BLANK Kuwait-Bunker 16Jul rev.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- Amendment 001 Retrofit of Existing Personnel Bunkers in the Countries of Iraq, Kuwait, and Jordan
- Solicitation number
- W912ER21R0044
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Proposal Schedule
| PROPOSAL SCHEDULE | |
| RFP: | W912ER21R0044 |
| PROJECT: | Bunker Retrofit IDIQ - Kuwait |
| LOCATION: | Kuwait country-wide |
| CLIN NO. | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL |
| BASE CONTRACT | |||||
| 0001 | Pre-Procurement and Pre-Fabrication Activities, to include existing bunker inspection and reporting | 1 | JA | ||
| 0002 | Bunkers requiring bulkhead and door system retrofits at Camp Arifjan. Concrete infill. | 100 | EA | ||
| 0003 | Bunkers requiring bulkhead and door system retrofits at Camp Buehring. Concrete infill. | 236 | EA | ||
| 0004 | Bunkers requiring bulkhead and door system retrofits at Kuwait Naval Base. Concrete infill. | 5 | EA | ||
| 0005 | Bunkers requiring bulkhead and door system retrofits at Shuaiba Port of Debarkation. Concrete infill. | 5 | EA | ||
| TOTAL BASE COST (CLIN 0001 - 0005) | 1 | JA | |||
| TOTAL CONTRACT COST (CLIN 0001 - 0005) | 1 | JA | |||
| *OUSD has mandated that the "dollars" or "lump sum" units of measure no longer be used on DoD contracts. "JA" will be used for "LS" |
&9&P of &N
Cost Breakdown Sheet
| COST BREAKDOWN | ||||||||||||
| RFP: | W912ER21R0044 | |||||||||||
| PROJECT: | Bunker Retrofit IDIQ - Kuwait | P2 -- 499392 | PROPOSER: | |||||||||
| LOCATION: | Kuwait country-wide | DATE: | ||||||||||
| ITEM | DESCRIPTION | LABOR MAN-HOURS | DIRECT LABOR COST | DIRECT EQUIPMENT COST | DIRECT MATERIALS COST | DIRECT SUB CONTRACTOR COST | TOTAL DIRECT COST | JOOH | HOOH | OVERHEAD/ INDIRECT COST | PROFIT | TOTAL PROPOSED COST |
| BASE CONTRACT | ||||||||||||
| 0001 | Pre-Procurement and Pre-Fabrication Activities, to include existing bunker inspection and reporting | |||||||||||
| 0002 | Bunkers requiring bulkhead and door system retrofits at Camp Arifjan. Concrete infill. | |||||||||||
| 0003 | Bunkers requiring bulkhead and door system retrofits at Camp Buehring. Concrete infill. | |||||||||||
| 0004 | Bunkers requiring bulkhead and door system retrofits at Kuwait Naval Base. Concrete infill. | |||||||||||
| 0005 | Bunkers requiring bulkhead and door system retrofits at Shuaiba Port of Debarkation. Concrete infill. | |||||||||||
| TOTAL BASE COST (CLIN 0001 - 0005) | ||||||||||||
| TOTAL CONTRACT COST (CLIN 0001 - 0005) |
&"Arial,Bold"&12EXHIBIT 1 Page &P of &N
Sheet1
General Notes: This template is to be used for Certified Cost Data. A seperate form is needed for each CLIN. <BLUE Text> indicates items to be populated by the user. This template shows 10 lines under each section. If 10 are not needed, delete the lines that don't apply. If more are needed, add accordingly. If there is not a cost associated with the CLIN (ex. no Subcontacting), write N/A
| CLIN Title (ex. CLIN no. 0001 Construct Power Plant) | ||||
| Element of Cost | Total | |||
| DIRECT LABOR COST | $ | |||
| DIRECT EQUIPMENT COST | $ | |||
| DIRECT MATERIAL COST | $ | |||
| DIRECT SUBCONTRACTING | $ | |||
| TOTAL DIRECT COST (Sub Total) | $ | |||
| OVERHEAD INDIRECT COST | $ | |||
| PROFIT | $ | |||
| Total Price | ||||
| DIRECT LABOR COST | ||||
| Labor Category | Rate/Hr | Hours | Total | |
| <Labor 1> (ex. Excavator) | $ | $ | ||
| <Labor 2> | $ | $ | ||
| <Labor 3> | $ | $ | ||
| <Labor 4> | $ | $ | ||
| <Labor 5> | $ | $ | ||
| <Labor 6> | $ | $ | ||
| <Labor 7> | $ | $ | ||
| <Labor 8> | $ | $ | ||
| <Labor 9> | $ | $ | ||
| <Labor 10> | $ | $ | ||
| Total | ||||
| DIRECT EQUIPMENT COST | ||||
| Equipment Type | Rate/Hr | Hours | Total | |
| <Equipment 1> (ex. 20 Ton Crane) | $ | $ | ||
| <Equipment 2> | $ | $ | ||
| <Equipment 3> | $ | $ | ||
| <Equipment 4> | $ | $ | ||
| <Equipment 5> | $ | $ | ||
| <Equipment 6> | $ | $ | ||
| <Equipment 7> | $ | $ | ||
| <Equipment 8> | $ | $ | ||
| <Equipment 9> | $ | $ | ||
| <Equipment 10> | $ | $ | ||
| Total | ||||
| DIRECT MATERIAL COST | ||||
| Materials | Quantity | Unit | Unit Price | Total |
| <Material 1> (ex. 8x8x16 CMU) | m2 | $ | $ | |
| <Material 2> | $ | $ | ||
| <Material 3> | $ | $ | ||
| <Material 4> | $ | $ | ||
| <Material 5> | $ | $ | ||
| <Material 6> | $ | $ | ||
| <Material 7> | $ | $ | ||
| <Material 8> | $ | $ | ||
| <Material 9> | $ | $ | ||
| <Material 10> | $ | $ | ||
| Total | ||||
| DIRECT SUBCONTRACTING COST | ||||
| Subcontracting | Total | |||
| <Subcontracting 1> (ex. Specialized Communication work) | $ | |||
| <Subcontracting 2> | $ | |||
| <Subcontracting 3> | $ | |||
| <Subcontracting 4> | $ | |||
| <Subcontracting 5> | $ | |||
| <Subcontracting 6> | $ | |||
| <Subcontracting 7> | $ | |||
| <Subcontracting 8> | $ | |||
| <Subcontracting 9> | $ | |||
| <Subcontracting 10> | $ | |||
| Total | ||||
| OVERHEAD INDIRECT COST | ||||
| Overhead Indirect Type | Amount | |||
| <OH Indirect type 1>(ex. Manager Salaries) | $ | |||
| <OH Indirect type 2> (ex. Holiday Pay) | $ | |||
| <OH Indirect Type 3> (ex. Sick Leave) | $ | |||
| <OH Indirect Type 4> (ex. Travel) | $ | |||
| <OH Indirect Type 5> (ex. Rent) | $ | |||
| <OH Indirect Type 6> (ex. Telephone) | $ | |||
| <OH Indirect Type 7> | $ | |||
| <OH Indirect Type 8> | $ | |||
| <OH Indirect Type 9> | $ | |||
| <OH Indirect Type 10> | $ | |||
| Total | ||||
| Profit | Total | |||
| Subtotal * % | $ |
File details come from the government source that posted it. Updated .