CBS Bunker Retrofit IDIQ - Jordan.pdf
PDF 81 KB Posted
- Attached to
- Amendment 001 Retrofit of Existing Personnel Bunkers in the Countries of Iraq, Kuwait, and Jordan
- Solicitation number
- W912ER21R0044
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP: W912ER21R0044
PROJECT:
LOCATION: Jordan country-wide
CLIN NO. DESCRIPTION QTY UNIT UNIT PRICE TOTAL
0001 Pre-Procurement and Pre-Fabrication Activities, to include existing bunker inspection and reporting 1 JA
0002 Bunkers requiring bulkhead and door system retrofits at Camp Titin. Concrete Infill. 9 EA
0003 Bunkers requiring bulkhead and door system retrofits at King Adbullah II Air Base. Concrete Infill. 9 EA
0004 Bunkers requiring bulkhead and door system retrofits at Prince Hassan Air Base. Concrete Infill. 6 EA
0005 Bunkers requiring bulkhead and door system retrofits at Joint Training Center. Concrete Infill. 56 EA
1 JA
0006 Bunkers requiring bulkhead and door system retrofits at T22.
Concrete Infill. 24 EA
1 JA
1 JA
PROPOSAL SCHEDULE
Bunker Retrofit IDIQ - Jordan
*OUSD has mandated that the "dollars" or "lump sum" units of measure no longer be used on DoD contracts. "JA" will be used for "LS"
TOTAL BASE COST (CLIN 0001 - 0006)
TOTAL CONTRACT COST (CLIN 0001 - 0006)
BASE CONTRACT
OPTION ITEMS
TOTAL OPTION COST (CLIN 0006)
EXHIBIT 1 Page 2 of 2
RFP: W912ER21R0044
PROJECT: Bunker Retrofit IDIQ - Jordan P2 -- 499387 PROPOSER:
LOCATION: Jordan country-wide DATE:
ITEM DESCRIPTION LABOR MAN-
HOURS
DIRECT LABOR
COST
DIRECT
EQUIPMENT COST
DIRECT
MATERIALS COST
DIRECT SUB
CONTRACTOR
COST
TOTAL
DIRECT
COST
JOOH HOOH OVERHEAD/
INDIRECT COST PROFIT TOTAL PROPOSED
COST
BASE CONTRACT
Pre-Procurement and Pre-Fabrication Activities, to include existing bunker inspection and reporting
Bunkers requiring bulkhead and door system retrofits at Camp Titin.
Concrete Infill.
Bunkers requiring bulkhead and door system retrofits at King Adbullah II Air Base. Concrete Infill.
Bunkers requiring bulkhead and door system retrofits at Prince Hassan Air Base. Concrete Infill.
Bunkers requiring bulkhead and door system retrofits at Joint Training Center. Concrete Infill.
TOTAL BASE
COST (CLIN 0001 -
0006)
OPTION ITEMS
Bunkers requiring bulkhead and door system retrofits at T22. Concrete Infill.
TOTAL OPTION
COST (CLIN 0006)
TOTAL
CONTRACT COST
(CLIN 0001 - 0006)
COST BREAKDOWN
| Proposal Schedule |
| Cost Breakdown Sheet |
File details come from the government source that posted it. Updated .