CDRL A006 - 4.6 Activitiy Hazard Analysis_5 Mar 2021_signed.pdf

PDF 285 KB Posted

Attached to
Elevator Maintenance and Repair Services (NSWCPD) Federal contract opportunity
Solicitation number
N6449822R5000
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document package includes a Contract Data Requirements List (CDRL) and details of a related federal contract opportunity.

The CDRL outlines requirements for an Activity Hazard Analysis report to be delivered under a contract for elevator maintenance and repair services. It specifies the contracting agency, requiring office, distribution controls, submission frequency and due dates. The contractor must prepare hazard analyses for all applicable work activities, updating them when conditions change, and submit in Microsoft Word or PDF format.

The federal contract opportunity notice is for elevator maintenance and repair services at a Naval facility. Interested vendors can attend an optional site visit on January 24th, 2022 by requesting attendance by January 19th. Questions are due by January 26th. Proposals must follow the instructions in sections L and M of the solicitation. The contract is with the Department of the Navy Naval Sea Systems Command. The deadline for initial proposals is not specified.

View the file

Other files for this federal contract opportunity

Other files attached to Elevator Maintenance and Repair Services (NSWCPD), newest first.
File Type Posted
Amendment 0002.pdf PDF
N6449822R5000 Amendment 0001.pdf PDF
PWS Attachment 2 NSWCPD Elevator Equipment List_11 Jan 2022.docx DOCX document
PWS Attachment 3 Elevator Certification Schedule 18 Nov 21.xlsx XLSX spreadsheet
PWS Attachment 5 Performance Requirements_18 Nov 2021.docx DOCX document
PWS Attachment 6 PM Elevator Checklists.pdf PDF
CDRL A003 - 4.3 Contractor’s Personnel Roster_5 Mar 2021_signed.pdf PDF
N6449822R5000.pdf PDF
CDRL A001 - 4.1 Contract Status Report_5 Mar 2021_signed.pdf PDF
CDRL A007 - 4.7 Accident Reports_5 Mar 2021.pdf PDF
PWS Attachment 4 Historical Service Call Data_25 Jun 2021 --JPS.xlsx XLSX spreadsheet
CDRL A005 - 4.5 Accident Prevention Plan_5 Mar 2021_signed.pdf PDF
CDRL A008 - 4.8 OSHA Citations and Violations Corrective Action Report_5 Mar 2021_signed.pdf PDF
CDRL A009 - 4.9 Asbestos Containing Material Report_5 Mar 2021_signed.pdf PDF
Wage Determination (Attachment 16).docx DOCX document
Price Proposal Form (Attachment 18).xlsx XLSX spreadsheet
PWS Attachment 1 PNBC Site Map.pdf PDF
CDRL A002 - 4.2 Contractor's Maintenace Program Plan_5 Mar 2021_signed.pdf PDF
CDRL A004 - 4.4 Contractor's Quality Management Plan_5 Mar 2021_signed.pdf PDF
Past Performance Questionnaire (Attachment 17).doc DOC document
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A006
title: Safety Summary Report
sub: Activity Hazard Analysis (AHA)
auth: DI-SAFT-82155
ref: PWS 4.6 See BLK 16
req_ofc: Code 1022
dd250: LT
appcode: N/A
dist: See BLK 16
freq: See BLK 16
asof: See BLK 16
firstsub: See BLK 16
subsub: See BLK 16
addressee1: Tech POC
draft1: 0
reg1: 1
repro1:
addressee2: COR
draft2: 0
reg2: 1
repro2:
addressee3: Alternate TPOC
draft3: 0
reg3: 1
repro3:
addressee4: KO
draft4: 0
reg4: 1
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 4
total_repro: 0
remarks: Block 4:

1. The Contractor shall prepare Activity Hazard Analyses (AHAs) for all applicable work activities performed under this contract. AHAs for recurring work shall be submitted with the APP and shall be updated as work activities or conditions change and additional AHAs prepared as new work activities are required. AHAs for non-recurring and one-time (e.g., non-recurring work task orders) work occurrences shall be submitted at least two working days prior to start of work. Specifically,

a. for contract modifications to recurring work requirements where changes are germane to the original contract, the Contractor shall revise applicable AHAs within 15 calendar days after modification is signed;

b. for contracts with non-recurring work ELINs, the Contractor shall submit an AHA on non-recurring work task orders, with the associated proposal, whenever the service environment or required task is different from the recurring work priced services; and

c. for construction (including renovation or alteration) task orders placed on the non-recurring work portion of contract, the Contractor shall submit a separate AHA for each task order with the associated proposal.

2. The Contractor shall follow the Risk Management Process for the development of Activity Hazard Analysis (AHA) in accordance with paragraph 01.A.14 and Appendix A of EM 385-1-1. A formatted outline of an AHA is provided in Figure 1-2 of EM 385-1-1.

3. During performance of services, the Contractor's Site Safety & Health Officer (SSHO), or other OSHA competent person, shall periodically review the AHA at each service site and for each sub-annex to assess the effectiveness of the Contractor’s overall APP. If changes to the AHAs are required, such changes shall be submitted to the Contracting Officer for review and acceptance.

Block 9: Distribution authorized to personnel listed in Block 14, Distribution Statement B. Other requests for this document shall be referred to Commander, Naval Surface Warfare Center, Philadelphia Division, 5001 South Broad Street, Building 4, Philadelphia, PA 19112.

Block 10: The AHA is required once, unless changes are made or requested by the Government.

group:
total_price:
prep_name:
line_item: TBD
exhibit: A
xtdp: Off
xtm: Off
othercat: SAFT
system: Elevator System Maintenance Contract
ctr_no: TBD
contr: TBD
remarksb:

Block 12 The AHA shall be submit no later than 15 days after award.

Block 13 The Contractor shall review, update, and submit revisions to the AHA whenever a change in work conditions, hazards, or activities occur no later than 48 hours after the change.

BLK 14: Submit via electronic mail in a digital format that can be read by Microsoft Office 2010 applications (or earlier) or Adobe PDF applications.

***END***

Page2: 2
Reset:
2020-04-30T09:11:21-0400
RODRIGUEZ.JESSICA.PAULINE.1374286567
prep_date: 2/9/2021
app_by:
2021-03-05T12:14:37-0500
LAGATTA.MARK.D.1398632172
app_date: 5 Mar 2021
Page: 1
of_pages: 2
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .