C250095_ICE.pdf
PDF 205 KB Posted
- Attached to
- Compressed Natural Gas Fuel Tank Replacement
- Solicitation number
- 250095
- Issued by
- Orange County, California
About this file
This Independent Cost Estimate (ICE) document was prepared by the Orange County Transportation Authority (OCTA) for the procurement of compressed natural gas (CNG) fuel tank replacement services. The project involves replacing CNG tanks on 48 New Flyer buses from the 2007-2008 model years, with each bus requiring seven new tanks. The scope of work encompasses the procurement of new CNG fuel tanks, associated piping, fittings, valves, and complete installation services. OCTA's Maintenance Department completed two prototype buses under Contract C42693 to confirm project feasibility and identify all necessary components. The total project encompasses 48 buses requiring retrofitting, with an anticipated contract term of two years.
The total estimated cost for this procurement is $2,721,744.00, calculated at $56,703 per bus. This estimate is based on pricing data from the prototype contract (C42693), which established a cost of $51,548 per bus, with a 10% increase applied to account for inflation and tariff impacts. The CNG tanks are currently obsolete and nearing the end of their service life, originally manufactured by Lincoln and now available on a build-to-order basis through Agility. The estimate includes all materials, equipment, and labor necessary for tank replacement and installation, with no separate line items for direct labor, overhead, or subcontractor costs identified in the ICE breakdown.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Compressed_Natural_Gas_Fuel_Tank_Replacement.pdf | ||
| C250095_IFB_Exhibit_A_SOW.pdf | ||
| C250095_IFB_Exhibit_A_SOW_GMEDITS.pdf | ||
| C250095_Staff_Report_3-23-2026.pdf | ||
| C250095_PS.doc | DOC document | |
| C250095_PP-APPROVED.pdf | ||
| C250095_PP.docx | DOCX document | |
| C250095_IFB_Exhibit_C_Insurance.docx | DOCX document | |
| C250095_Public_Notice_Proof.pdf | ||
| C250095_R000451.pdf | ||
| C250095_IFB_Exhibit_B_Price_Summary_Sheet.docx | DOCX document | |
| C250095_IFB_Exhibit_D_Safety_Specifications.doc | DOC document | |
| C250095_Insurance_and_Indemnification_Memo_and_RM_Review.pdf | ||
| C250095_SOWV.pdf | ||
| DBE_Program_Requirements.docx | DOCX document | |
| Davis-Bacon_Labor_Provisions.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEPENDENT COST ESTIMATE (ICE)
FA-CAMM-006.docm (04/30/13) Page 1 of 3
INSTRUCTIONS
Complete and submit all three pages to Contracts Administration & Materials Management (CAMM), along with your requisition and scope of work. CAMM will not start the procurement until all three documents have been received.
PART I – GENERAL INFORMATION
Project Description: Procurement of CNG fuel tank dor 48 buses and associated piping, fittings, valves and installation (48 buses and each bus has 7 tanks)
SHADED AREA FOR PROCUREMENT USE ONLY
Assigned Buyer No.:
D/M/WBE%:
Purchase Requisition No.: R000451
New Contract / Procurement
Contract Amendment Contract / PO No.:
Contract Task Order Contract / PO No.:
Option Term Contract / PO No.:
Date: 8/18/2025
Requestor: Sunil Chettiar Section Manager II Phone Ext.: 4539 Name Title
Signature:
Cost Estimate: $ 2,721,744.00 (include shipping, handling and taxes, if applicable)
PART II – ESTIMATE GUIDE
Please substantiate the estimate using the following information.
Estimate Type Items to Include Where to Find Supporting Information
Services (Other than A&E)
1. Tasks you want done
2. Types of people needed (i.e., supervisor, administrative assistant, other)
3. Positions required (i.e., Project Manager, Deputy PM, Senior Engineer / Planner, other)
4. Estimated hours by position
5. Salary / billing rates applied
6. Prevailing wage rate category applied
7. Profit / applied fee
8. Direct expenses
9. Completion schedule
1. Current or past contracts for similar services
2. Other properties / departments doing similar work
3. Historical price and cost data
Estimate Guide Continued
FA-CAMM-006.docm (04/30/13) Page 2 of 3
Estimate Type Items to Include Where to Find Supporting Information
Architects, Engineers, Designers
1. Tasks you want done
2. Types of people needed (i.e., engineers, administrative assistant, other)
3. Positions (Project Manager, Deputy PM, Senior Engineer / Planner, other)
4. Estimated hours by position
5. Salary / billing rates applied
6. Profit / applied fee
7. Overhead rate (%)
8. Direct expenses
9. Completion schedule
1. Current or past contracts for similar services
2. Other properties / departments doing similar work
3. Historical price and cost data
Goods/Equipment 1. Product needed
2. Quantity
3. Unit price
4. Markups, overhead, profit
5. Delivery schedule desired
6. Warranty
1. Vendor survey / market survey
2. Current or past contracts for the same or similar product
3. Historical price and cost data
4. Various published indices
Construction 1. Product needed
2. Labor (at a minimum use Davis Bacon)
3. Materials
4. Bonds
5. Insurance
6. Mobilization
7. Equipment
8. Markups, fringes, overheads, profit
9. Completion schedule
1. “Means Book”
2. “Blue Book”
3. Davis Bacon wage rates / prevailing wages
4. Current or past contracts for the same project
5. Historical price and cost data
Additional Information: OCTA needs to replace the CNG tanks on a sub-fleet of approximately 50 New Flyer buses from the 2007/08 model years. The Maintenance Department has completed two prototype buses, each requiring seven new CNG tanks, to confirm the project’s feasibility and identify all necessary components. These tanks are nearing the end of their service life and will expire soon. They are currently obsolete, originally manufactured by Lincoln, a company now owned by Agility. Agility can still produce these tanks on a build-to-order basis. The project scope includes purchasing new tanks, associated piping, fittings, valves, and completing the installation. Two prototypes were completed under Contract C42693, 48 buses remain to be retrofitted. The pricing estimate is based on Contract C42693, which covered CNG tank replacements for two bus prototypes. The cost per bus under this contract was $51,548. Applying a 10% increase to account for inflation and tariff impacts results in an updated cost of $56,703 per bus. For 48 buses, the total estimated cost is $2,721,744.
FA-CAMM-006.docm (04/30/13) Page 3 of 3
PART III – INDEPENDENT COST ESTIMATE
Using the information provided in Part II, prepare the ICE for your procurement.
Use any or all of the categories listed below.
Prepared By: Sunil Chettiar Date: 8/18/2025
Signature:
DESCRIPTION OF COST ELEMENTS
1. DIRECT LABOR
(List of Labor Categories)
Estimated Hours
Rate Per Hour ($)
Estimated Cost ($)
Total Est.
Cost ($)
$ $ 0.00 $ $ 0.00 $ $ 0.00 $ $ 0.00 $ $ 0.00 $ $ 0.00
Total Direct Labor: $ 0.00
2. OVERHEAD
Rate (%)
(use decimal input)
Total Labor ($)
Estimated Cost ($)
Total Est.
Cost ($)
% $ 0.00 $ 0.00 $ 0.00
3. MATERIALS/SERVICES (Excluding Information Technology [IT]) Estimated Cost ($)
Total Est.
Cost ($)
Procurement of CNG fuel tank dor 48 buses and associated piping, fittings, valves and installation. $ 2,721,744.00 $ 2,721,744.00
4. INFORMATION TECHNOLOGY SUPPORT Estimated Cost ($)
Total Est.
Cost ($)
Total IT Support: $ 0.00
5. TRAVEL Estimated Cost ($)
Total Est.
Cost ($)
$ $ 0.00
6. SUBCONTRACTOR(S) / CONSULTANT(S) Estimated Cost ($)
Total Est.
Cost ($)
Total Subcontractor(s) / Consultant(s): $ 0.00
7. OTHER DIRECT COSTS Estimated Cost ($)
Total Est.
Cost ($)
$ $ 0.00
8. TOTAL ESTIMATED COST: $ 2,721,744.00