CFM_EWP_-_Set_6-20-25.pdf

PDF 7 MB Posted

Attached to
NRCS Emergency Watershed Protection Grant
Solicitation number
ITB 25-092
Issued by
Lee County, Fort Lauderdale City, Florida

About this file

This is a set of construction drawings and specifications for the City of Fort Myers Public Works Department Engineering Division, developed in conjunction with the Natural Resources Conservation Service (NRCS) Emergency Watershed Protection program. The project encompasses comprehensive waterways debris and sediment removal across multiple canal systems and waterways in Fort Myers, Florida, including the Caloosahatchee River, Billys Creek, Eastwood Golf Course Canal, L-3 Canal, Ford Street Canal, Veronica S. Shoemaker Canal, Manuels Branch, Canal Street Canal, Carrell Road Canal, and Winkler Avenue Canal. The scope of work includes removal of vegetative and construction debris, underwater vegetative debris removal, sediment removal and transport, bank reshaping, tree clearing for construction access, and erosion control repairs using articulated concrete block mat (ACB mat) systems. Specific work areas are detailed across four debris removal location maps covering approximately 40,000 linear feet of waterway improvements, with sediment removal and bank reshaping ranging from 200 to 3,963 feet at individual sites. The drawings, dated June 16, 2025 and revised July 24, 2025, were prepared by Richard H. Thompson, P.E. (Florida Registration No. 46720), and include ten sheets detailing site locations, three debris removal detail specifications, one erosion control repair detail, and streambank erosion repair construction notes. Construction requires a minimum 72-hour advance notice to NRCS, utility location coordination per 811 requirements, and strict adherence to attached technical specifications and quality assurance plans.

The project requires contractors to follow NRCS construction responsibility protocols and coordinate with utility owners to ensure all underground utilities are properly marked before construction commences. Debris disposal must comply with specified construction standards, with fallen trees retaining embedded root systems in banks to maintain structural integrity. The erosion control repair work at Ballard Farm Canal involves installation of 300 feet of articulated concrete block mat protection along the channel bank. Bank reshaping and minor erosion repairs are to be applied across multiple sites as needed to stabilize eroded channel banks. All work must be documented through weekly inspection reports, record drawings, and comprehensive grant reimbursement documentation to support the NRCS Emergency Watershed Protection funding mechanism. The project is structured under Construction Manager at Risk (CMAR) delivery, with the selected contractor responsible for trade coordination, cost management, and strict environmental protection compliance throughout execution.

View the file

Other files

File Type Posted
NRCS_Emergency_Watershed_Protection_Grant.pdf PDF
NRCS_Emergency_Watershed_Protection_Grant.pdf PDF
CM@R_Contract_draft_10-02-25.pdf PDF
CM@R_Contract_draft_10-02-25.pdf PDF
Operation_and_Maintenance_Plan_CFM_4.pdf PDF
Solicitation_General_Terms_and_Conditions_April_2025_NCS-ara2025.07.10.pdf PDF
Stream_Debris_Removal__Specs_4.pdf PDF
Solicitation_General_Terms_and_Conditions_April_2025_NCS-ara2025.07.10.pdf PDF
Stream_Debris_Removal__Specs_4.pdf PDF
CIty_of_Fort_Myers_Technical_Specifications.pdf PDF
CFM_EWP_-_Set_6-20-25.pdf PDF
CIty_of_Fort_Myers_Technical_Specifications.pdf PDF
Schedule_Milton_-_Helene_Canal_Clean-up_CFM.pdf PDF
275-030-11-DBE_BID_PACKAGE_INFORMATION.pdf PDF
375-030-30-TRUTH_IN_NEGOTIATION_CERTIFICATION.pdf PDF
375-030-32-CERTIFICATION_REGARDING_DEBAREMENT,_SUSPENSION,_INELIGIBILITY..._.pdf PDF
375-040-84-LAP_PROFESSIONAL_SERVICES_TERMS.pdf PDF
575-060-13-NON-COLLUSION_DECLARATION_AND_COMPLIANCE_WITH_49_CFR_29.pdf PDF
Notice_of_Award.docx DOCX document
SRF_SupplementaryConditions_Construction_Contract_(August_2022).pdf PDF
Scope_of_Services_Engineering_Project_1182-2023.pdf PDF
w37503050_v001.docm DOCM document
375-030-32-CERTIFICATION_REGARDING_DEBAREMENT,_SUSPENSION,_INELIGIBILITY..._.pdf PDF
575-060-13-NON-COLLUSION_DECLARATION_AND_COMPLIANCE_WITH_49_CFR_29.pdf PDF
SRF_SupplementaryConditions_EM_Contract_(August_2022).pdf PDF
Checklist_Solicitation.xlsx XLSX spreadsheet
Local_Preference_Affidavit.pdf PDF
SRF_SupplementaryConditions_EM_Contract_(August_2022).pdf PDF
375-030-30-TRUTH_IN_NEGOTIATION_CERTIFICATION.pdf PDF
375-030-34-DISCLOSURE_OF_LOBBYING_ACTIVITIES.pdf PDF
375-040-84-LAP_PROFESSIONAL_SERVICES_TERMS.pdf PDF
525-010-46-LAP_CERTIFICATION_OF_CURRENT_CAPACITY.pdf PDF
FHWA-1273_(10_23)_.pdf PDF
Local_Preference_Affidavit.pdf PDF
Notice_of_Award.docx DOCX document
370-040-24-MBE_PLANNED_UTILIZATION.pdf PDF
375-030-34-DISCLOSURE_OF_LOBBYING_ACTIVITIES.pdf PDF
525-010-46-LAP_CERTIFICATION_OF_CURRENT_CAPACITY.pdf PDF
FHWA-1273_(10_23)_.pdf PDF
w37503083_(3).docx DOCX document
275-030-11-DBE_BID_PACKAGE_INFORMATION.pdf PDF
375-030-31_Affidavit_Regarding_Labor_and_Services.docx DOCX document
Scope_of_Services_Engineering_Project_1182-2023.pdf PDF
w37503050_v001.docm DOCM document
w37503083_(3).docx DOCX document
375-030-31_Affidavit_Regarding_Labor_and_Services.docx DOCX document
375-030-33-DISCLOSE_OF_LOBBY_ACTIVITIES.pdf PDF
370-040-24-MBE_PLANNED_UTILIZATION.pdf PDF
375-030-33-DISCLOSE_OF_LOBBY_ACTIVITIES.pdf PDF
Checklist_Solicitation.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION RESPONSIBILITY: It shall be the responsibility of the cooperator to assure that the project is constructed according to the attached drawings and specifications.

NOTICE OF CONSTRUCTION: NRCS shall be notified a minimum of 72 hours prior to construction.

UTILITIES: NRCS makes no representation as to the existence or non-existence of any utilities at the construction site. Utility Owners must be notified of the date and time construction is scheduled to approach the utility (pipeline, telephone lines, electric lines, etc.). Construction shall not commence until all Utility Owners have been notified and have their utilities located on the ground.

INDEX OF SHEETS

Sheet No. Sheet Title

1 Cover Sheet 2 Debris Removal Location Map 1 3 Debris Removal Location Map 2

Debris Removal & Erosion Control

Repair Site Location Map 3 5 Debris Removal Location Map 4 6 Debris Removal Detail No. 1 7 Debris Removal Detail No. 2 8 Debris Removal Detail No. 3 9 Erosion Control Repair Detail

10 Streambank Erosion Repair Details and Construction Notes

Always call 811 two full business days before you dig to have underground utilities located and marked.

C

IT

Y O

F

FO

R T

M Y

ER

S

PU

B

LI

C W

O R

K S

D

EP

A R

T M

EN

T

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

S

EC

O N

D S

T R

EE

T

F O

R T

M Y

ER

S, F

LO

R

ID

A

-3

-7

B Y

N O

D

A

TE

D

ES

C R

IP

TI

O

N

R

EV

IS

IO

N S

LIST OF SPECIFICATIONS

NO. TITLE

1 400. STREAM DEBRIS AND SEDIMENT REMOVAL

2 CITY OF FORT MYERS TECHNICAL SPECIFICATIONS

3 QUALITY ASSURANCE PLAN CFM

4 CITY WIDE DEBRIS AND SEDIMENT REMOVAL ENVIRONMENTAL EVALUATION

5 1 SCOPE OF SERVICES

SITE LOCATIONS

CITY OF FORT MYERS

EMERGENCY WATERSHED PROTECTION

WATERWAYS DEBRIS, SEDIMENT REMOVAL

AND BANK RESHAPING

SHEET: SHEET: OF1 10

W A

TE

R W

A

YS

D

EB

R

IS

A N D

S

ED

IM

EN

T R

EM

O V A L

C ov er S he et

Ca loo sa ha tch ee

R ive r

I-7

Ve no ni ca

S . S ho em ak er

U S-

M cG re go r B lvd

. Colonial Blvd.

Palm Beach Blvd.

O rti z Av e

R

IC

H A R D

H

TH

O

M

PS

O N

P.

E.

FL

R

EG

N O

S

IG

N D

A

TE

R

EG

IS

TE

R

ED

P R O

FE

S S

IO

N A L

DRWN:

1182-2023PROJ:

DATE:

DSGN:JAZ RHT

N.T.S.SCALE:

SEE SHEET 3 OF 10 FOR

DEBRIS LOCATION MAP

SEE SHEET 2 OF 10 FOR

DEBRIS LOCATION MAP

SEE SHEET 4 OF 10 FOR

DEBRIS LOCATION MAP

AND STREAMBANK EROSION

CONTROL REPAIR SITE LOCATION

SEE SHEET 5 OF 10 FOR

DEBRIS LOCATION MAP

06/16/2025

7/

RT

RE

VI

SE

D

M ar sh A ve

SR 82 Blvd.

Th is it em h as b ee n el ec tro ni ca lly s ig ne d an d se al ed b y

R ic ha rd

H

. T ho m ps on o n th e da te a dj ac en t t o th e se al u si ng a S

H A au th en tic at io n co de

Pr in te d co pi es o f t hi s do cu m en t a re n ot c on si de re d si gn ed a nd se al ed a nd th e

SH

A au th en tic at io n co de m us t b e ve rif ie d on an y el ec tro ni c co pi es

/2 5/

AutoCAD SHX Text N

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text S

C

IT

Y O

F

FO

R T

M Y

ER

S

PU

B

LI

C W

O R

K S

D

EP

A R

T M

EN

T

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

S

EC

O N

D S

T R

EE

T

F O

R T

M Y

ER

S, F

LO

R

ID

A

-3

-7

B Y

N O

D

A

TE

D

ES

C R

IP

TI

O

N

R

EV

IS

IO

N S

SHEET: SHEET:

D eb ris R em ov al L oc at io n

M ap

OF2 10

L-

C

AN

AL

S

ED

IM

EN

T R

EM

O

VA

L

AN

D

B

AN

K R

ES

H

AP

IN

G

Colonial Blvd.

C le ve la nd A ve

U S-

Winkler Ave.

Fowler St.

D eL eo n

St

Sam Fleishman Regional Sports

PAGE FIELD AIRPORT

Ev an s Av e.

R

IC

H A R D

H

TH

O

M

PS

O N

P.

E.

FL

R

EG

N O

S

IG

N D

A

TE

R

EG

IS

TE

R

ED

P R O

FE

S S

IO

N A L

DRWN:

1182-2023PROJ:

DATE:

DSGN:JAZ RHT

N.T.S.SCALE:

Complex

W A

TE

R W

A

YS

D

EB

R

IS

A N D

S

ED

IM

EN

T R

EM

O V A L

06/16/2025

7/

RT

RE

VI

SE

D

Su m m er lin R d.

AutoCAD SHX Text N

AutoCAD SHX Text W

AutoCAD SHX Text E

Y O

F

FO

R T

M Y

ER

S

PU

B

LI

C W

O R

K S

D

EP

A R

T M

EN

T

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

S

EC

O N

D S

T R

EE

T

F O

R T

M Y

ER

S, F

LO

R

ID

A

-3

-7

B Y

N O

D

A

TE

D

ES

C R

IP

TI

O

N

R

EV

IS

IO

N S

SHEET: SHEET: OF3 10

WINKLER AVE. CANAL - 3,963'

400' - SEDIMENT REMOVAL AND BANK RESHAPING

M cG re go r B lvd

C le ve la nd A ve

U S-

EDISON MALL

CFM GOLF COURSE

300' - SEDIMENT REMOVAL AND BANK RESHAPING

CARRELL RD. CANAL - 9,327'

Winkler Ave.

Br oa dw ay

A ve

C en tra l A ve

Metro Pkwy

CANAL ST. CANAL - 5,322'

200' - SEDIMENT REMOVAL AND BANK RESHAPING

CA

LO

O

SA

HA

TC

HE

E

RI

VE

R

MANUELS BRANCH - 4,319SEDIMENT

HospitalFort Myers High School

Pr in ce to n St

Carrell Rd.

Hill Ave.

D eb ris R em ov al L oc at io n

M ap

R

IC

H A R D

H

TH

O

M

PS

O N

P.

E.

FL

R

EG

N O

S

IG

N D

A

TE

R

EG

IS

TE

R

ED

P R O

FE

S S

IO

N A L

DRWN:

1182-2023PROJ:

DATE:

DSGN:JAZ RHT

N.T.S.SCALE:

Memorial Lee

W A

TE

R W

A

YS

D

EB

R

IS

A N D

S

ED

IM

EN

T R

EM

O V A L

06/16/2025

7/

RT

RE

VI

SE

DBANK

RESHAPING

1145'

REMOVAL

1594'

1580'

TREE

CLEARING FOR

CONSTRUCTION

BANK

RESHAPING BANK RESHAPING

AutoCAD SHX Text N

AutoCAD SHX Text W

AutoCAD SHX Text E

Y O

F

FO

R T

M Y

ER

S

PU

B

LI

C W

O R

K S

D

EP

A R

T M

EN

T

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

S

EC

O N

D S

T R

EE

T

F O

R T

M Y

ER

S, F

LO

R

ID

A

-3

-7

B Y

N O

D

A

TE

D

ES

C R

IP

TI

O

N

R

EV

IS

IO

N S

SHEET: SHEET: OF4 10

FO

R

D S

T.

C

AN

AL

R oc kf ill

R

d. Martin Luther King (Jr.) Blvd

O rti z Av e.

Ve ro ni ca

S . S ho em ak er

B lv

d. Michigan Ave.

Calo os ah atc he e R ive r

Diana Ave.

BILLYS CREEK

7,500' - U

NDER WATER VEGETATIVE DEBRIS REMOVAL

Palm Beach Blvd.

N un a Av e.

0'

SE

D

IM

EN

T

R

EM

O

VA

L

D eb ris R em ov al L oc at io n

M ap

R

IC

H A R D

H

TH

O

M

PS

O N

P.

E.

FL

R

EG

N O

S

IG

N D

A

TE

R

EG

IS

TE

R

ED

P R O

FE

S S

IO

N A L

DRWN:

1182-2023PROJ:

DATE:

DSGN:JAZ RHT

N.T.S.SCALE:

W A

TE

R W

A

YS

D

EB

R

IS

A N D

S

ED

IM

EN

T R

EM

O V A L

STRUCTURAL REPAIR BETWEEN DIANE ST.AND

BALLARD RD. IS DETAILED IN A SEPARATE SET

OF CONSTRUCTION DRAWINGS AND SPECS.

SEE SHEET 10 OF 10.

NOTE:

06/16/2025

7/

RT

RE

VI

SE

D

AN

D

B

AN

K R

ES

H

AP

IN

G

0'

SE

D

IM

EN

T R

EM

O

VA

L

AN

D

B

AN

K R

ES

H

AP

IN

G

BA

LL

AR

D

F

AR

M C

AN

AL

300' - EROSION CONTROL - REPAIR

ARTICULATED CONCRETE BLOCK MAT (ACB MAT)

AutoCAD SHX Text N

AutoCAD SHX Text W

AutoCAD SHX Text E

Y O

F

FO

R T

M Y

ER

S

PU

B

LI

C W

O R

K S

D

EP

A R

T M

EN

T

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

S

EC

O N

D S

T R

EE

T

F O

R T

M Y

ER

S, F

LO

R

ID

A

-3

-7

B Y

N O

D

A

TE

D

ES

C R

IP

TI

O

N

R

EV

IS

IO

N S

R

IC

H A R D

H

TH

O

M

PS

O N

P.

E.

FL

R

EG

N O

S

IG

N D

A

TE

R

EG

IS

TE

R

ED

P R O

FE

S S

IO

N A L

SHEET:

DRWN:

1182-2023PROJ:

DATE:

DSGN:JAZ RHT

SHEET: OF5 10

N.T.S.SCALE:

R oc kf ill

R d.

Martin Luther King (Jr.) Blvd

Edison Ave.

O rti z Av e.

Ve ro ni ca

S . S ho em ak er

B lv d.

Canal St.

Colonial Blvd.

Hanson St.

I-7

EASTWOOD

GOLF COURSE

EA

ST

W O

O D

G O

LF

C

O U

R

SE

C

AN

AL

1905' - TREE CLEARING FOR CONSTRUCTION

SEDIMENT REMOVAL AND BANK RESHAPING

D eb ris R em ov al L oc at io n

M ap

W A

TE

R W

A

YS

D

EB

R

IS

A N D

S

ED

IM

EN

T R

EM

O V A L

06/16/2025

7/

RT

RE

VI

SE

D

AutoCAD SHX Text N

AutoCAD SHX Text W

AutoCAD SHX Text E

Y O

F

FO

R T

M Y

ER

S

PU

B

LI

C W

O R

K S

D

EP

A R

T M

EN

T

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

S

EC

O N

D S

T R

EE

T

F O

R T

M Y

ER

S, F

LO

R

ID

A

-3

-7

B Y

N O

D

A

TE

D

ES

C R

IP

TI

O

N

R

EV

IS

IO

N S

SHEET: SHEET: OF6 10

NOTES:

1. Left and right looking downstream.

2. Debris shall be disposed as specified in the construction specification.

3. Fallen trees that still have roots embedded in the bank will be cut, leaving roots embedded in the bank.

4. This drawing is more applicable to Billy's Creek.

20' 20'

VARIABLE TOP WIDTH

DEBRIS REMOVAL AREA

BEFORE CONSTRUCTION

AFTER CONSTRUCTION

STREAM

DETAIL NO. 1 - DEBRIS/SEDIMENT REMOVAL

N.T.S.

STREAM

20' 20'

DEBRIS REMOVAL AREA

VARIABLE TOP WIDTH

D eb ris R em ov al D et ai l N o.

R

IC

H A R D

H

TH

O

M

PS

O N

P.

E.

FL

R

EG

N O

S

IG

N D

A

TE

R

EG

IS

TE

R

ED

P R O

FE

S S

IO

N A L

DRWN:

1182-2023PROJ:

DATE:

DSGN:JAZ RHT

N.T.S.SCALE:

W A

TE

R W

A

YS

D

EB

R

IS

A N D

S

ED

IM

EN

T R

EM

O V A L

SEDIMENT

06/16/2025

7/

RT

RE

VI

SE

D

AutoCAD SHX Text N

AutoCAD SHX Text W

AutoCAD SHX Text E

Y O

F

FO

R T

M Y

ER

S

PU

B

LI

C W

O R

K S

D

EP

A R

T M

EN

T

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

S

EC

O N

D S

T R

EE

T

F O

R T

M Y

ER

S, F

LO

R

ID

A

-3

-7

B Y

N O

D

A

TE

D

ES

C R

IP

TI

O

N

R

EV

IS

IO

N S

SHEET: SHEET:

D eb ris R em ov al D et ai l N o.

OF7 10

20' 20'

VARIABLE TOP WIDTH

DEBRIS REMOVAL AREA

BEFORE CONSTRUCTION

AFTER CONSTRUCTION

CHANNEL

DETAIL NO. 2 - DEBRIS/SEDIMENT REMOVAL

N.T.S.

1. Left and right looking downstream.

2. Debris shall be disposed as specified in the construction specification.

3. Fallen trees that still have roots embedded in the bank will be cut, leaving roots embedded in the bank.

4. This drawing is more applicable to Eastwood Golf Course Canal.

NOTES:

CHANNEL

20' 20'

DEBRIS REMOVAL AREA

VARIABLE TOP WIDTH

EM

ER

G

EN

C Y

W A

TE

R S H

ED

PR

O

TE

C

TI

O

N R

IC

H A R D

H

TH

O

M

PS

O N

P.

E.

FL

R

EG

N O

S

IG

N D

A

TE

R

EG

IS

TE

R

ED

P R O

FE

S S

IO

N A L

DRWN:

1182-2023PROJ:

DATE:

DSGN:JAZ RHT

N.T.S.SCALE:

SEDIMENT

06/16/2025

7/

RT

RE

VI

SE

D

Y O

F

FO

R T

M Y

ER

S

PU

B

LI

C W

O R

K S

D

EP

A R

T M

EN

T

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

S

EC

O N

D S

T R

EE

T

F O

R T

M Y

ER

S, F

LO

R

ID

A

-3

-7

B Y

N O

D

A

TE

D

ES

C R

IP

TI

O

N

R

EV

IS

IO

N S

SHEET: SHEET:

D eb ris R em ov al D et ai l N o.

OF8 10

20' 20'

VARIABLE TOP WIDTH

DEBRIS REMOVAL AREA

BEFORE CONSTRUCTION

AFTER CONSTRUCTION

CANAL

DETAIL NO. 3 - DEBRIS/SEDIMENT REMOVAL

N.T.S.

1. Left and right looking downstream.

2. Debris shall be disposed as specified in the construction specification.

3. Fallen trees that still have roots embedded in the bank will be cut, leaving roots embedded in the bank.

4. This drawing is more applicable to the following waterways: L-3 Canal, Ford Street Canal, Veronica S. Shoemaker Canal, Manuels Branch, Canal St. Canal, Carrell Rd. Canal, and Winkler Ave. Canal.

NOTES:

CANAL

20' 20'

DEBRIS REMOVAL AREA

VARIABLE TOP WIDTH

VEGETATIVE AND C & D

(CONSTRUCTION &

DEMOLITION) DEBRIS

R

IC

H A R D

H

TH

O

M

PS

O N

P.

E.

FL

R

EG

N O

S

IG

N D

A

TE

R

EG

IS

TE

R

ED

P R O

FE

S S

IO

N A L

DRWN:

1182-2023PROJ:

DATE:

DSGN:JAZ RHT

N.T.S.SCALE:

W A

TE

R W

A

YS

D

EB

R

IS

A N D

S

ED

IM

EN

T R

EM

O V A L

SEDIMENT

06/16/2025

7/

RT

RE

VI

SE

D

AutoCAD SHX Text N

AutoCAD SHX Text W

AutoCAD SHX Text E

Y O

F

FO

R T

M Y

ER

S

PU

B

LI

C W

O R

K S

D

EP

A R

T M

EN

T

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

S

EC

O N

D S

T R

EE

T

F O

R T

M Y

ER

S, F

LO

R

ID

A

-3

-7

B Y

N O

D

A

TE

D

ES

C R

IP

TI

O

N

R

EV

IS

IO

N S

SHEET: SHEET:

Er os io n

C on tr ol

R ep ai r

D et ai l

OF9 10

EM

ER

G

EN

C Y

W A

TE

R S H

ED

PR

O

TE

C

TI

O

N R

IC

H A R D

H

TH

O

M

PS

O N

P.

E.

FL

R

EG

N O

S

IG

N D

A

TE

R

EG

IS

TE

R

ED

P R O

FE

S S

IO

N A L

DRWN:

1182-2023PROJ:

DATE:

DSGN:JAZ RHT

N.T.S.SCALE:

06/16/2025

7/

RT

RE

VI

SE

DErosion repair area

VARIABLE TOP WIDTH

BEFORE CONSTRUCTION

AFTER CONSTRUCTION

CHANNEL

DETAIL NO. 4 - BANK EROSION REPAIRS/MINOR RESHAPING

N.T.S.

1. Left and right looking downstream.

NOTES:

CHANNEL

EROSION REPAIR AREA

ERODED CHANNEL BANK

2. This drawing applies to minor bank reshaping applicable to all sites, as needed.

Y O

F

FO

R T

M Y

ER

S

PU

B

LI

C W

O R

K S

D

EP

A R

T M

EN

T

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

S

EC

O N

D S

T R

EE

T

F O

R T

M Y

ER

S, F

LO

R

ID

A

-3

-7

B Y

N O

D

A

TE

D

ES

C R

IP

TI

O

N

R

EV

IS

IO

N S

SHEET: SHEET:

S tr ea m

B an k Er os io n R ep ai r

D et ai ls a nd

C on st ru ct io n N ot es

OF10 10

EM

ER

G

EN

C Y

W A

TE

R S H

ED

PR

O

TE

C

TI

O

N R

IC

H A R D

H

TH

O

M

PS

O N

P.

E.

FL

R

EG

N O

S

IG

N D

A

TE

R

EG

IS

TE

R

ED

P R O

FE

S S

IO

N A L

DRWN:

1182-2023PROJ:

DATE:

DSGN:JAZ RHT

N.T.S.SCALE:

06/16/2025

7/

RT

RE

VI

SE

D

Sheet - 1
Sheet - 2
Sheet - 3
Sheet - 4
Sheet - 5
Sheet - 6
Sheet - 7
Sheet - 8
Sheet - 9
Sheet - 10

File details come from the government source that posted it. Updated .