CDRL 1423 A001_CalibrationCertificate_OCLPC.pdf

PDF 1 MB Posted

Attached to
Oxygen Clean Low Pressure Calibrator
Solicitation number
N6426724R0014
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) outlining calibration report requirements for an oxygen clean low pressure calibrator. The CDRL requires the contractor to submit a preliminary calibration report format for government review no later than 60 days prior to initial operating capability. Upon government approval, the contractor must submit the final calibration report containing actual data no later than 30 days before initial delivery. The report format should follow guidance in data item description DI-QCIC-80798C and Statement of Work paragraph 5.3.2. Submission of electronic reports in MS Office format is preferred. Reports must be provided with each delivered unit. The Navy's Naval Air Systems Command is the requiring activity, with distribution to personnel at various Naval commands.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

Draft

DD FORM 1423 (CDRL) Supplemental

BLOCK 14 ENTRY COMPLETE ADDRESS

Draft

CDRL Template (002).pdf
Page 2.pdf
Blank Page
A_CONTRACT_LINE_ITEM_NO: TBD
B_EXHIBIT: A
TDP:
TM:
OTHER: QCIC
DSYSTEMITEM: Oxygen Clean Low Pressure Calibrator
E_CONTRACTPR_NO: N64267-22-R-XXXX
FCONTRACTOR: TBD
1_DATA_ITEM_NO: A001
2_TITLE_OF_DATA_ITEM: CALIBRATION CERTIFICATION
3_SUBTITLE: Calibration Report with Data
4_AUTHORITY_Data_Acquisit: DI-QCIC-80798C (See Block 16)
5_CONTRACT_REFERENCE: SOW Paragraph: 5.3.2 (See Block 16)
6_REQUIRING_OFFICE: NAWCAD BL31400
7_DID_250_REQ: LT
8_APP_CODE: A
DIST_STATEMENT: A
10_FREQUENCY: (See Block 16)
11_AS_OF_DATE: N/A
12_DATE_OF_FIRST_SUBMISSI: (See Block 16)
13_DATE_OF_SUBSEQUENT_SUB: N/A
addressee1: Patrick Brannick
draft1: 1
reg1: 1
repro1:
addressee2: NAWCAD BL31400
draft2:
reg2:
repro2:
addressee3: Cory Barnhouse
draft3: 1
reg3: 1
repro3: 0
addressee4: NAWCAD AA14200
draft4:
reg4:
repro4:
addressee5: Heather Loprano
draft5: 1
reg5: 1
repro5: 1
addressee6: NAWCAD BL31400
draft6:
reg6:
repro6:
addressee7: Copies with each unit delivered
draft7: 0
reg7: 1
repro7: 0
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 3
reg38t: 4
total_repro: 1
16_REMARKS: Block 4/5: DI-QCIC-80798C and SOW paragraph 5.3.2 shall be used as guidance and are provided for reference. Information items in DI-QCIC-80798C that are not relevant to the procured unit do not need to be included in format. Actual calibration data should be contained in the calibration report related to the certificate.

Block 8: Calibration Report (CDRL A001 subtitle) requires government approval. The contractor shall provide a preliminary draft of the Calibration Report of data to the Government for review, comment, and approval of the format no later than (NLT) 60 calendar days prior to initial operating capability (IOC) for each system. IOC shall be defined as the delivery date of the initial order of system(s). Government will provide the contractor with approval/disapproval of format including comments within 15 days of receipt of preliminary draft. Contractor shall provide a government approved final version with incorporated comments NLT 30 days prior to IOC for first system.

Block 10: Frequency of Calibration Report shall be generated for each system installed.

Block 12: Date of first submission shall be no later than (NLT) 60 calendar days prior to initial operating capability (IOC) of the first system procured.

Block 13: Date of subsequent submissions: N/A

Block 14: Submission in contractor format is acceptable. Electronic format is preferred if in a widely available commercial document format such as MS-Excel or MS Word. Electronic submission of data is also accepted on CD-ROM. Quantity and copies shall be provided in accordance with (IAW) CDRL distribution (Block 14). Addressee's POC information provided on CDRL supplemental page 2.

Block 16: This CDRL refers only to the format of the Calibration Report printed by the calibration standards, it is not intended that the contractor run actual US Navy workload for calibration.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY: Phillip Brown
H_DATE:
1_APPROVED_BY:
J_DATE:
Page:
of_pages:
Reset:
Address Box: Patrick Brannick, patrick.j.brannick.civ@us.navy.mil

NAWCAD BL31400

JB MDL

Highway 547, Building 120-3, Rm. 269 Lakehurst, NJ 08733

Heather M. Loprano, heather.m.loprano.civ@us.navy.mil NAVAIR Metrology and Calibration

NAWCAD BL31400

JB MDL

Highway 547, Building 120-3, Rm. 269 Lakehurst, NJ 08733

Corry Barnhouse, corry.barnhouse.civ@us.navy.mil

NAVAIR METCAL AA14200

Bldg 1403 22113 Fortin Circle, Unit 7 Patuxent River, MD 20670

File details come from the government source that posted it. Updated .