C04k-Attachment 11-QASP-1240LS26Q0044.pdf

PDF 232 KB Posted

Attached to
Swan Lake Ranger District Janitorial Contract, Flathead National Forest
Solicitation number
1240LS26Q0044
Issued by

About this file

This is a Quality Assurance Surveillance Plan (QASP) for the Swan Lake Ranger District Janitorial Contract (Contract Number 1240LS26Q0044) administered by the USDA US Forest Service.

The QASP establishes the systematic methods, procedures, and guidelines for monitoring contractor performance against the Statement of Work requirements. The plan defines performance standards and Acceptable Quality Levels (AQLs) for janitorial services at the Swan Lake Ranger District facilities, including the main office and wellness room. Performance standards address daily items required three times per week (waste basket emptying, floor vacuuming, mopping, furniture cleaning, bathroom sanitation, supplies refilling, window cleaning, and equipment maintenance), weekly items for the wellness room (waste removal, floor cleaning, shower and bathroom sanitation), and periodic seasonal tasks (blind cleaning in January, April, July, October; window washing and light fixture cleaning in April and September). The contractor is responsible for implementing a Quality Control Plan, maintaining quality records, and designating a single quality control point-of-contact. The Contracting Officer (CO) administers contract compliance and cost control, while the Contracting Officer Representative (COR) performs surveillance and monitoring activities, including inspections, documentation of deficiencies, and recommendations for corrective action or penalties. The plan allows for adjustment of surveillance levels based on performance progression—reducing surveillance for consistently excellent performance or increasing it for consistent deficiencies. Non-performance is documented and may result in remedial actions and penalties under Federal Acquisition Regulation provisions. The plan includes a detailed Quality Assurance Checklist for conducting inspections across all required service areas.

View the file

Other files

File Type Posted
SF30-amendment 1.pdf PDF
SF-1449-1240LS26Q0044-corrected.pdf PDF
C04d-Attachment 4-Schedule of Items-Swan Lake Janitor-1240LS26Q0044-final-corrected.pdf PDF
C04j-Attachment 10 Template for Mandatory Training Procedures for Contractor Employees-1240LS26Q0044-corrected.pdf PDF
C04a-Attachment 1-Solicitation Terms and Conditions-Swan Lake Janitor-1240LS26Q0044-final.pdf PDF
Wage Determination-Flathead Cnty-8-27-2026.pdf PDF
C04j-Attachment 10 Template for Mandatory Training Procedures for Contractor Employees-1240LS26Q0044.pdf PDF
C04g-Attachment 7-Biobased Product List-Swan Lake Janitor-1240LS26Q0044.pdf PDF
C04h-Attachment 8-Equipment List-Swan Lake Janitor-1240LS26Q0044.pdf PDF
C04c-Attachment 3-Office Photos.pdf PDF
C04e-Attachment 5-Past Performance Data Sheet-Swan Lake Janitor-1240LS26Q0044.pdf PDF
C04d-Attachment 4-Schedule of Items-Swan Lake Janitor-1240LS26Q0044-final.pdf PDF
C04b-Attachment 2-Statement of Work-Swan Lake Janitor-1240LS26Q0044-final.pdf PDF
C04i-Attachment 9-Contractor Credentialing-Training Requirements-Swan Lake RD Janitor-1240LS26Q0044.pdf PDF
C04a-Attachment 1-Solicitation Terms and Conditions-Swan Lake Janitor-1240LS26Q0044-final.pdf PDF
C04f-Attachment 6-Team Partner Consent Form-Swan Lake Janitor-1240LS26Q0044.pdf PDF
SF-1449-1240LS26Q0044.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Quality Assurance Surveillance Plan

Contents Project Name Solicitation / Contract Number Section 1: Introduction

1.1 Purpose

1.2 QASP Relation to the Contract

1.2.1 QASP Revisions

1.2.2 Surveillance of Performance Progression

1.3 QASP Relation to the Quality Control Plan (QCP)

Section 2: Performance Description

2.1 Performance Standards and Acceptable Quality Levels (AQLs)

2.1.1 Allowable Deviation

2.1.2 Substantially Complete

2.2 Non-Performance

2.2.1 Documentation

2.2.2 Remedial Actions

Section 3: Contractor and Government Responsibilities

3.1 Contractor Responsibility

3.2 Government Responsibility

3.2.1 Contracting Officer (CO)

3.2.2 Contracting Officer Representative (COR)

3.2.3 Customers.................................................................................................................................. Error! Bookmark not defined.

Section 4: Surveillance Methods to Perform Quality Assurance

4.1 Surveillance Methods

4.2 Analysis and Results .................................................................................................................. Error! Bookmark not defined.

Project Name Swan Lake Ranger District Janitorial Contract

Solicitation / Contract Number

1240LS26Q0044

Section 1: Introduction This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the Statement of Work (SOW) entitled Swan Lake Ranger District Janitorial Contract. This plan sets forth the procedures and guidelines that the USDA, US Forest Service will use in ensuring the required performance standards or services levels are achieved by the contractor.

1.1 Purpose

The purpose of the QASP is to describe the systematic methods used to measure performance and to identify the reports required and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards identified in the SOW. This QASP is designed to define roles and responsibilities, identify the performance objectives, define the methodologies used to monitor and evaluate the contractor’s performance, describe quality assurance reporting, and describe the analysis of quality assurance monitoring results.

1.2 QASP Relation to the Contract

1.2.1 QASP Revisions

The Contracting Officer Representative (COR) may make revisions or changes to the QASP procedures and surveillance methods or increase or decrease the degree of surveillance methods at any time during the contract performance period. Changes to the Metric must be incorporated into the SOW and QASP by a bilateral modification to contract that is issued by the Contracting Officer (CO). A copy of the QASP is provided to the contractor to enable the contractor to enhance its Quality Control (QC) program to perform in accordance with its Quality Control Plan (QCP).

1.2.2 Surveillance of Performance Progression

As the performance period progresses, the levels of surveillance may be altered for service areas where performance is either consistently excellent or unsatisfactory. If consistently good performance, then the amount of surveillance may be reduced. If observations reveal consistent deficiencies, increased surveillance may be implemented.

1.3 QASP Relation to the Quality Control Plan (QCP)

The QCP is a required element of contract and the Contractor shall adhere to its established quality control processes and procedures in managing and performing work as described in the contract. While the QCP represents the way in which the Contractor will ensure its quality and timeliness of services, as defined in the SOW, the QASP represents the way in which the Government personnel specified in Section 3: Contractor and Government Responsibilities, Paragraph 3.2, Government Responsibilities will evaluate the contractor’s performance. The contractor’s QC program and the residual organization’s QASP should be complementary programs that ensure successful contractor performance.

Section 2: Performance Description Performance of the contractor will be monitored through the surveillance methods described in Section 4: Surveillance Methods to Perform Quality Assurance to assess the Contractor’s performance against SOW requirements.

2.1 Performance Standards and Acceptable Quality Levels (AQLs) For selected activities in the SOW, the PRS provides a performance standard and an AQL. A performance standard is the expected level of contractor performance. An AQL defines the level of performance that is satisfactory. Depending on the service evaluated and the evaluation method selected, performance standards and AQLs may be stated as a number of occurrences or as a percentage. Performance standards and AQLs for random sampling and 100 percent inspection are generally stated as percentages. For periodic inspections, performance standards may be stated as either percentages or as absolute numbers.

The contract requires the Contractor to perform all work as specified. Any inaccuracies or omissions in services or products are referred to as “defects” on the part of the Contractor. The Contractor shall be responsible for all identified defects and may be required to perform the work at no cost to the government. The AQLs take into account that in some instances an allowable level of deficiencies (deviations) is possible while overall performance continues to meet the government’s desired level of service.

2.1.1 Allowable Deviation

The AQLs define the level or number of performance deficiencies the Contractor is permitted to reach under this contract. AQLs take into account the difference between an occasional defect and a gross number of defects. AQLs can be expressed as a percentage of or as an absolute number (e.g., three per month). There may be instances where 100 percent compliance is required, and no deviation is acceptable (e.g., where safety is involved).

2.1.2 Substantially Complete

In some cases, service outputs are evaluated using subjective values (e.g., excellent, satisfactory, unsatisfactory). The criteria for acceptable performance and for defects must be defined for these service outputs. The concept of “substantially complete” should be the basis for inspections based on subjective scales. Work is considered “substantially complete” where there has been no significant departure from the terms of the contract and no omission of essential work. In addition, the Contractor has performed the work required to the best of its ability and the only variance consists of minor omissions or deficiencies.

2.2 Non-Performance

Non-performance occurs when the contractor’s performance does not meet the AQL for a given requirement.

Requirements may contain multiple performance elements, and therefore, deficiencies may occur in one or more aspects of performance (e.g., timeliness, accuracy, completeness, etc.) or subject areas of effort.

When surveillance indicates that the contractor's service output is not in compliance with the contract requirements, the Contracting Officer’s Representative (COR) must determine whether the Contractor or the Government caused the deficiency. If the cause of the defect rests with the Government, corrective action must be taken through Government channels. If the cause of the defect is due to action or inaction by the contractor, the contractor is responsible for correction of the problem at no additional expense to the Government.

2.2.1 Documentation

Documentation of work non-performed or unacceptable work is essential for tracking Contractor performance. The COR will document deficient work by compiling facts describing the inspection methods and results and to substantiate nonconformance with the contract. The documentation, with any recommendations, will be forwarded to the CO. In the case of the Contractor, the COR will decide whether to elevate the problem to the CO for corrective action.

2.2.2 Remedial Actions

The Federal Acquisition Regulation allows for penalties in the event that the Contractor fails to perform the required services. Penalties are defined as those actions taken under the direction of the CO against the contractor within the general provisions of the contract for nonconformance to the SOW.

Section 3: Contractor and Government Responsibilities

3.1 Contractor Responsibility

The Contractor is responsible for delivering products or services in accordance with the contract. Implementing its QCP, which describes the Contractor’s methods for ensuring all products and services under the contract meet established performance standards and AQLs. Maintaining, and providing for audit, quality control records and reports and all records associated with the investigation and complaint resolutions. Appointing a single quality control point-of-contact to act as a central recipient of communication from the COR or CO.

3.2 Government Responsibility

3.2.1 Contracting Officer (CO)

The CO is responsible for administering and monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by COR and the contractor’s performance. The CO may delegate various day-to-day contract administration duties to a Administering ACO (ACO) and/or the COR for performance management and administrative actions such as invoice approval and issuance of Contract Discrepancy Reports may be, and normally are, delegated by the CO to the COR. The CO shall approve any revisions to the QASP processes or standards.

3.2.2 Contracting Officer Representative (COR)

The COR, is designated in writing, by the CO. The COR will ensure that the QA function is properly executed, plays a key role in contract administration and performs the contract surveillance and monitoring. Some key contract administration duties include, but are not limited to, performs surveillance as required by this QASP; make recommendations to the CO for issuance of Contract Discrepancy Reports or letters of commendation and acceptance or rejection of completed work and for administrative actions based on unsatisfactory or non-performed work, and revisions or changes to the QASP;

and assists the CO in identifying necessary contract modifications and preparing reports of Contractor performance and cost.

Section 4: Surveillance Methods to Perform Quality Assurance

4.1 Surveillance Methods

The surveillance methods used in the QA process are the Government’s tools to monitor the Contractor’s products and services. The best means of determining whether the Contractor has met all contract requirements is to inspect the Contractor’s service products and analyze the results. Further, documented inspection results are an effective tool in contract administration that can confirm the successful achievement of all performance requirements or highlight areas where defects exist and improvements are necessary.

SWAN LAKE JANITORIAL CONTRACT QUALITY ASSURANCE CHECKLIST

Inspector Name: _______________________

Contract #: ______________________________

Contractor: ______________________________ Inspection Date/Time: ______________________

Last Cleaning Date/Time: ______________________________

Inspector Criteria Comments MAIN OFFICE – DAILY ITEMS (3 times per week) Waste baskets emptied, washed, lined with garbage bags.

Carpet floors vacuumed.

Solid surface floors swept and damp mopped.

Furniture cleaned (bookcases, tables, counters, file cab, etc.)

Walls, counters, ledges, display surfaces dusted.

Toilet bowls and urinals cleaned and disinfected.

Sinks cleaned.

Bathroom fixtures clean (walls, mirrors, stalls, dispensers, etc.)

Toilet paper, paper towels, and soap refilled.

Drinking fountains cleaned and disinfected.

Cobwebs at all levels removed.

Floor mats vacuumed (washed if needed) Walls, doors, trim clean and free of marks.

Microwave exterior clean.

Refrigerator exterior clean.

Windows of front, side, rear entry doors and adjacent windows clean.

MAIN OFFICE-WEEKLY ITEMS

Blue paper recycle bins emptied

WELLNESS ROOM - WEEKLY ITEMS

Waste baskets emptied, washed, lined with garbage bags.

Floors vacuumed clean and damp mopped.

Showers cleaned, disinfected and free of marks/residue.

Toilet bowls and urinals cleaned and disinfected.

Sinks cleaned.

Bathroom fixtures clean (walls, mirrors, stalls, dispensers, etc.)

Toilet paper, paper towels, and soap refilled.

Cobwebs at all levels removed.

Floor mats vacuumed (washed if needed) MAIN OFFICE and WELLNESS ROOM – OTHER ITEMS Blinds (January, April, July, October) Window washing (April, September) Light Fixtures (April, September)

Project Name
Solicitation / Contract Number
Section 1: Introduction
1.1 Purpose
1.2 QASP Relation to the Contract
1.2.1 QASP Revisions
1.2.2 Surveillance of Performance Progression
1.3 QASP Relation to the Quality Control Plan (QCP)
Section 2: Performance Description
2
2.1 Performance Standards and Acceptable Quality Levels (AQLs)
2.1.1 Allowable Deviation
2.1.2 Substantially Complete
2.2 Non-Performance
2.2.1 Documentation
2.2.2 Remedial Actions
Section 3: Contractor and Government Responsibilities
3
3.1 Contractor Responsibility
3.2 Government Responsibility
3.2.1 Contracting Officer (CO)
3.2.2 Contracting Officer Representative (COR)
Section 4: Surveillance Methods to Perform Quality Assurance
4
4.1 Surveillance Methods

File details come from the government source that posted it. Updated .