471013NANANA1
E.12Furnishings, Equipment, and Built-Ins01481114NANANA1
E.13Window Treatment002345NANANA3
TotalCATEGORY E (Maximum = 162)0125088126162NA- 0- 0NA
FBUILDING/PROJECT DESIGN PARAMETERS012345Review LevelCategory F CommentsScoreMin ScoreMax ScoreNo
F.1Civil/Site Design01471114NANANA1
F.2Architectural Design017121722NANANA1
F.3Structural Design01591418NANANA1
F.4Mechanical Design026111520NANANA1
F.5Electrical Design01581215NANANA1
F.6Building Life Safety Requirements0135810NANANA1
F.7Constructability Analysis01481114NANANA1
F.8Technological Sophistication013579NANANA3
TotalCATEGORY F (Maximum = 122)09376595122NA- 0- 0NA
GEQUIPMENT012345Review LevelCategory G CommentsScoreMin ScoreMax ScoreNo
G.1Equipment List01581215NANANA1
G.2Equipment Location Drawings0135810NANANA1
G.3Equipment Utility Requirements0146911NANANA0
TotalCATEGORY G (Maximum = 36)0312192936NA- 0- 0NA
TotalSECTION II (Maximum = 429)033131231332429NA- 0- 0NA

&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition PDRI 2 Summary PDRI 2 Section I PDRI 2 Section III PDRI 2 Low Def.

Print

PDRI 2

Print Section II Reset PDRI Elements Double click on selected row to display dialog box Buildings Hide Element Weights Show Element Weights

PDRI 2i - Section II

PDRI 2i Section II - Basis of Design
Project:Date:
Enter on Cover PageEnter on Summary Page
PDRI 2i SECTION II - BASIS OF DESIGN
CATEGORY
ElementDefinition LevelReview LevelCommentsScoreMin ScoreMax ScoreNo
DSITE INFORMATION012345Review LevelCategory D CommentsScoreMin ScoreMax ScoreNo
D.1Site Layout01471014NANANA1
D.2Site Surveys01481114NANANA1
D.3Civil/Geotechnical Information026101419NANANA1
D.4Governing Regulatory Requirements01481114NANANA1
D.5Environmental Assessment01591216NANANA1
D.6Utility Sources with Supply Conditions01471013NANANA1
D.7Site Life Safety Considerations012468NANANA1
D.8Special Water and Waste Treatment Requirements0136811NANANA3
TotalCATEGORY D (Maximum = 109)09325982109NA- 0- 0NA
EBUILDING PROGRAMMING012345Review LevelCategory E CommentsScoreMin ScoreMax ScoreNo
E.1Program Statement01591216NANANA1
E.2Building Summary Space List016111621NANANA1
E.3Overall Adjacency Diagrams0136810NANANA1
E.4Stacking Diagrams01471013NANANA1
E.5Growth and Phase Development01581215NANANA1
E.6Circulation and Open Space Requirements01471013NANANA1
E.7Functional Relationship Diagrams/Room by Room0135810NANANA1
E.8Loading/Unloading/Storage Facilities Requirements012468NANANA1
E.9Transportation Requirements013579NANANA1
E.10Building Finishes01581215NANANA1
E.11Room Data Sheets01471013NANANA1
E.12Furnishings, Equipment, and Built-Ins01481114NANANA1
E.13Window Treatment002345NANANA3
TotalCATEGORY E (Maximum = 162)0125088126162NA- 0- 0NA
FBUILDING/PROJECT DESIGN PARAMETERS012345Review LevelCategory F CommentsScoreMin ScoreMax ScoreNo
F.1Civil/Site Design01471114NANANA1
F.2Architectural Design017121722NANANA1
F.3Structural Design01591418NANANA1
F.4Mechanical Design026111520NANANA1
F.5Electrical Design01581215NANANA1
F.6Building Life Safety Requirements0135810NANANA1
F.7Constructability Analysis01481114NANANA1
F.8Technological Sophistication013579NANANA3
TotalCATEGORY F (Maximum = 122)09376595122NA- 0- 0NA
GEQUIPMENT012345Review LevelCategory G CommentsScoreMin ScoreMax ScoreNo
G.1Equipment List01581215NANANA1
G.2Equipment Location Drawings0135810NANANA1
G.3Equipment Utility Requirements0146911NANANA0
TotalCATEGORY G (Maximum = 36)0312192936NA- 0- 0NA
TotalSECTION II (Maximum = 429)033131231332429NA- 0- 0NA

&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition PDRI 2i Summary PDRI 2i Section I PDRI 2i Section III PDRI 2i Low Def.

Print PDRI 2i Print Section II Reset PDRI Elements Double click on selected row to display dialog box Buildings Hide Element Weights Show Element Weights

PDRI 3 - Section II

PDRI 3 Section II - Basis of Design
Project:Date:
Enter on Cover PageEnter on Summary Page
PDRI 3 SECTION II - BASIS OF DESIGN
CATEGORY
ElementDefinition LevelReview LevelCommentsScoreMin ScoreMax ScoreNo
DSITE INFORMATION012345Review LevelCategory D CommentsScoreMin ScoreMax ScoreNo
D.1Site Layout01471014NANANA1
D.2Site Surveys01481114NANANA1
D.3Civil/Geotechnical Information026101419NANANA1
D.4Governing Regulatory Requirements01481114NANANA1
D.5Environmental Assessment01591216NANANA1
D.6Utility Sources with Supply Conditions01471013NANANA1
D.7Site Life Safety Considerations012468NANANA1
D.8Special Water and Waste Treatment Requirements0136811NANANA3
TotalCATEGORY D (Maximum = 109)09325982109NA- 0- 0NA
EBUILDING PROGRAMMING012345Review LevelCategory E CommentsScoreMin ScoreMax ScoreNo
E.1Program Statement01591216NANANA1
E.2Building Summary Space List016111621NANANA1
E.3Overall Adjacency Diagrams0136810NANANA1
E.4Stacking Diagrams01471013NANANA1
E.5Growth and Phase Development01581215NANANA1
E.6Circulation and Open Space Requirements01471013NANANA1
E.7Functional Relationship Diagrams/Room by Room0135810NANANA1
E.8Loading/Unloading/Storage Facilities Requirements012468NANANA1
E.9Transportation Requirements013579NANANA1
E.10Building Finishes01581215NANANA1
E.11Room Data Sheets01471013NANANA1
E.12Furnishings, Equipment, and Built-Ins01481114NANANA1
E.13Window Treatment002345NANANA3
TotalCATEGORY E (Maximum = 162)0125088126162NA- 0- 0NA
FBUILDING/PROJECT DESIGN PARAMETERS012345Review LevelCategory F CommentsScoreMin ScoreMax ScoreNo
F.1Civil/Site Design01471114NANANA1
F.2Architectural Design017121722NANANA1
F.3Structural Design01591418NANANA1
F.4Mechanical Design026111520NANANA1
F.5Electrical Design01581215NANANA1
F.6Building Life Safety Requirements0135810NANANA1
F.7Constructability Analysis01481114NANANA1
F.8Technological Sophistication013579NANANA3
TotalCATEGORY F (Maximum = 122)09376595122NA- 0- 0NA
GEQUIPMENT012345Review LevelCategory G CommentsScoreMin ScoreMax ScoreNo
G.1Equipment List01581215NANANA1
G.2Equipment Location Drawings0135810NANANA1
G.3Equipment Utility Requirements0146911NANANA0
TotalCATEGORY G (Maximum = 36)0312192936NA- 0- 0NA
TotalSECTION II (Maximum = 429)0124984124158NA- 0- 0NA

&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition PDRI 3 Summary PDRI 3 Section I PDRI 3 Section III PDRI 3 Low Def.

Print

PDRI 3

Print Section II Reset PDRI Elements Double click on selected row to display dialog box Buildings Show Element Weights Hide Element Weights

PDRI 1 - Section III

PDRI 1 Section III - Execution Approach
Project:Date:
Enter on Cover PageEnter on Final Score Page
PDRI 1 SECTION III - EXECUTION APPROACH
CATEGORY
ElementDefinition LevelReview LevelCommentsScoreMin ScoreMax ScoreNo
HPROCREMENT STRATEGY012345Review LevelCategory H CommentsScoreMin ScoreMax ScoreNo
H.1Identify Long-lead/Critical Equipment and Materials01471014NANANA1
H.2Procurement Procedures and Plans0136911NANANA3
TotalCATEGORY H (Maximum = 25)027131925NA- 0- 0NA
JDELIVERABLES012345Review LevelCategory J CommentsScoreMin ScoreMax ScoreNo
J.1CADD/Model Requirements001234NANANA1
J.2Documentation/Deliverables012467NANANA3
TotalCATEGORY J (Maximum = 11)0136911NA- 0- 0NA
KPROJECT CONTROLS012345Review LevelCategory K CommentsScoreMin ScoreMax ScoreNo
K.1Project Quality Assurance and Control013468NANANA1
K.2Project Cost Control01471013NANANA1
K.3Project Schedule Control01481114NANANA1
K.4Risk Management016101418NANANA1
K.5Safety Procedures013579NANANA3
TotalCATEGORY K (Maximum = 62)0520344862NA- 0- 0NA
LPROJECT EXECUTION PLAN012345Review LevelCategory L CommentsScoreMin ScoreMax ScoreNo
L.1Project Organization0135810NANANA1
L.2Owner Approval Requirements0146911NANANA1
L.3Project Delivery Method01581215NANANA1
L.4Design/Construction Plan and Approach01481115NANANA1
L.5Substantial Completion Requirements013579NANANA0
TotalCATEGORY L (Maximum = 60)0519324760NA- 0- 0NA
TotalSECTION III (Maximum = 158)0114272104133NA- 0- 0NA

&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition PDRI 1 Summary PDRI 1 Section I PDRI 1 Section II PDRI 1 Low Def.

Print

PDRI 1

Print Section III Reset PDRI Elements Double click on selected row to display dialog box Buildings Hide Element Weights Show Element Weights

PDRI 2 - Section III

PDRI 2 Section III - Execution Approach
Project:Date:
Enter on Cover PageEnter on Final Score Page
PDRI 2 SECTION III - EXECUTION APPROACH
CATEGORY
ElementDefinition LevelReview LevelCommentsScoreMin ScoreMax ScoreNo
HPROCUREMENT STRATEGY012345Review LevelCategory H CommentsScoreMin ScoreMax ScoreNo
H.1Identify Long-lead/Critical Equipment and Materials01471014NANANA1
H.2Procurement Procedures and Plans0136911NANANA3
TotalCATEGORY H (Maximum = 25)027131925NA- 0- 0NA
JDELIVERABLES012345Review LevelCategory J CommentsScoreMin ScoreMax ScoreNo
J.1CADD/Model Requirements001234NANANA1
J.2Documentation/Deliverables012467NANANA3
TotalCATEGORY J (Maximum = 11)0136911NA- 0- 0NA
KPROJECT CONTROLS012345Review LevelCategory K CommentsScoreMin ScoreMax ScoreNo
K.1Project Quality Assurance and Control013468NANANA1
K.2Project Cost Control01471013NANANA1
K.3Project Schedule Control01481114NANANA1
K.4Risk Management016101418NANANA1
K.5Safety Procedures013579NANANA3
TotalCATEGORY K (Maximum = 62)0520344862NA- 0- 0NA
LPROJECT EXECUTION PLAN012345Review LevelCategory L CommentsScoreMin ScoreMax ScoreNo
L.1Project Organization0135810NANANA1
L.2Owner Approval Requirements0146911NANANA1
L.3Project Delivery Method01581215NANANA1
L.4Design/Construction Plan and Approach01481115NANANA1
L.5Substantial Completion Requirements013579NANANA0
TotalCATEGORY L (Maximum = 60)0519324760NA- 0- 0NA
TotalSECTION III (Maximum = 158)0114272104133NA- 0- 0NA

&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor deficiencies Level 3:

Element has some deficiencies Level 4:

Element has mayor deficiencies Level 5:

Element has poor or incomplete definition Level 0:

Element not applicable Level 1:

Element completely defined Level 2:

Element has minor…