C8 Attachment 2 Price Proposal Worksheet.xlsx

XLSX spreadsheet 99 KB Posted

Attached to
Maintenance, Repair, and Preservation YT-802
Solicitation number
N4523A26Q1002
Issued by

About this file

This is a price proposal worksheet for a naval vessel maintenance contract for the YT-802. The document is an Excel spreadsheet designed for contractors to complete detailed pricing information across multiple work package categories, including labor hours, rates, and cost breakdowns. The worksheet contains multiple tabs for labor mix, rates, and pricing, with instructions specifying that only yellow-highlighted cells should be filled out by the contractor.

The pricing template covers an extensive range of maintenance and repair activities for the YT-802, including hull preservation, deck repairs, tank inspections, hydraulic system repairs, trials, and various other technical maritime services. The document is part of a 100% Small Business set-aside solicitation (NAICS 3366) by the Department of the Navy Naval Supply Systems Command, with the vessel availability scheduled from 01 July 2026 to 24 September 2026. Contractors are required to provide detailed labor category information, hourly rates, and cost calculations across numerous specific work items and paragraphs of the statement of work.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instruction Sheet

Instructions for Contractors for Filling-out J-2 Price Proposal Worksheet

All yellow fields are to be filled out by the Contractor prior to submittal to The Government.
DO NOT FILL IN ANY CELL THAT IS NOT BRIGHT YELLOW.
Labor Mix & Rates Sheet
1Enter Company Name and Date
2Fill in each rate in its applicable yellow cell
3Fill in each labor category and ensure all yellow boxes are filled in
a.Example Labor Categories
Shipfitter
Sheetmetal
Welder/Burer
Electrician
Inside Machinist
Outside Machinist
Boilermaker
Pipefitter
Insulator/Lagger
Shipwright/Carpenter
EX/Ord
Painter/Blaster
Rigger/Laborer
QA/NDT
4Next, fill in each yellow cell for Regular Labor Hours and Overtime Labor Hours
5Your Total Direct Labor Rate Per Hour will autopopulate in each sheet. All other rates entered will also auto populate.
Price Proposal Worksheet
1All company and contract information and rates will be autopopulated from previous sheet.
2Fill in each yellow cell with its applicable information
3Anything that is not in yellow is locked, these cells will auto-calculate.
4Before submitting, ensure there are no more bright yellow cells.
IF USING FCCOM
Facilities Capital Cost of Money (FCCOM) is not required. If you are not inputting FCCOM please enter N/A in all cells. However, if your company is inputting FCCOM, it needs to be calculated based on the proper CASB-CMF form. Please include the CASB-CMF form with your submission.
Labor Hour Breakdown
1Enter each labor categoy will autofill from the "labor Mix & Rates" sheet
2Fill in each Regular and Overtime hour for each labor category and line item.

Labor Mix & Rates

Contractor/Company Name:
Project/Vessel Name:YT-802Date:

Base Rates: Regular Labor ERROR:#DIV/0! Fringe Overhead G&A Profit FCCOM

Labor Mix and Rates

Labor Category Regular Hours Overtime Hours Total Category Hours Total Regular $/hour Total Overtime $/hour Total Category Dollars

0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
Column Totals000$0.00$0.00$0.00

Direct Labor Rate Per Hour ERROR:#DIV/0!

Example Labor Categories Shipfitter Sheetmetal Welder/Burer Electrician Inside Machinist Outside Machinist Boilermaker Pipefitter Insulator/Lagger Shipwright/Carpenter EX/Ord Painter/Blaster Rigger/Laborer QA/NDT

YT-802

Contractor/Company Name:0
Project/Vessel Name:YT- 802Date:12/31/99

Base Rates: Labor ERROR:#DIV/0! Fringe 0.00% Overhead 0.00% G&A 0.00% Profit 0.00% FCCOM 0.00%

Base Work Package Proposal
PARAGRAPH No.TITLEPRIMESUBCONTRACTOROther Direct Cost (ODC)*PRIMELine Item Total
M/HLabor CostMATERIAL PRICETOTALM/HLabor CostMaterial CostTOTALODCTravel ODCTOTALFringeOverheadG&AProfitFCCOM
1.4Arrival ConferenceERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.5Required DocumentsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.6Progress MeetingsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.7Availability RequirementsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.7.1Transportation of Vessel(s)ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.7.2Provide Metered Electrical ServiceERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.7.3Provide Office SpaceERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.8Care of VesselERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.17Enviromental & Hazwaste ManagementERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.22Gas FeeERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.23General Requirements for TestingERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
1.24Compartment Arrival / Closeout InspectionsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.1.1Personnel and EquipmentERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.1.2Docking ProceduresERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.1.3Blocking PlanERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.1.4Crib and Brace BlockingERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.1.5Setting and Alignment of Docking BlocksERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.1.6Stability CalculationsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.1.7Docking ConferenceERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.1.8Docking the VesselERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.1.9Post DockingERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.1.10Shifting the VesselERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.1.11Undocking the VesselERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.1.13Final Docking ReportERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.2.1Hull ID Figures and MarkingsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.2.2Rubber FendersERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.2.3Hull AnodesERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.2.4Hull Blast and PreservationERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.2.5Hull and Freeboard Visual InspectionERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.2.6Hull Freeboard UT InspectionERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.3.1Port and STBD Life Raft Mount ModificationERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.3.2Install New Life RaftERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.1Black Water Tank PCP (CHT)ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.2Open, Pump, Clean, Ventilate and Gas Free Tanks/VoidsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.3Tank/Void Visual Inspection (VT)ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.4Identify Color Schemes and MarkingsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.5Preliminary Air TestERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.6Tank/Void Touch-Up PreservationERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.7Install Access CoversERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.8Clean, Flush, and Disinfection of Potable Water SystemERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.9Certification of Potable Water Piping and TankERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.10Final Air TestERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.11Tank/Void Closeout InspectionERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.4.12On-Load FuelERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.5.1Main Deck Non-Skid RepairERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.5.2Visual Inspection for Structural DefectsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.1Deck House Expansion Joint RepairsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.2Wheelhouse Deck, Wheelhouse Roof, and Forward Stair Landings Non-Skd RepairERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.3Deckhouse, Pilothouse, Mast Preservation, Bulwarks, and Handrail PreservationERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.4Install Air Handler Splash GuardsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.5Mast Hydraulic Hose RepairERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.7.1Schottel Z-Drive RepairsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.9.1Replace Fresh Air Make Up UnitERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.11.1Sea ValvesERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.11.2Ship Firefighting Piping RepairERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.11.3Sea Chest Piping RepairERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.12.1Deck Winch Hose RepairsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.13.1Operational ResponsibilityERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.13.2Sea Trial Baseline TestingERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.13.3Dock TrialsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.13.4Sea TrialsERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.13.5Post Sea TrialERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.5.10ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.5.11ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.5.12ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.5.13ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.5.14ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.5.15ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.5.16ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.5.17ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.5.18ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.5.19ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.5.20ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.1ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.2ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.3ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.4ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.5ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.6ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.7ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.8ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.9ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.10ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.11ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.12ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.13ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.14ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.15ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.16ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.6.17ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.9.1ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.9.2ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.9.3ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.9.4ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.9.5ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.10.1ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.10.2ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.10.3ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.10.4ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.10.5ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.10.6ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.10.7ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.10.8ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.10.9ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.10.10ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.10.11ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.11.1ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.11.2ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.11.3ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.11.4ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.11.5ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.11.6ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.11.7ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.11.8ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.13.1ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.13.1.3ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.13.1.4ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.13.1.5ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.13.2ERROR:#DIV/0!ERROR:#DIV/0!$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Column Totals0ERROR:#DIV/0!$0.00ERROR:#DIV/0!0$0.00$0.00$0.00$0.00$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!

Base Work Package ERROR:#DIV/0!

Level of Effort to Completion
PARAGRAPH No.TITLEM/HLabor CostMATERIAL PRICETOTALM/HLabor CostMaterial CostTOTALODCTravel ODCTOTALFringeOverheadG&AProfitFCCOMLine Item Total
Level of Effort (LOE) to Completion - Growth2,798ERROR:#DIV/0!$21,664.83ERROR:#DIV/0!$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Column Totals2,798ERROR:#DIV/0!$21,664.83ERROR:#DIV/0!$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Column Totals5596ERROR:#DIV/0!$43,329.66ERROR:#DIV/0!0$0.00ERROR:#DIV/0!$0.00$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!

Total LOE to Completion: ERROR:#DIV/0!

TOTAL PROPOSED PRICE: ERROR:#DIV/0!

ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
Column Totals0ERROR:#DIV/0!$0.00ERROR:#DIV/0!$0.000ERROR:#DIV/0!$0.00$0.00$0.00ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!

Total Option Items (O): ERROR:#DIV/0!

TOTAL PROPOSED PRICE: ERROR:#DIV/0!

Total LOE to Completion: ERROR:#DIV/0!

TOTAL PROPOSED PRICE: ERROR:#DIV/0!

*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

Labor Hour Breakdown

Contractor/Company Name:0
Project/Vessel Name:YT-802Date:12/31/99
Base Rates:Regular Labor RateERROR:#DIV/0!
NameRateTotal CostNameRateTotal Cost
Labor Hour Breakdown
PARAGRAPH No.TITLELabor CategoriesTotal Overall Labor Cost
000000000000000000Total Regular HoursTotal Overtime Hours
REGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOT
1.4Arrival Conference00ERROR:#DIV/0!
1.5Required Documents00ERROR:#DIV/0!
1.6Progress Meetings00ERROR:#DIV/0!
1.7Availability Requirements00ERROR:#DIV/0!
1.7.1Transportation of Vessel(s)00ERROR:#DIV/0!
1.7.2Provide Metered Electrical Service00ERROR:#DIV/0!
1.7.3ERROR:#REF!00ERROR:#DIV/0!
1.8Provide Office Space00ERROR:#DIV/0!
1.17Enviromental & Hazwaste Management00ERROR:#DIV/0!
1.22Gas Fee00ERROR:#DIV/0!
1.23General Requirements for Testing00ERROR:#DIV/0!
1.24Compartment Arrival / Closeout Inspections00ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
3.1.2Personnel and Equipment00ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
3.1.4Crib and Brace Blocking00ERROR:#DIV/0!
3.1.5Setting and Alignment of Docking Blocks00ERROR:#DIV/0!
3.1.6Stability Calculations00ERROR:#DIV/0!
3.1.7Docking Conference00ERROR:#DIV/0!
3.1.9Post Docking00ERROR:#DIV/0!
3.1.10Shifting the Vessel00ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
3.1.11Undocking the Vessel00ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
3.1.13Final Docking Report00ERROR:#DIV/0!
3.2.1Hull ID Figures and Markings00ERROR:#DIV/0!
3.2.2Rubber Fenders00ERROR:#DIV/0!
3.2.3Hull Anodes00ERROR:#DIV/0!
3.2.4Hull Blast and Preservation00ERROR:#DIV/0!
3.2.5Hull and Freeboard Visual Inspection00ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
3.2.6Hull Freeboard UT Inspection00ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
3.4.1Black Water Tank PCP (CHT)00ERROR:#DIV/0!
3.4.2Open, Pump, Clean, Ventilate and Gas Free Tanks/Voids00ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
3.4.3Tank/Void Visual Inspection (VT)00ERROR:#DIV/0!
3.4.4Identify Color Schemes and Markings00ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
3.4.5Preliminary Air Test00ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
3.4.6Tank/Void Touch-Up Preservation00ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
3.4.7Install Access Covers00ERROR:#DIV/0!
3.4.8Clean, Flush, and Disinfection of Potable Water System00ERROR:#DIV/0!
3.4.9Certification of Potable Water Piping and Tank00ERROR:#DIV/0!
3.4.10Final Air Test00ERROR:#DIV/0!
3.4.11Tank/Void Closeout Inspection00ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
3.4.12On-Load Fuel00ERROR:#DIV/0!
3.5.1Main Deck Non-Skid Repair00ERROR:#DIV/0!
ERROR:#REF!ERROR:#REF!00ERROR:#DIV/0!
3.13.3Dock Trials00ERROR:#DIV/0!
3.13.4Sea Trials00ERROR:#DIV/0!
3.13.5Post Sea Trial00ERROR:#DIV/0!
3.5.10000ERROR:#DIV/0!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!$0.00ERROR:#REF!
Column Totals00000000000000000000000000000000000000ERROR:#DIV/0!

Base Work Package ERROR:#DIV/0!

OPTION YEAR TABLE IF NEEDED:

Labor Hour Breakdown
PARAGRAPH No.TITLELabor CategoriesTotal Overall Labor Cost
000000000000000000Total Direct HoursTotal Overtime Hours
REGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOT
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
0000ERROR:#DIV/0!
Column Totals00000000000000000000000000000000000000ERROR:#DIV/0!

Total Option Items (O): ERROR:#DIV/0!

TOTAL DIRECT LABOR COSTS BY WORK ITEM ERROR:#DIV/0!

File details come from the government source that posted it. Updated .