05 Architectural 1b.pdf

PDF 9 MB Posted

Attached to
Biloxi Building 1 Renovation - Biloxi, MS -- Y1DA
Solicitation number
QSE--36C10F24R50025
Issued by

About this file

This pre-solicitation notice seeks qualified contractors to renovate Biloxi Building 1 located in Biloxi, Mississippi. The scope of work includes selective demolition, exterior building envelope alterations, and interior renovations on the third, fourth, and fifth floors as well as within crawl spaces and the attic. Mechanical, electrical, plumbing and fire protection systems will be upgraded. Limited structural, mechanical, and electrical work will occur on the occupied second floor. The awardee must also monitor the building's foundation system throughout the project duration. Interested offerors should review the attached draft solicitation and pre-solicitation notice for additional requirements. The Department of Veterans Affairs Office of Construction and Facilities Management will administer the contract.

View the file

Other files

File Type Posted
C28_Specifications Vol I (Biloxi Bldg 1 Reno) - 10.27.23.pdf PDF
Building 1 Inventory (b).pdf PDF
05 Architectural 4.pdf PDF
01 General.pdf PDF
05 Architectural 2.pdf PDF
Building 1 Inventory (a).pdf PDF
Biloxi VA Reno B1_103287_SET_H.pdf PDF
10 Electrical_1.pdf PDF
13 Reference Drawings.pdf PDF
08 Plumbing_2a.pdf PDF
A-dec Floor Plan - VA Biloxi - Rev 2-24-23-Preliminary.pdf PDF
Compass Headwall 1.11.23.pdf PDF
VA Biloxi Patient Room Footwall Typical Elevation.pdf PDF
09 Mechanical_2.pdf PDF
07 Fire Protection.pdf PDF
A-dec Floor Plan - VA Biloxi - Rev 2-24-23-ELEVATIONS.pdf PDF
000000 Cover Page Appendix.pdf PDF
09 Mechanical_1.pdf PDF
04 Structural 1.pdf PDF
04 Structural 2.pdf PDF
LOCQ7780-03-SWS-Biloxi VA Dental Lab Drawing 1-5.pdf PDF
10 Electrical_2.pdf PDF
05 Architectural 3.pdf PDF
08 Plumbing_1.pdf PDF
Building 1 Inventory (d).pdf PDF
05 Architectural 1a.pdf PDF
08 Plumbing_2b.pdf PDF
Adec Submittal - VA Biloxi.pdf PDF
11 Telecommunication.pdf PDF
VA Biloxi 3rd Floor Footwall 2-13-23 FINAL-30x42.pdf PDF
Building 1 Inventory (c).pdf PDF
S02_DRAFT SOLICITATION (36C10F24R50025) - 02.07.24.pdf PDF
VA Biloxi 4th Floor Footwall 2-13-23 FINAL-30x42.pdf PDF
C28_Specifications Vol II (Biloxi Bldg 1 Reno) - 10.27.23.pdf PDF
06 Interior.pdf PDF
Pre-Solicitation Notice - Sources Sought Notice - Biloxi Bldg 1 Reno.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

9 13 1112

A A AAB 12 11 10

FOURTH FLOOR SFW OPENING ESW FOURTH FLOOR SFW OPENING ESW FIFTH FLOOR PW SS

THIRD FLOOR PW CSE THIRD FLOOR PW CSW

THIRD FLOOR PW CSS

SEE STRUCTURAL

DRAWING, SHEET S404

10.27.2023

SURROUND

CLOSURE

REMOVE EXISTING FAILING PORTION OF

MASONRY UNIT WALL FULL HEIGHT AT

INTERIOR SEE STRUCTURAL SHEET

REMOVE EXISTING STOREFRONT WINDOW

ASSEMBLY TYPICAL 3RD 4TH & 5TH FLOORS

REMOVE EXISTING FAILING

PORTION OF MASONRY UNIT

WALL FULL HEIGHT AT

INTERIOR. SEE STRUCTURAL

SHEET S404

EXISTING FAILING

PORTION OF MASONRY UNIT

WALL FULL HEIGHT AT INTERIOR

SEE STRUCTURAL SHEET S404

REMOVE EXISTING FAILING PORTION

OFMASONRY UNIT WALL FULL HEIGHT

AT INTERIOR. SEE STRUCTURAL

SHEET S404

REMOVE EXISTING STORE

FRONT WINDOW

ASSEMBLY TYPICAL 3RD

4TH & 5TH FLOOR

REMOVE EXISTING FAILING PORTION OF

MASONRY UNIT WALL FULL HEIGHT AT

INTERIOR. SEE STRUCTURAL SHEET S404

REMOVE EXISTING FAILING PORTION

OF MASONRY UNIT WALL FULL HEIGHT

AT INTERIOR. SEE STRUCTURAL

SHEET S404

REMOVE EXISTING FALLING

PORTION OF MASONRY UNIT WALL

FULL HEIGHT AT INTERIOR. SEE

STRUCTURAL SHEET S404

REMOVE EXISTING STOREFRONT

WINDOW ASSEMBLY TYPICAL 3RD

4TH AND 5TH FLOOR

THIRD FLOOR

THIRD FLOOR

THIRD FLOOR

THIRD FLOOR THIRD FLOOR THIRD FLOOR - THIRD FLOOR

THIRD FLOOR

REMOVE

REMOVE EXISTING PAINT/TEXTURE &

WOOD ENCLOSURE DOWN TO BELOW

THIRD FLOOR LINE SEE WALL

SECTION 2/AD301 SEE 1/AE502 FOR

WORK TYP.

REMOVE EXISTING PAINT/COATING

AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

REMOVE EXISTING PAINT/TEXTURE &

WOOD ENCLOSURE DOWN TO BELOW

THIRD FLOOR LINE SEE WALL

SECTION 2/AD301 SEE 1/AE502 FOR

WORK TYP.

REMOVE EXISTING PAINT/COATING

AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE EXISTING

PAINT/COATING AT ALL

EXISTING MASONRY IN

PREPARATION FOR PAINT

AND SILICONE

ELASTOMERIC COATING

REMOVE EXISTING PAINT/COATING

AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE EXISTING PAINT/TEXTURE

& WOOD ENCOSURE DOWN TO

BELOW THIRD FLOOR LINE.

SEE WALL SECTION 2/AD301

SEE 1/AE502 WORK TYP

REMOVE EXISTING PAINT/COATING

AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE EXISTING PAINT/COATING AT ALL

EXISTING MASONRY IN PREPARATION FOR

PAINT AND SILICONE ELASTOMERIC COATING

REMOVE EXISTING PAINT/COATING AT

ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE EXISTING PAINT/TEXTURE

& WOOD ENCOSURE DOWN TO

BELOW THIRD FLOOR LINE.

SEE WALL SECTION 2/AD301.

SEE 1/AE502 WORK TYP.

REMOVE EXISTING PAINT/COATING

AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE EXISTING PAINT/TEXTURE

& WOOD ENCOSURE DOWN TO

BELOW THIRD FLOOR LINE.

SEE WALL SECTION 2/AD301

SEE 1/AE502 WORK TYP

REMOVE EXISTING

PAINT/TEXTURE & WOOD

ENCOSURE DOWN TO BELOW

THIRD FLOOR LINE.

SEE WALL SECTION 2/AD301.

SEE 1/AE502 WORK TYP.

THIRD FLOOR

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

REMOVE WOOD BUCK

SUPPORTS ALL SIDES

REMOVE EXISTING PAINT/COATING

AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE EXISTING LOOSE MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

REMOVE EXISTING PAINT/COATING AT ALL EXISTING MASONRY

IN PREPARATION FOR PAINT AND SILICONE ELASTOMERIC

COATING

REMOVE EXISTING

PAINT/TEXTURE & WOOD

ENCOSURE DOWN TO BELOW

THIRD FLOOR LINE.

SEE WALL SECTION 2/AD301

SEE 1/AE502 WORK TYP

REMOVE EXISTING LOOSE MORTAR IN

PREPARATION FOR MASONRY MAINTENANCE

REMOVE EXISTING PAINT/TEXTURE

& WOOD SURROUND DOWN TO

BELOW THIRD FLOOR LINE.

SEE WALL SECTION 2/AD301.

STONE LEDGE BELOW CLEAN &

PREP FOR MORTAR REPAIR.

PREFINISHED METAL FLASHING

BELOW - REMOVE AND PREP FOR

REPLACEMENT

REMOVE EXISTING PAINT/TEXTURE

& WOOD SURROUND DOWN TO

BELOW THIRD FLOOR LINE.

SEE WALL SECTION 2/AD301.

REMOVE EXISTING FAILING PORTION OF MASONRY

UNIT WALL FULL HEIGHT AT INTERIOR. SEE STRUCTURAL

SHEET S404

REMOVE EXISTING FAILING

PORTION OF MASONRY

UNIT WALL FULL HEIGHT AT

INTERIOR. SEE STRUCTURAL

SHEET S404

REMOVE EXISTING STOREFRONT

WINDOW ASSEMBLY, TYPICAL 3RD

4TH & 5TH FLOORS

THIRD FLOOR THIRD FLOOR

SECOND FLOOR EXPANSION JOINT

ASSEMBLY

REMOVE EXISTING FAILING

PORTION OF MASONRY

UNIT WALL FULL HEIGHT AT

INTERIOR. SEE STRUCTURAL

SHEET S404

REMOVE EXISTING

STOREFRONT WINDOW

ASSEMBLY TYPICAL 3RD

4TH & 5TH FLOOR

THIRD FLOOR

REMOVE EXISTING PAINT/COATING AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND SILICONE ELASTOMERIC COATING

REMOVE EXISTING PAINT/TEXTURE PANEL AND ALL

ASSOCIATED CAULKING AT EXISTING EXPANSION JOINT

ASSEMBLY BEWTEEN BUILDINGS 1 & 53. PREP EXTERIOR

WALL FOR NEW EXPANSION JOINT ASSEMBLY.

REMOVE EXISTING LOOSE MORTAR IN

PREPARATION FOR MASONRY MAINTENANCE

REMOVE EXISTING PAINT/TEXTURE

& WOOD ENCOSURE DOWN TO

BELOW THIRD FLOOR LINE.

SEE WALL SECTION 2/AD301.

SEE 1/AE502 WORK TYP.

REMOVE EXISTING PAINT/COATING AT

ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

REMOVE EXISTING PAINT/TEXTURE

& WOOD ENCOSURE DOWN TO

BELOW THIRD FLOOR LINE.

SEE WALL SECTION 2/AD301.

SEE 1/AE502 WORK TYP.

REMOVE EXISTING PAINT/COATING AT ALL

EXISTING MASONRY IN PREPARATION FOR

PAINT AND SILICONE ELASTOMERIC COATING

REMOVE EXISTING LOOSE MORTAR IN

PREPARATION FOR MASONRY

MAINTENANCE

REMOVE EXISTING PAINT/TEXTURE

& WOOD ENCOSURE DOWN TO

BELOW THIRD FLOOR LINE.

SEE WALL SECTION 2/AD301.

SEE 1/AE502 WORK TYP.

1 1/2" THICK WOOD

DECK BOARDS

EXISTING WOOD STUDS&

PLATES TO REMAIN

FOR ADDITIONAL

FRAMING INFORMATION

SEE 7/AD503

LOOSEN ROOF PANELS TO

ALLOW ACCESS TO FLASHING

AND FASTENERS FOR DEDUCT

ALTERNATE

REMOVE EXISTING METAL

ROOF IN ITS ENTIRETY UNDER

BASE BID

DEMO DORMER VENT SECTION DEMO DORMER JAMB DETAIL

DEMO DORMER HEAD DETAIL

DEMO DORMER VENT SIDE ELEVATION DEMO DORMER VENT FRONT ELEVATION DEMO DORMER VENT SECTION DEMO DORMER SILL DETAIL

LOOSEN ROOF PANELS TO

ALLOW ACCESS TO FLASHING

AND FASTENERS FOR DEDUCT

ALTERNATE

DEMO DORMER VENT SECTION

SELF ADHERING ROOFING

MEMBRANE; RUN FROM

UNDER LOUVER TO 12" MIN

DOWN ROOF DECK; TIE

INTO EXIST MEMBRANE

EXISTING BLOCKING TO REMAIN,

WRAP IN SELF ADHERING

ROOFING MEMBRANE

EXIST PLYWD SHEATHING W/

ROOFING FELT; REMOVE

ROOFING FELT IN ITS ENTIRETY.

NOTIFY ARCHITECT AND

RESIDENT ENGINEER OF ANY

EVIDENCE OF DETERIORATED

PLYWD

EXIST PLYWD SHEATHING W/

ROOFING FELT; REMOVE

ROOFING FELT IN ITS ENTIRETY.

NOTIFY ARCHITECT AND

RESIDENT ENGINEER OF ANY

EVIDENCE OF DETERIORATED

PLYWD/WOOD

EXIST PLYWD SHEATHING TO

REMAIN

EXIST PLYWD SHEATHING W/

ROOFING FELT; REMOVE ROOFING

FELT IN ITS ENTIRETY. NOTIFY

ARCHITECT AND RESIDENT

ENGINEER OF ANY EVIDENCE OF

DETERIORATED PLYWD/WOOD

EXIST PLYWD SHEATHING W/

ROOFING FELT; REMOVE

ROOFING FELT IN ITS ENTIRETY.

NOTIFY ARCHITECT AND

RESIDENT ENGINEER OF ANY

EVIDENCE OF DETERIORATED

PLYWD/WOOD

PREFIN ALUM LOUVER

PREFIN ALUM SUBSILL W/ END

DAMS SET IN BED OF MASTIC

FLAT ROOF EDGE DETAIL 3

NOTE:

FOR ADDITIONAL NOTES AND

INFORMATION SEE OTHER DETAILS

ON THIS SHEET

VERIFY CONDITION

Demo Window Wall Detail

LOOSEN ROOF PANELS TO ALLOW

ACCESS TO TRIM AND TO INSTALL

NEW ROOFING MEMBRANE

REMOVE WOOD EAVE TRIM IN

ITS ENTIRETY

TO REMAIN

VERIFY

CONDITION

REMOVE WOOD EAVE TRIM IN

ITS ENTIRETY

REMOVE EXISTING BUILT-UP

ROOFING

EXISTING STRUCTURE TO REMAIN

VERIFY CONDITION

VERIFY CONDITION

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION

FOR MASONRY MAINTENANCE

REMOVE EXISTING PAINT/COATING

AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE STANDING SEAM

CLEAT AS REQUIRED TO

REMOVE WOOD TRIM &

INSTALL ROOFING

MEMBRANE

REMOVE METAL EDGE CAP &

CONTINUOUS CLIP AS

REQUIRED TO REMOVE

WOOD TRIM & INSTALL

ROOFING MEMBRANE

EXISTING WOOD FRAMING TO REMAIN

VERIFY CONDITION AND CONFIGURATION

REMOVE WOOD SOFFIT AND FASCIA TRIM.

VERIFY CONDITION AND CONFIGURATION

OF EXISTING WOOD BLOCKING

EMOVELOOSEN THRU WALL FLASHING TO ALLOW

REMOVE OF METAL FLASHING/ROOF, CLEAN

AND PREP FOR REUSE

R

REMOVE WINDOW ACCESSORIES

AND FASTENERS IN ITS ENTIRETY

SAWCUT AND REMOVE "+/- OF

CLAY BLOCK FOR THE NEW GROUT

SEE STRUCTURAL

REMOVE BLOCKING AND

FASTENERS IN ITS ENTIRETY

3 4 45

DEMO WINDOW JAMB DETAIL

DEMO WINDOW SILL DETAIL BUILDING SECTION @ OPENINGS - CALLOUT 4 BUILDING SECTION @ OPENINGS

REMOVE EXISTING PAINT/COATING

AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

REMOVE EXISTING PAINT/COATING AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND SILICONE ELASTOMERIC COATING

REMOVE EXISTING LOOSE MORTAR IN

PREPARATION FOR MASONRY MAINTENANCE

LOOSEN THRU WAL FLASHING TO ALLOW

REMOVE OF METAL FLASHING/ROOF, CLEAN

AND PREP FOR REUSE

REMOVE

REMOVE EXISTING PAINT/COATING

AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

1 DEMO WINDOW HEAD DETAIL

REMOVE EXISTING PAINT/COATING

AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE EXISTING LOOSE

MORTAR IN PREPARATION FOR

MASONRY MAINTENANCE

REMOVE EXISTING PAINT/COATING

AT ALL EXISTING MASONRY IN

PREPARATION FOR PAINT AND

SILICONE ELASTOMERIC COATING

REMOVE EXISTING LOOSE MORTAR IN

PREPARATION FOR MASONRY MAINTENANCE

5410.27.2023

5510.27.2023

5610.27.2023

5710.27.2023

5810.27.2023

File details come from the government source that posted it. Updated .