RFP: W912ER21R0044

PROJECT:

LOCATION: Jordan country-wide

CLIN NO. DESCRIPTION QTY UNIT UNIT PRICE TOTAL

0001 Pre-Procurement and Pre-Fabrication Activities, to include existing bunker inspection and reporting 1 JA

0002 Bunkers requiring bulkhead and door system retrofits at Camp Titin. Concrete Infill. 9 EA

0003 Bunkers requiring bulkhead and door system retrofits at King Adbullah II Air Base. Concrete Infill. 9 EA

0004 Bunkers requiring bulkhead and door system retrofits at Prince Hassan Air Base. Concrete Infill. 6 EA

0005 Bunkers requiring bulkhead and door system retrofits at Joint Training Center. Concrete Infill. 56 EA

1 JA

0006 Bunkers requiring bulkhead and door system retrofits at T22.

Concrete Infill. 24 EA

1 JA

1 JA

PROPOSAL SCHEDULE

Bunker Retrofit IDIQ - Jordan

*OUSD has mandated that the "dollars" or "lump sum" units of measure no longer be used on DoD contracts. "JA" will be used for "LS"

TOTAL BASE COST (CLIN 0001 - 0006)

TOTAL CONTRACT COST (CLIN 0001 - 0006)

BASE CONTRACT

OPTION ITEMS

TOTAL OPTION COST (CLIN 0006)

EXHIBIT 1 Page 2 of 2

RFP: W912ER21R0044

PROJECT: Bunker Retrofit IDIQ - Jordan P2 -- 499387 PROPOSER:

LOCATION: Jordan country-wide DATE:

ITEM DESCRIPTION LABOR MAN-

HOURS

DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

DIRECT

MATERIALS COST

DIRECT SUB

CONTRACTOR

COST

TOTAL

DIRECT

COST

JOOH HOOH OVERHEAD/

INDIRECT COST PROFIT TOTAL PROPOSED

COST

BASE CONTRACT

Pre-Procurement and Pre-Fabrication Activities, to include existing bunker inspection and reporting

Bunkers requiring bulkhead and door system retrofits at Camp Titin.

Concrete Infill.

Bunkers requiring bulkhead and door system retrofits at King Adbullah II Air Base. Concrete Infill.

Bunkers requiring bulkhead and door system retrofits at Prince Hassan Air Base. Concrete Infill.

Bunkers requiring bulkhead and door system retrofits at Joint Training Center. Concrete Infill.

TOTAL BASE

COST (CLIN 0001 -

0006)

OPTION ITEMS

Bunkers requiring bulkhead and door system retrofits at T22. Concrete Infill.

TOTAL OPTION

COST (CLIN 0006)

TOTAL

CONTRACT COST

(CLIN 0001 - 0006)

COST BREAKDOWN

Proposal Schedule
Cost Breakdown Sheet