C05_A002_12363N26Q4189_SF-30.pdf

PDF 152 KB Posted

Attached to
Mitchell-Jackson IRSC
Solicitation number
12363N26Q4189
Issued by

About this file

This is Amendment 0002 to solicitation 12363N26Q4189, issued by the USDA Forest Service Stewardship Contracting Branch on July 1, 2026, for the Mitchell Jackson Integrated Resource Service Contract (IRSC) at Kootenai National Forest Supervisors Office. The amendment shares pre-proposal conference notes and answers to questions received. Quotes and proposals are due August 10, 2026, with no extensions anticipated. The period of performance is June 15, 2027, through October 15, 2032. All questions must be directed to Matt Daigle, the Contract Specialist.

This is a total small business set-aside requiring a small business prime contractor with at least 50% of work completed by the small business prime or similarly situated small business. The contract encompasses two distinct road packages: Area 56 in Tub Gulch/Michaels Draw with new road construction, and Powerhouse in Alexander Creek drainage with typical timber sale road package without new construction. Key requirements include extensive construction activities with mass haul operations, site-specific staking with 1-meter GPS accuracy (apps like onX or Avenza acceptable), and preparation for rock encounters without additional compensation. The normal operating season is June 15 through October 15 annually. Timber removed may be delivered to any accepting outlet, not limited to small business mills. The pre-proposal conference identified considerations for Mass Haul drawings, rock hammer/blasting needs, and government-provided Trimble GPS receiver availability with associated subscription costs.

View the file

Other files

File Type Posted
C05a_A006_12363N26Q4189_SF-30.pdf PDF
C05b_A006 MJ IRSC SOI.xlsx XLSX spreadsheet
C05a_A005_12363N26Q4189_SF-30.pdf PDF
C05b_A005 MJ IRSC SOI.xlsx XLSX spreadsheet
C05f_A004_Powerhouse_VolumeSummary.pdf PDF
C05b_A004_MJ_Weighted Average Haul.xlsx XLSX spreadsheet
C05c_A004_Area56_LoggingPlans.pdf PDF
C05d_A004_Area56_VolumeSummary.pdf PDF
C05a_A004_12363N26Q4189_SF-30.pdf PDF
C05e_A004_Powerhouse_LoggingPlans.pdf PDF
C05_A003_12363N26Q4189_SF-30.pdf PDF
C05_A001_12363N26Q4189_SF-30.pdf PDF
C04l_5c Area 56 Appendix D.pdf PDF
C04_MJ IRSC SF1449 12363N26Q4189.pdf PDF
C04a_1. Mitchell Jackson IRSC_12363N26Q4189.pdf PDF
C04i_4 MJ_Appendix C.pdf PDF
C04s_8 SCA 1976-1342v83 05132026.pdf PDF
C04m_6a Area 56 CAM.pdf PDF
C04n_5d Area 56_FSSS.pdf PDF
C04a_1a MJ IRSC SOI.xlsx XLSX spreadsheet
C04h_3 MJ_Appendix B.pdf PDF
C04q_7a Area 56 Cruise Report.pdf PDF
C04g_2c_Mitchell Jackson IRSC Unit Summary.xlsx XLSX spreadsheet
C04e_2a MJ_Appendix A.pdf PDF
C04r_7b Powerhouse Cruise Report.pdf PDF
C04f_2b MJ IRSC_Tree Planting and ADC_PWS.pdf PDF
C04c_1c MJ IRSC_Bio Preferred Products.pdf PDF
C04b_1b OU3_Factsheet.pdf PDF
C04p_6c MJ IRSC Service Work CAM.pdf PDF
C04t_9 DBA MT20260080 06042026.pdf PDF
C04d_1d MJ IRSC Powerline RIght of Ways.pdf PDF
C04j_5a Powerhouse Appendix D.pdf PDF
C04k_5b Powerhouse_FSSS.pdf PDF
C04o_6b Powerhouse CAM.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12363N26Q4189 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

363N

WASHINGTON DC 20250-1138

MS-1138

1400 INDEPENDENCE AVE SW

USDA-FS STEWARDSHIP CONTRACTING BR

07/01/20260002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/01/2026

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment shares the pre=proposal conference notes and answers to questions received.

All questions need to be directed to Matt Daigle. Quotes and proposals are due on August

10th, no extensions are anticipated.

Period of Performance: 06/15/2027 to 10/15/2032

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

MARK T. PHILLIPP

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Mitchell Jackson IRSC Pre-Proposal Contract Kootenai National Forest Supervisors Office 7/22/2026

Forest Service Attendees:

Matt Daigle, Contract Specialist (Call in) Keith Meredith, Design Engineer Ken Wickard, Forest Engineer Annora Nelson, Roads COR Brent Hoffman, TMA and Timber Project Manager Seth Cole, Supervisory Forester Lauren Saint Pierre, Timber Sale Administrator

Industry Attendees:

Noble Excavation- Matt Thompson and Eric Drake Siegmund Excavation- Gibson Kuenzi and Fletcher (?)

Discussion Topics:

Extensive requirements for construction. How to interpret a Mass Haul drawing was explained, showing how to determine from diagrams that truck haul would be likely to balance cut and fill, there should not be considerable side-casting of material. Two example diagrams from the plans were reviewed, one that showed lack of material at the beginning of the template that would need to be hauled from cuts further down the road, and one that showed the major cut and fill adjacent to each other where haul would likely not be needed.

Rock will be found once excavation starts, be prepared to encounter it. No additional compensation will be made for encountering rock once work starts, a site visit to assess conditions is imperative from interested offerors. More rock can be expected to be found on the upper third of the contract area than on the lower third of the contract elevations. Recommendation made to plan for a rock hammer or blasting as necessary.

Staking that is required per the road plans does not require a surveyor to complete, this can be accomplished with apps like onX or Avenza. 1 meter accuracy is required; this may require an external GPS receiver to obtain. The Government has an external Trimble GPS receiver to assist with this that may be used by the awardee, however there is an associated subscription cost that would be required.

Integrated Resource Service Contracts (IRSCs) are similar to standard timber sale contracts except for the scope of the road package and inclusion of additional post-harvest service activities. There are two distinct road packages within this solicitation. Area 56 in the Tub Gulch/Michaels Draw area has the more complicated package with new road construction, while Powerhouse in the Alexander Creek drainage is a typical Timber Sale road package with no new construction.

Questions:

Q1. Can a large business, or other than small business, be the prime contractor?

A1. No, this solicitation is a total small business set aside. A Small Business must be the prime contractor, and at least 50% of the work must be completed by the Small Business prime or similarly situated small business. A similarly situated small business is defined as: (1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and (2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract. Refer to FAR 52.219-14 for more information.

Q2. Does timber removed under this IRSC have to be delivered to a Small Business mill?

A2. No, timber removed under this IRSC does not have to be delivered to a small business mill. It can be delivered to any accepting outlet.

Q3. What are the timing restrictions in the area?

A3. There are no stated timing restrictions in the solicitation, the normal operating season is June 15 through October 15 annually. Plan for being snowed out by October or November, there have been open years, but there is no guarantee.