This document is a solicitation for Construction Manager as Constructor (CMc) Services for the Phases 2-5 Repairs and Alterations Prospectus for the U.S. Courthouse in Clarksburg, West Virginia. The project scope consists of major renovations to the interior finishes, mechanical, electrical, and plumbing (MEP) systems, stairs, and elevators, including the renovation/construction of new district courtroom, judges' chambers, grand jury room, and USMS space. The government intends to deliver this requirement through the CMc project delivery method utilizing a Guaranteed Maximum Price (GMP) contract. The solicitation is subject to the mandatory use of a Project Labor Agreement. The technical evaluation factors are listed in descending order of importance and are significantly more important than price. Phase I proposals are due by August 30, 2024 and will be evaluated, with Phase II price proposals to be requested via amendment. The NAICS code is 236220, Commercial and Institutional Building Construction, with an estimated total construction cost between $40-50 million.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PDRI Cover
| Building Projects | |
| Project | Type of Project (e.g., Office, School, Lab, or Hotel) |
| Owner/Client | Project Location |
| Project No. | Other Control No. |
&R&G &L&8File: &Z&F [&A] Page &P of &N Project Definition Rating Index Score Sheet and Session Report Feasibility Concept Detailed Scope Design and Construction
PDRI 1
PDRI 2
PDRI 2i Select PDRI that best correspond to the current status of your project PDRI Instructions Summary Chart Print PDRI Summaries Print Low Def. Elements Macro Security Settings Reset PDRI Elements
PDRI 3
Construction Industry Institute®
CII Copyright
Version 4.0
Buildings Copyright © 2013 Construction Industry Institute™.
The University of Texas at Austin.
CII members may reproduce and distribute this work internally in any medium at no cost to internal recipients. CII members are permitted to revise and adapt this work for the internal use provided an informational copy is furnished to CII.
Available to non-members by purchase; however, no copies may be made or distributed and no modifications made without prior written permission from CII. Contact CII at https://www.construction-institute.org/catalog.htm to purchase copies. Volume discounts may be available.
All CII Members, current students and faculty at a college or university are eligible to purchase CII products at member prices. Faculty and students at a college or university may reproduce and distribute this work without modification for educational use.
Instructions
| Instructions and Utilization Rights | |
| Column1 | SYSTEM REQUIREMENTS |
| This tool must be used in EXCEL 2007 or later. | |
| INSTRUCTIONS | |
| Column1 | Session Assesment Process: |
| - | Introductions: Name, Company, Role (pass attendance sheet around) |
| - | Ask if anyone present has not been through a PDRI. If yes, briefly explain PDRI |
| - | Explain ground rules and scoring. |
| - | Begin PDRI Section I for applicable project stage. |
| - | Repeat process as project progresses to other stages. |
| Column1 | Toolkit Security Issue: |
| - | Due to the presence of macros in this toolkit package, ensure that the Macro Security Settings is set to "Enable all Macros" before use and afterwards, re-start the toolkit package. This can be done by using the "Macro Security Settings" button on the PDRI Cover page.to check and/or change present settings. |
| Column1 | How to use: |
| - | For new projects reset the PDRI tool by clicking on "Clear and Reset All PDRI Worksheets" button on the PDRI Cover page. You can also clear PDRI's for specific project stages on their specific PDRI Summary pages. |
| - | Start by entering Project name on PDRI Cover Page |
| - | Select project status (i.e., Conceptual, Feasibility, etc.) and then press on the corresponding PDRI button (i.e., PDRI1, PDRI 2, PDRI 2i, or PDRI 3). Pressing different PDRI buttons, will activate different sets of PDRI tabs. |
| - | Make sure you document the participants by completing the Attendance Sheet tab |
| - | Enter basic information on the summary Final Results page for the corresponding PDRI and then press the button for Section I sheet. |
| - | Complete the Review Level and Comments column to score each element. |
| - | After completing the questions for the section proceed to the next section. |
| NOTE: If you want to see the weights of each element press "Show Element Weights" button. | |
| - | In each section, double click anywhere along the row of the element name you want to evaluate and a dialog box with the the official element description will appear. You can use this dialog box for scoring. You can also enter comments to each element. Make sure the comments are entered first before entering the score. The form will change to the next question as soon as you enter a score. |
| YOU MUST DOUBLE CLICK anywhere along the appropriate element row to get the dialog box with the element description to appear. If the text for the individual element does not fit on the screen, click on the text box and you will be able to scroll and see the rest of the description. | |
| - | Click on the Low definition button at any time to see a summary of all elements with a score higher than the one predetermined on the page. By default all elements with a score higher than 3 will be displayed. You can change the Low Definition threshold by selecting the value from the pull-down menu. You will have to press the "Refresh" button to update the page. |
| - | Click on the Low definition button at any time to see a summary of all elements with a score higher than the one predetermined on the page. By default all elements with a score higher than 3 will be displayed. You can change the Low Definition threshold by selecting the value from the pull-down menu. You will have to press the "Refresh" button to update the page. |
| - | Save frequently to insure that you do not lose any information, using the "Save As" button and a file name that is unique to your project. |
| - | To see the results go to the Summary page of the corresponding PDRI. |
| - | You can use the same worksheet to record the results of different PDRI conducted on the same project. The PDRI Score Chart page will graphically display the results of up to four PDRIs conducted on the same project. |
| Column1 | ACKNOWLEDGEMENT |
| - | CII would like to acknowledge the contributions of and express appreciation to Eskil Carlsson at CSA Group for the development of this program. |
&R&G &L&8File: &Z&F [&A] Page &P of &N
PDRI
Cover Page Print this Page Summary Chart
PDRI 1
PDRI 2
PDRI 2i
PDRI 3
Buildings
PDRI Score Chart
| Note: * | Typical range of scores are based on experience on PDRI tools since 1996. | |||
| Project: | Enter on Cover Page | |||
| Type of Project: | Enter on Cover Page | |||
| Project Location: | Enter on Cover Page | |||
| Owner/Client: | Enter on Cover Page | |||
| Project No.: | Enter on Cover Page | |||
| Other Control No.: | Enter on Cover Page | |||
| Stage | PDRI 1: Feasibility | PDRI 2: Concept | PDRI 2i: Detailed Scope | PDRI 3: Detailed Scope |
| Normalized Score | NA | NA | NA | NA |
| Score | - 0 | - 0 | - 0 | - 0 |
| Max Score | - 0 | - 0 | - 0 | - 0 |
| Total Max Score | 1,000 | 1,000 | 1,000 | 1,000 |
| Typical Min * | 550 | 450 | 300 | 150 |
| Typical Max * | 800 | 600 | 450 | 250 |
&R&G &R&8File: &Z&F [&A] Page &P of &N
PDRI Score Chart
Typical Min * Normalized Score Typical Max * Front End Planning Stage Normalized Score PDRI Score Chart Summary
Clear PDRI Templates
Reset PDRI Worksheets
PDRI 1
PDRI 2
PDRI 2i
PDRI 3
PDRI
Cover Page Print Chart Buildings &R&G
PDRI 2
PDRI 1
PDRI 2i
PDRI 3
Careful! Save your work before proceeding!
Processes cannot be reversed. Information will be cleared!
Clear PDRI 1 Attendance Sheet Clear Entire
PDRI 1
Clear Entire
PDRI 2
Clear Entire PDRI 2i Clear Entire
PDRI 3
Clear PDRI 2 Attendance Sheet Clear PDRI 2i Attendance Sheet Clear PDRI 3 Attendance Sheet Return to PDRI 1 Return to PDRI 2 Return to PDRI 2i Return to PDRI 3 Clear PDRI 1 Section I Clear PDRI 2 Section I Clear PDRI 1 Section II Clear PDRI 2i Section I Clear PDRI 3 Section I Clear PDRI 2 Section II Clear PDRI 2i Section II Clear PDRI 3 Section II Clear PDRI 1 Section III Clear PDRI 2 Section III Clear PDRI 2i Section III Clear PDRI 3 Section III Clear PDRI 1 Low Definition Clear PDRI 2 Low Definition Clear PDRI 2i Low Definition Clear PDRI 3 Low Definition Return to PDRI Cover Page Reset All PDRI Worksheets Buildings
PDRI 1 - Summary
| PDRI 1 - Summary Results | ||||||
| Project: | ||||||
| Enter on Cover Page | ||||||
| Project Manager: | ||||||
| Facilitator: | ||||||
| Status of Project: | ||||||
| Date: | ||||||
| Section | Description | PDRI 1 Score | Min Score | Max Score | Def1 (%) | |
| I | BASIS OF PROJECT DECISION | NA | NA | NA | NA | |
| II | BASIS OF DESIGN | NA | NA | NA | NA | |
| III | EXECUTION APPROACH | NA | NA | NA | NA | |
| Total | NA | NA | NA | NA | ||
| PDRI TOTAL MAXIMUM SCORE = 1000 | ||||||
| Normalized Score: | NA | |||||
| Category | Description | PDRI 1 Score | Min Score | Max Score | Def1 (%) | |
| A | BUSINESS STRAGEGY | NA | NA | NA | NA | |
| B | OWNER PHILOSOPHIES | NA | NA | NA | NA | |
| C | PROJECT REQUIREMENTS | NA | NA | NA | NA | |
| D | SITE INFORMATION | NA | NA | NA | NA | |
| E | BUILDING PROGRAMMING | NA | NA | NA | NA | |
| F | BUILDING/PROJECT DESIGN PARAMETERS | NA | NA | NA | NA | |
| G | EQUIPMENT | NA | NA | NA | NA | |
| H | PROCUREMENT STRATEGY | NA | NA | NA | NA | |
| J | DELIVERABLES | NA | NA | NA | NA | |
| K | PROJECT CONTROLS | NA | NA | NA | NA | |
| L | PROJECT EXECUTION PLAN | NA | NA | NA | NA | |
| Total | - 0 | - 0 | 0 | NA | ||
| Top Elements | Description | PDRI 1 Score | Min Score | Max Score | Def1 (%) | |
| A.1 | Building Use Requirement | NA | NA | NA | NA | |
| A.5 | Facility Requirements | NA | NA | NA | NA | |
| A.7 | Site Selection Considerations | NA | NA | NA | NA | |
| A.2 | Business Justification | NA | NA | NA | NA | |
| C.6 | Project Cost Estimate | NA | NA | NA | NA | |
| A.3 | Business Plan | NA | NA | NA | NA | |
| C.2 | Project Design Criteria | NA | NA | NA | NA | |
| C.3 | Evaluation of Existing Facilities | NA | NA | NA | NA | |
| A.6 | Future Expansion/Alteration Considerations | NA | NA | NA | NA | |
| F.2 | Architectural Design | NA | NA | NA | NA | |
| Total | NA | 0 | 0 | NA | ||
| Notes: | ||||||
| 1 - Definition percentage indicates the level of completeness of specific Section, Category and Element. |
&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D
PDRI
Cover Page Print
PDRI 1
PDRI 1 Section I Print PDRI 1 Summary PDRI 1 Section II PDRI 1 Section III PDRI 1 Attendance PDRI 1 Low Definition Summary Chart Reset PDRI Elements Buildings
PDRI 2 - Summary
| PDRI 2 - Summary Results | ||||||
| Project: | ||||||
| Enter on Cover Page | ||||||
| Project Manager: | ||||||
| Facilitator: | ||||||
| Status of Project: | ||||||
| Date: | ||||||
| Section | Description | PDRI 2 Score | Min Score | Max Score | Def1 (%) | |
| I | BASIS OF PROJECT DECISION | NA | NA | NA | NA | |
| II | BASIS OF DESIGN | NA | NA | NA | NA | |
| III | EXECUTION APPROACH | NA | NA | NA | NA | |
| Total | NA | NA | NA | NA | ||
| PDRI TOTAL MAXIMUM SCORE = 1000 | ||||||
| Normalized Score: | NA | |||||
| Category | Description | PDRI 2 Score | Min Score | Max Score | Def1 (%) | |
| A | BUSINESS STRAGEGY | NA | NA | NA | NA | |
| B | OWNER PHILOSOPHIES | NA | NA | NA | NA | |
| C | PROJECT REQUIREMENTS | NA | NA | NA | NA | |
| D | SITE INFORMATION | NA | NA | NA | NA | |
| E | BUILDING PROGRAMMING | NA | NA | NA | NA | |
| F | BUILDING/PROJECT DESIGN PARAMETERS | NA | NA | NA | NA | |
| G | EQUIPMENT | NA | NA | NA | NA | |
| H | PROCUREMENT STRATEGY | NA | NA | NA | NA | |
| J | DELIVERABLES | NA | NA | NA | NA | |
| K | PROJECT CONTROLS | NA | NA | NA | NA | |
| L | PROJECT EXECUTION PLAN | NA | NA | NA | NA | |
| Total | NA | - 0 | 0 | NA | ||
| Top Elements | Description | PDRI 2 Score | Min Score | Max Score | Def1 (%) | |
| A.1 | Building Use Requirement | NA | NA | NA | NA | |
| A.5 | Facility Requirements | NA | NA | NA | NA | |
| A.7 | Site Selection Considerations | NA | NA | NA | NA | |
| A.2 | Business Justification | NA | NA | NA | NA | |
| C.6 | Project Cost Estimate | NA | NA | NA | NA | |
| A.3 | Business Plan | NA | NA | NA | NA | |
| C.2 | Project Design Criteria | NA | NA | NA | NA | |
| C.3 | Evaluation of Existing Facilities | NA | NA | NA | NA | |
| A.6 | Future Expansion/Alteration Considerations | NA | NA | NA | NA | |
| F.2 | Architectural Design | NA | NA | NA | NA | |
| Total | NA | - 0 | 0 | NA | ||
| Notes: | ||||||
| 1 - Definition percentage indicates the level of completeness of specific Section, Category and Element. |
&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D
PDRI
Cover Page PDRI 2 Attendance Print
PDRI 2
Print PDRI 2 Summary PDRI 2 Section I PDRI 2 Section II PDRI 2 Section III PDRI 2 Low Definition Summary Chart Reset PDRI Elements Buildings
PDRI 2i - Summary
| PDRI 2i - Summary Results | ||||||
| Project: | ||||||
| Enter on Cover Page | ||||||
| Project Manager: | ||||||
| Facilitator: | ||||||
| Status of Project: | ||||||
| Date: | ||||||
| Section | Description | PDRI 2i Score | Min Score | Max Score | Def1 (%) | |
| I | BASIS OF PROJECT DECISION | NA | NA | NA | NA | |
| II | BASIS OF DESIGN | NA | NA | NA | NA | |
| III | EXECUTION APPROACH | NA | NA | NA | NA | |
| Total | NA | NA | NA | NA | ||
| PDRI TOTAL MAXIMUM SCORE = 1000 | ||||||
| Normalized Score: | NA | |||||
| Category | Description | PDRI 2i Score | Min Score | Max Score | Def1 (%) | |
| A | BUSINESS STRAGEGY | NA | NA | NA | NA | |
| B | OWNER PHILOSOPHIES | NA | NA | NA | NA | |
| C | PROJECT REQUIREMENTS | NA | NA | NA | NA | |
| D | SITE INFORMATION | NA | NA | NA | NA | |
| E | BUILDING PROGRAMMING | NA | NA | NA | NA | |
| F | BUILDING/PROJECT DESIGN PARAMETERS | NA | NA | NA | NA | |
| G | EQUIPMENT | NA | NA | NA | NA | |
| H | PROCUREMENT STRATEGY | NA | NA | NA | NA | |
| J | DELIVERABLES | NA | NA | NA | NA | |
| K | PROJECT CONTROLS | NA | NA | NA | NA | |
| L | PROJECT EXECUTION PLAN | NA | NA | NA | NA | |
| Total | NA | - 0 | 0 | NA | ||
| Top Elements | Description | PDRI 2i Score | Min Score | Max Score | Def1 (%) | |
| A.1 | Building Use Requirement | NA | NA | NA | NA | |
| A.5 | Facility Requirements | NA | NA | NA | NA | |
| A.7 | Site Selection Considerations | NA | NA | NA | NA | |
| A.2 | Business Justification | NA | NA | NA | NA | |
| C.6 | Project Cost Estimate | NA | NA | NA | NA | |
| A.3 | Business Plan | NA | NA | NA | NA | |
| C.2 | Project Design Criteria | NA | NA | NA | NA | |
| C.3 | Evaluation of Existing Facilities | NA | NA | NA | NA | |
| A.6 | Future Expansion/Alteration Considerations | NA | NA | NA | NA | |
| F.2 | Architectural Design | NA | NA | NA | NA | |
| Total | NA | - 0 | 0 | NA | ||
| Notes: | ||||||
| 1 - Definition percentage indicates the level of completeness of specific Section, Category and Element. |
&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D
PDRI
Cover Page Summary Chart PDRI 2i Attendance Print PDRI 2i Print PDRI 2i Summary PDRI 2i Section I PDRI 2i Section II PDRI 2i Section III PDRI 2i Low Definition Reset PDRI Elements Buildings
PDRI 3 - Summary
| PDRI 3 - Summary Results | ||||||
| Project: | ||||||
| Enter on Cover Page | ||||||
| Project Manager: | ||||||
| Facilitator: | ||||||
| Status of Project: | ||||||
| Date: | ||||||
| Section | Description | PDRI 3 Score | Min Score | Max Score | Def1 (%) | |
| I | BASIS OF PROJECT DECISION | NA | NA | NA | NA | |
| II | BASIS OF DESIGN | NA | NA | NA | NA | |
| III | EXECUTION APPROACH | NA | NA | NA | NA | |
| Total | NA | NA | NA | NA | ||
| PDRI TOTAL MAXIMUM SCORE = 1000 | ||||||
| Normalized Score: | NA | |||||
| Category | Description | PDRI 3 Score | Min Score | Max Score | Def1 (%) | |
| A | BUSINESS STRAGEGY | NA | NA | NA | NA | |
| B | OWNER PHILOSOPHIES | NA | NA | NA | NA | |
| C | PROJECT REQUIREMENTS | NA | NA | NA | NA | |
| D | SITE INFORMATION | NA | NA | NA | NA | |
| E | BUILDING PROGRAMMING | NA | NA | NA | NA | |
| F | BUILDING/PROJECT DESIGN PARAMETERS | NA | NA | NA | NA | |
| G | EQUIPMENT | NA | NA | NA | NA | |
| H | PROCUREMENT STRATEGY | NA | NA | NA | NA | |
| J | DELIVERABLES | NA | NA | NA | NA | |
| K | PROJECT CONTROLS | NA | NA | NA | NA | |
| L | PROJECT EXECUTION PLAN | NA | NA | NA | NA | |
| Total | NA | - 0 | 0 | NA | ||
| Top Elements | Description | PDRI 3 Score | Min Score | Max Score | Def1 (%) | |
| A.1 | Building Use Requirement | NA | NA | NA | NA | |
| A.5 | Facility Requirements | NA | NA | NA | NA | |
| A.7 | Site Selection Considerations | NA | NA | NA | NA | |
| A.2 | Business Justification | NA | NA | NA | NA | |
| C.6 | Project Cost Estimate | NA | NA | NA | NA | |
| A.3 | Business Plan | NA | NA | NA | NA | |
| C.2 | Project Design Criteria | NA | NA | NA | NA | |
| C.3 | Evaluation of Existing Facilities | NA | NA | NA | NA | |
| A.6 | Future Expansion/Alteration Considerations | NA | NA | NA | NA | |
| F.2 | Architectural Design | NA | NA | NA | NA | |
| Total | NA | - 0 | 0 | NA | ||
| Notes: | ||||||
| 1 - Definition percentage indicates the level of completeness of specific Section, Category and Element. |
&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D
PDRI
Cover Page Summary Chart PDRI 3 Attendance Print
PDRI 3
Print PDRI 3 Summary PDRI 3 Section I PDRI 3 Section II PDRI 3 Low Definition PDRI 3 Section III Reset PDRI Elements Buildings
PDRI 1 - Attendance Sheet
| PDRI 1 - Attendance Sheet | ||||
| Project: | ||||
| Enter on Cover Page | ||||
| Project Manager: | ||||
| Enter on Summary Page | ||||
| Facilitator: | ||||
| Enter on Summary Page | ||||
| Status of Project: | ||||
| Enter on Summary Page | ||||
| Date: | ||||
| Enter on Summary Page | ||||
| No. | Participants Name | Organization | Role | Contact Number |
| 1 | ||||
| 2 | ||||
| 3 | ||||
| 4 | ||||
| 5 | ||||
| 6 | ||||
| 7 | ||||
| 8 | ||||
| 9 | ||||
| 10 | ||||
| 11 | ||||
| 12 | ||||
| 13 | ||||
| 14 | ||||
| 15 | ||||
| 16 | ||||
| 17 | ||||
| 18 | ||||
| 19 | ||||
| 20 | ||||
| 21 | ||||
| 22 | ||||
| 23 | ||||
| 24 | ||||
| 25 | ||||
| 26 | ||||
| 27 | ||||
| 28 | ||||
| 29 | ||||
| 30 |
&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D PDRI 1 Summary Print this Page Print
PDRI 1
PDRI 1 Section I PDRI 1 Section II PDRI 1 Section III PDRI 1 Low Def.
Reset PDRI Elements Buildings
PDRI 2 - Attendance Sheet
| PDRI 2 - Attendance Sheet | ||||
| Project: | ||||
| Enter on Cover Page | ||||
| Project Manager: | ||||
| Enter on Summary Page | ||||
| Facilitator: | ||||
| Enter on Summary Page | ||||
| Status of Project: | ||||
| Enter on Summary Page | ||||
| Date: | ||||
| Enter on Summary Page | ||||
| No. | Participants Name | Organization | Role | Contact Number |
| 1 | ||||
| 2 | ||||
| 3 | ||||
| 4 | ||||
| 5 | ||||
| 6 | ||||
| 7 | ||||
| 8 | ||||
| 9 | ||||
| 10 | ||||
| 11 | ||||
| 12 | ||||
| 13 | ||||
| 14 | ||||
| 15 | ||||
| 16 | ||||
| 17 | ||||
| 18 | ||||
| 19 | ||||
| 20 | ||||
| 21 | ||||
| 22 | ||||
| 23 | ||||
| 24 | ||||
| 25 | ||||
| 26 | ||||
| 27 | ||||
| 28 | ||||
| 29 | ||||
| 30 |
&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D PDRI 2 Summary PDRI 2 Section I Print
PDRI 2
Print this Page Reset PDRI Elements PDRI 2 Section II PDRI 2 Section III PDRI 1 Low Def.
Buildings
PDRI 2i - Attendance Sheet
| PDRI 2i - Attendance Sheet | ||||
| Project: | ||||
| Enter on Cover Page | ||||
| Project Manager: | ||||
| Enter on Summary Page | ||||
| Facilitator: | ||||
| Enter on Summary Page | ||||
| Status of Project: | ||||
| Enter on Summary Page | ||||
| Date: | ||||
| Enter on Summary Page | ||||
| No. | Participants Name | Organization | Role | Contact Number |
| 1 | ||||
| 2 | ||||
| 3 | ||||
| 4 | ||||
| 5 | ||||
| 6 | ||||
| 7 | ||||
| 8 | ||||
| 9 | ||||
| 10 | ||||
| 11 | ||||
| 12 | ||||
| 13 | ||||
| 14 | ||||
| 15 | ||||
| 16 | ||||
| 17 | ||||
| 18 | ||||
| 19 | ||||
| 20 | ||||
| 21 | ||||
| 22 | ||||
| 23 | ||||
| 24 | ||||
| 25 | ||||
| 26 | ||||
| 27 | ||||
| 28 | ||||
| 29 | ||||
| 30 |
&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D PDRI 2i Summary PDRI 2i Section I PDRI 2i Section II PDRI 2i Section III PDRI 2i Low Def.
Print PDRI 2i Print this Page Reset PDRI Elements Buildings
PDRI 3 - Attendance Sheet
| PDRI 3 - Attendance Sheet | ||||
| Project: | ||||
| Enter on Cover Page | ||||
| Project Manager: | ||||
| Enter on Summary Page | ||||
| Facilitator: | ||||
| Enter on Summary Page | ||||
| Status of Project: | ||||
| Enter on Summary Page | ||||
| Date: | ||||
| Enter on Summary Page | ||||
| No. | Participants Name | Organization | Role | Contact Number |
| 1 | ||||
| 2 | ||||
| 3 | ||||
| 4 | ||||
| 5 | ||||
| 6 | ||||
| 7 | ||||
| 8 | ||||
| 9 | ||||
| 10 | ||||
| 11 | ||||
| 12 | ||||
| 13 | ||||
| 14 | ||||
| 15 | ||||
| 16 | ||||
| 17 | ||||
| 18 | ||||
| 19 | ||||
| 20 | ||||
| 21 | ||||
| 22 | ||||
| 23 | ||||
| 24 | ||||
| 25 | ||||
| 26 | ||||
| 27 | ||||
| 28 | ||||
| 29 | ||||
| 30 |
&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D PDRI 3 Summary PDRI 3 Section I PDRI 3 Section II PDRI 3 Section III PDRI 3 Low Def.
PDRI 3
Print this Page Reset PDRI Elements Buildings
PDRI 1 - Section I
| PDRI 1 Section I - Basis of Project Decision | ||||||||||||||
| Project: | Date: | |||||||||||||
| Enter on Cover Page | Enter on Summary Page | |||||||||||||
| PDRI 1 SECTION I - BASIS OF PROJECT DECISION | ||||||||||||||
| CATEGORY | ||||||||||||||
| Element | Definition Level | Review Level | Comments | Score | Min Score | Max Score | No. | |||||||
| A | BUSINESS STRATEGY | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category A Comments | Score | Min Score | Max Score | No | |
| A.1 | Building Use Requirement | 0 | 1 | 12 | 23 | 33 | 44 | NA | NA | NA | 1 | |||
| A.2 | Business Justification | 0 | 1 | 8 | 14 | 21 | 27 | NA | NA | NA | 1 | |||
| A.3 | Business Plan | 0 | 2 | 8 | 14 | 20 | 26 | NA | NA | NA | 1 | |||
| A.4 | Economic Analysis | 0 | 2 | 6 | 11 | 16 | 21 | NA | NA | NA | 1 | |||
| A.5 | Facility Requirements | 0 | 2 | 9 | 16 | 23 | 31 | NA | NA | NA | 1 | |||
| A.6 | Future Expansion/Alteration Considerations | 0 | 1 | 7 | 12 | 17 | 22 | NA | NA | NA | 1 | |||
| A.7 | Site Selection Considerations | 0 | 1 | 8 | 15 | 21 | 28 | NA | NA | NA | 1 | |||
| A.8 | Project Objective Statement | 0 | 1 | 4 | 8 | 11 | 15 | NA | NA | NA | 3 | |||
| Total | Category A (Maximum = 214) | 0 | 11 | 62 | 113 | 162 | 214 | NA | - 0 | - 0 | NA | |||
| B | OWNER PHILOSOPHIES | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category B Comments | Score | Min Score | Max Score | No | |
| B.1 | Reliability Philosophy | 0 | 1 | 5 | 10 | 14 | 18 | NA | NA | NA | 1 | |||
| B.2 | Maintenance Philosophy | 0 | 1 | 5 | 9 | 12 | 16 | NA | NA | NA | 1 | |||
| B.3 | Operating Philosophy | 0 | 1 | 5 | 8 | 12 | 15 | NA | NA | NA | 1 | |||
| B.4 | Design Philosophy | 0 | 1 | 6 | 10 | 14 | 19 | NA | NA | NA | 3 | |||
| Total | CATEGORY B (Maximum = 68) | 0 | 4 | 21 | 37 | 52 | 68 | NA | - 0 | - 0 | NA | |||
| C | PROJECT REQUIREMENTS | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category C Comments | Score | Min Score | Max Score | No | |
| C.1 | Value-Analysis Process | 0 | 1 | 6 | 10 | 14 | 19 | NA | NA | NA | 1 | |||
| C.2 | Project Design Criteria | 0 | 1 | 7 | 13 | 18 | 24 | NA | NA | NA | 1 | |||
| C.3 | Evaluation of Existing Facilities | 0 | 2 | 7 | 13 | 19 | 24 | NA | NA | NA | 1 | |||
| C.4 | Scope of Work Overview | 0 | 1 | 5 | 9 | 13 | 17 | NA | NA | NA | 1 | |||
| C.5 | Projecct Schedule | 0 | 2 | 6 | 11 | 15 | 20 | NA | NA | NA | 1 | |||
| C.6 | Project Cost Estimate | 0 | 2 | 8 | 15 | 21 | 27 | NA | NA | NA | 0 | |||
| Total | CATEGORY C (Maximum = 131) | 0 | 9 | 39 | 71 | 100 | 131 | NA | - 0 | - 0 | NA | |||
| Total | SECTION I (Maximum = 413) | 0 | 24 | 122 | 221 | 314 | 413 | NA | - 0 | - 0 | NA |
&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition PDRI 1 Summary PDRI 1 Section II Print Section I Print
PDRI 1
PDRI 1 Section III PDRI 1 Low Def.
Reset PDRI Elements Double click on selected row to display dialog box Buildings Show Element Weights Hide Element Weights
PDRI 2 - Section I
| PDRI 2 Section I - Basis of Project Decision | ||||||||||||||
| Project: | Date: | |||||||||||||
| Enter on Cover Page | Enter on Final Score Page | |||||||||||||
| PDRI 2 SECTION I - BASIS OF PROJECT DECISION | ||||||||||||||
| CATEGORY | ||||||||||||||
| Element | Definition Level | Review Level | Comments | Score | Min Score | Max Score | No. | |||||||
| A | BUSINESS STRATEGY | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category A Comments | Score | Min Score | Max Score | No | |
| A.1 | Building Use Requirement | 0 | 1 | 12 | 23 | 33 | 44 | NA | NA | NA | 1 | |||
| A.2 | Business Justification | 0 | 1 | 8 | 14 | 21 | 27 | NA | NA | NA | 1 | |||
| A.3 | Business Plan | 0 | 2 | 8 | 14 | 20 | 26 | NA | NA | NA | 1 | |||
| A.4 | Economic Analysis | 0 | 2 | 6 | 11 | 16 | 21 | NA | NA | NA | 1 | |||
| A.5 | Facility Requirements | 0 | 2 | 9 | 16 | 23 | 31 | NA | NA | NA | 1 | |||
| A.6 | Future Expansion/Alteration Considerations | 0 | 1 | 7 | 12 | 17 | 22 | NA | NA | NA | 1 | |||
| A.7 | Site Selection Considerations | 0 | 1 | 8 | 15 | 21 | 28 | NA | NA | NA | 1 | |||
| A.8 | Project Objective Statement | 0 | 1 | 4 | 8 | 11 | 15 | NA | NA | NA | 3 | |||
| Total | Category A (Maximum = 214) | 0 | 11 | 62 | 113 | 162 | 214 | NA | - 0 | - 0 | NA | |||
| B | OWNER PHILOSOPHIES | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category B Comments | Score | Min Score | Max Score | No | |
| B.1 | Reliability Philosophy | 0 | 1 | 5 | 10 | 14 | 18 | NA | NA | NA | 1 | |||
| B.2 | Maintenance Philosophy | 0 | 1 | 5 | 9 | 12 | 16 | NA | NA | NA | 1 | |||
| B.3 | Operating Philosophy | 0 | 1 | 5 | 8 | 12 | 15 | NA | NA | NA | 1 | |||
| B.4 | Design Philosophy | 0 | 1 | 6 | 10 | 14 | 19 | NA | NA | NA | 3 | |||
| Total | CATEGORY B (Maximum = 68) | 0 | 4 | 21 | 37 | 52 | 68 | NA | - 0 | - 0 | NA | |||
| C | PROJECT REQUIREMENTS | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category C Comments | Score | Min Score | Max Score | No | |
| C.1 | Value-Analysis Process | 0 | 1 | 6 | 10 | 14 | 19 | NA | NA | NA | 1 | |||
| C.2 | Project Design Criteria | 0 | 1 | 7 | 13 | 18 | 24 | NA | NA | NA | 1 | |||
| C.3 | Evaluation of Existing Facilities | 0 | 2 | 7 | 13 | 19 | 24 | NA | NA | NA | 1 | |||
| C.4 | Scope of Work Overview | 0 | 1 | 5 | 9 | 13 | 17 | NA | NA | NA | 1 | |||
| C.5 | Projecct Schedule | 0 | 2 | 6 | 11 | 15 | 20 | NA | NA | NA | 1 | |||
| C.6 | Project Cost Estimate | 0 | 2 | 8 | 15 | 21 | 27 | NA | NA | NA | 0 | |||
| Total | CATEGORY C (Maximum = 131) | 0 | 9 | 39 | 71 | 100 | 131 | NA | - 0 | - 0 | NA | |||
| Total | SECTION I (Maximum = 413) | 0 | 24 | 122 | 221 | 314 | 413 | NA | - 0 | - 0 | NA |
&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition PDRI 2 Summary PDRI 2 Section II PDRI 2 Section III PDRI 2 Low Def.
PDRI 2
Print Section I Reset PDRI Elements Double click on selected row to display dialog box Buildings Hide Element Weights Show Element Weights
PDRI 2i - Section I
| PDRI 2i Section I - Basis of Project Decision | ||||||||||||||
| Project: | Date: | |||||||||||||
| Enter on Cover Page | Enter on Summary Page | |||||||||||||
| PDRI 2i SECTION I - BASIS OF PROJECT DECISION | ||||||||||||||
| CATEGORY | ||||||||||||||
| Element | Definition Level | Review Level | Comments | Score | Min Score | Max Score | No. | |||||||
| A | BUSINESS STRATEGY | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category A Comments | Score | Min Score | Max Score | No | |
| A.1 | Building Use Requirement | 0 | 1 | 12 | 23 | 33 | 44 | NA | NA | NA | 1 | |||
| A.2 | Business Justification | 0 | 1 | 8 | 14 | 21 | 27 | NA | NA | NA | 1 | |||
| A.3 | Business Plan | 0 | 2 | 8 | 14 | 20 | 26 | NA | NA | NA | 1 | |||
| A.4 | Economic Analysis | 0 | 2 | 6 | 11 | 16 | 21 | NA | NA | NA | 1 | |||
| A.5 | Facility Requirements | 0 | 2 | 9 | 16 | 23 | 31 | NA | NA | NA | 1 | |||
| A.6 | Future Expansion/Alteration Considerations | 0 | 1 | 7 | 12 | 17 | 22 | NA | NA | NA | 1 | |||
| A.7 | Site Selection Considerations | 0 | 1 | 8 | 15 | 21 | 28 | NA | NA | NA | 1 | |||
| A.8 | Project Objective Statement | 0 | 1 | 4 | 8 | 11 | 15 | NA | NA | NA | 3 | |||
| Total | Category A (Maximum = 214) | 0 | 11 | 62 | 113 | 162 | 214 | NA | - 0 | - 0 | NA | |||
| B | OWNER PHILOSOPHIES | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category B Comments | Score | Min Score | Max Score | No | |
| B.1 | Reliability Philosophy | 0 | 1 | 5 | 10 | 14 | 18 | NA | NA | NA | 1 | |||
| B.2 | Maintenance Philosophy | 0 | 1 | 5 | 9 | 12 | 16 | NA | NA | NA | 1 | |||
| B.3 | Operating Philosophy | 0 | 1 | 5 | 8 | 12 | 15 | NA | NA | NA | 1 | |||
| B.4 | Design Philosophy | 0 | 1 | 6 | 10 | 14 | 19 | NA | NA | NA | 3 | |||
| Total | CATEGORY B (Maximum = 68) | 0 | 4 | 21 | 37 | 52 | 68 | NA | - 0 | - 0 | NA | |||
| C | PROJECT REQUIREMENTS | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category C Comments | Score | Min Score | Max Score | No | |
| C.1 | Value-Analysis Process | 0 | 1 | 6 | 10 | 14 | 19 | NA | NA | NA | 1 | |||
| C.2 | Project Design Criteria | 0 | 1 | 7 | 13 | 18 | 24 | NA | NA | NA | 1 | |||
| C.3 | Evaluation of Existing Facilities | 0 | 2 | 7 | 13 | 19 | 24 | NA | NA | NA | 1 | |||
| C.4 | Scope of Work Overview | 0 | 1 | 5 | 9 | 13 | 17 | NA | NA | NA | 1 | |||
| C.5 | Projecct Schedule | 0 | 2 | 6 | 11 | 15 | 20 | NA | NA | NA | 1 | |||
| C.6 | Project Cost Estimate | 0 | 2 | 8 | 15 | 21 | 27 | NA | NA | NA | 0 | |||
| Total | CATEGORY C (Maximum = 131) | 0 | 9 | 39 | 71 | 100 | 131 | NA | - 0 | - 0 | NA | |||
| Total | SECTION I (Maximum = 413) | 0 | 24 | 122 | 221 | 314 | 413 | NA | - 0 | - 0 | NA |
&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition PDRI 2i Summary PDRI 2i Section II PDRI 2i Section III PDRI 2i Low Def.
Print PDRI 2i Print Section I Reset PDRI Elements Double click on selected row to display dialog box Buildings Hide Element Weights Show Element Weights
PDRI 3 - Section I
| PDRI 3 Section I - Basis of Project Decision | ||||||||||||||
| Project: | Date: | |||||||||||||
| Enter on Cover Page | Enter on Summary Page | |||||||||||||
| PDRI 3 SECTION I - BASIS OF PROJECT DECISION | ||||||||||||||
| CATEGORY | ||||||||||||||
| Element | Definition Level | Review Level | Comments | Score | Min Score | Max Score | No. | |||||||
| A | BUSINESS STRATEGY | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category A Comments | Score | Min Score | Max Score | No | |
| A.1 | Building Use Requirement | 0 | 1 | 12 | 23 | 33 | 44 | NA | NA | NA | 1 | |||
| A.2 | Business Justification | 0 | 1 | 8 | 14 | 21 | 27 | NA | NA | NA | 1 | |||
| A.3 | Business Plan | 0 | 2 | 8 | 14 | 20 | 26 | NA | NA | NA | 1 | |||
| A.4 | Economic Analysis | 0 | 2 | 6 | 11 | 16 | 21 | NA | NA | NA | 1 | |||
| A.5 | Facility Requirements | 0 | 2 | 9 | 16 | 23 | 31 | NA | NA | NA | 1 | |||
| A.6 | Future Expansion/Alteration Considerations | 0 | 1 | 7 | 12 | 17 | 22 | NA | NA | NA | 1 | |||
| A.7 | Site Selection Considerations | 0 | 1 | 8 | 15 | 21 | 28 | NA | NA | NA | 1 | |||
| A.8 | Project Objective Statement | 0 | 1 | 4 | 8 | 11 | 15 | NA | NA | NA | 3 | |||
| Total | Category A (Maximum = 214) | 0 | 11 | 62 | 113 | 162 | 214 | NA | - 0 | - 0 | NA | |||
| B | OWNER PHILOSOPHIES | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category B Comments | Score | Min Score | Max Score | No | |
| B.1 | Reliability Philosophy | 0 | 1 | 5 | 10 | 14 | 18 | NA | NA | NA | 1 | |||
| B.2 | Maintenance Philosophy | 0 | 1 | 5 | 9 | 12 | 16 | NA | NA | NA | 1 | |||
| B.3 | Operating Philosophy | 0 | 1 | 5 | 8 | 12 | 15 | NA | NA | NA | 1 | |||
| B.4 | Design Philosophy | 0 | 1 | 6 | 10 | 14 | 19 | NA | NA | NA | 3 | |||
| Total | CATEGORY B (Maximum = 68) | 0 | 4 | 21 | 37 | 52 | 68 | NA | - 0 | - 0 | NA | |||
| C | PROJECT REQUIREMENTS | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category C Comments | Score | Min Score | Max Score | No | |
| C.1 | Value-Analysis Process | 0 | 1 | 6 | 10 | 14 | 19 | NA | NA | NA | 1 | |||
| C.2 | Project Design Criteria | 0 | 1 | 7 | 13 | 18 | 24 | NA | NA | NA | 1 | |||
| C.3 | Evaluation of Existing Facilities | 0 | 2 | 7 | 13 | 19 | 24 | NA | NA | NA | 1 | |||
| C.4 | Scope of Work Overview | 0 | 1 | 5 | 9 | 13 | 17 | NA | NA | NA | 1 | |||
| C.5 | Projecct Schedule | 0 | 2 | 6 | 11 | 15 | 20 | NA | NA | NA | 1 | |||
| C.6 | Project Cost Estimate | 0 | 2 | 8 | 15 | 21 | 27 | NA | NA | NA | 0 | |||
| Total | CATEGORY C (Maximum = 131) | 0 | 9 | 39 | 71 | 100 | 131 | NA | - 0 | - 0 | NA | |||
| Total | SECTION I (Maximum = 413) | 0 | 24 | 122 | 221 | 314 | 413 | NA | - 0 | - 0 | NA |
&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition PDRI 3 Summary PDRI 3 Section II PDRI 3 Section III PDRI 3 Low Def.
PDRI 3
Print Section I Reset PDRI Elements Double click on selected row to display dialog box Buildings Hide Element Weights Show Element Weights
PDRI 1 - Section II
| PDRI 1 Section II - Basis of Design | ||||||||||||||
| Project: | Date: | |||||||||||||
| Enter on Cover Page | Enter on Summary Page | |||||||||||||
| PDRI 1 SECTION II - BASIS OF DESIGN | ||||||||||||||
| CATEGORY | ||||||||||||||
| Element | Definition Level | Review Level | Comments | Score | Min Score | Max Score | No | |||||||
| D | SITE INFORMATION | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category D Comments | Score | Min Score | Max Score | No | |
| D.1 | Site Layout | 0 | 1 | 4 | 7 | 10 | 14 | NA | NA | NA | 1 | |||
| D.2 | Site Surveys | 0 | 1 | 4 | 8 | 11 | 14 | NA | NA | NA | 1 | |||
| D.3 | Civil/Geotechnical Information | 0 | 2 | 6 | 10 | 14 | 19 | NA | NA | NA | 1 | |||
| D.4 | Governing Regulatory Requirements | 0 | 1 | 4 | 8 | 11 | 14 | NA | NA | NA | 1 | |||
| D.5 | Environmental Assessment | 0 | 1 | 5 | 9 | 12 | 16 | NA | NA | NA | 1 | |||
| D.6 | Utility Sources with Supply Conditions | 0 | 1 | 4 | 7 | 10 | 13 | NA | NA | NA | 1 | |||
| D.7 | Site Life Safety Considerations | 0 | 1 | 2 | 4 | 6 | 8 | NA | NA | NA | 1 | |||
| D.8 | Special Water and Waste Treatment Requirements | 0 | 1 | 3 | 6 | 8 | 11 | NA | NA | NA | 3 | |||
| Total | CATEGORY D (Maximum = 109) | 0 | 9 | 32 | 59 | 82 | 109 | NA | - 0 | - 0 | NA | |||
| E | BUILDING PROGRAMMING | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category E Comments | Score | Min Score | Max Score | No | |
| E.1 | Program Statement | 0 | 1 | 5 | 9 | 12 | 16 | NA | NA | NA | 1 | |||
| E.2 | Building Summary Space List | 0 | 1 | 6 | 11 | 16 | 21 | NA | NA | NA | 1 | |||
| E.3 | Overall Adjacency Diagrams | 0 | 1 | 3 | 6 | 8 | 10 | NA | NA | NA | 1 | |||
| E.4 | Stacking Diagrams | 0 | 1 | 4 | 7 | 10 | 13 | NA | NA | NA | 1 | |||
| E.5 | Growth and Phase Development | 0 | 1 | 5 | 8 | 12 | 15 | NA | NA | NA | 1 | |||
| E.6 | Circulation and Open Space Requirements | 0 | 1 | 4 | 7 | 10 | 13 | NA | NA | NA | 1 | |||
| E.7 | Functional Relationship Diagrams/Room by Room | 0 | 1 | 3 | 5 | 8 | 10 | NA | NA | NA | 1 | |||
| E.8 | Loading/Unloading/Storage Facilities Requirements | 0 | 1 | 2 | 4 | 6 | 8 | NA | NA | NA | 1 | |||
| E.9 | Transportation Requirements | 0 | 1 | 3 | 5 | 7 | 9 | NA | NA | NA | 1 | |||
| E.10 | Building Finishes | 0 | 1 | 5 | 8 | 12 | 15 | NA | NA | NA | 1 | |||
| E.11 | Room Data Sheets | 0 | 1 | 4 | 7 | 10 | 13 | NA | NA | NA | 1 | |||
| E.12 | Furnishings, Equipment, and Built-Ins | 0 | 1 | 4 | 8 | 11 | 14 | NA | NA | NA | 1 | |||
| E.13 | Window Treatment | 0 | 0 | 2 | 3 | 4 | 5 | NA | NA | NA | 3 | |||
| Total | CATEGORY E (Maximum = 162) | 0 | 12 | 50 | 88 | 126 | 162 | NA | - 0 | - 0 | NA | |||
| F | BUILDING/PROJECT DESIGN PARAMETERS | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category F Comments | Score | Min Score | Max Score | No | |
| F.1 | Civil/Site Design | 0 | 1 | 4 | 7 | 11 | 14 | NA | NA | NA | 1 | |||
| F.2 | Architectural Design | 0 | 1 | 7 | 12 | 17 | 22 | NA | NA | NA | 1 | |||
| F.3 | Structural Design | 0 | 1 | 5 | 9 | 14 | 18 | NA | NA | NA | 1 | |||
| F.4 | Mechanical Design | 0 | 2 | 6 | 11 | 15 | 20 | NA | NA | NA | 1 | |||
| F.5 | Electrical Design | 0 | 1 | 5 | 8 | 12 | 15 | NA | NA | NA | 1 | |||
| F.6 | Building Life Safety Requirements | 0 | 1 | 3 | 5 | 8 | 10 | NA | NA | NA | 1 | |||
| F.7 | Constructability Analysis | 0 | 1 | 4 | 8 | 11 | 14 | NA | NA | NA | 1 | |||
| F.8 | Technological Sophistication | 0 | 1 | 3 | 5 | 7 | 9 | NA | NA | NA | 3 | |||
| Total | CATEGORY F (Maximum = 122) | 0 | 9 | 37 | 65 | 95 | 122 | NA | - 0 | - 0 | NA | |||
| G | EQUIPMENT | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category G Comments | Score | Min Score | Max Score | No | |
| G.1 | Equipment List | 0 | 1 | 5 | 8 | 12 | 15 | NA | NA | NA | 1 | |||
| G.2 | Equipment Location Drawings | 0 | 1 | 3 | 5 | 8 | 10 | NA | NA | NA | 1 | |||
| G.3 | Equipment Utility Requirements | 0 | 1 | 4 | 6 | 9 | 11 | NA | NA | NA | 0 | |||
| Total | CATEGORY G (Maximum = 36) | 0 | 3 | 12 | 19 | 29 | 36 | NA | - 0 | - 0 | NA | |||
| Total | SECTION II (Maximum = 429) | 0 | 33 | 131 | 231 | 332 | 429 | NA | - 0 | - 0 | NA |
&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition PDRI 1 Summary PDRI 1 Section I PDRI 1 Section III PDRI 1 Low Def.
PDRI 1
Print Section II Reset PDRI Elements Double click on selected row to display dialog box Buildings Hide Element Weights Show Element Weights
PDRI 2 - Section II
| PDRI 2 Section II - Basis of Design | ||||||||||||||
| Project: | Date: | |||||||||||||
| Enter on Cover Page | Enter on Final Score Page | |||||||||||||
| PDRI 2 SECTION II - BASIS OF DESIGN | ||||||||||||||
| CATEGORY | ||||||||||||||
| Element | Definition Level | Review Level | Comments | Score | Min Score | Max Score | No | |||||||
| D | SITE INFORMATION | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category D Comments | Score | Min Score | Max Score | No | |
| D.1 | Site Layout | 0 | 1 | 4 | 7 | 10 | 14 | NA | NA | NA | 1 | |||
| D.2 | Site Surveys | 0 | 1 | 4 | 8 | 11 | 14 | NA | NA | NA | 1 | |||
| D.3 | Civil/Geotechnical Information | 0 | 2 | 6 | 10 | 14 | 19 | NA | NA | NA | 1 | |||
| D.4 | Governing Regulatory Requirements | 0 | 1 | 4 | 8 | 11 | 14 | NA | NA | NA | 1 | |||
| D.5 | Environmental Assessment | 0 | 1 | 5 | 9 | 12 | 16 | NA | NA | NA | 1 | |||
| D.6 | Utility Sources with Supply Conditions | 0 | 1 | 4 | 7 | 10 | 13 | NA | NA | NA | 1 | |||
| D.7 | Site Life Safety Considerations | 0 | 1 | 2 | 4 | 6 | 8 | NA | NA | NA | 1 | |||
| D.8 | Special Water and Waste Treatment Requirements | 0 | 1 | 3 | 6 | 8 | 11 | NA | NA | NA | 3 | |||
| Total | CATEGORY D (Maximum = 109) | 0 | 9 | 32 | 59 | 82 | 109 | NA | - 0 | - 0 | NA | |||
| E | BUILDING PROGRAMMING | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category E Comments | Score | Min Score | Max Score | No | |
| E.1 | Program Statement | 0 | 1 | 5 | 9 | 12 | 16 | NA | NA | NA | 1 | |||
| E.2 | Building Summary Space List | 0 | 1 | 6 | 11 | 16 | 21 | NA | NA | NA | 1 | |||
| E.3 | Overall Adjacency Diagrams | 0 | 1 | 3 | 6 | 8 | 10 | NA | NA | NA | 1 | |||
| E.4 | Stacking Diagrams | 0 | 1 | 4 | 7 | 10 | 13 | NA | NA | NA | 1 | |||
| E.5 | Growth and Phase Development | 0 | 1 | 5 | 8 | 12 | 15 | NA | NA | NA | 1 | |||
| E.6 | Circulation and Open Space Requirements | 0 | 1 | 4 | 7 | 10 | 13 | NA | NA | NA | 1 | |||
| E.7 | Functional Relationship Diagrams/Room by Room | 0 | 1 | 3 | 5 | 8 | 10 | NA | NA | NA | 1 | |||
| E.8 | Loading/Unloading/Storage Facilities Requirements | 0 | 1 | 2 | 4 | 6 | 8 | NA | NA | NA | 1 | |||
| E.9 | Transportation Requirements | 0 | 1 | 3 | 5 | 7 | 9 | NA | NA | NA | 1 | |||
| E.10 | Building Finishes | 0 | 1 | 5 | 8 | 12 | 15 | NA | NA | NA | 1 | |||
| E.11 | Room Data Sheets | 0 | 1 | 4 | 7 | 10 | 13 | NA | NA | NA | 1 | |||
| E.12 | Furnishings, Equipment, and Built-Ins | 0 | 1 | 4 | 8 | 11 | 14 | NA | NA | NA | 1 | |||
| E.13 | Window Treatment | 0 | 0 | 2 | 3 | 4 | 5 | NA | NA | NA | 3 | |||
| Total | CATEGORY E (Maximum = 162) | 0 | 12 | 50 | 88 | 126 | 162 | NA | - 0 | - 0 | NA | |||
| F | BUILDING/PROJECT DESIGN PARAMETERS | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category F Comments | Score | Min Score | Max Score | No | |
| F.1 | Civil/Site Design | 0 | 1 | 4 | 7 | 11 | 14 | NA | NA | NA | 1 | |||
| F.2 | Architectural Design | 0 | 1 | 7 | 12 | 17 | 22 | NA | NA | NA | 1 | |||
| F.3 | Structural Design | 0 | 1 | 5 | 9 | 14 | 18 | NA | NA | NA | 1 | |||
| F.4 | Mechanical Design | 0 | 2 | 6 | 11 | 15 | 20 | NA | NA | NA | 1 | |||
| F.5 | Electrical Design | 0 | 1 | 5 | 8 | 12 | 15 | NA | NA | NA | 1 | |||
| F.6 | Building Life Safety Requirements | 0 | 1 | 3 | 5 | 8 | 10 | NA | NA | NA | 1 | |||
| F.7 | Constructability Analysis | 0 | 1 | 4 | 8 | 11 | 14 | NA | NA | NA | 1 | |||
| F.8 | Technological Sophistication | 0 | 1 | 3 | 5 | 7 | 9 | NA | NA | NA | 3 | |||
| Total | CATEGORY F (Maximum = 122) | 0 | 9 | 37 | 65 | 95 | 122 | NA | - 0 | - 0 | NA | |||
| G | EQUIPMENT | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category G Comments | Score | Min Score | Max Score | No | |
| G.1 | Equipment List | 0 | 1 | 5 | 8 | 12 | 15 | NA | NA | NA | 1 | |||
| G.2 | Equipment Location Drawings | 0 | 1 | 3 | 5 | 8 | 10 | NA | NA | NA | 1 | |||
| G.3 | Equipment Utility Requirements | 0 | 1 | 4 | 6 | 9 | 11 | NA | NA | NA | 0 | |||
| Total | CATEGORY G (Maximum = 36) | 0 | 3 | 12 | 19 | 29 | 36 | NA | - 0 | - 0 | NA | |||
| Total | SECTION II (Maximum = 429) | 0 | 33 | 131 | 231 | 332 | 429 | NA | - 0 | - 0 | NA |
&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition PDRI 2 Summary PDRI 2 Section I PDRI 2 Section III PDRI 2 Low Def.
PDRI 2
Print Section II Reset PDRI Elements Double click on selected row to display dialog box Buildings Hide Element Weights Show Element Weights
PDRI 2i - Section II
| PDRI 2i Section II - Basis of Design | ||||||||||||||
| Project: | Date: | |||||||||||||
| Enter on Cover Page | Enter on Summary Page | |||||||||||||
| PDRI 2i SECTION II - BASIS OF DESIGN | ||||||||||||||
| CATEGORY | ||||||||||||||
| Element | Definition Level | Review Level | Comments | Score | Min Score | Max Score | No | |||||||
| D | SITE INFORMATION | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category D Comments | Score | Min Score | Max Score | No | |
| D.1 | Site Layout | 0 | 1 | 4 | 7 | 10 | 14 | NA | NA | NA | 1 | |||
| D.2 | Site Surveys | 0 | 1 | 4 | 8 | 11 | 14 | NA | NA | NA | 1 | |||
| D.3 | Civil/Geotechnical Information | 0 | 2 | 6 | 10 | 14 | 19 | NA | NA | NA | 1 | |||
| D.4 | Governing Regulatory Requirements | 0 | 1 | 4 | 8 | 11 | 14 | NA | NA | NA | 1 | |||
| D.5 | Environmental Assessment | 0 | 1 | 5 | 9 | 12 | 16 | NA | NA | NA | 1 | |||
| D.6 | Utility Sources with Supply Conditions | 0 | 1 | 4 | 7 | 10 | 13 | NA | NA | NA | 1 | |||
| D.7 | Site Life Safety Considerations | 0 | 1 | 2 | 4 | 6 | 8 | NA | NA | NA | 1 | |||
| D.8 | Special Water and Waste Treatment Requirements | 0 | 1 | 3 | 6 | 8 | 11 | NA | NA | NA | 3 | |||
| Total | CATEGORY D (Maximum = 109) | 0 | 9 | 32 | 59 | 82 | 109 | NA | - 0 | - 0 | NA | |||
| E | BUILDING PROGRAMMING | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category E Comments | Score | Min Score | Max Score | No | |
| E.1 | Program Statement | 0 | 1 | 5 | 9 | 12 | 16 | NA | NA | NA | 1 | |||
| E.2 | Building Summary Space List | 0 | 1 | 6 | 11 | 16 | 21 | NA | NA | NA | 1 | |||
| E.3 | Overall Adjacency Diagrams | 0 | 1 | 3 | 6 | 8 | 10 | NA | NA | NA | 1 | |||
| E.4 | Stacking Diagrams | 0 | 1 | 4 | 7 | 10 | 13 | NA | NA | NA | 1 | |||
| E.5 | Growth and Phase Development | 0 | 1 | 5 | 8 | 12 | 15 | NA | NA | NA | 1 | |||
| E.6 | Circulation and Open Space Requirements | 0 | 1 | 4 | 7 | 10 | 13 | NA | NA | NA | 1 | |||
| E.7 | Functional Relationship Diagrams/Room by Room | 0 | 1 | 3 | 5 | 8 | 10 | NA | NA | NA | 1 | |||
| E.8 | Loading/Unloading/Storage Facilities Requirements | 0 | 1 | 2 | 4 | 6 | 8 | NA | NA | NA | 1 | |||
| E.9 | Transportation Requirements | 0 | 1 | 3 | 5 | 7 | 9 | NA | NA | NA | 1 | |||
| E.10 | Building Finishes | 0 | 1 | 5 | 8 | 12 | 15 | NA | NA | NA | 1 | |||
| E.11 | Room Data Sheets | 0 | 1 | 4 | 7 | 10 | 13 | NA | NA | NA | 1 | |||
| E.12 | Furnishings, Equipment, and Built-Ins | 0 | 1 | 4 | 8 | 11 | 14 | NA | NA | NA | 1 | |||
| E.13 | Window Treatment | 0 | 0 | 2 | 3 | 4 | 5 | NA | NA | NA | 3 | |||
| Total | CATEGORY E (Maximum = 162) | 0 | 12 | 50 | 88 | 126 | 162 | NA | - 0 | - 0 | NA | |||
| F | BUILDING/PROJECT DESIGN PARAMETERS | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category F Comments | Score | Min Score | Max Score | No | |
| F.1 | Civil/Site Design | 0 | 1 | 4 | 7 | 11 | 14 | NA | NA | NA | 1 | |||
| F.2 | Architectural Design | 0 | 1 | 7 | 12 | 17 | 22 | NA | NA | NA | 1 | |||
| F.3 | Structural Design | 0 | 1 | 5 | 9 | 14 | 18 | NA | NA | NA | 1 | |||
| F.4 | Mechanical Design | 0 | 2 | 6 | 11 | 15 | 20 | NA | NA | NA | 1 | |||
| F.5 | Electrical Design | 0 | 1 | 5 | 8 | 12 | 15 | NA | NA | NA | 1 | |||
| F.6 | Building Life Safety Requirements | 0 | 1 | 3 | 5 | 8 | 10 | NA | NA | NA | 1 | |||
| F.7 | Constructability Analysis | 0 | 1 | 4 | 8 | 11 | 14 | NA | NA | NA | 1 | |||
| F.8 | Technological Sophistication | 0 | 1 | 3 | 5 | 7 | 9 | NA | NA | NA | 3 | |||
| Total | CATEGORY F (Maximum = 122) | 0 | 9 | 37 | 65 | 95 | 122 | NA | - 0 | - 0 | NA | |||
| G | EQUIPMENT | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category G Comments | Score | Min Score | Max Score | No | |
| G.1 | Equipment List | 0 | 1 | 5 | 8 | 12 | 15 | NA | NA | NA | 1 | |||
| G.2 | Equipment Location Drawings | 0 | 1 | 3 | 5 | 8 | 10 | NA | NA | NA | 1 | |||
| G.3 | Equipment Utility Requirements | 0 | 1 | 4 | 6 | 9 | 11 | NA | NA | NA | 0 | |||
| Total | CATEGORY G (Maximum = 36) | 0 | 3 | 12 | 19 | 29 | 36 | NA | - 0 | - 0 | NA | |||
| Total | SECTION II (Maximum = 429) | 0 | 33 | 131 | 231 | 332 | 429 | NA | - 0 | - 0 | NA |
&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition PDRI 2i Summary PDRI 2i Section I PDRI 2i Section III PDRI 2i Low Def.
Print PDRI 2i Print Section II Reset PDRI Elements Double click on selected row to display dialog box Buildings Hide Element Weights Show Element Weights
PDRI 3 - Section II
| PDRI 3 Section II - Basis of Design | ||||||||||||||
| Project: | Date: | |||||||||||||
| Enter on Cover Page | Enter on Summary Page | |||||||||||||
| PDRI 3 SECTION II - BASIS OF DESIGN | ||||||||||||||
| CATEGORY | ||||||||||||||
| Element | Definition Level | Review Level | Comments | Score | Min Score | Max Score | No | |||||||
| D | SITE INFORMATION | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category D Comments | Score | Min Score | Max Score | No | |
| D.1 | Site Layout | 0 | 1 | 4 | 7 | 10 | 14 | NA | NA | NA | 1 | |||
| D.2 | Site Surveys | 0 | 1 | 4 | 8 | 11 | 14 | NA | NA | NA | 1 | |||
| D.3 | Civil/Geotechnical Information | 0 | 2 | 6 | 10 | 14 | 19 | NA | NA | NA | 1 | |||
| D.4 | Governing Regulatory Requirements | 0 | 1 | 4 | 8 | 11 | 14 | NA | NA | NA | 1 | |||
| D.5 | Environmental Assessment | 0 | 1 | 5 | 9 | 12 | 16 | NA | NA | NA | 1 | |||
| D.6 | Utility Sources with Supply Conditions | 0 | 1 | 4 | 7 | 10 | 13 | NA | NA | NA | 1 | |||
| D.7 | Site Life Safety Considerations | 0 | 1 | 2 | 4 | 6 | 8 | NA | NA | NA | 1 | |||
| D.8 | Special Water and Waste Treatment Requirements | 0 | 1 | 3 | 6 | 8 | 11 | NA | NA | NA | 3 | |||
| Total | CATEGORY D (Maximum = 109) | 0 | 9 | 32 | 59 | 82 | 109 | NA | - 0 | - 0 | NA | |||
| E | BUILDING PROGRAMMING | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category E Comments | Score | Min Score | Max Score | No | |
| E.1 | Program Statement | 0 | 1 | 5 | 9 | 12 | 16 | NA | NA | NA | 1 | |||
| E.2 | Building Summary Space List | 0 | 1 | 6 | 11 | 16 | 21 | NA | NA | NA | 1 | |||
| E.3 | Overall Adjacency Diagrams | 0 | 1 | 3 | 6 | 8 | 10 | NA | NA | NA | 1 | |||
| E.4 | Stacking Diagrams | 0 | 1 | 4 | 7 | 10 | 13 | NA | NA | NA | 1 | |||
| E.5 | Growth and Phase Development | 0 | 1 | 5 | 8 | 12 | 15 | NA | NA | NA | 1 | |||
| E.6 | Circulation and Open Space Requirements | 0 | 1 | 4 | 7 | 10 | 13 | NA | NA | NA | 1 | |||
| E.7 | Functional Relationship Diagrams/Room by Room | 0 | 1 | 3 | 5 | 8 | 10 | NA | NA | NA | 1 | |||
| E.8 | Loading/Unloading/Storage Facilities Requirements | 0 | 1 | 2 | 4 | 6 | 8 | NA | NA | NA | 1 | |||
| E.9 | Transportation Requirements | 0 | 1 | 3 | 5 | 7 | 9 | NA | NA | NA | 1 | |||
| E.10 | Building Finishes | 0 | 1 | 5 | 8 | 12 | 15 | NA | NA | NA | 1 | |||
| E.11 | Room Data Sheets | 0 | 1 | 4 | 7 | 10 | 13 | NA | NA | NA | 1 | |||
| E.12 | Furnishings, Equipment, and Built-Ins | 0 | 1 | 4 | 8 | 11 | 14 | NA | NA | NA | 1 | |||
| E.13 | Window Treatment | 0 | 0 | 2 | 3 | 4 | 5 | NA | NA | NA | 3 | |||
| Total | CATEGORY E (Maximum = 162) | 0 | 12 | 50 | 88 | 126 | 162 | NA | - 0 | - 0 | NA | |||
| F | BUILDING/PROJECT DESIGN PARAMETERS | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category F Comments | Score | Min Score | Max Score | No | |
| F.1 | Civil/Site Design | 0 | 1 | 4 | 7 | 11 | 14 | NA | NA | NA | 1 | |||
| F.2 | Architectural Design | 0 | 1 | 7 | 12 | 17 | 22 | NA | NA | NA | 1 | |||
| F.3 | Structural Design | 0 | 1 | 5 | 9 | 14 | 18 | NA | NA | NA | 1 | |||
| F.4 | Mechanical Design | 0 | 2 | 6 | 11 | 15 | 20 | NA | NA | NA | 1 | |||
| F.5 | Electrical Design | 0 | 1 | 5 | 8 | 12 | 15 | NA | NA | NA | 1 | |||
| F.6 | Building Life Safety Requirements | 0 | 1 | 3 | 5 | 8 | 10 | NA | NA | NA | 1 | |||
| F.7 | Constructability Analysis | 0 | 1 | 4 | 8 | 11 | 14 | NA | NA | NA | 1 | |||
| F.8 | Technological Sophistication | 0 | 1 | 3 | 5 | 7 | 9 | NA | NA | NA | 3 | |||
| Total | CATEGORY F (Maximum = 122) | 0 | 9 | 37 | 65 | 95 | 122 | NA | - 0 | - 0 | NA | |||
| G | EQUIPMENT | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category G Comments | Score | Min Score | Max Score | No | |
| G.1 | Equipment List | 0 | 1 | 5 | 8 | 12 | 15 | NA | NA | NA | 1 | |||
| G.2 | Equipment Location Drawings | 0 | 1 | 3 | 5 | 8 | 10 | NA | NA | NA | 1 | |||
| G.3 | Equipment Utility Requirements | 0 | 1 | 4 | 6 | 9 | 11 | NA | NA | NA | 0 | |||
| Total | CATEGORY G (Maximum = 36) | 0 | 3 | 12 | 19 | 29 | 36 | NA | - 0 | - 0 | NA | |||
| Total | SECTION II (Maximum = 429) | 0 | 12 | 49 | 84 | 124 | 158 | NA | - 0 | - 0 | NA |
&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition PDRI 3 Summary PDRI 3 Section I PDRI 3 Section III PDRI 3 Low Def.
PDRI 3
Print Section II Reset PDRI Elements Double click on selected row to display dialog box Buildings Show Element Weights Hide Element Weights
PDRI 1 - Section III
| PDRI 1 Section III - Execution Approach | ||||||||||||||
| Project: | Date: | |||||||||||||
| Enter on Cover Page | Enter on Final Score Page | |||||||||||||
| PDRI 1 SECTION III - EXECUTION APPROACH | ||||||||||||||
| CATEGORY | ||||||||||||||
| Element | Definition Level | Review Level | Comments | Score | Min Score | Max Score | No | |||||||
| H | PROCREMENT STRATEGY | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category H Comments | Score | Min Score | Max Score | No | |
| H.1 | Identify Long-lead/Critical Equipment and Materials | 0 | 1 | 4 | 7 | 10 | 14 | NA | NA | NA | 1 | |||
| H.2 | Procurement Procedures and Plans | 0 | 1 | 3 | 6 | 9 | 11 | NA | NA | NA | 3 | |||
| Total | CATEGORY H (Maximum = 25) | 0 | 2 | 7 | 13 | 19 | 25 | NA | - 0 | - 0 | NA | |||
| J | DELIVERABLES | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category J Comments | Score | Min Score | Max Score | No | |
| J.1 | CADD/Model Requirements | 0 | 0 | 1 | 2 | 3 | 4 | NA | NA | NA | 1 | |||
| J.2 | Documentation/Deliverables | 0 | 1 | 2 | 4 | 6 | 7 | NA | NA | NA | 3 | |||
| Total | CATEGORY J (Maximum = 11) | 0 | 1 | 3 | 6 | 9 | 11 | NA | - 0 | - 0 | NA | |||
| K | PROJECT CONTROLS | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category K Comments | Score | Min Score | Max Score | No | |
| K.1 | Project Quality Assurance and Control | 0 | 1 | 3 | 4 | 6 | 8 | NA | NA | NA | 1 | |||
| K.2 | Project Cost Control | 0 | 1 | 4 | 7 | 10 | 13 | NA | NA | NA | 1 | |||
| K.3 | Project Schedule Control | 0 | 1 | 4 | 8 | 11 | 14 | NA | NA | NA | 1 | |||
| K.4 | Risk Management | 0 | 1 | 6 | 10 | 14 | 18 | NA | NA | NA | 1 | |||
| K.5 | Safety Procedures | 0 | 1 | 3 | 5 | 7 | 9 | NA | NA | NA | 3 | |||
| Total | CATEGORY K (Maximum = 62) | 0 | 5 | 20 | 34 | 48 | 62 | NA | - 0 | - 0 | NA | |||
| L | PROJECT EXECUTION PLAN | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category L Comments | Score | Min Score | Max Score | No | |
| L.1 | Project Organization | 0 | 1 | 3 | 5 | 8 | 10 | NA | NA | NA | 1 | |||
| L.2 | Owner Approval Requirements | 0 | 1 | 4 | 6 | 9 | 11 | NA | NA | NA | 1 | |||
| L.3 | Project Delivery Method | 0 | 1 | 5 | 8 | 12 | 15 | NA | NA | NA | 1 | |||
| L.4 | Design/Construction Plan and Approach | 0 | 1 | 4 | 8 | 11 | 15 | NA | NA | NA | 1 | |||
| L.5 | Substantial Completion Requirements | 0 | 1 | 3 | 5 | 7 | 9 | NA | NA | NA | 0 | |||
| Total | CATEGORY L (Maximum = 60) | 0 | 5 | 19 | 32 | 47 | 60 | NA | - 0 | - 0 | NA | |||
| Total | SECTION III (Maximum = 158) | 0 | 11 | 42 | 72 | 104 | 133 | NA | - 0 | - 0 | NA |
&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition PDRI 1 Summary PDRI 1 Section I PDRI 1 Section II PDRI 1 Low Def.
PDRI 1
Print Section III Reset PDRI Elements Double click on selected row to display dialog box Buildings Hide Element Weights Show Element Weights
PDRI 2 - Section III
| PDRI 2 Section III - Execution Approach | ||||||||||||||
| Project: | Date: | |||||||||||||
| Enter on Cover Page | Enter on Final Score Page | |||||||||||||
| PDRI 2 SECTION III - EXECUTION APPROACH | ||||||||||||||
| CATEGORY | ||||||||||||||
| Element | Definition Level | Review Level | Comments | Score | Min Score | Max Score | No | |||||||
| H | PROCUREMENT STRATEGY | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category H Comments | Score | Min Score | Max Score | No | |
| H.1 | Identify Long-lead/Critical Equipment and Materials | 0 | 1 | 4 | 7 | 10 | 14 | NA | NA | NA | 1 | |||
| H.2 | Procurement Procedures and Plans | 0 | 1 | 3 | 6 | 9 | 11 | NA | NA | NA | 3 | |||
| Total | CATEGORY H (Maximum = 25) | 0 | 2 | 7 | 13 | 19 | 25 | NA | - 0 | - 0 | NA | |||
| J | DELIVERABLES | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category J Comments | Score | Min Score | Max Score | No | |
| J.1 | CADD/Model Requirements | 0 | 0 | 1 | 2 | 3 | 4 | NA | NA | NA | 1 | |||
| J.2 | Documentation/Deliverables | 0 | 1 | 2 | 4 | 6 | 7 | NA | NA | NA | 3 | |||
| Total | CATEGORY J (Maximum = 11) | 0 | 1 | 3 | 6 | 9 | 11 | NA | - 0 | - 0 | NA | |||
| K | PROJECT CONTROLS | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category K Comments | Score | Min Score | Max Score | No | |
| K.1 | Project Quality Assurance and Control | 0 | 1 | 3 | 4 | 6 | 8 | NA | NA | NA | 1 | |||
| K.2 | Project Cost Control | 0 | 1 | 4 | 7 | 10 | 13 | NA | NA | NA | 1 | |||
| K.3 | Project Schedule Control | 0 | 1 | 4 | 8 | 11 | 14 | NA | NA | NA | 1 | |||
| K.4 | Risk Management | 0 | 1 | 6 | 10 | 14 | 18 | NA | NA | NA | 1 | |||
| K.5 | Safety Procedures | 0 | 1 | 3 | 5 | 7 | 9 | NA | NA | NA | 3 | |||
| Total | CATEGORY K (Maximum = 62) | 0 | 5 | 20 | 34 | 48 | 62 | NA | - 0 | - 0 | NA | |||
| L | PROJECT EXECUTION PLAN | 0 | 1 | 2 | 3 | 4 | 5 | Review Level | Category L Comments | Score | Min Score | Max Score | No | |
| L.1 | Project Organization | 0 | 1 | 3 | 5 | 8 | 10 | NA | NA | NA | 1 | |||
| L.2 | Owner Approval Requirements | 0 | 1 | 4 | 6 | 9 | 11 | NA | NA | NA | 1 | |||
| L.3 | Project Delivery Method | 0 | 1 | 5 | 8 | 12 | 15 | NA | NA | NA | 1 | |||
| L.4 | Design/Construction Plan and Approach | 0 | 1 | 4 | 8 | 11 | 15 | NA | NA | NA | 1 | |||
| L.5 | Substantial Completion Requirements | 0 | 1 | 3 | 5 | 7 | 9 | NA | NA | NA | 0 | |||
| Total | CATEGORY L (Maximum = 60) | 0 | 5 | 19 | 32 | 47 | 60 | NA | - 0 | - 0 | NA | |||
| Total | SECTION III (Maximum = 158) | 0 | 11 | 42 | 72 | 104 | 133 | NA | - 0 | - 0 | NA |
&R&G &LFile: &Z&F Tab: &A&CPage &P of &N&RDate: &D Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor deficiencies Level 3:
Element has some deficiencies Level 4:
Element has mayor deficiencies Level 5:
Element has poor or incomplete definition Level 0:
Element not applicable Level 1:
Element completely defined Level 2:
Element has minor…