C15578-Form SP-editable.docx

DOCX document 18 KB Posted

Attached to
US101/OR540 ADA Curb Ramps (Coos Bay/North Bend), Phase 2
Solicitation number
S-73000-00014433
Issued by
Columbia County, Condon City, Oregon

About this file

This is a Schedule of Prices form for an Oregon Department of Transportation (ODOT) design and construction project involving Americans with Disabilities Act (ADA) compliance improvements across three distinct price centers in ODOT Region 3. The project encompasses three separate locations: North Bend OR540 (milepost 0.05 to 2.24), North Bend US101 (milepost 234.88 to 235.60), and Coos Bay US101 (milepost 237.69 to 239.60). Each price center requires proposers to submit detailed pricing for Design Services, Quality Management Services, Construction Mobilization, and Construction work. The form permits proposers to structure Design Services into up to five separate Design Units, with corresponding Construction pricing broken down by the same Design Unit structure, allowing flexibility in how proposers organize and price their work scope.

Proposers must complete the pricing schedule by replacing placeholder text with specific proposal values for each line item and price center. The total project cost is calculated as the sum of all three price centers. The form requires proposers to delete any unused Design Unit rows while maintaining all other mandatory rows within each Price Center table. This structure allows ODOT to evaluate and compare pricing across multiple design approaches and construction methodologies for each geographic location, ultimately selecting the proposal that best meets the agency's technical and financial requirements for these ADA accessibility improvements.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORM SP - SCHEDULE OF PRICES

INSTRUCTIONS TO PROPOSERS: Replace blue italicized text below with information specific to the Proposal. . Delete any unused Design Unit rows in each Price Center Table. If the price center will only include a single Design Unit, delete all Design Unit rows below the main “Design” Price Item. DO NOT DELETE ANY OTHER ROWS IN THE PRICE CENTER TABLES.

PRICE CENTER A: ODOT Region 3 ADA North Bend OR540, MP 0.05 to 2.24

PRICE ITEM
PRICE ITEM

VALUE

A1 Design Services
$ (Sum of Design Unit Values)
A1.1 Proposer’s Design Unit 1
$Proposal Value
A1.2 Proposer’s Design Unit 2
$Proposal Value
A1.3 Proposer’s Design Unit 3
$Proposal Value
A1.4 Proposer’s Design Unit 4
$Proposal Value
A1.5 Proposer’s Design Unit 5
$Proposal Value
A2 Quality Management Services
$Proposal Value
A3 Construction Mobilization
$Proposal Value
A4 Construction
$Proposal Value
A4.1 Proposer’s Design Unit 1
$Proposal Value
A4.2 Proposer’s Design Unit 2
$Proposal Value
A4.3 Proposer’s Design Unit 3
$Proposal Value
A4.4 Proposer’s Design Unit 4
$Proposal Value
A4.5 Proposer’s Design Unit 5
$Proposal Value
PRICE CENTER A TOTAL
$(Sum of Price Item Values)

PRICE CENTER B: ODOT Region 3 ADA North Bend US101, MP 234.88 to 235.60

PRICE ITEM
PRICE ITEM

VALUE

B1 Design Services
$ (Sum of Design Unit Values)
B1.1 Proposer’s Design Unit 1
$Proposal Value
B1.2 Proposer’s Design Unit 2
$Proposal Value
B1.3 Proposer’s Design Unit 3
$Proposal Value
B1.4 Proposer’s Design Unit 4
$Proposal Value
B1.5 Proposer’s Design Unit 5
$Proposal Value
B2 Quality Management Services
$Proposal Value
B3 Construction Mobilization
$Proposal Value
B4 Construction
$Proposal Value
B4.1 Proposer’s Design Unit 1
$Proposal Value
B4.2 Proposer’s Design Unit 2
$Proposal Value
B4.3 Proposer’s Design Unit 3
$Proposal Value
B4.4 Proposer’s Design Unit 4
$Proposal Value
B4.5 Proposer’s Design Unit 5
$Proposal Value
PRICE CENTER B TOTAL
$(Sum of Price Item Values)

PRICE CENTER C: ODOT Region 3 ADA Coos Bay US101, MP 237.69 to 239.60

PRICE ITEM
PRICE ITEM

VALUE

C1 Design Services
$ (Sum of Design Unit Values)
C1.1 Proposer’s Design Unit 1
$Proposal Value
C1.2 Proposer’s Design Unit 2
$Proposal Value
C1.3 Proposer’s Design Unit 3
$Proposal Value
C1.4 Proposer’s Design Unit 4
$Proposal Value
C1.5 Proposer’s Design Unit 5
$Proposal Value
C2 Quality Management Services
$Proposal Value
C3 Construction Mobilization
$Proposal Value
C4 Construction
$Proposal Value
C4.1 Proposer’s Design Unit 1
$Proposal Value
C4.2 Proposer’s Design Unit 2
$Proposal Value
C4.3 Proposer’s Design Unit 3
$Proposal Value
C4.4 Proposer’s Design Unit 4
$Proposal Value
C4.5 Proposer’s Design Unit 5
$Proposal Value
PRICE CENTER C TOTAL
$(Sum of Price Item Values)

Total of Price Center A + Price Center B + Price Center C = ______________

File details come from the government source that posted it. Updated .