47PD0224R0048 Clarksburg Construction Phase 2-5 CMc RFI Log Amendment 0001 8 26 2024.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Construction Manager as Constructor (CMc) Services for the Phases 2-5 Repairs and Alterations Prospectus for the U. S. Courthouse in Clarksburg, West Virginia.
Solicitation number
47PD0224R0048
Issued by

About this file

This document is a Request for Information (RFI) log amendment related to a Construction Manager as Constructor (CMc) solicitation for the Phases 2-5 Repairs and Alterations Prospectus for the U.S. Courthouse in Clarksburg, West Virginia. The project consists of major interior renovations, including a new district Courtroom, Judges Chambers, clerks' space, and USMS space. The government intends to deliver this requirement through the CMc project delivery method utilizing a Guaranteed Maximum Price (GMP) contract. The RFI log addresses questions related to page limits for experience, past performance, and performance recognition documents. It confirms that Tabs D, E, and F will be part of the Phase II submission, not the Phase I submission due on August 30, 2024. The related federal contract opportunity (Solicitation Number 47PD0224R0048) is seeking CMc services for this project, which has an estimated total construction cost range of $40,000,000 to $50,000,000.

View the file

Other files

File Type Posted
47PD0224R0048 Clarksburg Construction Phase 2-5 CMc Amendment 0001 8 26 2024.pdf PDF
47PD0224R0048 Turn-over Checklist in Standard PDF.pdf PDF
47PD0224R0048 PDRI Participants Guide.pdf PDF
47PD0224R0048 CMc Services for Clarksburg Courthouse Modernization Phases 2-5 Project Form 101 7 24 2024.pdf PDF
47PD0224R0048 CMc Services for Clarksburg Courthouse Modernization Phases 2-5 Project Form 301 7 24 2024.pdf PDF
47PD0224R0048 Partnering_FAQs_Final_06112020.docx DOCX document
47PD0224R0048 Copy of 2 1969 Construction Drawings S.PME.FP.pdf PDF
Clarksburg CH Phase 1 Drawings - Volume 2 Conformed Set.pdf PDF
47PD0224R0048 Terracon geotech report - Clarksburg CH - 2020-09-15.pdf PDF
47PD0224R0048 CMc Services for Clarksburg Courthouse Modernization Phases 2-5 Project Form 201 7 24 2024.pdf PDF
47PD0224R0048 NDWV Courthouse Contractor Form.pdf PDF
47PD0224R0048 PDRI Faciltators Guide.pdf PDF
47PD0224R0048 PDRI Explanation and Implementation Requirements and Recommendations.pdf PDF
47PD0224R0048 Past Performance and Sub Contracting Form.pdf PDF
47PD0224R0048 Site Assessment_2018-10-03_Phase I Report_Clarksburg Courthouse_Final.pdf PDF
47PD0224R0048 Latest Concept Plans.pdf PDF
47PD0224R0048 Copy of 1 1969 Construction Drawings.pdf PDF
47PD0224R0048 PDRI Buildings_v4.xls XLS spreadsheet
47PD0224R0048 Submission 4 - Volume 2.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tech Phase RFIs

Request for Information Log
Solicitation Number:

Clarksburg U.S. Courthouse Ph. 2-5 Repairs and Alterations Prospectus CMc

RFI#RFIGSA Response
1On page 9/41, Tab A Factor#1 – Experience is limited to 15 pages. Tab B, Factor#2 Past Performance indicates (information included in Factor 1). Each PPQ will be at least five pages. Please confirm that “information included in Factor 1” means that PPQs are required for the projects submitted in Factor 1, but that there is no page limit for Factor#2 Past Performance as long as only PPQs are submitted.Correct: PPQs are required, but there is no page limit for Factor#2 Past Performance as long as only system-generated PBS PPQs are submitted.
2On Page 14/41 Tab B – Factor 2 Past Performance requests “performance recognition documents received within the last six (6) years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition. Please confirm that there is no maximum page limit for this additional information.There is no page limit for these attachments, however, each separate performance recognition document attachment shall be limited to two (2) pages.
3On Page 12, Under TAB A: Experience, 1) Construction Projects valued at $40 Million or Higher:
Will The Government take into consideration cost escalation for previously completed projects?The value is at the time of construction completion in dollars current at that time.
4Please confirm TABS D, E and F will fall under Phase II (due date still to be announced) submission, and not part of the Phase I, August 30, 2024 Submission.TABS D, E and F are a not required part of the Phase I, August 30, 2024 Submission. The Phase II required information shall be requested via an amendment.

File details come from the government source that posted it. Updated .