C250095_IFB_Exhibit_A_SOW.pdf

PDF 1 MB Posted

Attached to
Compressed Natural Gas Fuel Tank Replacement
Solicitation number
250095
Issued by
Orange County, California

About this file

This is a Scope of Work document prepared by the Orange County Transportation Authority (OCTA) for the replacement of compressed natural gas (CNG) fuel tanks on forty-eight (48) 2007-2008 New Flyer LFR buses. The project involves the provision and delivery of replacement CNG fuel tanks that meet specified safety and performance standards. The contractor shall be responsible for supplying tanks that comply with applicable regulations, including DOT FMVSS 304 and CGA C6.5 standards. The contract term is two (2) years, and the total project budget is $2,721,744.00. Specific response deadlines, site visit requirements, bidder's meeting details, and award dates are to be established in the invitation for bids (IFB) documentation.

The scope of work outlines detailed specifications for the CNG fuel tanks, including pressure ratings, material composition, safety valve requirements, and installation considerations. The contractor must ensure all tanks are properly tested and certified before delivery and installation on the buses. Additional requirements include warranty provisions, technical documentation, and compliance with OCTA's quality assurance procedures. The project is funded through OCTA's operating budget, and pricing terms will be established through the competitive bidding process. Interested contractors must meet specific technical qualifications and insurance requirements to be eligible for award consideration.

View the file

Other files

File Type Posted
Compressed_Natural_Gas_Fuel_Tank_Replacement.pdf PDF
C250095_IFB_Exhibit_A_SOW_GMEDITS.pdf PDF
C250095_Staff_Report_3-23-2026.pdf PDF
C250095_PS.doc DOC document
C250095_PP-APPROVED.pdf PDF
C250095_PP.docx DOCX document
C250095_IFB_Exhibit_C_Insurance.docx DOCX document
C250095_Public_Notice_Proof.pdf PDF
C250095_ICE.pdf PDF
C250095_R000451.pdf PDF
C250095_IFB_Exhibit_B_Price_Summary_Sheet.docx DOCX document
C250095_IFB_Exhibit_D_Safety_Specifications.doc DOC document
C250095_Insurance_and_Indemnification_Memo_and_RM_Review.pdf PDF
C250095_SOWV.pdf PDF
DBE_Program_Requirements.docx DOCX document
Davis-Bacon_Labor_Provisions.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IFB 250095

EXHIBIT A

SCOPE OF WORK

CNG Fuel Tanks Replacement

1. Background

The Orange County Transportation Authority (OCTA) intends to procure up to forty-eight (48) compressed natural gas (CNG) bus fuel tanks kits to replace fuel tanks on forty-eight (48) buses as a part of a CNG fuel tank replacement program for 2007-08 New Flyer Low Floor buses, Sales Release (SR) No. 1273. The current fuel tanks are nearing the end of their service life and are set to expire soon, making their replacement necessary.

Awarded Contractor shall provide and install new CNG tanks in OCTA’s bus fuel tank cradles and associated components. Cradles will be provided by OCTA.

2. Parts and Equipment Requirements

a. OCTA requires the following CNG tank. No substitution shall be accepted for CNG fuel tanks:

CNG Tank Manufacturer Part Number and Description Quantity

Hexagon Agility 240270-164A, Cylinder 15.6 in X 119.5 in, 315.4 L, NGV2, 3600 psig., with all hardware. 336

b. Parts and equipment shall be compatible with the following bus type:

c. All parts and equipment shall be new material, not refurbished material, and the condition of the material(s) shall be equivalent to acceptable standard practices within the industry.

Bus Type Year SR #

New Flyer, Low Floor, 40-ft.

CNG bus

2007-08

SR 1273

and

SR 1272

Referential picture of CNG tank decal with part number

3. Scope of Work

a. Contractor shall provide forty-eight (48) new CNG fuel tanks kits for forty-eight (48) buses. Fuel tanks provided must be as specified to ensure compatibility with the existing bus system and associated components.

b. Bus has seven (7) tanks and two (2) cradles. Four (4) tanks in one (1) cradle and three (3) tanks in another cradle. Total tanks for forty-eight (48) buses will be three hundred thirty-six (336) tanks. Deliver completed cradles with new CNG fuel tanks in sets of seven (7) tanks and two (2) cradles.

Referential pictures and drawings of CNG fuel tanks and piping

c. The section highlighted in the red box represents the CNG cradle. All components fuel tanks, fuel lines, electrical harnesses, within this section shall be Contractor’s responsibility. Any fuel lines or fittings located outside of this red box will remain on the bus and are excluded from the scope of work

C ra dl e si de

Refertial picture of new CNG fuel tanks kits installed in the cradle

d. OCTA will provide empty CNG fuel tank cradles. OCTA will remove fuel tank cradles from buses, remove the older fuel tanks from the cradles, clean and paint the cradles.

Referential picture of two (2) fuel tank cradles from one (1) bus that will hold seven (7) CNG fuel tanks.

e. Contractor shall install the new fuel tanks in the CNG cradles at Contractor’s facility. Contractor shall provide SNs for each new fuel tank.

f. Contractor shall be responsible for arranging transportation to pick up the CNG cradles to Contractor’s facility.

g. Contractor shall perform pressure test fuel tanks at the Contractor’s facility.

h. After completing the installation, pressure test, fixing any leaks found during the pressure test, Contractor shall deliver the cradles with new fuel tanks back to

OCTA.

i. OCTA shall install the cradles with new fuel tanks on to the bus.

j. Contractor will perform pressure test of fuel tanks and fuel lines at OCTA’s facility after it is installed in the bus. Any leaks identified during testing shall be promptly repaired by the Contractor.

k. After all fuel leaks are repaired, bus will put in two (2) hours of road testing. Bus needs to run 2 hours of fail-free road testing.

l. Contractor will provide tank specification, inspection decals and fuel fill decals.

Fuel Tank specification and inspection details can be obtained from fuel tank supplier Hexagon Agility.

m. Note: Since these buses are hand-built, there may be minor fit-up variations from cradle to cradle. It is the Contractor’s responsibility to ensure that all tanks properly fit into the cradles.

n. Below are some referential pictures of decals:

4. Additional Requirements

OCTA shall perform eight (8) hours of road testing to ensure no fuel leaks are present.

If the bus experiences a failure during the eight (8)-hour road testing, the clock will reset, and road testing will be restarted.

5. Regulatory Requirements Contractor shall be responsible for meeting and complying with all applicable federal, state, and local regulations, as well as adhering to accepted industry standards and practices typical for this type of procurement.

6. Warranty

a. Contractor shall provide a one (1) year warranty for all components, covering defects in materials and workmanship.

b. The warranty period shall commence upon completion of eight (8)-hour fail-free in-service testing. Failures shall be limited to fuel tanks, piping, fittings, valves on the cradle.

c. Warranty shall also include field service to repair defects.

d. Warranty services, unless specified otherwise, shall be provided at below mentioned OCTA/Contracted operated bases listed below:

Santa Ana Base 4301 MacArthur Blvd Santa Ana, CA 92704

Garden Grove Base 11790 Cardinal Circle Garden Grove, CA 92843

Anaheim Base 1717 E Via Burton Anaheim, CA 92806

Irvine Sand Canyon Base 14736 Sand Canyon

Irvine, CA 92618Garden Grove, CA 92843

e. Contractor shall be responsible for resolving any discrepancies encountered during installation and testing, either by making the necessary corrections or providing compensation.

7. Warranty Request – Field Service

a. OCTA’s Warranty Department shall be responsible for communicating with Contractor’s Warranty Service Center and/or Dealer Network to request repairs to be performed at OCTA’s facility(ies).

b. To meet OCTA’s service needs for twenty-four (24)-hour operations, three hundred sixty-five (365) days per year, Contractor shall be responsible for providing warranty support and repairs within twenty-four (24)-hours of receiving OCTA’s notification requesting such service. Warranty field service shall be provided within the specified twenty-four (24)-hour period, seven (7) days per week, including all weekends and holidays. This will apply during the warranty period.

8. Delivery and Pick Up Location

a. Contractor shall be responsible for picking up and delivering the CNG cradle(s) from the base address:

OCTA-Santa Ana Base/Shipping and Receiving 4301 W. MacArthur Blvd.

Santa Ana, CA-92704

b. Contractor shall be responsible for the transportation and delivery of the cradle with new CNG tanks. Each completed cradle with the new CNG fuel tank shall be delivered with protection from damage and scratching, which may occur from handling during the shipping process.

c. Note: OCTA employees are prohibited from entering the truck trailer. All cradles must be positioned so they can be accessed and removed from outside using a forklift. If specialized equipment is required for unloading, it is the Contractor’s responsibility to provide and arrange such equipment.

d. Contractor shall coordinate all delivery(ies) with OCTA’s Project Manager or designee.

e. All cradles with new CNG fuel tanks shall be delivered to:

OCTA-Santa Ana Base/Shipping and Receiving 4301 W. MacArthur Blvd.

Santa Ana, CA-92704

f. Delivery(ies) shall be made between the hours of 7:00 am and 3:30 pm, Monday through Friday.

g. The Contractor shall also be responsible for hauling away the old/removed fuel tanks. Any pallets required to securely load the tanks onto the truck shall be provided by the Contractor.

h. Referential pictures of wooden pieces used by vendors to haul away the tanks.

i. Final delivery shall be made within three hundred sixty-five (365) days after the

Purchase Ordered is released.

3. Scope of Work
4. Additional Requirements
5. Regulatory Requirements
6. Warranty
7. Warranty Request – Field Service