08 Plumbing_2b.pdf

PDF 6 MB Posted

Attached to
Biloxi Building 1 Renovation - Biloxi, MS -- Y1DA
Solicitation number
QSE--36C10F24R50025
Issued by

About this file

This package includes construction documents and drawings for the Biloxi Building 1 Renovation project located in Biloxi, Mississippi. The project involves selective demolition, exterior building envelope alterations, and interior renovation of areas within Building 1, including upgrades to HVAC, plumbing, electrical, telecommunication systems, chilled water systems, and modifications to fire protection systems. Limited structural, mechanical, and electrical work is also required on the underside of the 3rd floor within occupied areas of the 2nd floor. The awarded contractor will be responsible for monitoring the existing building foundation system throughout the project duration. Work will occur on unoccupied floors 3 through 5 and within crawl spaces and the attic. The solicitation number is QSE-36C10F24R50025 and is currently in the pre-solicitation stage.

View the file

Other files

File Type Posted
C28_Specifications Vol I (Biloxi Bldg 1 Reno) - 10.27.23.pdf PDF
Building 1 Inventory (b).pdf PDF
05 Architectural 4.pdf PDF
05 Architectural 1b.pdf PDF
01 General.pdf PDF
05 Architectural 2.pdf PDF
Building 1 Inventory (a).pdf PDF
Biloxi VA Reno B1_103287_SET_H.pdf PDF
10 Electrical_1.pdf PDF
13 Reference Drawings.pdf PDF
08 Plumbing_2a.pdf PDF
A-dec Floor Plan - VA Biloxi - Rev 2-24-23-Preliminary.pdf PDF
Compass Headwall 1.11.23.pdf PDF
VA Biloxi Patient Room Footwall Typical Elevation.pdf PDF
09 Mechanical_2.pdf PDF
07 Fire Protection.pdf PDF
A-dec Floor Plan - VA Biloxi - Rev 2-24-23-ELEVATIONS.pdf PDF
000000 Cover Page Appendix.pdf PDF
09 Mechanical_1.pdf PDF
04 Structural 1.pdf PDF
04 Structural 2.pdf PDF
LOCQ7780-03-SWS-Biloxi VA Dental Lab Drawing 1-5.pdf PDF
10 Electrical_2.pdf PDF
05 Architectural 3.pdf PDF
08 Plumbing_1.pdf PDF
Building 1 Inventory (d).pdf PDF
05 Architectural 1a.pdf PDF
Adec Submittal - VA Biloxi.pdf PDF
11 Telecommunication.pdf PDF
VA Biloxi 3rd Floor Footwall 2-13-23 FINAL-30x42.pdf PDF
Building 1 Inventory (c).pdf PDF
S02_DRAFT SOLICITATION (36C10F24R50025) - 02.07.24.pdf PDF
VA Biloxi 4th Floor Footwall 2-13-23 FINAL-30x42.pdf PDF
C28_Specifications Vol II (Biloxi Bldg 1 Reno) - 10.27.23.pdf PDF
06 Interior.pdf PDF
Pre-Solicitation Notice - Sources Sought Notice - Biloxi Bldg 1 Reno.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEDICAL GAS MOUNTING HEIGHT DETAIL

NOT TO SCALE

PIPE PENETRATION THROUGH WALL BELOW GRADE

NOT TO SCALE

(P-809) DIALYSIS BOX DETAIL

NOT TO SCALE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL501

DETAILS - PLUMBING RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 161 238Revisions: Date:

PORTABLE

WATER

ANALYZER

AUTOMATIC SPRINKLER SYSTEM SECTIONAL

CONTROL VALVE AND INSPECTOR'S TEST

VALVE AND DRAIN ASSEMBLY DETAIL

FLOOR MOUNTED HANDICAPPED, WATER CLOSET DETAIL

WALL HUNG HANDICAPPED, WATER CLOSET DETAIL

MEDICAL GAS PIPING AT OUTLETS 4

5a

3 5WATER MONITORING SYSTEM DETAIL

NOT TO SCALE

5b

NOT TO SCALE

NOT TO SCALE NOT TO SCALE

NOT TO SCALE

NOT TO SCALE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL502

DETAILS - PLUMBING RENOVATE BUILDING 1

10/27/2023 SCOPRZ AARMEY 162 238Revisions: Date:

1ST FLOOR 0'-0"

2ND FLOOR 13'-0"

3RD FLOOR 26'-0"

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

CS-2

CS-2

EXISTING FLOOR

DRAIN

EXISTING

4" VTR

EXISTING

4" VTR

EXISTING

4" VTR

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

4" VTR

4" VTR

4" VTR

CONNECT TO

EXISTING 4" VTR

EXISTING 4" VTR

CS-2

EXISTING VENT PIPING IN

ATTIC WHICH IS TO BE

REMOVED AS EXISTING

RISERS ARE REMOVED FROM

SERVICE. (TYPICAL)

REMOVE EXISTING

4" VTR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL505

OVERALL SANITARY RISER RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 163 238

KEYED NOTES:

1. PROVIDE 1/2" CW, 1/2" HW, AND 1 1/2" WASTE

CONNECTIONS FOR SINK LOCATED IN SIDE ACCESSORY

CONSOLE. COORDINATE ROUGH-IN REQUIREMENTS

WITH EQUIPMENT PROVIDER.

GENERAL SHEET NOTES:

1. REFER TO FLOOR PLANS FOR SIZES.

2. REFER TO PL601 FOR SYMBOLS AND NOTES.

3. REFER TO PL508, PL509, PL510, AND PL511 FOR

ENLARGED RISER DIAGRAMS.

DEDUCT ALTERNATE:

1. REFER TO GENERAL REQUIREMENTS

SPECIFICATION SECTION 01 00 00.1.38

ALTERNATE NO.2 FOR REQUIREMENTS OF

DEDUCT ALTERNATE OF THE DIALYSIS BOXES

INDICATED ON THIS SHEET.

Revisions: Date:

3RD FLOOR 26'-0"

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

6TH FLOOR 66'-0"

CS-2

CS-2

CS-2

CS-2

CS-2

CS-2

CS-2

CS-2

CS-2

CS-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

TP-2

CS-2

CS-2

CS-2

CS-2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL506

OVERALL WATER RISER RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 164 238

KEYED NOTES:

1. PROVIDE 1/2" CW, 1/2" HW, AND 1 1/2" WASTE

CONNECTIONS FOR SINK LOCATED IN SIDE

ACCESSORY CONSOLE. COORDINATE ROUGH-

IN REQUIREMENTS WITH EQUIPMENT

PROVIDER.

2. PROVIDE P-710 HANDHELD EYEWASH STATION

WITH MIXING VALVE MOUNTED BELOW

COUNTER. COORDINATE PIPING, MOUNTING

BRACKET, UNIT LOCATION, AND MIXING VALVE

LOCATION WITH SINK AND EQUIPMENT.

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. REFER TO FLOOR PLANS FOR SIZES.

3. REFER TO PL508, PL509, PL510, AND PL511 FOR

ENLARGED RISER DIAGRAMS.

DEDUCT ALTERNATE:

1. REFER TO GENERAL REQUIREMENTS

SPECIFICATION SECTION 01 00 00.1.38

ALTERNATE NO.2 FOR REQUIREMENTS OF

DEDUCT ALTERNATE OF THE DIALYSIS BOXES

INDICATED ON THIS SHEET.

ATTIC 66'-0"

5TH FLOOR 52'-0"

4TH FLOOR 39'-0"

3RD FLOOR 26'-0"

2ND FLOOR 13'-0"

1ST FLOOR 0'-0"

EXISTING

EXISTING

EXISTING

EXISTING

VA PROVIDED,

CONTRACTOR INSTALLED

SEPARATOR TANK

EXISTING

VA PROVIDED,

CONTRACTOR INSTALLED

VACUUM PUMP

MEDICAL GAS

AREA ALARM

MEDICAL GAS

AREA ALARM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL507

OVERALL MED GAS RISER RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 165 238

GENERAL NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. REFER TO FLOOR PLANS FOR SIZES NOT SHOWN.

3. REFER TO FLOOR PLANS PL301, PL302, AND PL307 FOR SYSTEM CONNECTIONS.

4. PROVIDE MEDICAL GAS RISER DIAGRAM IN SHOP DRAWING SUBMITTAL FOR REVIEW. VERIFY ROUTING IN FIELD PRIOR TO SUBMITTING DRAWINGS.

WCO

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

6TH FLOOR 66'-0"

TO EXISTING VTR

3RD FLOOR 26'-0"

4TH FLOOR 39'-0"

TP-2

TP-2

CS-2

WCO

WCO

WCO

WCO

3RD FLOOR 26'-0"

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

6TH FLOOR 66'-0"

FD-M

FD-M

2" VTR

TP-2

TP-2

3RD FLOOR 26'-0"

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

3RD FLOOR 26'-0"

4TH FLOOR

39'-0"

5TH FLOOR 52'-0"

TP-2

TP-2

TP-2

TP-2

WCO

3RD FLOOR 26'-0"

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

6TH FLOOR 66'-0"

3RD FLOOR 26'-0"

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

6TH FLOOR 66'-0"

3/4" HW DRAIN LINES WITH

SOLENOID VALVE THEN MANUAL

SHUT-OFF VALVE EXTENDED TO

FLOOR SINK (OR MOP SINK) TO

"HEAT AND FLUSH" DOMESTIC HOT

WATER LINE.

3RD FLOOR 26'-0"

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

6TH FLOOR 66'-0"

3/4" HW DRAIN LINES WITH

SOLENOID VALVE THEN MANUAL

SHUT-OFF VALVE EXTENDED TO

FLOOR SINK (OR MOP SINK) TO

"HEAT AND FLUSH" DOMESTIC

HOT WATER LINE.

TP-2

TP-2

3RD FLOOR 26'-0"

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

3RD FLOOR 26'-0"

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

BFP

BFP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL508

PLUMBING RISERS RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 166 238

SIMILAR RISERS:

P/3, P/4, P/7, P/8, P/9

SIMILAR RISERS:

P/3, P/4, P/7, P/8, P/9

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. CONTRACTOR SHALL SET ALL BALANCE VALVES TO

0.5GPM UNLESS NOTED OTHERWISE.

DEDUCT ALTERNATE:

1. REFER TO GENERAL REQUIREMENTS

SPECIFICATION SECTION 01 00 00.1.38 ALTERNATE

NO.2 FOR REQUIREMENTS OF DEDUCT ALTERNATE

OF THE DIALYSIS BOXES INDICATED ON THIS SHEET.

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

3RD FLOOR 26'-0"

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

3RD FLOOR 26'-0"

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

3RD FLOOR 26'-0"

4TH FLOOR 39'-0"

WCO

5TH FLOOR 52'-0"

6TH FLOOR 66'-0"

5TH FLOOR 52'-0"

6TH FLOOR 66'-0"

3/4" HW DRAIN LINES WITH SOLENOID

VALVE THEN MANUAL SHUT-OFF VALVE

EXTENDED TO FLOOR SINK (OR MOP

SINK) TO "HEAT AND FLUSH" DOMESTIC

HOT WATER LINE.

WCO

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

3RD FLOOR 26'-0"

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

3RD FLOOR 26'-0"

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL509

PLUMBING RISERS RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 167 238

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. CONTRACTOR SHALL SET ALL BALANCE VALVES TO

0.5GPM UNLESS NOTED OTHERWISE.

DEDUCT ALTERNATE:

1. REFER TO GENERAL REQUIREMENTS

SPECIFICATION SECTION 01 00 00.1.38 ALTERNATE

NO.2 FOR REQUIREMENTS OF DEDUCT ALTERNATE

OF THE DIALYSIS BOXES INDICATED ON THIS SHEET.

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

FLOOR 3 26'-0"

FLOOR 4 39'-0"

FLOOR 5 52'-0"

WCO

2ND FLOOR 13'-0"

3RD FLOOR 26'-0"

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

6TH FLOOR 66'-0"

3RD FLOOR 26'-0"

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

6TH FLOOR 66'-0"

2ND FLOOR 13'-0"

3RD FLOOR 26'-0"

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

6TH FLOOR 66'-0"

3RD FLOOR 26'-0"

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

6TH FLOOR 66'-0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL510

PLUMBING RISERS RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 168 238

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. CONTRACTOR SHALL SET ALL BALANCE VALVES TO

0.5GPM UNLESS NOTED OTHERWISE.

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

6TH FLOOR 66'-0"

CS-2

TP-2

TP-2

3RD FLOOR 26'-0"

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

6TH FLOOR 66'-0"

3/4" HW DRAIN LINES WITH SOLENOID

VALVE THEN MANUAL SHUT-OFF VALVE

EXTENDED TO FLOOR SINK (OR MOP

SINK) TO "HEAT AND FLUSH" DOMESTIC

HOT WATER LINE.

CS-2

TP-2

TP-2

FILTER

BFP

2ND FLOOR 13'-0"

3RD FLOOR 26'-0"

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

3RD FLOOR 26'-0"

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

CS-2

CS-2

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

CS-2

CS-2

3RD FLOOR 26'-0"

PATIENT ROOMS

3&4, 5&6, 8&9 10&11

ARE SIMILAR

3RD FLOOR 26'-0"

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

CS-2

CS-2

CS-2

CS-2

PATIENT ROOMS

3&4, 5&6, 8&9, 10 &11

ARE SIMILAR 3RD FLOOR 26'-0"

4TH FLOOR 39'-0"

5TH FLOOR 52'-0"

CS-2

CS-2

CS-2

CS-2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL511

PLUMBING RISERS RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 169 238

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. CONTRACTOR SHALL SET ALL BALANCE VALVES TO

0.5GPM UNLESS NOTED OTHERWISE.

DEDUCT ALTERNATE:

1. REFER TO GENERAL REQUIREMENTS SPECIFICATION

SECTION 01 00 00.1.38 ALTERNATE NO.2 FOR

REQUIREMENTS OF DEDUCT ALTERNATE OF THE

DIALYSIS BOXES INDICATED ON THIS SHEET.

PACKAGE BOOSTER PUMP SCHEDULE

MARK LOCATION AREA AND/OR

BLDG SERVED

SYSTEM

AND/OR

SERVICE

TYPE

CIRCULATING FLUID

PRESSURE

TRANSMITTER

SETPOINT

OUTLET BUFFER

TANK ACCEPTANCE

VOLUME

(MINIMUM)

ELECTRICAL MOTOR

FLUID NO

PUMPS

FLOW EA. PUMP HEAD EA. PUMP MIN

NPSH

AVAIL

TEMPERATURE

SP GR % EFF

NOMINAL POWER,

EA. PHASE VOLT MAX RPM SPEED

CONTROL REMARKS

GPM [L/s] FT [M] °F [°C] PSIG [kPa] GAL [L] HP [kW]

1-BP1

BLDG 1

BASEMENT

MECH ROOM BC

HOSPITAL

PRESSURE

FLOORS 3, 4,

AND 5

DOMESTIC

BOOSTER PUMP

VERTICAL

MULTISTAGE

DOMESTIC COLD

WATER 3 75 [ 5 ] 173.3 [ 52 ] N/A 50 [ 10 ] 1 68 75 [ 520 ] 30 [ 110 ] 3.0 [ 2 ] 3 208 3600 VARIABLE -----

NOTES:

1. UNIT INCOMING PRESSURE 50PSI, OUTLET PRESSURE TO BE 75 PSI. REFER TO SPECIFICATIONS FOR OPERATION.

2. PROVIDE UNIT WITH CAPABILITY TO INTERFACE WITH BAS. REFER TO DRAWINGS AND SPECIFICATIONS FOR MORE INFORMATION.

3. SYSTEM CONTROLLER SHALL ALTERNATE PUMPS TO EQUAL RUNTIME ON THE PUMPS. REFER TO SPECIFICATIONS FOR MORE INFORMATION.

4. PROVIDE SEPARATE PRESSURE SWITCHES FOR THE HIGH PRESSURE CUT OFF AND NOT FLOW CUT OFF SAFETIES. EACH DEVICE SHALL BE WIRED SEPARATELY TO THE BOOSTER PUMP CONTROL. THE USE OF A SINGLE DEVICE FOR VFD/SYSTEM PRESSURE CONTROL

AND MULTIPLE SAFETIES IS NOT ACCEPTABLE.

5. BASIS OF DESIGN UNIT ARMSTRONG DESIGN ENVELOPE 6800 BOOSTER SYSTEM MODEL N290102-3. CONTRACTOR IS RESPONSIBLE FOR ANY CHANGES REQUIRED DUE TO DIFFERENCES FROM BASIS OF DESIGN MODEL INCLUDING COORDINATION WITH ELECTRICAL.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL601

SCHEDULES - PLUMBING RENOVATE BUILDING 1

10/27/2023 SCOPRZ AARMEY 170 238Revisions: Date:

PROVIDE TWO 6" LOW PRESSURE DROP RPZ STYLE BACK FLOW

PREVENTORS ARRANGED IN PARALLEL CONFIGURATION ON 8" WATER LINE

SERVING BUILDING 1. UNITS SHALL BE INSTALLED ABOVE GRADE WITH

PIPING CONNECTION TO EXISTING MAINS LOCATED BELOW GRADE.

CONTRACTOR SHALL FIELD VERIFY EXISTING PIPING LOCATIONS PRIOR TO

EXCAVATING. CONTRACTOR SHALL COORDINATE TIE IN LOCATIONS AND

NEW BACKFLOW PREVENTOR LOCATION WITH THE RESIDENT ENGINEER.

CONNECT TO EXISTING 4" CW MAIN. ROUTE NEW 4" CW LINE THROUGH

BASEMENT WINDOW BOX AT BUILDING 53. CONTRACTOR SHALL VERIFY

EXISTING PIPE MATERIAL AT TIE-IN LOCATIONS. CONTRACTOR SHALL FIELD

VERIFY EXISTING PIPING LOCATIONS PRIOR TO EXCAVATING.

CONTRACTOR SHALL COORDINATE TIE IN LOCATION WITH THE RESIDENT

ENGINEER.

8" CW

8" CW

PRIMARY PUMP LOCATION

IN ROOM BC 109

ALTERNATE PUMP

LOCATION IN ROOM BC 109

APPROXIMATE LOCATION

OF ROOM BC 109

PROVIDE DOMESTIC WATER

BOOSTER PUMP SYSTEM IN

BASEMENT ROOM BC 109.

UNIT SHALL BE NO LARGER

THAN 72"W X 88" H X 60"D.

4" CW

CONTRACTOR TO TIE INTO VA FURNISHED 4"

COPPER PIPING WITH BACKFLOW PREVENTOR

IN MECHANICAL SPACE BELOW BUILDING 53.

REFER TO PL101 FOR MORE INFORMATION.

EXISTING 4" WATER

MAIN FOR BUILDING 53

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PS101

SITE PLAN - PLUMBING RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 136 238

KEYED NOTES:

1. CONNECT TO EXISTING LIFT STATION.

2. REFER TO PL101 FOR CONTINUATION.

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. CONTRACTORS SHALL REVIEW ROUTING OF PIPING

PRIOR TO BID. ROUTING SHOWN IS ONE POTENTIAL ROUTE

WITH FINAL ROUTE UP TO INSTALLING CONTRACTOR TO

DETERMINE.

3. CONTRACTORS SHALL COORDINATE ROUTING OF PIPING

WITH EXISTING CONDITIONS.

File details come from the government source that posted it. Updated .