C04a_1a MJ IRSC SOI.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- Mitchell-Jackson IRSC
- Solicitation number
- 12363N26Q4189
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Statement of Interest (SOI) spreadsheet template for the Mitchell-Jackson IRSC (Integrated Restoration and Stewardship Concept) project issued by the Department of Agriculture Forest Service under solicitation number 12363N26Q4189. The document serves as a template for small business contractors to express their interest in participating in this forest fuel modification and wildland fire risk reduction project, which aims to reduce the potential spread of wildland fire into Operable Unit 3 and mitigate exposure and migration risks associated with Libby Amphibole Asbestos contamination. The acquisition is a Total Small Business Set-Aside restricted to small business concerns with a size standard of 500 employees, classified under NAICS code 113310 (forestry services). Interested contractors must submit quotations via email to Mark Phillipp (mark.phillipp@usda.gov) and Matt Daigle (matthew.daigle@usda.gov) in response to the RFQ issued as a combined synopsis/solicitation for commercial items under FAR Part 12 procedures.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MJ IRSC SOI
| ITEM No. | DESCRIPTION of MANDATORY WORK ACTIVITIES | UNIT of MEASURE | EST. QTY | UNIT PRICE | TOTAL PRICE | TIMBER/PRODUCT REMOVAL PRICE SCHEDULE | ||||||
| 1 | CUT and REMOVE INCLUDED TIMBER | TON | 122,631 | N/A | N/A | Species | Product | Estimated Quantity | Unit of Measure | Minimum Acceptable Offer | Quoters Offer | Total Offer |
| 2 | ROAD CONSTRUCTION & RECONSTRUCTION – AREA 56 | DF & Other | Sawtimber | 122,631 | Ton | $10.69 | $ - 0 | |||||
| 2a | MOBILIZATION | LUMP SUM | 1.00 | $ - 0 | ||||||||
| 2b | CENTERLINE ESTABLISHMENT AND CLEARING LIMIT FLAGGING | MILE | 6.97 | $ - 0 | ||||||||
| 2c | CLEARING AND GRUBBING, DISPOSAL METHOD E, COMPACTION METHOD 5 | ACRE | 47.42 | $ - 0 | ||||||||
| 2d | REMOVAL OF INDIVIDUAL TREES, DISPOSAL METHOD (I) | EACH | 4.00 | $ - 0 | Mandatory Activities Total | $ - 0 | ||||||
| 2e | SELECTIVE CLEARING, TYPE ROADSIDE, DISPOSAL METHOD (F) | MILE | 30.97 | $ - 0 | Optional Activites Total | $ - 0 | ||||||
| 2f | REMOVAL OF CULVERT, DISPOSAL METHOD (A), COMPACTION METHOD 5 | EACH | 7.00 | $ - 0 | Timber Total | $ - 0 | ||||||
| 2g | REMOVAL OF SIGNS, DISPOSAL METHOD (A), COMPACTION METHOD 5 | EACH | 3.00 | $ - 0 | ||||||||
| 2h | ROADWAY EXCAVATION, ROAD CONSTRUCTION, COMPACTION PLACEMENT METHOD 3, TOLERANCE CLASS I | CUBIC YARD | 200.00 | $ - 0 | ||||||||
| 2i | ROADWAY EXCAVATION, CONSTRUCT TURNOUT, TURNAROUND, COMPACTION PLACEMENT METHOD 3, TOLERANCE CLASS I | EACH | 5.00 | $ - 0 | ||||||||
| 2j | ROADWAY EXCAVATION, COMPACTION METHOD 3, TOLERANCE CLASS M | CUBIC YARD | 67189.00 | $ - 0 | ||||||||
| 2k | DRAINAGE EXCAVATION, CONSTRUCT TYPE II DRAIN DIP, TOLERANCE CLASS A, COMPACTION METHOD 3 | EACH | 105.00 | $ - 0 | ||||||||
| 2l | DRAINAGE EXCAVATION, CONSTRUCT TYPE I DRAIN DIP, TOLERANCE CLASS A, COMPACTION METHOD 3 | EACH | 87.00 | $ - 0 | ||||||||
| 2m | DRAINAGE EXCAVATION, TYPE ROADSIDE DITCH, DISPOSAL METHOD F | FOOT | 330.00 | $ - 0 | ||||||||
| 2n | DRAINAGE EXCAVATION, TYPE OUTLET DITCH | FOOT | 70.00 | $ - 0 | ||||||||
| 2o | DRAINAGE EXCAVATION, RECONSTRUCT CATCH BASIN | EACH | 4.00 | $ - 0 | ||||||||
| 2p | DRAINAGE EXCAVATION, CONSTRUCT SEDIMENT BASIN | EACH | 2.00 | $ - 0 | ||||||||
| 2q | LINEAR GRADING,DISPOSAL METHOD F, COMPACTION METHOD 3 | MILE | 6.81 | $ - 0 | ||||||||
| 2r | PLACED RIPRAP, CLASS 1, COMMERCIAL SOURCE, VISUAL ACCEPTANCE METHOD | CUBIC YARD | 45.00 | $ - 0 | ||||||||
| 2s | AGGREGATE SURFACE COURSE, GOVERNMENT FURNISHED, COMPACTION METHOD B | CUBIC YARD | 1180.00 | $ - 0 | ||||||||
| 2t | DITCH RECONDITIONING | MILE | 0.70 | $ - 0 | ||||||||
| 2u | SHOULDER RECONDITIONING | MILE | 0.70 | $ - 0 | ||||||||
| 2v | ROADWAY RECONDITIONING, COMPACTION METHOD 2 | MILE | 31.15 | $ - 0 | ||||||||
| 2w | FULL DEPTH RECLAMATION, 4-INCH DEPTH, 1-INCH MINUS, COMPACTION METHOD B | MILE | 0.7 | $ - 0 | ||||||||
| 2x | 24 INCH PIPE CULVERT, CORRUGATED STEEL, 16 GAGE, COMPACTION METHOD 6 | FOOT | 100 | $ - 0 | ||||||||
| 2y | 18 INCH PIPE CULVERT, CORRUGATED STEEL, GAGE 16, COMPACTION METHOD 2 OR 6 | FOOT | 198 | $ - 0 | ||||||||
| 2z | 24 INCH PIPE CULVERT, CORRUGATED STEEL, GAGE 16, COMPACTION METHOD 2or 6 | FOOT | 190 | $ - 0 | ||||||||
| 2aa | 18 INCH PIPE CULVERT EXTENSION, CORRUGATED STEEL, GAGE 16, COMPACTION METHOD 2 OR 6 | FOOT | 54 | $ - 0 | ||||||||
| 2ab | 30 INCH PIPE CULVERT, CORRUGATED STEEL, 16 GAGE, COMPACTION METHOD 2 or 6 | FOOT | 40 | $ - 0 | ||||||||
| 2ac | CONCRETE OPEN TOP CULVERT, COMPACTION METHOD 6 | FOOT | 84 | $ - 0 | ||||||||
| 2ad | CLEANING CULVERTS IN PLACE, FLUSH CULVERT | EACH | 5 | $ - 0 | ||||||||
| 2ae | RECONDITIONING DRAINAGE STRUCTURES, JACK CULVERT END | EACH | 3 | $ - 0 | ||||||||
| 2af | RECONDITIONING DRAINAGE STRUCTURES, TRIM CULVERT END AND TREAT WITH ZINC RICH COATING , DISPOSAL METHOD (a) | EACH | 1 | $ - 0 | ||||||||
| 2ag | REMOVE AND RESET METAL PIPE GATE | EACH | 2 | $ - 0 | ||||||||
| 2ah | SEEDING, DRY METHOD | ACRE | 8.84 | $ - 0 | ||||||||
| 2ai | TURF ESTABLISHMENT, DRY METHOD SEEDING, DRY METHOD MULCHING, COMMERCIAL FURNISHED SEED | ACRE | 19.77 | $ - 0 | ||||||||
| 2aj | SIGN, FLEXIBLE POST FM1-7V PANEL, BROWN CARSONITE | EACH | 18 | $ - 0 | ||||||||
| 2ak | SIGN, ALUMINUM FD10-1 PANEL, TYPE III SHEETING | EACH | 46 | $ - 0 | ||||||||
| 2al | SIGN, ALUMINUM FM1-7V PANEL, TYPE III SHEETING | EACH | 2 | $ - 0 | ||||||||
| 2am | SIGN, ALUMINUM R1-1 PANEL, TYPE III SHEETING | EACH | 2 | $ - 0 | ||||||||
| 2an | POST, 8' GALVANIZED METAL, U-CHANNEL STEEL | EACH | 25 | $ - 0 | ||||||||
| 2ao | POST, 10' GALVANIZED METAL, U-CHANNEL STEEL | EACH | 2 | $ - 0 | ||||||||
| 2ap | 36 INCH PIPE CULVERT, CORRUGATED STEEL, GAGE 16, COMPACTION METHOD 6 | FOOT | 146 | $ - 0 | ||||||||
| 2aq | DUST PALLIATIVE, TYPE CALC PELLET | MILE | 3.24 | $ - 0 | ||||||||
| 2ar | DRAINAGE EXCAVATION, TYPE RUBBER SURFACE WATER DEFLECTOR, COMPACTION METHOD 6 | FOOT | 184 | $ - 0 | ||||||||
| 3 | ROAD RECONSTRUCTION - POWERHOUSE | |||||||||||
| 3a | MOBILIZATION | LUMP SUM | 1 | $ - 0 | ||||||||
| 3b | CLEARING AND GRUBBING, DISPOSAL METHOD (K) | MILE | 1.57 | $ - 0 | ||||||||
| 3c | SELECTIVE CLEARING, TYPE ROADSIDE, DISPOSAL METHOD (F) | MILE | 6.34 | $ - 0 | ||||||||
| 3d | SPECIAL CLEARING AND GRUBBING, TYPE ROADWAY, DISPOSAL METHOD (K), COMPACTION METHOD (5) | MILE | 11.2 | $ - 0 | ||||||||
| 3e | REMOVAL OF CULVERT, DISPOSAL METHOD (A), COMPACTION METHOD (5) | EACH | 6 | $ - 0 | ||||||||
| 3f | REMOVAL OF SURFACE WATER DEFLECTOR, DISPOSAL METHOD (A), COMPACTION METHOD (5) | EACH | 4 | $ - 0 | ||||||||
| 3g | EMBANKMENT CONSTRUCTION, COMPACTION METHOD (3), TOLERANCE CLASS (A) | CUBIC YARD | 12 | $ - 0 | ||||||||
| 3h | DRAINAGE EXCAVATION, TYPE ROADSIDE DITCH, TOLERANCE CLASS (A), COMPACTION METHOD (5) | FOOT | 50 | $ - 0 | ||||||||
| 3i | DRAINAGE EXCAVATION, TYPE CATCH BASIN, TOLERANCE CLASS (A), COMPACTION METHOD (5) | EACH | 2 | $ - 0 | ||||||||
| 3j | DRAINAGE EXCAVATION, RECONDITION DRAIN DIP TYPE II, TOLERANCE CLASS (A), COMPACTION METHOD (3) | EACH | 58 | $ - 0 | ||||||||
| 3k | LINEAR GRADING, COMPACTION METHOD (3), DISPOSAL METHOD (F) | MILE | 1.57 | $ - 0 | ||||||||
| 3l | PLACED RIPRAP, CLASS 3 | CUBIC YARD | 14 | $ - 0 | ||||||||
| 3m | SCREENED AGGREGATE, GRADING O, COMPACTION METHOD (A) | CUBIC YARD | 50 | $ - 0 | ||||||||
| 3n | ROADWAY AGGREGATE, COMPACTION METHOD (A) | CUBIC YARD | 125 | $ - 0 | ||||||||
| 3o | ROADWAY RECONDITIONING, COMPACTION METHOD (4) | MILE | 19.75 | $ - 0 | ||||||||
| 3p | 18 INCH PIPE CULVERT, CORRUGATED STEEL, 16 GAGE, COMPACTION METHOD (6) | FOOT | 252 | $ - 0 | ||||||||
| 3q | SURFACE WATER DEFLECTOR, COMPACTION METHOD (6) | FOOT | 95 | $ - 0 | ||||||||
| 3r | CLEANING CULVERTS IN PLACE | EACH | 2 | $ - 0 | ||||||||
| 3s | TURF ESTABLISHMENT, DRY METHOD SEEDING, DRY METHOD MULCHING, COMMERCIAL FURNISHED SEED | ACRE | 8.76 | $ - 0 | ||||||||
| 3t | SIGN SYSTEM | EACH | 11 | $ - 0 | ||||||||
| 3u | REMOVE SIGN, DISPOSAL METHOD (A) | EACH | 11 | $ - 0 | ||||||||
| 3v | MOBILIZATION, PIT DEVELOPMENT AND CRUSHING | LUMP SUM | 1 | $ - 0 | ||||||||
| 4 | ROAD MAINTENANCE ASSOCIATED with COMMERCIAL TIMBER HARVESTING | |||||||||||
| 4a | T-101: SURFACE BLADING | MILE | 89 | $ - 0 | ||||||||
| 4b | T-103: DUST ABATEMENT | MILE | 37 | $ - 0 | ||||||||
| 4c | T-108: SLIDE REMOVAL / REPAIR | MILE | 17 | $ - 0 | ||||||||
| 4d | T-113: SUFACE REPAIR, AGGREGATE | MILE | 9.88 | $ - 0 | ||||||||
| 4e | T-301: DITCH CLEANING | MILE | 13.85 | $ - 0 | ||||||||
| 4f | T-310: MINOR DRAINAGE STRUCTURES | EACH | 35 | $ - 0 | ||||||||
| 5 | TIMBER STAND IMPROVEMENT | |||||||||||
| 5a | PRE-COMMERCIAL THINNING (PCT) by HAND - LOW DENSITY (0 - 700 Trees / Ac.) | Acre | 129 | $ - 0 | ||||||||
| 5b | PRE-COMMERCIAL THINNING (PCT) by HAND - MODERATE DENSITY (701 - 1,500 Trees / Ac.) | Acre | 347 | $ - 0 | ||||||||
| 5c | PRE-COMMERCIAL THINNING (PCT) by HAND - HIGH DENSITY (1,501 + Trees / Ac.) | Acre | 387 | $ - 0 | ||||||||
| 5d | WESTERN WHITE PINE PRUNING for BLISTER RUST CONTROL | Acre | 61 | $ - 0 | ||||||||
| 5e | GIRDLING OF WESTERN LARCH WITHIN PCT UNITS for DWARF MISTLETOE CONTROL | Acre | 331 | $ - 0 | ||||||||
| 6 | REFORESTATION | |||||||||||
| 6a | TREE PLANTING - 15 x 15 FOOT SPACING | Acre | 727 | $ - 0 | ||||||||
| 6b | TREE PLANTING - 17 x 17 FOOT SPACING | Acre | 34 | $ - 0 | ||||||||
| 6c | TREE PLANTING - 20 x 20 FOOT SPACING | Acre | 278 | $ - 0 | ||||||||
| 6d | SEEDLING PROTECTION (ANIMAL DAMAGE CONTROL) - INSTALL RIGID SEEDLING PROTECTOR TUBES on PONDEROSA PINE | Acre | 819 | $ - 0 | ||||||||
| 7 | SITE PREPARATION | |||||||||||
| 7a | NINEBARK BRUSH SLASHING - SITE PREPARATION for REFORESTATION | Acre | 56 | $ - 0 | ||||||||
| 7b | MACHINE SOIL SCARIFICATION - SITE PREPARATION for REFORESTATION | Acre | 395 | $ - 0 | ||||||||
| 7c | HAND CONSTRUCTION of FIRELINE / FUELBREAK | Mile | 6.71 | $ - 0 | ||||||||
| 7d | MECHANICAL CONSTRUCTION of FIRELINE / FUELBREAK | Mile | 8.13 | $ - 0 | ||||||||
| 8 | FUELS TREATMENT | |||||||||||
| 8b | SLASHING: COMMERCIAL UNITS – GROUND BASED SKIDDING UNITS | Acre | 1,060 | $ - 0 | ||||||||
| 8c | SLASHING: COMMERCIAL UNITS – CABLE BASED YARDING UNITS | Acre | 939 | $ - 0 | ||||||||
| 8d | MACHINE (EXCAVATOR) PILING of SLASH: COMMERCIAL UNITS | Acre | 1,060 | $ - 0 | ||||||||
| 8e | MECHANICAL MASTICATION - ROADSIDES | Mile | 0.89 | $ - 0 | ||||||||
| 8f | MECHANICAL MASTICATION - NON-COMMERCIAL UNITS | Acre | 63 | $ - 0 | ||||||||
| 8g | HAND SLASHING - NON-COMMERCIAL UNITS | Acre | 1,379 | $ - 0 | ||||||||
| 8h | HAND PILING of SLASH - NON-COMMERCIAL UNITS | Acre | 1,272 | $ - 0 | ||||||||
| 9 | NOXIOUS WEED TREATMENT | |||||||||||
| 9a | NOXIOUS WEED TREATMENT – RIGHT-OF-WAY APPLICATIONS | Acre | 246.42 | $ - 0 | ||||||||
| 9b | NOXIOUS WEED TREATMENT – FRONT COUNTRY APPLICATIONS with BACKPACK EQUIPMENT | Acre | 3.71 | $ - 0 | ||||||||
| TOTAL of All Mandatory Service Items | $ - 0 |
| ITEM No. | DESCRIPTION of OPTIONAL WORK ACTIVITIES | UNIT of MEASURE | EST. QTY | UNIT PRICE | TOTAL PRICE |
| 3w | STOCKPILED AGGREGATE, SECTION 301 SURFACE COARSE AGGREGATE, GRADING F, GOV'T FURNISHED MATERIAL SOURCE, SLASH DISPOSAL METHOD K | CUBIC YARD | 10,000 | $ - 0 | |
| 3x | STOCKPILED AGGREGATE, SECTION 301 SUBBASE COARSE AGGREGATE, GRADING A, GOV'T FURNISHED MATERIAL SOURCE, SLASH DISPOSAL METHOD K | CUBIC YARD | 5,000 | $ - 0 | |
| 3y | STOCKPILED AGGREGATE, SECTION 301 SURFACE COARSE AGGREGATE, GRADING F, GOV'T FURNISHED MATERIAL SOURCE, SLASH DISPOSAL METHOD K | CUBIC YARD | 10,000 | $ - 0 | |
| 8a | AIR CURTAIN BURNER OPERATION for SLASH DISPOSAL | TON | 520 | $ - 0 | |
| 9c | NOXIOUS WEED TREATMENT – BACK COUNTRY APPLICATIONS with BACKPACK EQUIPMENT | ACRE | 1,000 | $ - 0 | |
| 10 | REMOVAL (HAULING) OF NON-SAWTIMBER MATERIAL | TON | 6,003 | $ - 0 | |
| TOTAL of All Optional Service Items | $ - 0 |
Schedule Notes
These schedules are for pricing/payment purposes. Refer to 52.212-1, Instructions to Offerors for business proposal requirements. Evaluation criteria used by the Forest Service for proposals is located in 52.212-2 of this solicitation.
Period of Performance is June 15, 2027 through October 15, 2032 The contractor will be required to pay a co-op deposit of $1.22/Ton for the collection and cultivation of replacement seed of native species for use on future contracts.
The contractor will be required to pay lump sum co-op deposits as shown in C4.228# - SLASH DISPOSAL DEPOSIT SCHEDULE for slash disposal activities to be performed by the Forest Service.
Price Proposals MUST be provided on ALL Items in Schedules: Mandatory Work and Optional Work Activities and Timber or other products Removal Price Schedule. Unit prices prevail. Nonsaw products are available for removal by agreement. Payment for nonsaw products will be in accordance with the rates listed in C4.225# ADVANCED PAYMENT FOR NON-SAWTIMBER If funding dictates and it is in the best interest of the government, work items may be awarded by Unit/Acre or Unit/Mile and for amounts less than the total estimated amount based on the unit prices quoted.
This solicitation contains minimum liability insurance coverage requirements. Refer to 52.228-10 for required minimums.
The following apply to Item 2 and 3 only:
A. For Items 2 and 3, the estimated price magnitude for mandatory reconstruction work is between $1,600,000 and $2,200,000.
B. A Bid Guarantee of 20% of the proposed price for mandatory reconstruction requirements is required with proposals. Failure to furnish a bid guarantee in the proper form and amount, by the stated response date and time may result in an offeror being determined unresponsive and rejection of the proposal.
C. Per FAR 28.102-3, Alternate Payment Protections are required for construction projects greater than $35,000 and shall be provided within 10 days of award.
D. Davis-Bacon wage rates.
File details come from the government source that posted it. Updated .