Proposal Schedule

PROPOSAL SCHEDULE
RFP:W912ER21R0044
PROJECT:Bunker Retrofit IDIQ - Iraq
LOCATION:Iraq, Country Wide
CLIN NO.DESCRIPTIONQTYUNITUNIT PRICETOTAL
BASE CONTRACT
0001Pre-Procurement and Pre-Fabrication Activities, to include existing bunker inspection and reporting1JA
0002Bunkers requiring bulkhead and door system retrofits at Al-Asad Air Base. Concrete Infill.268EA
0003Bunkers requiring bulkhead and door system retrofits at Erbil Air Base. Concrete Infill.78EA
0004Bunkers requiring bulkhead and door system retrofits at Union III. Concrete Infill.58EA
TOTAL BASE COST (CLIN 0001 - 0004)1JA
OPTION ITEMS
0005Bunkers requiring bulkhead and door system retrofits at Al-Asad Air Base. Concrete Infill.4EA
0006Bunkers requiring bulkhead and door system retrofits at Erbil Air Base. Concrete Infill.11EA
0007Bunkers requiring bulkhead and door system retrofits at Baghdad Diplomatic Security Complex. Concrete Infill.7EA
0008Bunkers requiring bulkhead and door system retrofits at Union III. Concrete Infill.4EA
TOTAL OPTION COST (CLIN 0005 - 0008)1JA
TOTAL CONTRACT COST (CLIN 0001 - 0008)1JA
*OUSD has mandated that the "dollars" or "lump sum" units of measure no longer be used on DoD contracts. "JA" will be used for "LS"

&9&P of &N

Cost Breakdown Sheet

COST BREAKDOWN
RFP:W912ER21R0044
PROJECT:Bunker Retrofit IDIQ - IraqP2 -- 499393PROPOSER:
LOCATION:Iraq, Country WideDATE:
ITEMDESCRIPTIONLABOR MAN-HOURSDIRECT LABOR COSTDIRECT EQUIPMENT COSTDIRECT MATERIALS COSTDIRECT SUB CONTRACTOR COSTTOTAL DIRECT COSTJOOHOVERHEAD/ INDIRECT COSTPROFITTOTAL PROPOSED COST
BASE CONTRACT
0001Pre-Procurement and Pre-Fabrication Activities, to include existing bunker inspection and reporting
0002Bunkers requiring bulkhead and door system retrofits at Al-Asad Air Base. Concrete Infill.
0003Bunkers requiring bulkhead and door system retrofits at Erbil Air Base. Concrete Infill.
0004Bunkers requiring bulkhead and door system retrofits at Union III. Concrete Infill.
TOTAL BASE COST (CLIN 0001 - 0004)
OPTION ITEMS
0005Bunkers requiring bulkhead and door system retrofits at Al-Asad Air Base. Concrete Infill.
0006Bunkers requiring bulkhead and door system retrofits at Erbil Air Base. Concrete Infill.
0007Bunkers requiring bulkhead and door system retrofits at Baghdad Diplomatic Security Complex. Concrete Infill.
0008Bunkers requiring bulkhead and door system retrofits at Union III. Concrete Infill.
TOTAL OPTION COST (CLIN 0005 - 0008)
TOTAL CONTRACT COST (CLIN 0001 - 0008)

&"Arial,Bold"&12EXHIBIT 1 Page &P of &N

Sheet1

General Notes: This template is to be used for Certified Cost Data. A seperate form is needed for each CLIN. <BLUE Text> indicates items to be populated by the user. This template shows 10 lines under each section. If 10 are not needed, delete the lines that don't apply. If more are needed, add accordingly. If there is not a cost associated with the CLIN (ex. no Subcontacting), write N/A

CLIN Title (ex. CLIN no. 0001 Construct Power Plant)
Element of CostTotal
DIRECT LABOR COST$
DIRECT EQUIPMENT COST$
DIRECT MATERIAL COST$
DIRECT SUBCONTRACTING$
TOTAL DIRECT COST (Sub Total)$
OVERHEAD INDIRECT COST$
PROFIT$
Total Price
DIRECT LABOR COST
Labor CategoryRate/HrHoursTotal
<Labor 1> (ex. Excavator)$$
<Labor 2>$$
<Labor 3>$$
<Labor 4>$$
<Labor 5>$$
<Labor 6>$$
<Labor 7>$$
<Labor 8>$$
<Labor 9>$$
<Labor 10>$$
Total
DIRECT EQUIPMENT COST
Equipment TypeRate/HrHoursTotal
<Equipment 1> (ex. 20 Ton Crane)$$
<Equipment 2>$$
<Equipment 3>$$
<Equipment 4>$$
<Equipment 5>$$
<Equipment 6>$$
<Equipment 7>$$
<Equipment 8>$$
<Equipment 9>$$
<Equipment 10>$$
Total
DIRECT MATERIAL COST
MaterialsQuantityUnitUnit PriceTotal
<Material 1> (ex. 8x8x16 CMU)m2$$
<Material 2>$$
<Material 3>$$
<Material 4>$$
<Material 5>$$
<Material 6>$$
<Material 7>$$
<Material 8>$$
<Material 9>$$
<Material 10>$$
Total
DIRECT SUBCONTRACTING COST
SubcontractingTotal
<Subcontracting 1> (ex. Specialized Communication work)$
<Subcontracting 2>$
<Subcontracting 3>$
<Subcontracting 4>$
<Subcontracting 5>$
<Subcontracting 6>$
<Subcontracting 7>$
<Subcontracting 8>$
<Subcontracting 9>$
<Subcontracting 10>$
Total
OVERHEAD INDIRECT COST
Overhead Indirect TypeAmount
<OH Indirect type 1>(ex. Manager Salaries)$
<OH Indirect type 2> (ex. Holiday Pay)$
<OH Indirect Type 3> (ex. Sick Leave)$
<OH Indirect Type 4> (ex. Travel)$
<OH Indirect Type 5> (ex. Rent)$
<OH Indirect Type 6> (ex. Telephone)$
<OH Indirect Type 7>$
<OH Indirect Type 8>$
<OH Indirect Type 9>$
<OH Indirect Type 10>$
Total
ProfitTotal
Subtotal * %$