About this file
This is a Questions and Answers document issued by the Oregon Department of Forestry in response to inquiries regarding ITB S-62900-00016394 for the Chetco Fuels Reduction project on the Rogue River-Siskiyou National Forest in Curry County. The document clarifies specific project parameters, particularly regarding the Road Brushing Segment detailed in Attachment A. The Q&A addresses a contractor inquiry about the 11.324-mile Road Brushing Segment on Road System 1376, specifying that work extends from Point A at the 1376/1917 junction (T39S R12W S 9 NWNW) to Point B located 1.03 miles southeast of the 1407 junction (T37.5S R12S S33 SWSE). The response includes a vicinity map depicting the roadside brushing area relative to the Chetco River and South Fork Chetco River, with notation that map locations are approximate and exact feature locations will be determined on site based on existing conditions. The project encompasses fuels reduction and hazard mitigation services including tree cutting, brush cutting, slash treatment, and optional mastication across approximately 532 acres, with deliverables including 321.517 acres of cut and pile treatment, 210.385 acres of lop and scatter treatment, and the aforementioned 11.324 miles of roadside brushing. All groundwork must be completed by December 31, 2026, with the RFP closed on April 20, 2026 at 2:00 PM PST and the anticipated Notice of Intent to Award issued approximately April 27, 2026.
The contract is funded through approximately $425,000 in United States Forest Service appropriations provided to the Oregon Department of Forestry under Good Neighbor Authority, representing the maximum contract value. Contractors must submit detailed pricing including personnel, travel, supplies, overhead, and administrative costs, with all prices firm for 90 days from submission and through the contract term if awarded. Required contractor qualifications include an experienced foreman with a minimum of two years of forestry-related experience and one year of supervisory experience, plus at least two chainsaw operators meeting Industrial Fire Precaution Level standards. Proposers must maintain workers' compensation insurance with $500,000 employers' liability per accident, commercial general liability of $1,000,000 per occurrence with $2,000,000 annual aggregate, and automobile liability of $1,000,000 combined single limit. The Oregon Department of Forestry encourages participation of Certified Disadvantaged Business Enterprises (DBEs), and proposers must submit a COBID Certification Outreach Plan if subcontracting opportunities exist. The Agency reserves the right to award one contract and may award all, part, or none of the proposal items based on its best interests and funding availability.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB S-62900-00016394 – Chetco Fuels Reduction Rogue River-Siskiyou GNA Q&A
Chetco Fuels Reduction Rogue River-Siskiyou GNA
ITB S-62900-00016394
Questions & Answers
1. Regarding the Road Brushing Segment (Att. A, Pg. 14), the table states "Segment 1, Road System 1376, Map Point A to B, 11.324 Miles." Could you please verify which map(s) this 11.324-mile Road Brushing Segment covers? We see Maps 12, 15, and
16 have portions of 1376, but we would like to know which 11.324 miles needs the
Road Brushing treatment?
A. Roadside brushing is from Point A located at the 1376/1917 junction (T39S
R12W S 9 NWNW) to Point B located 1.03 miles SE of the 1407 junction (T37.5S
R12S S33 SWSE). Please see the attached map for further details.
B
A
4 097
Chetco River
Chetco River
Chetco River
South Fork Chetco River
Chetco River
5 4 2 1
24 35
20 23
32 36
363534
1110 1224
38S12W
39S12W
38S11W
37.5S12W
39S11W
38S13W
39S13W
Road Points
Forest Service Roads
Roadside Brushing 1376 (11.324 miles)
M A P 1 7
´0 1.5 30.75 Miles
The information shown on maps are approximate locations. Exact locations of features represented by map symbols will be determined on site and shall depend on the conditions that exists on site. Activities shall be conducted based on features determined on site rather than features shown on maps.
Chetco Release GNA - Curry County, Oregon Roadside brushing Vicinity Map
File details come from the government source that posted it. Updated .