CBS Bunker Retrofit IDIQ - Kuwait.pdf
PDF 79 KB Posted
- Attached to
- Amendment 001 Retrofit of Existing Personnel Bunkers in the Countries of Iraq, Kuwait, and Jordan
- Solicitation number
- W912ER21R0044
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP: W912ER21R0044
PROJECT:
LOCATION: Kuwait country-wide
CLIN NO. DESCRIPTION QTY UNIT UNIT PRICE TOTAL
0001 Pre-Procurement and Pre-Fabrication Activities, to include existing bunker inspection and reporting 1 JA
0002 Bunkers requiring bulkhead and door system retrofits at Camp Arifjan. Concrete infill. 100 EA
0003 Bunkers requiring bulkhead and door system retrofits at Camp Buehring. Concrete infill. 236 EA
0004 Bunkers requiring bulkhead and door system retrofits at Kuwait Naval Base. Concrete infill. 5 EA
0005 Bunkers requiring bulkhead and door system retrofits at Shuaiba Port of Debarkation. Concrete infill. 5 EA
1 JA
1 JA
PROPOSAL SCHEDULE
Bunker Retrofit IDIQ - Kuwait
*OUSD has mandated that the "dollars" or "lump sum" units of measure no longer be used on DoD contracts. "JA" will be used for "LS"
TOTAL BASE COST (CLIN 0001 - 0005)
TOTAL CONTRACT COST (CLIN 0001 - 0005)
BASE CONTRACT
EXHIBIT 1 Page 1 of 2
RFP: W912ER21R0044
PROJECT: Bunker Retrofit IDIQ - Kuwait P2 -- 499392 PROPOSER:
LOCATION: Kuwait country-wide DATE:
ITEM DESCRIPTION LABOR MAN-
HOURS
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
DIRECT
MATERIALS COST
DIRECT SUB
CONTRACTOR
COST
TOTAL
DIRECT
COST
OVERHEAD/
INDIRECT COST PROFIT TOTAL PROPOSED
COST
Pre-Procurement and Pre-Fabrication Activities, to include existing bunker inspection and reporting
Bunkers requiring bulkhead and door system retrofits at Camp Arifjan.
Concrete infill.
Bunkers requiring bulkhead and door system retrofits at Camp Buehring.
Concrete infill.
Bunkers requiring bulkhead and door system retrofits at Kuwait Naval Base. Concrete infill.
Bunkers requiring bulkhead and door system retrofits at Shuaiba Port of Debarkation. Concrete infill.
TOTAL BASE COST (CLIN 0001 - 0005)
TOTAL CONTRACT COST (CLIN 0001 - 0005)
COST BREAKDOWN
BASE CONTRACT
| Cost Breakdown Sheet |
| Proposal Schedule |
File details come from the government source that posted it. Updated .