C8 Attachment 8 Growth Management Request Form.docx
DOCX document 28 KB Posted
- Attached to
- Maintenance, Repair, and Preservation YT-802
- Solicitation number
- N4523A26Q1002
About this file
This document is a Growth Management Request Form for Solicitation N4523A26Q1002, related to maintenance and repair of the YT-802 vessel at Puget Sound Naval Shipyard and Intermediate Maintenance Facility. The form is designed to document and track potential contract modifications, with sections for statement of work requirements, pricing calculations, and approvals from the contractor, project manager, and contracting officer.
The associated federal contract opportunity is a 100% Small Business set-aside for maintenance, repair, and preservation of a 93-foot steel vessel. The scope includes comprehensive vessel maintenance activities such as cleaning, zinc anode replacement, blasting and preserving various vessel surfaces, conducting ultrasonic and visual inspections, repairing hull and winch valves, replacing hydraulic hoses, and managing tank systems. The vessel availability is scheduled from 01 July 2026 to 24 September 2026, with work to be performed in the Puget Sound, WA region, specifically between Olympia and Bellingham, Washington.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N4523A26Q1002 Growth Management Request Form
| Request Number: |
| Ship/Hull: |
| SOW Para(s): |
| CFR Number(s): |
YT-802 Valiant
| Prepared by COR: | Date: | |||
| Period of Performance: | to | CLIN(s) | ACRN: | |
| Growth Management Process Utilized |
N/A Small Dollar Value Growth
Authorized N/A of N/A
X Level Of Effort (LOE) to Completion
1. Statement of Work Requirements:
1.1 Scope:
1.2 Location of Work:
2. References:
3. Requirements:
4. Government Furnished Material (GFM):
Price for Statement of Work Requirements Small Dollar Value Growth Pre-Priced Amount per Occurrence $__N/A_____
OR
LOE to Completion:
Contractor proposal for work under this request must be completed with the current period of performance unless a schedule revision is included in the terms.
| Contractor Estimate: |
| Labor (MHs): |
| Material ($): |
| Subcontractor ($): |
| Total Price (Fully Burdened): |
| Negotiated Price: |
| Labor (MHs): |
| Material ($): |
| Subcontractor ($): |
| Total Price (Fully Burdened): |
Total price calculations are based upon the formulary established for work items in the base contract; see rates contained under Section B, Note C of the contract.
Agreement to Negotiated Price:
Date:
PSNS Project Manager / Agreement to Negotiated Amount
Date:
Contractor Representative / Agreement to Negotiated Amount
| Date: | ||
| PSNS Contracting Officer / Agreement to Negotiated Amount | Growth Mgmt. Effective Date |
Final Acceptance / Completion of Work Signatures:
Date:
Contractor Representative
Date:
PSNS Contracting Officer’s Representative
File details come from the government source that posted it. Updated .