C5_5__Combined_Synopsis_Solicitation.pdf
PDF 497 KB Posted
- Attached to
- CGB-400 IMT GIS Technical Service Support
- Solicitation number
- 140R2026Q0014
About this file
Combined Synopsis/Solicitation for GIS Technical Service Support
This is a Combined Synopsis/Solicitation for a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside issued by the Bureau of Reclamation, Interior Region 10 (California-Great Basin). The solicitation number is 140R2026Q0014, classified under NAICS 541611 with a size standard of $24.5 million. Quotations are due no later than August 6, 2026, at 11:00 AM Pacific Daylight Time, submitted via email in PDF format to erma_clark@ios.doi.gov. The Government intends to award a hybrid Firm Fixed Price and Time and Materials (for travel) contract for Geographic Information System (GIS) Technical Service Support to operate the CGBGIS Service Center serving the California Great-Basin Region and supporting Reclamation's nationwide geospatial enterprise activities (BORGIS).
The contract requires four personnel positions: Consulting GIS Specialist (Service Center Manager/Site Supervisor/Application Developer), GIS Specialist–Production, GIS Specialist–Senior, and GIS Specialist. The first two positions must be 100% on-site at 2800 Cottage Way, Sacramento, California; the latter two are remote-optional within a 50-mile radius of DOI BOR facilities in the 17 Western states. Key deliverables include weekly progress reports, bimonthly invoices and management reports, digital/paper products from tasking documents, authorized training and travel, and GIS enhancement recommendations. The contract period is one six-month base period plus two twelve-month option years (30 months total). Core services encompass software/application development, analysis and modeling, positioning and data acquisition, end-user support, systems management, travel, planning, operations, development, maintenance, training, and reporting. All data, code, and products created become U.S. Government property in the public domain. Security requirements include background investigations, Personal Identity Verification (PIV) cards, facility access compliance, and handling of sensitive/controlled unclassified information per Reclamation standards.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Combined Synopsis/Solicitation 140R2026Q0014
CALIFORNIA GREAT BASIN (CGB-400) GEOGRAPHIC INFORMATION SYSTEM (GIS)
TECHNICAL SERVICE SUPPORT
Contracting Office:
Bureau of Reclamation Interior Region 10 • California-Great Basin
Acquisitions and Services Division Supply and Services Branch
Sacramento CA, 95825
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.202 included in this notice. The Bureau of Reclamation intends to award a hybrid of Firm Fixed Price (FFP) and Time and Materials (T&M for Travel) Purchase Order for Geographic Information System (GIS) Technical Service Support as represented in the Performance Work Statement (PWS). This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation will not be issued. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-01 as of March 13, 2026.
This requirement is being solicited as a total set aside Service-Disabled Veteran-Owned Small Business
(SDVOSB).
SECTION A - GENERAL INFORMATION
Solicitation Number: 140R2026Q0014
Request for Quotation (RFQ) Request for Proposal (RFP) Invitation for Bid
(IFB)
North American Industry Classification Code (NAICS): 541611 Size Standard: $24.5 million
Offerors must be registered in System for Award Management (SAM.gov) with completed Representations and Certifications by the closing date of the solicitation in order to be considered for award. SAM is an official website of the U.S. Government and there is no cost to register in SAM.gov.
Submission is due no later than (NLT) August 6, 2026, at 11:00 AM Pacific Daylight Time
Quote Submission: By email to erma_clark@ios.doi.gov. Ensure ALL documents are in .pdf format.
Contact Information: Erma Clark
Quote shall be valid for 90 days from the submission due date.
Documents necessary for quote submission are as follows:
1. Completed and signed page 3 of this document.
2. Completed Pricing Schedule (Attachment 1)
Please see further instructions for quote submission under 52.212-1 and 52.212-2 on pages 43 to 45 of this document.
mailto:erma_clark@ios.doi.gov
VENDOR INFORMATION
Business Name: _______________________________
Business Point of Contact (POC): _______________________________
UEI Number/Cage Code: ______________________
GSA Contract Number: __________________________
Authorized POC Signature: ______________________
Business Size (select one): Large Small
PERFORMANCE WORK STATEMENT (PWS)
GEOSPATIAL INFORMATION SYSTEMS (GIS) TECHNICAL SUPPORT
1. BACKGROUND
This PWS is provided to establish requirements for Bureau of Reclamation (Reclamation/BOR) Geospatial Information Systems (GIS) technical support principally for the California Great-Basin (CGB) Region.
GIS is a complex system of databases and software applications (including but not limited to: Global Positioning Systems, Computer-Aided Drafting, and Environmental Systems Research Institute (ESRI) software and applications) to capture, store, check and display, analyze data, and produce information related to the surface of the Earth. The data exists as tables, models, maps, and spectral imagery. Geospatial data has a unique component in that it can show relationships between tabular data sets. Its purpose is to support Reclamation’s mission and programs and their analytical needs.
2. OBJECTIVE
To operate the CGBGIS Service Center for the CGB Region of Reclamation. This includes developing and maintaining the regional spatial resources enterprise databases and Reclamation-wide enterprise data to meet Reclamation’s objectives and comply with Federal Government policies that concern data. Service support includes providing GIS and related technologies for the CGB Region in the following categories:
2.1. GIS Technical Service (Firm Fixed Price)
2.1.1. Software and Application Development
Design and development of geospatial software and applications, including GIS software products, applications for processing, analysis, or adding value to remotely sensed data, and applications to automate routine tasks and to customize end-user interfaces.
2.1.2. Analysis and Modeling
Application of analytical functions (exploratory analyses as well as model-driven analyses) of geospatial software tools.
2.1.3. Positioning and Data Acquisition
Knowledge of the unique geometric and thematic properties of geospatial data, the factors that affect data quality, and data production technologies. This includes data collection, data capture methods and technologies used to collect georeferenced observations and measurements along with the development of metadata on all data created that is to adhere to the Federal Geographic Data Committee (FGDC) International Organization for Standardization (ISO).
2.1.4. End-user Support
Provide a Reclamation Help Desk and ESRI enterprise technical support/service.
2.2. Systems Management (Firm Fixed Price)
Includes but not limited to management of the Department of Interior (DOI) cloud server system, systems configurations for GIS and database technology, and management of ArcGIS servers which are to include the web servers. The Contractor shall work closely with Reclamation IT and or DOI Cloud IT to ensure the integrity of the system.
2.3 Travel (Time and Materials)
The Contractor may participate in key GIS project and development meetings, including BORGIS meetings and Geospatial Technical Team meetings, conferences, and/or training sessions which are located outside of the CGB region.
Approval to participate and secure travel must be requested to the Chief of Land Resources no less than thirty (30) days prior to confirming attendance.
All travel must be in accordance with (IAW) Federal Acquisition Regulation (FAR) 31.205-46 Travel Costs and only actual expenses will be reimbursed and shall not exceed the proposed.
3. TASKS
3.1. Planning
The Contractor shall conduct ongoing investigation and analysis of current and emerging technologies and report on their relevance and applicability to the geospatial resources field in support of Reclamation’s mission, programs, and operational priorities. Utilize planning as a tool to keep all CGBGIS Service Center systems operational and available for integration as technologies emerge. The Contractor shall work with Reclamation planners and managers in using resources of the CGBGIS Service Center to meet Reclamation’s mission.
3.2. Operations
The Contractor shall ensure proper operation of government provided GIS related supplies and equipment (GIS systems, equipment and software) and ongoing management of Geospatial Cloud services, systems/network administration, and load balancing.
3.3. Development
The Contractor shall provide GIS application development, studies, modeling, map work, proximity analysis, web services including ArcGIS online for the Region and at times Reclamation programs at the Enterprise level (Reclamation-wide). Reclamation will become the owner of any developed programs/applications as part of this effort.
3.4. Maintenance
The Contractor shall perform maintenance on the GIS systems and shall collaborate, coordinate with Reclamation IT staff in routine maintenance and/or replacement of servers, system configuration, backups, security, web services, geospatial database maintenance, ArcGIS online, printer/plotter maintenance and other equipment necessary to meet the present and future needs of Reclamation.
3.5. Training
The Contractor shall collaborate, coordinate, and train Reclamation IT staff in routine maintenance of GIS systems and data structure/configuration to ensure that the necessary backups, security, web services, and geospatial database maintenance is performed to ensure continuity of the data over time.
Additionally, the Contractor shall provide training or assist in the coordination of training for Reclamation staff and GIS users of current software applications and provide the technical user support to those users.
3.6. Travel
The Contractor may participate in key GIS project and development meetings, including BORGIS meetings and Geospatial Technical Team meetings, to provide training and support at the Cottage Way Federal Building, CGB Area Offices, field offices, and other locations within the continental United States. The Government will provide advance notice of any projected travel within the CGB region, and no unplanned trips to area or field offices will occur. If travel outside the CGB region is deemed necessary, the Contractor must request approval from the Chief of Land Resources no less than thirty
(30) days prior to confirming attendance.
The following locations are CGB field and area offices which the Contractor may travel to:
CGB Area/Field Office Address Klamath Basin Area Office (KBAO) 6600 Washburn Way
Klamath Falls, OR 97603 Northern California Area Office (NCAO) 16349 Shasta Dam Blvd.
Shasta Lake, CA 96019 Central California Area Office (CCAO) 7794 Folsom Dam Rd.
Folsom, CA 95630 South Central California Area Office (SCCAO) 1243 N St.
Fresno, CA 93721 Lahontan Basin Area Office (LBAO) 705 North Plaza St.
Carson City, NV 89701 Bay Delta Office (BDO) 801 I St., Suite 300
Sacramento, CA 95821 Central Valley Operations Office (CVOO) 3310 El Camino Ave., Suite 300
Sacramento, CA95821 Regional Construction Office (RCO) 1140 W Wood St.
Willows, CA 95988 Trinity River Restoration Program Office
(TRRPO)
1313 South Main Street Weaverville, CA 96093
3.7. Reporting
The Contractor shall prepare a Weekly Progress/Status and a monthly Management Report/Invoice and shall deliver to COR by documenting accomplishments, plans, program changes, problems, expenditures, and issues for the reporting period.
4. SCOPE
The scope of this work effort supports the CGBGIS Service Center and Reclamation geospatial enterprise activities (BORGIS) which encompasses the seventeen (17) Western states (Attachment 4). BORGIS is identified as a Reclamation critical business system and CGBGIS is the California Great-Basin Region’s component of BORGIS. The contractor shall provide GIS experienced personnel to operate and maintain (system administration) the GIS data, server environment, and support Reclamation programs, activities, and projects with digital and paper deliverables (maps, tables, geospatial data analyses, narrative reports, PowerPoint slides, GIS and web services applications) such as:
• Enterprise technical support for end users throughout the Region and Reclamation.
• Management of Region’s geospatial data bases.
• Flood inundation studies and Emergency Action Plan (EAP) updates and exercises.
• Land classification, ownership, and land use (cropping patterns) relationships.
• Surface and groundwater modeling support (e.g., CALSIM, total wetting, watershed).
• Internal and Web-based GIS services and ESRI applications (e.g., ArcGIS Field Maps, Dashboards, Arc GIS Online and other software).
• Compliance/enforcement of water & land use contracts.
• Water deliveries and transfers monitoring and adjustments.
• District boundary, PLSS, and ownership data and map development for property appraisals, Reclamation land resources management.
• Inclusion/exclusion of lands in water user organizations, including tabulation of acreages and adjustment of boundaries.
• Reclamation land records management.
• Global climate change activities and development of facilities operations models.
• Drainage Program analysis and map work, including model and groundwater mapping and modeling
• Land use planning includes but not limited to RMPs, EISs, Feasibility Studies, and project plans.
• Identification of habitat for Endangered Species Act (ESA) compliance with water contracting program.
• Proximity analysis for earthquake response/disaster response assessment programs
• Field Collection map/data preparation
COMBINED SYNOPSIS/SOLICITATION
5. DESCRIPTION
The work performed by the CGB GIS Service Center staff will involve expert use of the ESRI GIS software suite. Reclamation uses an extensive library of natural resource and engineering databases as they relate to water resource management and environmental modeling, The tasks are centered on analysis, development and maintenance of spatial databases, development of applications using but not limited to the following programming languages: VB.net, C#, Javascript/HTML, ASP.net, MVC, ArcObjects/COM, Python, and Arcade. Understanding of frameworks such as Bootstrap, Breeze, JQuery and or Dojo. Other tasks include web-based services, map development and reporting. This includes integrating environmental models (e.g., DHI models, CALSIM, LTC) with GIS, developing links to external databases from the ArcGIS environment and designing user interfaces and helping maintain a sound GIS enterprise environment. Some of the work will also involve the use of Remote Sensing technology. The work performed will require in-depth use of computer hardware and software architecture, including peripheral devices normally used by GIS such as network printers, scanners, and GPS units and other data collection technologies. A thorough understanding of computer architecture and networks is desirable, as the work occasionally requires system management tasks to be performed such as GIS software upgrades, and operating system maintenance.
6. SECURITY
The work defined in this contract is UNCLASSIFIED but involves working with SENSITIVE information with some frequency. This requires that new employees have a completed NAC (National Agency Check) and, at Reclamation’s discretion, the NACI (National Agency Check with Inquiries) prior to reporting for work. Higher clearance levels will be determined on a case-by-case basis. Incumbent employees must maintain existing clearance levels. All contract employees must comply with Reclamation Information Technology (IT) Security Program (ITSP): IT Security Awareness and Training Requirements as described in Directives and Standards IRM 08-09 (http://www.usbr.gov/recman/irm/irm08-09.htm) and WBR 1452.237-80 Security Requirements, Information Technology - Bureau of Reclamation (Oct 2006) Contract employees shall comply with Homeland Security Presidential Directive (HSPD-12 and FIPS 201) and Reclamation procedures associated with Personal Identity Verification cards. On a case-by-case basis, contracted employees may be required to sign non-disclosure agreement (NDA) when tasked to work on sensitive assignments.
7. PERSONNEL REQUIRED
The California Great-Basin GIS Service Center is set up to deliver services and support the CGB Region and Reclamation’s GIS related technologies activities as a complete cost recovery activity. The following GIS positions are required:
A. Consulting GIS Specialist - Service Center Manager and Site Supervisor/Application Developer* B. GIS Specialist – Production* C. GIS Specialist – Senior D. GIS Specialist
* Asterisked positions are required to be on site at 2800 Cottage Way in Sacramento, CA each work day and are positions for which no personnel substitutions may be made without prior approval by the Contracting Officer (CO) or his/her designee.
7.1. Position Descriptions and Requirements
6.1.1 Consulting GIS Specialist (Service Center Manager and Site Supervisor/Application Developer):
Management of the day-to-day operations and workload of the CGBGIS Service Center staff.
Provides support services associated with Contractor staff such as payroll, billing, benefits programs, health care programs, human resources, travel and training. Coordinates GIS staff efforts to implement Reclamation’s policies and directives by scheduling and assigning tasks and duties to GIS programmers, production specialists and technicians. Oversees GIS operations support and operator training. Provides supervisory and administrative direction on production tasks, including the review of output for accuracy, adherence to design concepts and user standards, and for progress in accordance with work schedules. Supervises the updating and maintenance of the GIS databases. Ensures databases’ integrity and user access to the databases are maintained in accordance with the CGBGIS Management Plan.
In addition to the position requirements for GIS Senior Specialists, the suggested minimum training and education includes the following (NOTE: Comparable work experience is acceptable):
1. BA/BS in Geography, Natural Resources Management, Earth Sciences, Engineering, or Computer Sciences.
a. Systems and network administration supporting GIS CAD operations.
b. Database management operations analyzing GIS systems requirements and defining work requirements.
c. Designing and developing GIS production and user interface tools.
d. Analyzing, designing, and developing GIS program language components to produce, test, and implement mathematical modeling systems functions.
e. Estimating costs for GIS tasks to include staffing and hardware utilization requirements.
f. Projecting GIS Service Center workloads and recommending hardware and software upgrades to meet upcoming requirements.
g. Developing Enterprisesystems and applications using ESRI server technologies that include Javascript, API, and ArcGIS Online.
6.1.2 GIS Specialist (Production):
Coordinates with hardware or software vendors to ensure problem free hardware/software environment. Implements quality control procedures. Oversees all procedures performed by associate specialists and data technicians. Monitor and ensure proper data backups. Approve and release final product databases, maps and reports when appropriate and as delegated by the Service Center Manager.
Assists Service Center Manager and Assistant Manager in preparing and implementing user and project setup, accounting, and security. Performs mapping and database management functions on a variety of Reclamation projects. Creates schemas and workflow procedures for the enterprise operation. Manages various data collection technologies. Must have the ability to work independently, as well as within an interdisciplinary GIS Team.
In addition to the items outlined for GIS Specialists, the suggested minimum training and education includes the following (NOTE: Comparable work experience is acceptable):
2. 3 years of more of Python, Arcade, and/or Modelbuilder.
3. Successful completion of any combination of the following ESRI training courses within the last two (2) years may be substituted for some of the following experience and/or time requirements:
a. Current ArcGIS Pro.
b. Building Geodatabases or like coursework.
c. Cartographic production.
d. ESRI 3D Creation/Analysis or Visualization coursework.
e. Modernizing field workflows using Fields for ArcGIS.
f. Demonstrated working knowledge of ArcGIS software suite to include ArcPro and Spatial Analyst.
g. Demonstrated geography, mapping, and cartography skills.
h. Experience with ArcGIS Server and ArcSDE configuration is desired.
i. ArcGIS Online administration.
6.1.3 GIS Specialist (Senior):
Performs systems analysis, concept and design, and program development, implementation, and documentation in the data processing specialty area of GIS. Prepares and implements user/project setup for any given GIS related project. Designs databases, automation and processing macros, and related analytical procedures. Maintains the application software, and the GIS databases. Performs digitizing tasks, as needed.
In addition to the items outlined for GIS Specialists, the suggested minimum training and education includes the following (NOTE: Comparable work experience is acceptable):
2. 3 to 5 years of GIS production work using ESRI software.
3. 3 years of more of Python, Arcade, and/or Modelbuilder.
4. Successful completion of any combination of the following ESRI training courses within the last two (2) years may be substituted for some of the following experience and/or time requirements:
a. Current ArcGIS Pro.
b. Building Geodatabases or like coursework.
c. Cartographic Production.
d. ESRI 3D Creation/Analysis or Visualization coursework
e. Enterprise Geodata Management or like coursework.
f. Modernizing field workflows using Fields for ArcGIS.
7.1.1. GIS Specialist:
Performs mapping and graphics and tabular data. Assists in database design, automation and processing macros related analytical procedures. Maintains and updates geodatabases. Reviews output for data accuracy and for adherence to end user’s output criteria. Assists with Arc GIS Online, maintains logs, records and files. Provides GIS assistance to Reclamation staff.
Suggested minimum training and education includes the following (NOTE: Comparable work experience is acceptable):
2. 3 to 5 years of GIS production work using ESRI software.
3. Coursework in cartography and/or graphic design.
4. Successful completion of any combination of 3 the following ESRI training courses within the past two years. This may be substituted for some of the experience and/or time requirements:
a. ArcGIS Pro.
b. Introduction of Geoprocessing Scripts Using Python.
c. Basics of Python.
d. Managing Lidar Data Using Mosaic Datasets.
e. Map Design Fundamentals.
f. Creating Prediction Surfaces in ArcGIS.
g. Building Geoprocessing Models Using ArcGIS Pro.
h. Creating and Sharing GIS Content Using ArcGIS Online.
i. User Workflows for ArcGIS Online Organizations.
8. DELIVERABLE(S)/DELIVERY SCHEDULE
The following table outlines the required contract deliverables. Each deliverable, except for the weekly report, shall specify the contract number, deliverable title, Contract Data Requirements List (CDRL)/Data Item Description (DID) number, due date, quantity, and distribution information.
Task Deliverable Frequency Receiver Remarks
3.7
Biweekly Progress and Status Report
(GIS Labor Admin.mdb)
Weekly COR
9. CONDUCT
The Contractor working on this contract shall conduct themselves in a professional manner and become familiar with all Government regulations as posted. If any complaints are received, they shall be investigated immediately and the issue either resolved or the Contractor violating the policy removed from the facility.
10. GOVERNMENT FURNISHED EQUIPMENT (GFE)/GOVERNMENT FURNISHED
INFORMATION (GFI)
The Government will provide one (1) issued laptop and two (2) computer monitors to each of the Contractor GIS personnel. An office printer and plotter is available for use.
Should it become necessary for the Contractor to temporarily relocate to another Federal building or office space at 2800 Cottage Way Sacramento, CA, the Government will continue to provide one (1) issued laptop and two (2) monitors to each of the Contractor GIS personnel. The Government will provide access to GIS program software and hardware components, architectures, designs, plans, information, and networks required to complete the required tasks.
11. TYPE OF CONTRACT
The government intends to award a hybrid Firm Fixed Price and Time and Materials (Travel) type of contract.
12. PERIOD OF PERFORMANCE
3.2, 3.3 Digital and or paper products identified as the appropriate end products from tasking documents
Variable as identified in tasking documents
COR
and end customer
Any documents appropriate to the type of products required including but not limited to e-mail, memo, project PWS or service level management.
3.7
Invoice of regular labor and Management Report
Bimonthly COR
3.5, 3.6, 3.7
Authorized Training and Travel
When approved by Chief of Land
Resources
COR
3.1, 3.4
Recommended GIS Enhancements
As Required
COR
The period of performance shall be for one (1) base period of six (6) months, and two (2) twelve (12) month option years. Total duration of contract is thirty (30) months.
13. HOURS OF OPERATIONS
The Contractor is responsible for conducting business between the hours of 8:00 am to 5:00 pm Pacific Standard Time (PST), Monday through Friday except Federal holidays or when the Government facility is closed due to administrative closings, or similar Government directed facility closings. In the event of a Federal, State or Locally declared emergency due to safety, natural or man-made event(s), it is expected the Contractor shall report for duty unless excused by the Chief of Land Resources. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
14. RECOGNIZED HOLIDAYS
New Year’s Day Martin Luther King Jr.’s Birthday President’s Day Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veteran’s Day Thanksgiving Day Christmas Day
The Contractor is not required to provide services on recognized holidays.
15. PLACE OF PERFORMANCE
The following two (2) positions are required to be 100% in office at the 2800 Cottage Way Federal building for the duration of their work day:
• Consulting GIS Specialist - Service Center Manager and Site Supervisor/Application Developer
• GIS Specialist – Production
The following two (2) positions are remote optional. If the incumbent of any of the following two (2) positions elects remote work, the assigned personnel must reside within a fifty (50) mile radius of a DOI BOR Federal building that is within the identified 17 Western states (Refer to Attachments 5 and 6) to ensure availability for any required IT support or onsite needs:
• GIS Specialist – Senior
• GIS Specialist
Remote personnel are not entitled to reimbursement when performing necessary initial onboarding tasks such as background screening, fingerprints, equipment issuances, software updates, initial Personal Identity
Verification (PIV) certifications and subsequent updates, or when seeking IT support due to connectivity issues. There is no guarantee that remote personnel will have a dedicated work space located at any of the DOI BOR Federal buildings aside from the 2800 Cottage Way Federal building. The privilege of working remotely may be revoked any time at the Government’s discretion.
A dedicated office space within the Division of Resource Management is available for all Contractor staff at the following location:
U.S. Bureau of Reclamation 2800 Cottage Way Sacramento, California 95825
16. IDENTIFICATION OF CONTRACTOR
All Contractor personnel require a DOI PIV card that must always be worn at all DOI BOR Federal buildings.
17. CONTRACTOR TRAVEL
Contractor may be required to travel to GIS training events, conferences, and/or meetings. While in travel status, the Contractor is required to attend in person. Prior approval by the Chief of Land Resources must be requested no less than thirty (30) days before confirming attendance. The Contractor must have valid driver’s license and REAL ID. The Contractor will only be reimbursed at the Federal per diem and continental United States (CONUS) rates for the locality. The Contractor is not authorized to drive Government vehicles.
17.1. Contractor Vehicle Use Clause
1. While travelling between sites, the Contractor shall track all miles for reimbursement.
The Contractor shall be reimbursed at the GSA-established standard mileage rate for all pre-authorized business travel. Information regarding Privately Owned Vehicle (POV) rates may be viewed at the following website: https://www.gsa.gov/travel/plan-a-trip
2. The Contractor shall provide to the COR a monthly vehicle log with mileage for reimbursement. This log will be supplied by the Government and signed off by the COR monthly.
3. The Contractor is required maintain valid automobile insurance that includes liability coverage meeting or exceeding the minimum requirements. Proof of insurance must be provided upon request.
4. The Contractor agrees to always operate their vehicle in a safe and lawful manner and to comply with all applicable traffic laws and regulations.
18. DATA RIGHTS
https://www.gsa.gov/travel/plan-a-trip
All data collected and created, all programming code/scripts created, all value added, and all products created are property of the United States and are in the public domain unless explicitly exempted by appropriate Federal law or regulation.
END OF PWS
SECTION C - COMMERICAL CLAUSES
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far/ http://www.acquisition.gov/far-overhaul
The clauses in the table below are hereby incorporated by reference:
52.252-2 Clauses Incorporated by Reference
FEB 1998
Clauses Title Date 52.203-3 Gratuities APR 1984 52.203-6 Restrictions on Subcontractor Sales to the Government – Alternate I
JUN 2021
52.203-12 Limitation on Payments to Influence Certain Federal Transactions
JUN 2020
52.203-17 Contractor Employee Whistleblower Rights. NOV 2023 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
JAN 2017
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (RFO DEVIATION)
MAR 2026
52.204-13 System for Award Management Maintenance (RFO DEVIATION)
MAR 2026
52.204-14 Service Contract Reporting Requirements (RFO DEVIATION)
MAR 2026
52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, Proposed for Debarment, or
Voluntarily Excluded
(RFO DEVIATION)
MAY 2026
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters
(RFO DEVIATION)
MAR 2026
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations
52.212-4 Alternate I
Terms and Conditions—Commercial Products and Commercial Services
52.219-8 Utilization of Small Business Concerns (RFO DEVIATION)
MAR 2026
http://www.acquisition.gov/far/ http://www.acquisition.gov/far-overhaul
52.219-14 Limitations on Subcontracting (RFO DEVIATION)
JAN 2026
52.219-27 Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-Owned Small Business (SDVOSB) Concerns Eligible
Under the SDVOSB Program
(RFO DEVIATION)
52.219-28
Postaward Small Business Program Rerepresentation.
52.222-3
Convict Labor (RFO DEVIATION)
52.222-19 Child Labor-Cooperation with Authorities and Remedies
52.222-35
Equal Opportunity for Veterans
52.222-36
Equal Opportunities for Workers with Disabilities (RFO DEVIATION)
52.222-37
Employment Reports on Veterans
52.222-40 Notification of Employee Rights Under the National Labor Relations Act
52.222-50
Combating Trafficking in Persons
52.222-54 Employment Eligibility Verification (RFO DEVIATION)
52.222-90 Addressing DEI Discrimination by Federal Contractors
52.223-5 Pollution Prevention and Right-to-Know Information
MAY 2024
52.223-23 Sustainable Products (RFO DEVIATION)
52.224-3 Privacy Training
JAN 2017
52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-Representation and Certifications
JUN 2020
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving
MAY 2024
52.227-17 Rights in Data-Special Works
DEC 2007
52.228-5 Insurance-Work on a Government Installation
JAN 1997
52.229-12 Tax on Certain Foreign Procurements (RFO DEVIATION)
OCT 2025
52.232-33 Payment by Electronic Funds Transfer—System for Award
OCT 2018
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days.
(End of clause)
(a) The Government may extend the term of this contract by written notice to the Contractor within 60 days;
provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 2.5 years.
52.240-93
Basic Safeguarding of Covered Contractor Information Systems
(RFO DEVIATION)
MAR 2026
(a) Definitions. As used in this clause—
52.232-40 Providing Accelerated Payments to Small Business Subcontractors
MAR 2023
52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim
NOV 2025
52.237-2 Protection of Government Buildings, Equipment, and Vegetation
APR 1984
52.240-91 Security Prohibitions and Exclusions (RFO DEVIATION)
52.244-6 Subcontracts for Commercial Products and Commercial Services
52.242-13 Bankruptcy JUL 1995 52.242-15 Stop-Work Order AUG 1989 52.243-3
Changes-Time-and-Materials or Labor-Hours SEP 2000 52.245-1 Government Property
SEP 2021
52.245-9 Use and Charges APR 2012
52.217-8 Option to Extend Services NOV 1999
52.217-9 Option to Extend the Term of the Contract MAR 2000
Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.
Federal contract information—
(1) Means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government; but
(2) Does not include information provided by the Government to the public (such as on public websites) or simple transactional information (such as information necessary to process payments).
Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).
Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).
Safeguarding means measures or controls that are prescribed to protect information systems.
(b) Safeguarding requirements.
(1) Basic requirements. The Contractor shall safeguard its covered contractor information systems by implementing, at minimum, the following security controls:
(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).
(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.
(iii) Verify and control/limit connections to and use of external information systems.
(iv) Control information posted or processed on publicly accessible information systems.
(v) Identify information system users, processes acting on behalf of users, or devices.
(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.
(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.
(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.
(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.
(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.
(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.
(xii) Identify, report, and correct information and information system flaws in a timely manner.
(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.
(xiv) Update malicious code protection mechanisms when new releases are available.
(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.
(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal departments and agencies relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.
(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial products, other than commercially available off-the-shelf items, or commercial services), in which the subcontractor may have Federal contract information residing in or transiting through its information system.
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any clauses listed above with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation. In accordance with E.O. 14275, the purpose of the Revolutionary FAR Overhaul (RFO) is to amend the Federal Acquisition Regulation (FAR) to ensure that it contains only provisions that are required by statute or that are otherwise necessary to support simplicity and usability, strengthen the efficacy of the procurement system, or protect economic or national security interests.
52.252-6 Authorized Deviations in Clauses
NOV 2020
DIAR 1452.201-70 Authorities and Delegations SEPT 2011
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award.
The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph
(e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
DIAR 1452.224-1 Privacy Act Notification (Deviation) JUL 1996
Applicable Department of the Interior regulations concerning the Privacy Act are set forth in 43 CFR 2, subpart D. The CFR is available for public inspection at the Departmental Library, Main Interior Bldg., 1849 C St. NW, Washington DC, at each of the regional offices of bureaus of the Department and at many public libraries.
(End of Clause)
DIAR 1452.228-70
Liability Insurance JUL 1996
(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:
$100k each person
$500k each occurrence
$20k property damage
(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.
WBR 1452.201-80 Contracting Officer’s Representative’s Authorities and Limitations --
Bureau of Reclamation
MAY 2018
a) Performance of the work under this contract shall be subject to the technical direction of the Reclamation Contracting Officer's Representative (COR). The term “technical direction” is defined to include, without limitation:
(1) Inspecting and accepting or rejecting work performed under the contract.
(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.
(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.
(b) The Contractor will receive a copy of the written COR designation from the Contracting Officer. It will specify the extent of the COR's authority to act on behalf of the Contracting Officer.
(c) Technical direction must be within the scope of work stated in the contract. Only the Contracting Officer is authorized to determine if a change is within the scope of the contract; therefore, the COR does not have the authority to, and may not, issue any technical direction that -
(1) Constitutes a direction of additional work outside the Contract requirements;
(2) Constitutes a change as defined in the contract clause entitled “Changes;”
(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;
(4) Changes any of the expressed terms, conditions or specifications of the contract; or
(5) Interferes with the Contractor's right to perform the terms and conditions of the contract.
(d) All technical direction shall be issued in writing by the COR.
(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of this clause. If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (c)(1) through (c)(5) of this clause, the Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or direction and must request the Contracting Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must -
(1) Advise the Contractor in writing after receipt of the Contractor's letter that the technical direction is within the scope of the contract effort and does not constitute a change under the Changes clause of the contract; or
(2) Advise the Contractor that the Government will issue a written change order.
(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled “Disputes.”
WBR 1452.231-80 Reimbursement of Travel Expenses -- Bureau of Reclamation OCT 2021
(a) The contractor shall not incur any travel expenses until after obtaining approval from the contracting officer or in accordance with the procedures specified in the Performance Work Statement.
(b) The Government will reimburse travel expenses approved in accordance with paragraph (a) based on actual and allowable costs in accordance with –
(1) Commercial Organizations FAR31.103 and 31.205-46.
(2) Educational Institutions FAR 31.104 and 31.3.
(3) State, Local or Federally recognized Indian Tribal governments FAR 31.107 and 31.6.
(4) Nonprofit organizations FAR 31.108 and 31.7.
DOI-AAAP-0028
Electronic Invoicing and Payment Requirements – Invoice Processing Platform
FEB 2021
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Terms and Conditions - Commercial Products and Commercial Services included in commercial item contracts. The IPP website address is:
https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
The contractor is encouraged to upload a copy of their invoice and supporting documentation to IPP.gov that will allow Reclamation to verify that the products or services comply with the terms of the contract. The information in the uploaded documents should not conflict with the data fields in the IPP submissions (service dates, invoice number, etc.). Prior to submitting an invoice to IPP, the contractor may coordinate with the designated Contracting Officer's Representative (COR), for review and verification of quantities for payment and for compliance with the applicable progress payment requirements of this contract. Prior coordination with the COR will allow for streamlined processing of the invoice.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment.
The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
DOI-AAAP-0050
(V3)
Contractor Performance Assessment Reporting System DEC 2015
1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The
Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in CPARS for Government use in evaluating past performance as part of a source selection action.
3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO).
Information in the report must be protected as source selection sensitive information not releasable to the public.
4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .