Clarification-2~2.pdf
PDF 109 KB Posted
- Attached to
- ODVA Roseburg Veterans Home CM/GC
- Solicitation number
- S-DASOBO-00016770
- Issued by
- Douglas County, Oregon
About this file
This is a Clarification document issued by the Oregon Department of Veterans Affairs (ODVA) for Request for Proposals RFP #S-DASOBO-00016770 regarding the Roseburg Veterans Home Construction Manager/General Contractor (CM/GC) procurement. The clarification, dated October 27, 2026, addresses a bidder inquiry regarding fire alarm system specifications and drawings. ODVA clarified that fire alarm drawings and specifications are not currently available and will be developed by the selected CM/GC team and design team during the pre-construction phase. As an I-2, Condition 1 occupancy facility under the 2025 Oregon Structural Specialty Code, the fire alarm system design must minimally comply with code sections 407.8, 407.9, 907.2.6, and 907.5. Additionally, as a state-licensed skilled nursing facility, the design must comply with the 2012 NFPA Life Safety Code 101 and its adopted references.
The clarification does not establish pricing, funding sources, or set-asides specific to fire alarm work. Rather, it establishes design and compliance expectations that the selected CM/GC firm will address collaboratively during the pre-construction phase as part of the broader 125,000-135,000 square-foot skilled nursing facility project with an Owner's Target GMP ranging from $69,000,000 to $99,000,000. This approach aligns with the project delivery model emphasizing collaborative design and constructability review prior to final construction document preparation scheduled for completion by July 2027.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clarification 2 Date: 10/27/2026
RFP # S-DASOBO-00016770
ODVA Roseburg Veteran’s Home
1) Question: I noticed that the current drawings reference fire alarm specifications; however, I was unable to locate those specifications in the documents provided. Are there updated drawings or fire alarm specifications available for the project? We also have a few questions regarding the fire alarm requirements, particularly whether the system will require voice evacuation/notification or standard horn/strobe notification. Any additional information you can provide would be greatly appreciated.
Answer: Fire alarm drawings and specifications are not available at this time. They will be produced by the selected CM/GC team and design team in the pre-construction phase. As an I-2, Condition 1 occupancy per the 2025 OSSC, at a minimum the design will need to comply with the following sections: 407.8 and 407.9, 907.2.6, and 907.5. As a state licensed skilled nursing facility, compliance with 2012 NFPA Life Safety Code 101 and its adopted references will also be required.