C28_Specifications Vol II (Biloxi Bldg 1 Reno) - 10.27.23.pdf
PDF 5 MB Posted
- Solicitation number
- QSE--36C10F24R50025
About this file
This is a pre-solicitation notice for the Biloxi Building 1 Renovation project located in Biloxi, Mississippi. The project involves selective demolition, exterior building envelope alterations, and interior renovation of areas within Building 1. Work will occur on unoccupied floors as well as crawl spaces and the attic. Interior utilities and building systems will be upgraded, including replacement of HVAC, plumbing, electrical, telecommunications, chilled water systems, and modifications to fire protection systems. Limited structural, mechanical, and electrical work is related to the underside of the third floor structure within occupied areas of the second floor. Site restoration is required after completion of other project work. The awardee will also be responsible for monitoring the existing Building 1 foundation system throughout the project duration by a separate qualified consultant.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Anderson Engineering of Minnesota, LLC 13605 1st Avenue North
Plymouth, MN 55441 Phone: 763-412-4000 Fax: 763-412-4090
Prepared in association with the following:
IMEG Corp. & Thomas Olesak
Gulf Coast Veterans Health Systems Renovate Building 1
VA PROJECT NUMBER: 520-317x
400 VETERANS DRIVE
Biloxi, Mississippi 39531
TECHNICAL SPECIFICATIONS VOL II
ANDERSON ENGINEERING OF MN, LLC
Project Number: 15090
Issue for Construction Documents
October 27, 2023
Gulf Coast Veterans Health Care System VA Project 520-317X Renovate Building 1 10-27-23 400 Veterans Ave Construction Documents Biloxi, MS 39531
Mechanical Engineer of Record
Electrical Engineer of Record
Technology Engineer of Record
400 Veterans Ave Construction Documents Biloxi, MS 39531
00 01 10-1
TABLE OF CONTENTS
DEPARTMENT OF VETERANS AFFAIRS
TABLE OF CONTENTS
Section 00 01 10
DIVISION 00 - SPECIAL SECTIONS DATE
00 01 15 List of Drawing Sheets 07-15
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21 01 00 00.1 Construction/ Renovation Risk Assessment 01 32 16.13 Network Analysis Schedules – Major Construction Project
Design-Bid-Build 01 33 23 Shop Drawings, Product Data, and Samples 09-22 01 33 23.01 Submittal Register 01 35 26 Safety Requirements 10-22 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 06-21 01 57 19 Temporary Environmental Controls 01-21 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 04-22 01 81 13 Sustainable Construction Requirements 10-17 01 91 00 General Commissioning Requirements 04-22
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17
DIVISION 03 – CONCRETE
03 30 53 (Short-Form) Cast-in-Place Concrete 02-16 03 56 00 Strengthening of Concrete with FRP Reinforcement
DIVISION 04 – MASONRY
04 01 00 Maintenance of Masonry 02-16 04 05 13 Masonry Mortaring 10-17 04 20 00 Unit Masonry 08-17
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 02-16 05 31 00 Steel Decking 05 40 00 Cold-Formed Metal Framing 05-16 05 50 00 Metal Fabrications
400 Veterans Ave Construction Documents Biloxi, MS 39531
00 01 10-2
TABLE OF CONTENTS
05 51 13 Metal Stair Railings 10-15
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 06 60 Resin Wall Panels 06 10 00 Rough Carpentry 10-17 06 20 00 Finish Carpentry 08-16 06 61 00 Solid Surface Trench Receptor 06 61 16 Solid Surface Fabrications
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 Preparation for Re-Roofing 02-16 07 21 13 Thermal Insulation 10-17 07 21 19 Foamed In Place Insulation 07 24 00 Exterior Insulation and Finish Systems 02-16 07 27 27 Fluid-Applied Membrane Air Barrier, Vapor Retarding 02-16 07 40 00 Metal Roof and Siding Panels 10-15 07 51 00 Built-Up Bituminous Roofing 08-18 07 60 00 Flashing and Sheet Metal 07-14 07 81 00 Applied Fireproofing 10-17 07 84 00 Firestopping 02-16 07 92 00 Joint Sealants 10-17 07 95 13 Expansion Joint Cover Assemblies 02-16
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 08-16 08 14 00 Interior Wood Doors 02-16 08 31 13 Access Doors and Frames 02-16 08 41 13 Aluminum Framed Entrances and Storefronts 08 44 13 Glazed Aluminum Curtain Walls 08-16 08 51 13 Aluminum Windows 02-16 08 71 00 Door Hardware 01-16 08 71 13 Automatic Door Operators 02-16 08 78 00 Special Function Hardware 08 80 00 Glazing 10-15 08 90 00 Louvers and Vents 05-15
DIVISION 09 – FINISHES
09 01 90 Paint Remover 09 05 16 Subsurface Preparation for Floor Finishes 02-15 09 06 00 Schedule for Finishes 01-21 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 09 30 00 Specialty Moldings and Trims 09 30 13 Ceramic/Porcelain Tiling 09-15 09 51 00 Acoustical Ceilings 12-16 09 65 13 Resilient Base and Accessories 09 65 16 Resilient Sheet Flooring 05-18
400 Veterans Ave Construction Documents Biloxi, MS 39531
00 01 10-3
TABLE OF CONTENTS
09 65 19 Resilient Tile Flooring 05-18 09 65 36.13 Static Dissipative Resilient Tile 09 68 00 Carpeting 09 91 00 Painting 09 91 00.01 Exterior Painting 09 96 00 High Performance Resinous Wall Coatings 09 96 13 Abrasion Resistant Coatings 09 96 53 Silicone Elastomeric Coatings
DIVISION 10 – SPECIALTIES
10 14 00 Signage 10 21 00 Toilet Compartments 12-15 10 21 23 Cubicle Curtain Tracks 10 26 00 Wall and Door Protection 10 28 00 Toilet, Bath, and Laundry Accessories 02-16 10 44 13 Fire Extinguisher Cabinets 08-18
DIVISION 11 – EQUIPMENT
11 52 23 Audio Visual Equipment Storage 11 73 00 Ceiling Mounted Patient Lifts 11 74 00 Dental Equipment
DIVISION 12 – FURNISHINGS
12 24 21 Sunscreen and Lightproof Shades 12 32 00 Manufactured Wood Casework 12 34 00 Integrated Patient Care Modular System 12 34 50 Laboratory Casework 12 35 70.74 Dental Casework
DIVISION 13 - SPECIAL CONSTRUCTION
13 49 00 Radiation Protection
DIVISION 14– CONVEYING EQUIPEMENT
14 91 33 Laundry and Linen Chutes
DIVISION 21- FIRE SUPPRESSION
21 05 11 Common Work Results For Fire Suppression 21 08 00 Commissioning of Fire Suppression System 11-16 21 12 00 Manual Dry Standpipe Systems 06-15 21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 07-16
400 Veterans Ave Construction Documents Biloxi, MS 39531
00 01 10-4
TABLE OF CONTENTS
22 05 12 General Motor Requirements for Plumbing Equipment 22 05 19 Meters and Gauges for Plumbing Piping 22 05 23 General-Duty Valves for Plumbing Piping 09-15 22 07 11 Plumbing Insulation 09-15 22 08 00 Commissioning of Plumbing Systems 11-16 22 11 00 Facility Water Distribution 22 11 23 Domestic Water Pumps 22 13 00 Facility Sanitary and Vent Piping 22 40 00 Plumbing Fixtures 09-15 22 61 13.74 Dental Compressed-Air Piping 22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 22 62 19.74 Dental Vacuum and Evacuation Equipment 22 63 00 Gas Systems for Laboratory and Healthcare Facilities
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 08-17 23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment 08-17
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment
02-15
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15 23 07 11 HVAC and Boiler Plant Insulation 02-15 23 08 00 Commissioning of HVAC Systems 11-16 23 09 23 Direct-Digital Control System for HVAC 09-11 23 21 13 Hydronic Piping 08-17 23 21 23 Hydronic Pumps 23 31 00 HVAC Ducts and Casings 03-13 23 34 00 HVAC Fans 02-15 23 36 00 Air Terminal Units 02-15 23 37 00 Air Outlets and Inlets 02-15 23 38 13 Exhaust Hoods 23 40 00 HVAC Air Cleaning Devices 02-12 23 73 00 Indoor Central-Station Air-Handling Units 04-11 23 82 00 Convection Heating and Cooling Units 04-11 23 82 16 Air Coils 04-11
DIVISION 25 – INTEGRATED AUTOMATION
25 10 10 Advanced Utility Metering System 02-10
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 05 41 Underground Electrical Construction 26 05 73 Overcurrent Protective Device Coordination Study 01-18 26 08 00 Commissioning of Electrical Systems 11-16
400 Veterans Ave Construction Documents Biloxi, MS 39531
00 01 10-5
TABLE OF CONTENTS
26 09 23 Lighting Controls 01-18 26 24 13 Distribution Switchboards 01-18 26 24 16 Panelboards 01-18 26 27 26 Wiring Devices 01-18 26 29 11 Motor Controllers 01-18 26 29 21 Enclosed Switches and Circuit Breakers 01-17 26 36 23 Automatic Transfer Switches 01-17 26 41 00 Facility Lightning Protection 01-17 26 43 13 Surge Protective Devices 01-17 26 51 00 Interior Lighting 01-18
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 06-15 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 06-15 27 08 00 Commissioning of Communications Systems 11-16 27 10 00 Control, Communication and Signal Wiring 06-15 27 11 00 Communications Equipment Room Fittings 06-15 27 15 00 Communications Structured Cabling 01-16 27 31 31 Voice Communications Switching and Routing Equipment -
Extension 06-15
27 41 31 Master Antenna Television Equipment and Systems 06-15 27 51 16 Public Address and Mass Notification Systems 10-15 27 52 23 Intercommunications and Program Systems 06-15
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and
Security 09-11
28 05 26 Grounding and Bonding for Electronic Safety and Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security
09-11
28 08 00 Commissioning of Electronic Safety and Security Systems 11-16 28 13 00 Physical Access Control System 10-11 28 23 00 Video Surveillance 09-11 28 31 00 Fire Detection and Alarm 10-11
DIVISION 33 – UTILITIES
33 08 00 Commissioning of Site Utility Systems 33 10 00 Water Utilities 33 30 00 Sanitary Sewer Utilities 06-13
APPENDIX
Compass Headwalls (Spec Section 12 34 00) Compass Footwalls(Spec Section 12 34 00) Guldmann Patient Lifts (Spec Section 11 73 00)
400 Veterans Ave Construction Documents Biloxi, MS 39531
00 01 10-6
TABLE OF CONTENTS
A-Dec Dental Equipment (Spec Section 11 74 00) A-Dec Dental Equipment (Spec Section 12 35 70.74) LOC Dental Lab Casework (12 34 50) Building 1 Inventory
03 30 53 - 1
Renovate Building 1 10-27-23 400 Veterans Avenue Bid Documents Biloxi, MS 39531
SECTION 03 30 53
(SHORT-FORM) CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Cast-in-place structural concrete.
2. Suspended slab infill on metal deck.
3. Preparation of existing surfaces to receive concrete.
4. Preparation of existing surface to received concrete topping.
1.2 RELATED REQUIREMENTS
A. Materials Testing and Inspection During Construction: Section 01 45 29, TESTING LABORATORY SERVICES.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this Section.
B. American Concrete Institute (ACI):
1. 117-15 - Tolerances for Concrete Construction, Materials and
Commentary.
2. 301/310M-10 - Structural Concrete.
3. 305.1-14 - Hot Weather Concreting.
4. 306.1-90(R2002) - Cold Weather Concreting.
5. 318/318M-14 - Building Code Requirements for Structural Concrete and
SP-66-04-ACI Detailing Manual.
6. 347-04 - Guide to Formwork for Concrete.
C. ASTM International(ASTM):
1. A615/A615M-15ae1 - Deformed and Plain Carbon-Steel Bars for Concrete
Reinforcement.
2. A1064/A1064M-15 - Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete.
3. C33/C33M-13 - Concrete Aggregates.
4. C39/C39M-15a - Compressive Strength of Cylindrical Concrete
Specimens.
5. C94/C94M-15a - Ready-Mixed Concrete.
6. C143/C143M-15 - Slump of Hydraulic Cement Concrete.
7. C150/C150M-15 - Portland Cement.
8. C192/C192M-15 - Making and Curing Concrete Test Specimens in the
Laboratory.
9. C219-14a - Terminology Relating to Hydraulic Cement.
03 30 53 - 2
Renovate Building 1 10-27-23
10. C260/C260M-10a - Air-Entraining Admixtures for Concrete.
11. C494/C494M-15 - Chemical Admixtures for Concrete.
12. C618-15 - Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete.
13. C881/C881M-14 - Epoxy-Resin-Base Bonding Systems for Concrete.
14. C989/C989M-14 - Slag Cement for Use in Concrete and Mortars.
15. E1155-14 - Determining FF Floor Flatness and FL Floor Levelness
Numbers.
D. International Concrete Repair Institute:
1. 310.2R-2013 - Selecting and Specifying Concrete Surface Preparation for Sealers, Coatings, Polymer Overlays, and Concrete Repair.
1.4 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Submittal Drawings:
1. Large scale drawings of reinforcing steel.
C. Manufacturer's Literature and Data:
1. Concrete Mix Design.
2. Chemical admixtures and curing compounds.
3. Indicate manufacturer's recommendation for each application.
D. Sustainable Construction Submittals:
1. Recycled Content: Identify post-consumer and pre-consumer recycled content percentage by weight.
E. Certificates: Certify products comply with specifications.
a. Each ready mix concrete batch delivered to site.
1.5 DELIVERY
A. Deliver each ready-mixed concrete batch with mix certification in duplicate according to ASTM C94/C94M.
1.6 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
PART 2 - PRODUCTS
2.1 MATERIALS
A. Portland Cement: ASTM C150/C150M, Type I or II.
B. Pozzolans:
1. Fly Ash: ASTM C618, Class C or F including supplementary optional physical requirements.
03 30 53 - 3
Renovate Building 1 10-27-23
C. Coarse Aggregate: ASTM C33/C33M.
1. Size 67 for other applications.
D. Fine Aggregate: ASTM C33/C33M.
E. Mixing Water: Fresh, clean, and potable.
F. Chemical Admixtures: ASTM C494/C494M.
G. Reinforcing Steel: ASTM A615/A615M or ASTM A996/A996M, deformed. See
Structural Drawings for grade.
H. Forms: Wood, plywood, metal, or other materials, approved by
Contracting Officer, of grade or type suitable to obtain type of finish specified.
1. Plywood: Exterior grade, free of defects and patches on contact surface.
2. Lumber: Sound, grade-marked, S4S stress graded softwood.
3. Form coating: As recommended by Contractor.
I. Welded Wire Fabric: ASTM A1064/A1064M, plain; deformed; Grade 56; sized as indicated.
J. Expansion Joint Filler: ASTM D1751.
K. Sheet Materials for Curing Concrete: ASTM C171.
L. Liquid Densifier/Sealer: 100 percent active colorless aqueous siliconate solution.
M. Grout, Non-Shrinking: Premixed ferrous or non-ferrous. Grout to show no settlement or vertical drying shrinkage at 3 days. Compressive strength for grout, at least 2500 psi at 3 days and 5000 psi at 28 days.
2.2 ACCESSORIES
A. Bonding Agent: ASTM C 1059/C 1059M, Type II.
B. Structural Adhesive: ASTM C881, 2-component material suitable for use on dry or damp surfaces. Provide material Type, Grade, and Class to suit Project requirements.
C. Weeps: Geotextile type as recommended by Contractor and approved by
Contracting Officer.
2.3 CONCRETE MIXES
A. Design concrete mixes according to ASTM C94/C94M, Option C.
B. Compressive strength at 28 days: minimum 4,000 psi.
C. Submit mix design and results of compression tests to the Contracting
Officer for his evaluation. Identify all materials, including admixtures, making-up the concrete.
D. Maximum Slump for Vibrated Concrete: 100 mm (4 inches) tested according
03 30 53 - 4
Renovate Building 1 10-27-23 to ASTM C143.
E. Cement and Water Factor (See Table I):
TABLE I - CEMENT AND WATER FACTORS FOR CONCRETE
Concrete: Strength Non-Air-Entrained Air-Entrained
Min. 28 Day Comp.
Str.
MPa (psi)
Min. Cement kg/cu. m
(lbs./cu.
yd.)
Max. Water
Cement Ratio
Min. Cement kg/cu. m
(lbs./cu.
yd.)
Max. Water
Cement Ratio
30 (4000)1,3 325 (550) 0.55 340 (570) 0.50
F. Air-entrainment as specified, and conform with the following for air content table:
TABLE II - TOTAL AIR CONTENT
FOR VARIOUS SIZES OF COARSE AGGREGATES
Nominal Maximum Size of
Coarse Aggregate
Total Air Content, percent
10 mm (3/8 inches) 6 Moderate exposure; 7.5 severe exposure
13 mm (1/2 inches) 5.5 Moderate exposure; 7 severe exposure
19 mm (3/4 inches) 5 Moderate exposure; 6 severe exposure
25 mm (1 inches) 4.5 Moderate exposure; 6 severe exposure
40 mm (1 1/2 inches) 4.5 Moderate exposure; 5.5 severe exposure
2.4 BATCHING AND MIXING
A. Store, batch, and mix materials according to ASTM C94/C94M.
1. Job-Mixed: Batch mix concrete in stationary mixers as specified in ASTM C94/C94M.
2. Ready-Mixed Concrete: Comply with ASTM C94/C94M, except use of non-agitating equipment for transporting concrete to Site is not acceptable.
3. When aggregate producer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.
03 30 53 - 5
Renovate Building 1 10-27-23
PART 3 - EXECUTION
3.1 FORMWORK
A. Installation: Conform to ACI 347. Construct forms to obtain concrete of the shapes, dimensions and profiles indicated, with tight joints.
B. Design and construct forms to prevent bowing-out of forms between supports and to be removable without prying against or otherwise damaging fresh concrete.
C. When patching formed concrete, seal form edges against existing surface to prevent leakage; set forms so that patch is flush with adjacent surfaces.
D. Treating and Wetting: Treat or wet concrete contact surfaces:
1. Coat plywood and lumber forms with non-staining form sealer.
2. Wet wood forms thoroughly when they are not treated with form release agent.
3. Prevent water from accumulating and remaining within forms.
4. Clean and coat removable metal forms with light form oil before reinforcement is placed.
5. In hot weather, cool metal forms by thoroughly wetting with water just before placing concrete.
6. Prevent water from accumulating and remaining within forms.
E. Inserts, Sleeves, and Similar Items: Install flashing reglets, masonry ties, anchors, inserts, wires, hangers, sleeves, boxes for floor hinges, and other cast-in items specified in other Sections. Place where indicated, square, flush and secured to formwork.
F. Construction Tolerances - General: Install and maintain concrete formwork to assure completion of work within specified tolerances.
G. Adjust or replace completed work exceeding specified tolerances before placing concrete.
3.2 REINFORCEMENT
A. Install concrete reinforcement according to ACI 318 and ACI SP-66.
B. Support and securely tie reinforcing steel to prevent displacement during placing of concrete.
C. Drilling for Dowels in Existing Concrete: Use sharp bits, drill hole slightly oversize, fill with epoxy grout, inset the dowel, and remove excess epoxy.
3.1 PLACING CONCRETE
A. Remove water from excavations before concrete is placed. Remove
03 30 53 - 6
Renovate Building 1 10-27-23 hardened concrete, debris and other foreign materials from interior of forms, and from inside of mixing and conveying equipment. Obtain approval from Contracting Officer's Representative before placing concrete.
B. Install screeds at required elevations for concrete slabs.
C. Roughen and clean free from laitance, foreign matter, and loose particles before placing new concrete on existing concrete.
1. Blow-out areas with compressed air and immediately coat contact areas with adhesive in compliance with manufacturer's instructions.
D. Place structural concrete according to ACI 301 and ACI 318.
E. Convey concrete from mixer to final place of deposit by method that will prevent segregation or loss of ingredients. Do not deposit, in
Work, concrete that has attained its initial set or has contained its water or cement more than 1 1/2 hours. Do not allow concrete to drop freely more than 1500 mm (5 feet) in unexposed work nor more than
900 mm (3 feet) in exposed work.
F. Place and consolidate concrete in horizontal layers not exceeding
12 inches in thickness. Consolidate concrete by spading, rodding, and mechanical vibrator. Do not secure vibrator to forms or reinforcement.
Continuously vibrate during placement of concrete.
G. Hot Weather Concrete Placement: As recommended by ACI 305.1 to prevent adversely affecting properties and serviceability of hardened concrete.
H. Cold Weather Concrete Placement: As recommended by ACI 306.1, to prevent freezing of thin sections less than 300 mm (12 inches) and to permit concrete to gain strength properly.
1. Do not use calcium chloride without written approval from
Contracting Officer's Representative.
3.2 PROTECTION AND CURING
A. Protect exposed surfaces of concrete from premature drying, wash by rain or running water, wind, mechanical damage, and excessive hot or cold temperatures.
B. Curing Methods: Cure concrete with curing compound using wet method with sheets.
C. Formed Concrete Curing: Wet the tops and exposed portions of formed concrete and keep moist until forms are removed.
1. If forms are removed before 14 days after concrete is cast, install sheet curing materials as specified above.
03 30 53 - 7
Renovate Building 1 10-27-23
D. Concrete Flatwork Curing:
1. Install sheet materials according to the manufacturer's instructions.
a. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's
Representative consideration.
3.3 FORM REMOVAL
A. Maintain forms in place until concrete is self-supporting, with construction operation loads.
B. Remove fins, laitance and loose material from concrete surfaces when forms are removed. Repair honeycombs, rock pockets, sand runs, spalls, or otherwise damaged surfaces by patching with the same mix as concrete minus the coarse aggregates.
C. Finish to match adjacent surfaces.
3.4 FINISHES
A. Vertical and Overhead Surface Finishes:
1. Surfaces Concealed in Completed Construction: As-cast; no additional finishing required.
2. Surfaces Exposed in Unfinished Areas: As-cast; no additional finishing required.
a. Mechanical rooms.
b. Electrical rooms.
3. Surfaces Exposed to View Scheduled for Paint Finish: Remove fins, burrs and similar projections by mechanical means approved by
Contracting Officer's Representative flush with adjacent surface.
Lightly rub with fine abrasive stone or hone. Use ample amount of water during rubbing without working up a lather of mortar or changing texture of concrete.
4. Surfaces Exposed to View in Finished Areas: Grout finish, unless otherwise shown, for uniform color and smooth finish treated.
a. Remove laitance, fins and burrs.
b. Scrub concrete with wire brushes. Clean stained concrete surfaces with hone or stone.
c. Apply grout composed of 1 part Portland cement and 1 part clean, fine sand (smaller than 600 micro-m (No. 30) sieve). Work grout into surface of concrete with cork floats or fiber brushes until pits and honeycomb are filled.
03 30 53 - 8
Renovate Building 1 10-27-23
d. After grout has hardened, but is still plastic, remove surplus grout with sponge rubber float and by rubbing with clean burlap.
e. In hot, dry weather fog spray surfaces with water to keep grout wet during setting period. Complete finished areas in same day.
Confine limits of finished areas to natural breaks in wall surface. Do not leave grout on concrete surface overnight.
B. Slab Finishes:
1. Allow bleed water to evaporate before surface is finished. Do not sprinkle dry cement on surface to absorb water.
2. Scratch Finish: Rake or wire broom after partial setting slab surfaces to received bonded applied cementitious application, within
2 hours after placing, to roughen surface and provide permanent bond between base slab and applied cementitious materials.
3. Float Finish: Interior slabs to receive non-cementitious materials, except as specified.
a. Screen and float to smooth dense finish.
b. After first floating, while surface is still soft, check surfaces for alignment using straightedge or template. Correct high spots by cutting down with trowel or similar tool. Correct low spots by filling in with material same composition as floor finish. Remove any surface projections on floated finish by rubbing or dry grinding. Refloat slab to uniform sandy texture.
4. Steel Trowel Finish: Applied toppings, concrete surfaces to receive resilient floor covering or carpet, future floor roof and other monolithic concrete floor slabs exposed to view without other finish indicated or specified.
a. Delay final steel troweling to secure smooth, dense surface, usually when surface can no longer be dented by fingers. During final troweling, tilt steel trowel at slight angle and exert heavy pressure on trowel to compact cement paste and form dense, smooth surface.
b. Finished surface: Free from trowel marks. Uniform in texture and appearance.
5. Broom Finish: Finish exterior slabs, ramps, and stair treads with bristle brush moistened with clear water after surfaces have been floated.
03 30 53 - 9
Renovate Building 1 10-27-23
3.5 SURFACE TREATMENTS
A. Mix and apply the following surface treatments according to manufacturer's instructions.
1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.
B. Liquid Densifier/Sealer: Use for exposed concrete floors and concrete floors to receive carpeting except those specified to receive non-slip finish.
3.6 APPLIED TOPPING
A. Install concrete topping with thickness and strength shown with only enough water to ensure stiff, workable, plastic mix.
B. Continuously place applied topping until entire area is complete, struck off with straightedge, compact by rolling or tamping, float and steel trowel to hard smooth finish.
- - E N D - -
03 56 00 - 1
Renovate Building 1 10-27-23
Section 03 56 00
STRENGTHENING OF CONCRETE WITH FRP (FIBER REINFORCED POLYMER) REINFORCEMENT
1.1 RELATED DOCUMENTS
A. The Conditions of the Contract for Construction and the General
Requirements of Division 1 of these Specifications apply to the Work in this Section.
1.2 WORK INCLUDED
A. This specification is intended to define the minimum requirements of structural strengthening using externally bonded fiber reinforced polymer (FRP) composite systems.
B. The work includes the furnishing of all materials, labor, equipment and services for the supply, installation and finish of all structural strengthening using externally bonded FRP systems.
C. The general contractor or subcontractor shall furnish all materials, tools, equipment, transportation, necessary storage, access, labor and supervision required for the proper installation of the externally bonded FRP systems.
1.3 REFERENCE STANDARDS
A. Comply with the following reference standards, except where more stringent requirements are indicated on the Drawings or specified herein:
1. American Concrete Institute (ACI)
a. ACI 440.2R-08, Guide for the Design and Construction of
Externally Bonded FRP Systems for Strengthening Concrete
Structures
b. ACI 440R-07, Report on Fiber-Reinforced Polymer (FRP) Reinforcement for Concrete Structures
c. ACI 440 R-96, State-of-the-Art Report on Fiber Reinforced
Plastic (FRP) Reinforcement for Concrete Structures.
d. ACI 503 R, Pull-off test to determine FRP adhesion to concrete substrate.
2. International Concrete Repair Institute (ICRI)
a. ICRI Guideline No. 03742, Guide for the Selection of
Strengthening Systems for Concrete Structures
b. ICRI Guideline No. 03739, Guide to Using In-Situ Tensile Pull-
Off Tests to Evaluate Bond of Concrete Surface Materials
03 56 00 - 2
Renovate Building 1 10-27-23
3. Sika CarboDur Composite Strengthening Systems – Engineering
Guidelines for Design and Application.
4. American Society of Testing and Materials (ASTM) as cited herein.
a. ASTM D7565, Standard Test Method for Determining Tensile
Properties of Fiber Reinforced Polymer Matrix Composites Used for Strengthening of Civil Structures.
b. ASTM D3039, Standard Test Method for Tensile Properties of
Polymer Matrix Composite Materials.
c. ASTM D7522, Standard Test Method for Pull-Off Strength for FRP
Bonded to Concrete Substrate.
d. ASTM D4541, Standard Test Method for Pull-off Strength of
Coating Using Portable Adhesive-Testers.
e. Fire Protection: ASTM E84 (regarding flame spread and smoke development requirement) and ASTM E119 (regarding hourly fire-rated requirement).
5. American Concrete Institute (ACI)
a. ACI 440.2R-08, Guide for the Design and Construction of
Externally Bonded FRP Systems for Strengthening Concrete
Structures.
6. International Concrete Repair Institute (ICRI)
a. ICRI Technical Guideline No. 310.2-1997 (formerly No. 03732), Guideline for Selecting and Specifying Concrete Surface
Preparation for Sealers, Coatings, and Polymer Overlays.
1.4 QUALITY CONTROL
A. Quality Control procedures performed by the Manufacturer shall include, but not be limited to the following:
1. Manufacturer shall have a nationally recognized program of contractor training, certification and technical support.
2. The Manufacturer shall have minimum ten years experience in FRP
Reinforcement confirmed by actual field tests of minimum
50 successful installations.
3. The Manufacturer shall be able to supply testing data to demonstrate system properties and durability of the actual FRP Reinforcement to be used.
B. Quality Control procedures performed by the Contractor shall include, but not be limited to the following:
1. The Contractor shall be trained by the Manufacturer and shall have completed a program of instruction in the use of FRP Reinforcement.
03 56 00 - 3
Renovate Building 1 10-27-23
2. The Contractor shall have a minimum of five years experience in FRP
Reinforcement confirmed by actual field tests of at least 5 successful installations.
3. The Contractor shall inspect all materials prior to application, to assure that they meet specifications and have arrived to the job-site undamaged.
4. The FRP Reinforcement shall be completely inspected by the contractor during and immediately following application of the composite materials. Conformance with the design drawings, proper alignment of fibers and quality workmanship shall be assured. Entrapped air shall be released or rolled out before the epoxy sets. Defects shall be noted in the Daily Construction Log.
5. After FRP Reinforcement has cured, the contractor shall inspect the all work to check for voids and or debonding. Repairs shall be made as per Par. 3.7 Repair of Defects and noted in the Daily Construction
Log.
1.5 SUBMITTALS
A. The FRP retrofit shall be engineered and installed by a contractor with a minimum of 5 years experience as a qualified single source entity in the retrofit and repair of concrete structures.
B. Provide engineering services performed by a licensed engineer having a minimum of 5 years experience in the design of FRP. The design and installation shall repair and strengthen the deficient concrete elements as required to meet the demand loads specified in the structural engineering analysis and as shown in the contract documents.
C. Calculations shall conform to the requirements set forth in ACI 440.2R-
08, Guide for the Design and Construction of Externally Bonded FRP
Systems for Strengthening Concrete Structures and be based on the design modulus and associated area of the cured laminate for the FRP system to be installed. FRP laminate design values must be lower than the calculated mean determined from the test results of the ASTM D7565 and/or ASTM D3039 field test specimens (See Section 3.3 of this specification). Submit for record Material Safety Data Sheets (MSDS) of each product, used on site.
D. Submit signed and sealed drawings for column, beam and joist repair.
Drawings shall show plan views, elevations and details to accurately address the Actual Field Conditions for the project.
E. Working drawings shall detail the type, locations, dimensions, numbers
03 56 00 - 4
Renovate Building 1 10-27-23 of layers, and orientation of all FRP materials and coatings to be installed.
F. Submit product data indicating product standards, physical and chemical characteristics, environmental durability, technical specifications, limitations, installation instructions, and general recommendations regarding each material.
G. Submit for record, a qualification statement by the Contractor listing their completed FRP Reinforcement projects, including size, location, owner, engineer/architect and contact numbers.
H. Submit for record a complete description of the FRP Reinforcing system materials, surface preparation, application procedures, application rates, and cure times.
I. Submit for record copies of purchase order and packaging slips showing quantities and dates of primer and resin purchased.
J. Submit for review and approval shop drawings including, the following:
1. Limits of FRP Reinforcing.
2. Details of epoxy injection crack repair and epoxy resin patching.
3. Complete system details including, but not limited to, FRP
Reinforcement, primer, resin, and protective coating.
K. Submit for record test results of the Pull-off test to determine FRP adhesion to concrete substrate.
L. Submit for record Daily Construction Logs kept by the Contractor. These logs shall include the following information: Weather and temperature at application times; Amount of product used and square footage/linear footage of substrate covered; Batch numbers of all products used; Names of all crew members; Any bond- strength tests, noting location, quantity and who performed these tests.
M. Submit an approved ICC Evaluation Report in the name of the proposed
FRP system to be used on this project.
N. Submit independent test report verifying the environmental durability of the proposed system to be used on this project. Such reports shall include as a minimum:
1. 10,000 hr. resistance to salt water
2. 10,000 hr. resistance to high temperature (38C) and high humidity
(100%)
3. 10,000 hr. resistance to alkali solution (pH 9.5)
4. 3,000 hr. resistance to dry heat (60C)
5. resistance to 20 freeze/thaw cycles
03 56 00 - 5
Renovate Building 1 10-27-23
6. resistance to UV/condensation @ 100 cycles
7. resistance to diesel fuel (4 hr. exposure)
1.6 JOB-SITE CONDITIONS
A. Do not apply FRP Reinforcement materials if raining, snowing, or dew condensation is expected, or existing concrete surface is wet or if the ambient or surface temperatures are below 40°F (4°C).
B. The ambient temperature and temperature of the epoxy components shall be between 50°F (10°C) and 80°F (27°C) at the time of mixing. See appropriate technical data sheets for more specific instructions.
C. Precautions should be taken to avoid damage to any surface near the work zone due to mixing and handling of the specified material.
D. The Contractor is solely responsible for fume control and shall take necessary precautions against injury to Installer personnel or adjacent building occupants during application of primer and resin, etc.
Contractor personnel shall use protective equipment and area shall be well vented to the outside. As a minimum, Installer must take the following precautions:
1. Contractor to locate and protect building air intake during application.
2. Contractor to follow all state, federal, and local safety regulations.
3. Contractor to follow all Manufacturers’ safety requirements as indicated on appropriate MSDS sheets.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Deliver primer, saturant and protective coating in original, unopened containers with the Manufacturer’s name, labels, product identification, and batch numbers.
B. FRP Reinforcement shall be stored in a cool dry area away from direct sunlight, flame, moisture, or other hazards.
C. Store primer, saturant and protective coating under conditions as recommended by the Manufacturer in a cool dry place out of direct sunlight. Products that have exceeded their shelf life shall not be used.
D. Contractor is required to confirm that all materials used in accordance with this Section conform to local, state, and federal environmental and worker’s safety laws and regulations.
E. During operations Contractor shall maintain barricades.
03 56 00 - 6
Renovate Building 1 10-27-23
F. The Contractor shall properly dispose of empty containers in accordance with local regulations.
PART 2 - PRODUCTS
2.1 FRP REINFORCEMENT FABRIC AND/OR LAMINATE
A. FRP Reinforcement fabric shall be high strength, high modulus, fiber fabric that may be unidirectional or woven (in various fiber architectures) to suit specific repair needs.
1. FRP Reinforcement fabric shall be of the type, size, layer and location as indicated on the Drawings.
2. FRP Reinforcement fabric shall meet the following minimum requirements:
SikaWrap Hex 100G
SikaWrap Hex
Property* Prior to testing, laminate samples shall be cured at least 7 days at
70°F then post-cured at
140°F for 48 hours
Requirement
Requirement
ASTM
Test
Method
Laminate Tensile
Strength, In primary fiber direction – 1 Laminate Tensile Modulus, In primary fiber direction
3,000 lbs./layer 3.4x106 psi (23,400 MPa)
3,775 lbs./layer 9.0x106 psi (62,000 MPa)
D3039
D3039
Laminate Elongation at break Dry Fabric Weight, Minimum, per square yard
2.00% 27 oz./yd2
(913 g/m2)
0.91% 18 oz./yd2 (618 g/m2)
D3039
Percent Laminate Tensile
Strength
Retained after:
7 days, 100% humidity,100°F 90% 90% (38°C) 3,000 hrs exposure to 90% 90% alkali 90% 90% 3,000 hrs exposure to salt 90% 90% water 3,000 hrs exposure at 140°F (60°C)
Visual Defects D2563
3. Approved products are:
a. Basis of Design: SikaWrap Hex Fabrics (100G, 106G, 107G, 320G, 430G, 103C, 113C, 117C, 230C), Sika Corp, Lyndhurst, NJ.
b. Alternate products must be submitted to the Contracting Officer and approved by the Engineer a minimum of two weeks prior to the bid date.
c. Only products of the same manufacturer shall be used in the
03 56 00 - 7
Renovate Building 1 10-27-23 system.
B. FRP Precured Strip shall be high strength, high modulus, unidirectional carbon fiber reinforced polymer (CFRP).
1. FRP Precured Strip shall be of the type, size, layer and location as indicated on the Drawings.
2. FRP Precured Strip, shall meet the following minimum requirements:
Sika CarboDur
Property Requirement ASTM Test Method Laminate Tensile Strength, In primary fiber direction
406,000 psi (2,800 MPa)
D3039
Laminate Tensile Modulus, In primary fiber direction
23.2x106 psi (160,000 D3039
MPa)
Laminate Elongation at break 1.69 % D3039
Laminate Thickness 0.047 in.
(1.2mm)
Fiber Volume, minimum 68% D2563
3. Approved products are:
a. Sika CarboDur, Sika Corp., Lyndhurst, NJ.
b. Alternate products must be submitted and approved by the Engineer a minimum of two weeks prior to the bid date.
2.2 CONCRETE SURFACE PRIMER
A. Surface Primer shall be a two component, 100% solids, moisture/tolerant, high modulus, high strength epoxy.
B. Surface Primer shall meet the following minimum requirements:
Sikadur 300 Sikadur 330
Property Requirement Requirement ASTM Test Method Tensile Strength 8,000 psi 4,900 psi D638 Tensile Modulus 250,000 psi --- D638 Elongation at Break 3.0% 1.2% D638 Flexural Strength 11,500 psi --- D790 Flexural Modulus 500,000 psi 506,000 psi D790 Heat Deflection Temp. (HDT) 117F (47C) 120F (48C) D648
C. Approved products are:
1. Sikadur 300, Sika Corp., Lyndhurst, NJ.
2. Sikadur 330, Sika Corp., Lyndhurst, NJ.
03 56 00 - 8
Renovate Building 1 10-27-23
3. Alternate products must be submitted and approved by the Engineer a minimum of two weeks prior to the bid date.
2.3 FABRIC SATURANT
A. Saturant resin shall be two component, 100% solids, moisture tolerant, high strength, high modulus epoxy.
B. Saturants shall meet the following minimum requirements:
Sikadur 300 Sikadur 330 (Dry Lay-up)
Property Requirement Requirement ASTM Test Tensile Strength 8,000 psi 4,900 psi D638 Tensile Modulus 250,000 psi --- D638 Elongation at Break 3.0% 1.2% D638 Flexural Strength 11,500 psi --- D790 Flexural Modulus 500,000 psi 506,000 psi D790 Heat Deflection Temp. (HDT) 120 F 120F (48C) D648
C. Approved products are:
1. Sikadur 300, Sika Corp, Lyndhurst, NJ.
2. Sikadur 330 (Dry Lay-up), Sika Corp, Lyndhurst, NJ.
3. Alternate products must be submitted and approved by the Engineer a minimum of two weeks prior to the bid date.
2.4 EPOXY REPAIR MORTAR
A. Repair mortar shall be 100% solids, non-sag paste epoxy.
B. Approved products are:
1. Sikadur 30, Sika Corp., Lyndhurst, NJ.
2. Sikadur 31, Sika Corp., Lyndhurst, NJ
3. Alternate products must be submitted and approved by the Engineer a minimum of two weeks prior to the bid date.
2.5 PROTECTIVE COATING
A. Protective coating shall be polymer or acrylic based and shall be UV resistant.
B. Approved products are:
1. Sikagard 550W, Sika Corp., Lyndhurst, NJ.
2. Sikagard 670W, Sika Corp., Lyndhurst, NJ.
3. Alternate products must be submitted and approved by the Engineer a minimum of two weeks prior to the bid date.
03 56 00 - 9
Renovate Building 1 10-27-23
3.1 GENERAL
A. Inspect surfaces to receive the work and report immediately in writing to the Engineer as required in the General Conditions and deficiencies in the surface that render if unsuitable for proper execution of this work.
B. Protect vehicles, concrete, and other items surrounding work area from dust or damage due to Work of this Section.
3.2 SURFACE PREPARATION
A. All concrete surfaces shall be dry and free of surface moisture and frost, and tested by the Contractor to evaluate moisture transmission in accordance with ASTM D4263 “Indicating Moisture in Concrete by the
Plastic Sheet Method.“
B. All concrete surfaces shall be sound. Remove deteriorated concrete, dust, laitance, grease, paint, curing compounds, waxes, impregnations, foreign particles, and other bond inhibiting materials from the surface by blast cleaning or equivalent mechanical means.
C. All concrete surfaces shall be air blasted and vacuumed clean to a dust free condition.
D. Concrete surface irregularities less than one inch shall be ground and smoothed and/or filled with an approved repair mortar (e.g., Sikadur
30) with the addition of 1 part oven dried sand to make an epoxy mortar. Surface irregularities shall be limited to less than 0.04 inches (1 mm). Surface irregularities greater than one inch shall be repaired using an approved cementitious repair mortar (e.g. SikaTop
123).
E. External concrete corners shall be rounded to at least a 1/2” radius when perpendicular to fiber orientation and internal corners shall be smoothed by trowelling epoxy mortar into the corners.
F. The adhesive strength of the concrete shall be verified after preparation by random pull-off testing (ACI 503R) at the direction of the Engineer. Minimum tensile strength is 200 psi with concrete substrate failure, or as approved by the Engineer.
3.3 SURFACE PREPARATION
A. Columns or “Contact-Critical” Applications:
1. The surface to receive the composite shall be free from fins, sharp edges and protrusions that will cause voids behind the installed
03 56 00 - 10
Renovate Building 1 10-27-23 casing or that, in the opinion of the Engineer of Record, will damage the fibers. Existing uneven surfaces to receive composite shall be filled with the system epoxy filler or other material approved by the
Engineer of Record.
2. Filling of large voids in surfaces to receive composite shall be included in the contract work of installing the composite system
(small pinholes or micro-bubbles in the concrete surface or resin do not require special detailing). The contact surfaces shall have no free moisture on them at the time of application. If moisture is present, use the manufacturer suggested wet prime epoxy, if available.
3. Repair all damaged concrete, spalls, and irregular surfaces to create a flat, or slightly convex, surface. Fill surfaces with thickened epoxy to eliminate air surface voids greater than 0.5” diameter.
Well-adhered paint and concrete do not require removal.
4. Round off sharp and chamfered corners to a minimum radius of 0.75” by means of grinding or forming with the system’s thickened epoxy.
Variations in the radius along the vertical edge shall not exceed
0.5” for each 12” of column height.
B. Beams/Slabs/Walls or “Bond-Critical” Applications:
1. Surfaces shall be prepared for bonding by means of abrasive blasting or grinding to remove existing laitance and expose aggregate, minimum
ICRI CSP-2 concrete surface profile. All contact surfaces shall then be cleaned by hand or compressed air. Prior to the application of the saturated composite fabric, prime surfaces and fill any uneven surfaces with the manufacturer’s thickened epoxy. Provide anchorage as detailed on construction drawings, if required.
2. Round off sharp and chamfered corners (to be wrapped around) to a minimum radius of 0.75” by means of grinding or forming with the system’s thickened epoxy. Variations in the radius along the edge shall not exceed 0.5” for each 12” of length.
3.4 MIXING PRIMER AND SATURANT
A. Mix components in accordance with Manufacturer’s recommendations.
B. Diluting is not permitted. Pre-condition materials as indicated on technical data sheet.
C. Mix only that quantity which can be used within its pot life.
D. Do not batch deliver units into smaller quantities. Mix only full units.
03 56 00 - 11
Renovate Building 1 10-27-23
3.5 PRIMER APPLICATION
A. Apply primer in accordance with Manufacturer’s recommendations.
B. Primer may be applied with a brush or roller. Apply second coat as necessary after first coat has penetrated into concrete.
C. Surface depressions shall be filled with epoxy filler per manufacturers’ instructions.
D. Primer must be covered with fiber within 24 hours of application, depending on temperature conditions. If 24-hour window is exceeded, the primed surfaces must be solvent wiped with a fast flashing solvent
(e.g. MEK) or roughened with sandpaper to break the amine blush.
3.6 FRP REINFORCEMENT APPLICATION
Method 1: Wet Lay-Up
A. Apply FRP Reinforcement in accordance with Manufacturer’s recommendations.
B. When using saturator equipment, follow Manufacturer’s procedures for proper machine set-up and calibration. Rollers shall be calibrated to saturate the fabric with the proper resin- to-fabric ratio. The roller gap shall be checked daily by a qualified
C. technician for accuracy. The resin-to-fabric ratio shall also be verified by resin usage and documented on the daily project logs.
D. Once the fabric is saturated, it may then either be spooled for easy handling, or cut to specified lengths and booked for handling. Care must be taken not to damage the fibers.
E. The fabric may then be applied to the surface with no delay. Work from one end to the other, taking care to orient the fibers as specified.
Remove any air entrapped in the fabric with a ribbed roller or squeegee.
F. Sheets shall be lapped in the longitudinal direction 6 inches minimum or as indicated on the Drawings. Note: no lapping is required of the sheets parallel to the direction of fiber orientation.
Method 2: Dry Lay-Up
A. Apply FRP Reinforcement in accordance with Manufacturer’s recommendations.
B. FRP Reinforcement sheets shall be cut beforehand into prescribed lengths. Sheets shall be lapped in the longitudinal direction 6 inches minimum or as indicated on the Drawings. Note: no lapping is required
03 56 00 - 12
Renovate Building 1 10-27-23 of the sheets parallel to the direction of fiber orientation.
C. Follow Manufacturer’s recommendations regarding primer open times.
D. Apply a primary saturant coat uniformly by roller brush.
E. Apply FRP Reinforcement sheets fiber side down to the concrete over the fresh saturant using a ribbed roller to remove any air bubbles.
F. FRP Reinforcement sheets shall be left alone for about 30 minutes allowing for the primary saturant to soak through the fabric. Correct any dislocation on lifting.
G. Apply secondary saturant coat with roller over installed sheets in order to impregnate and replenish primary saturant.
H. If succeeding FRP Reinforcement sheets are specified on the Drawings repeat application procedures.
Method 3: Precured Strip Application
A. Apply FRP Precured Strip in accordance with Manufacturer’s recommendations.
B. Care shall be taken not to damage the fibers in handling and unpacking the Strips.
C. Strips may be either delivered to project site in factory pre-cut lengths, or cut on site. Care must be taken not to fray or otherwise damage the fibers when field cutting. Follow Manufacturer’s recommendations for field cutting of strips.
D. Strips shall be cleaned with a fast flashing solvent (e.g. MEK) to remove any bond inhibiting materials. A clean white cotton rag shall be used for this purpose. Continue cleaning the Strip in this manner until no black residue shows on the rag. Cleaning shall be performed the same day the strips are to be used.
3.7 CURING
A. Protect finished installation of FRP Reinforcement from rain, sand, dust, etc. using protective sheeting or other barriers. Do not allow protective sheeting to come in contact with finished application.
B. Curing of finished application shall be a minimum of 24 hours and in order to achieve full strength curing shall be extended for a period of two weeks at an average ambient temperature of 68◻F.
3.8 REPAIR OF DEFECTS
A. Upon completion of the curing process, the installed system shall be checked for areas where saturant has not penetrated or where saturant has not completely cured. Such areas shall be epoxy injected to re-
03 56 00 - 13
Renovate Building 1 10-27-23 establish bond subject to the approval of the Project Engineer.
B. Repair procedures shall be performed in accordance with guidelines established by ACI 440.2R-08 (paragraph 7.2.3) and approved by the
Project Engineer. All repairs shall be subject to the same application, curing and quality control specifications as the original work.
1. Small delaminations and voids less than 2 in 2 each are permissible as long as the delaminated area is less than 5% of the total laminate area and there are no more than 10 such delaminations per 10 ft2.
2. Medium sized delaminations and voids greater than 2 in2 but less than
25 in2 may be repaired by epoxy resin injection or ply replacement, depending on the size and number of delaminations and their location. The repair procedure should be determined by the
Project Engineer.
3. Larger size delaminations and voids greater than 25 in2 should be repaired by selectively cutting away the affected sheet and applying an overlapping sheet patch of equivalent plies. The overlap should extend a minimum of 6 in. in all directions.
3.9 PROTECTIVE COATING
A. Apply protective coating in accordance with Manufacturer’s recommendations.
3.10 CLEANING
A. Uncured saturants may be cleaned from tools with an approved solvent and properly disposed.
B. Cured saturants shall be removed by mechanical means and properly disposed.
C. Remove all surplus material, equipment and debris from the site on completion of the work. Leave the site clean.
3.11 FIELD INSPECTION
A. The contractor shall monitor the mixing of all epoxy components for proper ratio and adherence to manufacturer’s recommendations. Record batch numbers for fabric and epoxy used each day, and note locations of installation. Measure square footage of fabric and volume of epoxy used each day. Complete report and submit to Owner, engineer-of-record and FRP composite system manufacturer.
B. A Certified Special Inspector is required. The Certified Special
Inspector shall periodically observe all aspects of preparation, mixing, and application. All FRP composite applied areas shall be inspected, in accordance with the manufacturer’s specifications for
03 56 00 - 14
Renovate Building 1…