08 Plumbing_2a.pdf

PDF 7 MB Posted

Attached to
Biloxi Building 1 Renovation - Biloxi, MS -- Y1DA
Solicitation number
QSE--36C10F24R50025
Issued by

About this file

This pre-solicitation notice and draft solicitation are for the Biloxi Building 1 Renovation project in Biloxi, Mississippi. The contractor will provide all labor, materials, equipment, supervision, and transportation necessary to complete selective demolition, exterior building envelope alterations, and interior renovations of areas within Building 1. Work includes upgrades to HVAC, plumbing, electrical, telecommunications, chilled water systems, and modifications to fire protection. Limited structural, mechanical, and electrical work will occur on occupied areas of the second floor. The contractor will also monitor the existing building foundation system throughout the project duration using a qualified consultant. The solicitation number is QSE--36C10F24R50025 and the project name is Biloxi Building 1 Renovation - Biloxi, MS -- Y1DA. The agency is the Department of Veterans Affairs Office of Construction and Facilities Management.

View the file

Other files

File Type Posted
C28_Specifications Vol I (Biloxi Bldg 1 Reno) - 10.27.23.pdf PDF
Building 1 Inventory (b).pdf PDF
05 Architectural 4.pdf PDF
05 Architectural 1b.pdf PDF
01 General.pdf PDF
05 Architectural 2.pdf PDF
Building 1 Inventory (a).pdf PDF
Biloxi VA Reno B1_103287_SET_H.pdf PDF
10 Electrical_1.pdf PDF
13 Reference Drawings.pdf PDF
A-dec Floor Plan - VA Biloxi - Rev 2-24-23-Preliminary.pdf PDF
Compass Headwall 1.11.23.pdf PDF
VA Biloxi Patient Room Footwall Typical Elevation.pdf PDF
09 Mechanical_2.pdf PDF
07 Fire Protection.pdf PDF
A-dec Floor Plan - VA Biloxi - Rev 2-24-23-ELEVATIONS.pdf PDF
000000 Cover Page Appendix.pdf PDF
09 Mechanical_1.pdf PDF
04 Structural 1.pdf PDF
04 Structural 2.pdf PDF
LOCQ7780-03-SWS-Biloxi VA Dental Lab Drawing 1-5.pdf PDF
10 Electrical_2.pdf PDF
05 Architectural 3.pdf PDF
08 Plumbing_1.pdf PDF
Building 1 Inventory (d).pdf PDF
05 Architectural 1a.pdf PDF
08 Plumbing_2b.pdf PDF
Adec Submittal - VA Biloxi.pdf PDF
11 Telecommunication.pdf PDF
VA Biloxi 3rd Floor Footwall 2-13-23 FINAL-30x42.pdf PDF
Building 1 Inventory (c).pdf PDF
S02_DRAFT SOLICITATION (36C10F24R50025) - 02.07.24.pdf PDF
VA Biloxi 4th Floor Footwall 2-13-23 FINAL-30x42.pdf PDF
C28_Specifications Vol II (Biloxi Bldg 1 Reno) - 10.27.23.pdf PDF
06 Interior.pdf PDF
Pre-Solicitation Notice - Sources Sought Notice - Biloxi Bldg 1 Reno.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

G

F

E

D

C

B

A

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

EXISTING 1-1/4"

OXYGEN RISER UP

WITH SHUT-OFF

VALVE IN RISER.

EXISTING 1/2" OXYGEN UP

TO ZONE VALVE ABOVE.

NEW 1-1/4" O, RISER UP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL301

EXISTING CRAWL SPACE -MED GAS RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 150 238

KEYED NOTES:

1. CONNECT TO EXISTING 2" OXYGEN PIPING.

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. CONTRACTORS SHALL REVIEW ROUTING OF PIPING

PRIOR TO BID. ROUTING SHOWN IS ONE POTENTIAL

ROUTE WITH FINAL ROUTE UP TO INSTALLING

CONTRACTOR TO DETERMINE.

3. CONTRACTORS SHALL COORDINATE ROUTING OF PIPING

WITH EXISTING CONDITIONS.

4. REMOVE ALL EXISTING DENTAL VACUUM PIPING

SERVING THE FIRST FLOOR AFTER THE NEW DENTAL LAB

HAS BEEN COMPLETED.

Revisions: Date:

F

E

D

C

B

A

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

EXISTING 1 1/4"O UP & DN

EXISTING 1 1/4" MA & 1 1/2" MV

UP

PROVIDE SHUT-OFF

VALVES.

UPUP & DN

UP

2" MV CAPPED

FOR FUTURE USE

EXISTING O, MA, MV UP

TO 2ND FLOOR

BIOMEDICAL DEPT.

EXISTING SHUT-OFF VALVES

FOR SERVICES TO 2ND FLOOR

BIOMEDICAL DEPT. EXISTING 0, MA, & MV SERVICES

TO EAST WING

1" O, 1" MA

REMOVE EXISTING DENTAL AIR RISER FROM THE

FIRST FLOOR BACK TO THE DENTAL AIR

COMPRESSORS AFTER THE NEW DENTAL LAB

HAS BEEN COMPLETED AND IS OPERATIONAL.

VERIFY WITH VA PRIOR TO REMOVAL.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL302

EXISTING 1ST FLOOR - MED GAS RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 151 238

KEYED NOTES:

1. CONNECT TO EXISTING 3/4" O & 3/4" MA

PIPING DOWNSTREAM OF EXISTING SHUT-OFF

VALVES. CAP EXISTING O & MA AT SHUT-OFF VALVES.

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. REFER TO PL501 AND PL502 FOR DETAILS.

3. REFER TO PL507 FOR RISER DIAGRAMS.

4. REMOVE ALL EXISTING DENTAL AIR AND DENTAL

VACUUM PIPING ON THE FIRST FLOOR AFTER THE

NEW DENTAL LAB HAS BEEN COMPLETED.

5. REFER TO DRAWING AE102 FOR INFORMATION

REGARDING PHASING OF WORK ON THE SECOND

FLOOR.

1 2 3 4 5 6 7 8 9

11 12

14 15 16 17 18 19 20 21 22

G

F

E

D

C

B

A

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

PROVIDE SHUT-OFF

VALVES AND CAP

FOR FUTURE USE.

TURN UP/DN..

1"O, 1" MA, 2" MV

CAPPED.

REMOVE EXISTING DENTAL AIR RISER FROM

THE FIRST FLOOR BACK TO THE DENTAL AIR

COMPRESSORS AFTER THE NEW DENTAL LAB

HAS BEEN COMPLETED AND IS OPERATIONAL.

VERIFY WITH VA PRIOR TO REMOVAL.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL303

EXISTING 2ND FLOOR - MED GAS RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 152 238

KEYED NOTES:

1. EXISTING 1 1/4" OXYGEN PIPING SHALL CONTINUE TO SERVE

THE 1ST & 2ND FLOORS. CAP RISER BELOW 3RD FLOOR & PROVIDE

WITH A SHUT-OFF VALVE.

2. CONNECT TO EXISTING 1 1/2" MA & 1 1/2" MV.

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. REFER TO PL501 AND PL502 FOR DETAILS.

3. REFER TO PL507 FOR RISER DIAGRAMS.

4. REFER TO DRAWING AE102 FOR INFORMATION REGARDING

PHASING OF WORK ON THE SECOND FLOOR.

F

E

D

C

B

A

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

FEC

FEC FEC

ZONE VALVE

MEDICAL GAS

AREA ALARM

PROVIDE

SHUT-OFF VALVES.

ZONE

VALVE

TURN UP/DN..

NEW MA & MV

UP/DN..

SHUT-OFF

VALVES

SHUT-OFF

VALVES

SHUT-OFF

VALVES

1 1/4" O, 1 1/2" MA,

2" MV

REMOVE EXISTING DENTAL AIR RISER FROM

THE FIRST FLOOR BACK TO THE DENTAL AIR

COMPRESSORS AFTER THE NEW DENTAL LAB

HAS BEEN COMPLETED AND IS OPERATIONAL.

VERIFY WITH VA PRIOR TO REMOVAL.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL304

3RD FLOOR - MED GAS RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 153 238

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. REFER TO PL501 AND PL502 FOR DETAILS.

3. REFER TO PL507 FOR RISER DIAGRAMS.

F

E

D

C

B

A

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

ZONE VALVE

ZONE

VALVE

1 1/2" LA & 1 1/2" DA

UP TO 5TH FLOOR

PROVIDE

SHUT-OFF VALVES.

DENTAL AIR

TURN UP/DN..

NEW MA & MV

UP/DN..

LA

SHUT-OFF VALVE IN

VERTICAL. ( TYP.)

SHUT-OFF

VALVES

1 1/4"O, 1 1/2"

MA, 2"MV

UP TO

WCO

UP TO

WCO

1 1/2" DV UP TO WCO

1 1/2" DV UP TO WCO

2" DV UP

REMOVE EXISTING DENTAL AIR RISER FROM

THE FIRST FLOOR BACK TO THE DENTAL AIR

COMPRESSORS AFTER THE NEW DENTAL LAB

HAS BEEN COMPLETED AND IS OPERATIONAL.

VERIFY WITH VA PRIOR TO REMOVAL.

2" DV FROM

DENTAL INTO TANK

2" DV FROM

PUMP INTO TANK

MEDICAL GAS

AREA ALARM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL305

4TH FLOOR - MED GAS RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 154 238

KEYED NOTES:

1. 1/2" DA UP TO DENTAL CHAIR FLOOR BOX.

2. 1/2" LA UP TO DENTAL LAB. COORDINATE

EXACT LOCATION WITH DENTAL LAB

EQUIPMENT LAYOUT, STRUCTURE, AND

RESIDENT ENGINEER.

3. 1-1/2" DV UP TO DENTAL CHAIR FLOOR BOX.

4. 1/2" DA UP TO SIDE ACCESSORY CONSOLE.

5. 1" LA PIPING UP TO DENTAL LAB.

COORDINATE EXACT LOCATION WITH DENTAL

LAB EQUIPMENT LAYOUT, STRUCTURE, AND

RESIDENT ENGINEER.

6. CONTRACTOR TO INSTALL VA PROVIDED

SEPARATOR TANK. CONTRACTOR SHALL

PROVIDE ALL NECESSARY COMPONENTS FOR

COMPLETE INSTALLATION. COORDINATE

REQUIREMENTS WITH VA.

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND

NOTES.

2. REFER TO PL501 AND PL502 FOR DETAILS.

F

E

D

C

B

A

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

ZONE VALVE

1 1/2" LA & 1 1/2" DA

DOWN TO 4TH FLOOR

PROVIDE SHUT-OFF

VALVES.

NEW MA & MV

DN..

NEW MA & MV

UP.

LA

1 1/4" O DN, 1 1/2"MA, 2"

MV UP/DN

UP

UP

UP & DN

WCO

WCO

WCO

WCO

REMOVE EXISTING DENTAL AIR RISER FROM

THE FIRST FLOOR BACK TO THE DENTAL AIR

COMPRESSORS AFTER THE NEW DENTAL LAB

HAS BEEN COMPLETED AND IS OPERATIONAL.

VERIFY WITH VA PRIOR TO REMOVAL.

LOCATE Y-SPLIT OUTLET

AT THESE STATIONS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL306

5TH FLOOR - MED GAS RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 155 238

KEYED NOTES:

1. CAP 2" MV & 1 1/2" MA FOR FUTURE USE.

2. 1/2" LA PIPING DOWN TO 4TH FLOOR.

COORDINATE EXACT FLOOR PENETRATION

LOCATION, PIPING TERMINATION, AND OUTLET

TYPE, LOCATION, AND ELEVATION WITH DENTAL

LAB EQUIPMENT/FURNITURE, STRUCTURE, AND

RESIDENT ENGINEER.

3. 1" LA PIPING DOWN TO 4TH FLOOR.

COORDINATE EXACT ROUTE OF LA PIPING WITH

VACUUM TUBING SYSTEM LOCATED WITHIN

ISLAND CABINETRY.COORDINATE EXACT FLOOR

PENETRATION LOCATION, PIPING TERMINATION,

AND OUTLET TYPE, LOCATION, AND ELEVATION

WITH DENTAL LAB EQUIPMENT/FURNITURE AND

VENDOR (LOC), STRUCTURE, AND RESIDENT

ENGINEER.

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. REFER TO PL501 AND PL502 FOR DETAILS.

F

E

D

C

B

A

7.4

F.8

F.3

B.4

B.7

D.8

D.2

B.8

B.2

10.8 12.2

5.1

EXISTING 1-1/2" MEDICAL AIR

EXISTING 2" MEDICAL VACUUM

NEW 1-1/2" DENTAL AIR

NEW 1 1/2"MA, 2"MV, 1 1/2" LA,

& 1 1/2" DA DOWN TO 5TH FLOOR

NEW MA & MV

DN..

NEW 1-1/2" LABORATORY AIR

DN

2" DV EXHAUST TO OUTSIDE WEATHER

CAP. COORDINATE INSTALLATION WITH

MECHANICAL CONTRACTOR. EXHAUST

OUTLET TO BE 25 FEET MINIMUM FROM

HVAC INTAKES.

INSTALL VA PROVIDED PUMP. CONTRACTOR

SHALL PROVIDE ALL NECESSARY

COMPONENTS FOR COMPLETE INSTALLATION.

COORDINATE REQUIREMENTS WITH VA AND

ELECTRICAL.

REMOVE EXISTING DENTAL AIR RISER FROM

THE FIRST FLOOR BACK TO THE DENTAL AIR

COMPRESSORS AFTER THE NEW DENTAL LAB

HAS BEEN COMPLETED AND IS OPERATIONAL.

VERIFY WITH VA PRIOR TO REMOVAL.

REVISE EXISTING PIPING ROUTE FOR NEW

MECHANICAL AND DUCT INSTALLATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL307

ATTIC - MED GAS RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 156 238

KEYED NOTES:

1. 1 1/2" LA CONNECTION TO EXISTING DENTAL

AIR COMPRESSOR. PROVIDE PRESSURE REDUCING VALVE

SET AT 50 PSI.

2. 1 1/2" DA CONNECTION TO EXISTING DENTAL AIR

COMPRESSOR. PROVIDE PRESSURE REDUCING VALVE SET

AT 140 PSI.

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

12 13

B

A

B.4

B.2

12.2

UP & DN

4" SAN UP

& DN

4"

VENT

UP

2" CW UP

1 1/2" CW

UP

UP

UP

UP

UP

UP & DN

16 17

D

D.2

4" SAN

UP & DN

3" VENT

UP

UP

UP

UP

UP

UP

UP

UP

12 13

B.4

B.2

12.2

4" SAN

DN

UP1" CW,

1/2" HW,

1/2" HWR

DN

UP

3 4

D

C

D.2

WCO

4" SV UP

4" SS DN

F

E

D.8

1 1/2" CW DN

1" HW DN

1" CW DN

1/2" HWR DN

DN

4" SV

UP

UP & DN

19 20 21 22

C

B

B.4

B.7

B.8

B.2

4" SAN

DN

2" SAN

DN

2" SS DN

WCO

4" SAN

DN

2" CW DN

1 1/2"HW DN

UP

UP

1 1/2"HWR DN

MULTIPLE

TRAP PRIMER

DN

4" SV UP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL401

ENLARGED PLANS - PLUMBING RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 157 238

KEYED NOTE

1. 1/2" CW BELOW SLAB TO TRAP.

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. CONTRACTOR SHALL SET ALL BALANCE VALVES TO

0.5GPM UNLESS NOTED OTHERWISE.

10 11 12 13

F

F.8

F.3

10.8 12.2

DN

UP

DN

3" SS

3" SS DN

2" SV UP

WCO

2" SV

4" SS

DN

2" CW DN

1 1/2" HW DN

1 1/2" HWR DN

1" CW UP TO

HOSE BIBBS IN

ATTIC.

UP

MULTIPLE

TRAP PRIMER

UP

3" SS UP TO EXISTING

FLOOR DRAIN

2 3 4

C

B

B.4

B.7

B.8

B.2

4" VENT

UP

UP & DN

WCO

UP

UP

UP

UP

UP

SERVICES TO

PATIENT

ROOM SINK

CS-2

UP

UP

TP-2

UP

UP

G

F

E

F.8

F.3

D.8

4" SAN

UP & DN

4" VENT

UPUP

UP

UPUP

UP

UP

UP

UP & DN

TP-2

TP-2

BFP

1/2" HWR UP

1/2" HW UP

1/2" CW UP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL402

ENLARGED PLANS - PLUMBING RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 158 238

KEYED NOTE

1. 1/2" CW BELOW SLAB TO TRAP

2. PROVIDE 3/4" DRAIN WITH SOLENOID VALVE THEN

MANUAL SHUT-OFF VALVE EXTENDED TO FLOOR SINK (OR

MOP SINK) TO "HEAT AND FLUSH" DOMESTIC HOT WATER

LINE. SOLENOID VALVE TO BE WIRED TO BAS FOR REMOTE

OPERATION AND MONITORING. COORDINATE VALVE

SELECTION AND LOCATION WITH OWNER AND

TEMPERATURE CONTROL CONTRACTOR.

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. CONTRACTOR SHALL SET ALL BALANCE VALVES TO

0.5GPM UNLESS NOTED OTHERWISE.

DEDUCT ALTERNATE:

1. REFER TO GENERAL REQUIREMENTS

SPECIFICATION SECTION 01 00 00.1.38

ALTERNATE NO.2 FOR REQUIREMENTS OF

DEDUCT ALTERNATE OF THE DIALYSIS

BOXES INDICATED ON THIS SHEET.

1 2 3 4 5 6

F

E

F.8

F.3

D.8

4" SV UP

4" SAN

UP & DN

4" SV UP

4" SAN

UP & DN

4" SAN

UP &

DN

4" SAN

UP & DN

1/2" HWR

UP

WC

UP

UP UP

UP

WCO

UP

UP UP & DN

UP

UP

DN

UPUP

UP

UP & DN

CS-2

CS-2

CS-2

CS-2

UPUP

UP

TP-2

TP-2

TP-2

DNTP-2

1/2" HW

UP

1/2" CW

UP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL403

ENLARGED PLANS - PLUMBING RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 159 238

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

DEDUCT ALTERNATE:

1. REFER TO GENERAL REQUIREMENTS

SPECIFICATION SECTION 01 00 00.1.38

ALTERNATE NO.2 FOR REQUIREMENTS OF

DEDUCT ALTERNATE OF THE DIALYSIS

BOXES INDICATED ON THIS SHEET.

19 20 21

C

B

B.4

B.7

B.8

B.2

UP

DN

UP & DN

DN

UP

DN

UP

UP

CS-2

TP-2

UP

UP

UP

UP

UP

UP

UP

1 2 3 4

C

B

B.4

B.7

B.8

B.2

DN

BAL V

4" SS DN

4 5

F

F.8

F.3

WCO

87.4

F.8

F.3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

BID DOCUMENTS

520-317X

Dwg. of

PL404

ENLARGED PLANS - PLUMBING RENOVATE BUILDING 1

BILOXI, MISSISSIPPI

10/27/2023 SCOPRZ AARMEY 160 238

KEYED NOTES:

1. PROVIDE 1/2" CW, 1/2" HW, AND 1 1/2" WASTE

CONNECTIONS FOR SINK LOCATED IN SIDE ACCESSORY

CONSOLE. COORDINATE ROUGH-IN REQUIREMENTS

WITH EQUIPMENT PROVIDER.

2. PROVIDE P-710 HANDHELD EYEWASH STATION WITH

MIXING VALVE MOUNTED BELOW COUNTER.

COORDINATE PIPING, MOUNTING BRACKET, UNIT

LOCATION, AND MIXING VALVE LOCATION WITH SINK

AND EQUIPMENT.

GENERAL SHEET NOTES:

1. REFER TO PL601 FOR SYMBOLS AND NOTES.

2. CONTRACTOR SHALL SET ALL BALANCE VALVES TO

0.5GPM UNLESS NOTED OTHERWISE.

DEDUCT ALTERNATE:

1. REFER TO GENERAL REQUIREMENTS

SPECIFICATION SECTION 01 00 00.1.38

ALTERNATE NO.2 FOR REQUIREMENTS OF

DEDUCT ALTERNATE OF THE DIALYSIS BOXES

INDICATED ON THIS SHEET.

File details come from the government source that posted it. Updated .