CAD_x-1_arch_231128-hh.dwg

DWG drawing 8 MB Posted

Attached to
Prequalification for Purchase of Custom Furniture (FF&E) Bid
Solicitation number
2026-059
Issued by
Los Angeles County, California

About this file

This is an architectural drawing (CAD file) for Mt. San Antonio College's Technology and Health Building project, a prequalification bid for custom furniture (FF&E) procurement in California. The project involves the design and procurement of furniture for a new four-story, 273,000-square-foot instructional facility that will consolidate programs currently distributed across six separate locations, including modular buildings, the Health Careers facility, and existing Technology buildings. The facility will support 10 departments and 26 academic programs and is designed to be the largest instructional facility of any community college in California. Contractors are being evaluated at the prequalification stage for their qualifications, experience, licensing, and ability to perform the scope of work, with only those who successfully meet prequalification requirements and receive formal approval from the College invited to participate in the subsequent main project solicitation. The attachments provided, including this architectural drawing, are for reference and informational purposes only to assist contractors in understanding the project's general scope, complexity, and anticipated requirements.

The furniture design philosophy emphasizes creating a dynamic, forward-thinking educational environment with flexible, strategically placed furnishings that showcase the identity of each program through visually distinct, branded spaces reflecting the character and purpose of the disciplines they serve. This prequalification procurement is intended to identify qualified vendors capable of delivering custom furniture solutions that align with the College's vision for an innovative learning environment. Specific pricing terms, set-asides, contract duration, and funding sources are not detailed in the prequalification announcement stage, as these elements will be finalized during the subsequent main project solicitation process for approved prequalified contractors.

Other files

File Type Posted
Prequalification_for_Purchase_of_Custom_Furniture_(FF&E)_Bid.pdf PDF
Prequalification_Application_(rev_06-2026).pdf PDF
Written_Specifications.pdf PDF
FF&E_Phase_II_Schedule.pdf PDF
CAD_x-2_arch_231128-HH.dwg DWG drawing
CF1_SCE_Reception_Spec.pdf PDF
CAD_1_Furn_Bid_2.dwg DWG drawing
CT1A_CT1B_Custom_Work_Table.pdf PDF
CF2_Division_Reception_Spec.pdf PDF
WT3_Work_Table.pdf PDF
RB1_Residential_Bed.pdf PDF
WT4A_WT4B__Work_Table.pdf PDF
CAD_4_Furn_Bid_2.dwg DWG drawing
WT1A_WT1B_Work_Table.pdf PDF
CAD_2_Furn_Bid_2.dwg DWG drawing
Furniture_Plan_Color_Coded.pdf PDF
WT2_Work_Table.pdf PDF
CAD_x-4_arch_231128_HH.dwg DWG drawing
Furniture_Log.pdf PDF
MSR1_Sheet_Rack.pdf PDF
Custom_Furniture_-_Standard.zip ZIP file
00430_Payment_Bond_Revised_Sample.pdf PDF
00420_Performance_Bond_Revised_sample.pdf PDF
Mt._SAC_-_Template_Field_Services_Contract.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .