Solicitation Summary: Mitchell Jackson IRSC Stewardship Project
This is a Request for Proposals (RFP) for a stewardship contracting project on the Kootenai National Forest, Libby Ranger District, with solicitation number 12363N26Q4189. The work encompasses forest fuel modification and wildland fire risk reduction across two subdivisions: Area 56 and Powerhouse, spanning approximately 5.1 years from June 15, 2027, through October 15, 2032. The resulting contract will be a firm fixed price with economic price adjustment for commercial services, including timber removal operations. All contractors must submit pricing for mandatory work items and optional activities listed in the Schedule of Items spreadsheet (Attachment C04a_1a). A 20% bid guarantee of the proposed price for mandatory reconstruction work (estimated between $1,600,000 and $2,200,000) is required with proposals.
Payment will be made through Stewardship Credits and appropriated funds, with contractors earning non-monetary credits for stewardship activities to offset timber product values. Timber payment guarantees are required in the form of surety bonds, cash deposits, or negotiable securities. Work activities include stand improvement, timber removal (scaled), road construction/reconstruction, slash disposal, and restoration activities. Davis-Bacon wage rates and Service Contract Act prevailing wages apply to this project. Key personnel assignments include an overall Project Manager, Logging Supervisor, and Roads Treatment Supervisor. Contractors must maintain vehicular and general public liability insurance with minimum coverage of $500,000 per person and $1,000,000 per occurrence for bodily injury, and $500,000 per accident and $1,000,000 aggregate for property damage. Offerors will be evaluated on technical approach (including work activity plan, quality control plan, methods, equipment, and key personnel), relevant past performance, and utilization of local workforces/community benefit, with technical factors weighted as significantly more important than cost/price considerations.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mitchell Jackson IRSC Kootenai National Forest Solicitation 12363N26Q4189 Libby Ranger District
Statement of Requirement
The Forest Service is executing this procurement under the stewardship contracting authority provided under Section 8205 of Public Law 113-79, the Agricultural Act of 2014 as amended under Section 204 & 207 of the Consolidated Appropriations Act (Omnibus Bill 2018). Stewardship authority grants the Forest Service Chief or designee the authority to aggregate contractual requirements into stewardship projects.
Performance of land management activities shall be in accordance with Project Description and Work Specifications.
Payment for Land Management Work Activities in Schedule of Items will be made in Stewardship Credits and Appropriated Funds.
All Base Work Activities (Mandatory) shall be performed. Optional activities are listed in order of planned priority.
Award may be made for optional items in any order that the Contracting Officer determines is in the best interest of the Government.
Schedule of Items
Refer to Attachment C04a_1a MJ IRSC SOI for a fillable schedule Schedule Notes
These schedules are for pricing/payment purposes. Refer to 52.212-1, Instructions to Offerors for business proposal requirements. Evaluation criteria used by the Forest Service for proposals is located in 52.212-2 of this solicitation.
Period of Performance is June 15, 2027 through October 15, 2032
The contractor will be required to pay a co-op deposit of $1.22/Ton for the collection and cultivation of replacement seed of native species for use on future contracts.
The contractor will be required to pay lump sum co-op deposits as shown in C4.228# - SLASH DISPOSAL DEPOSIT SCHEDULE for slash disposal activities to be performed by the Forest Service.
Price Proposals MUST be provided on ALL Items in Schedules: Mandatory Work and Optional Work Activities and Timber or other products Removal Price Schedule. Unit prices prevail. Nonsaw products are available for removal by agreement. Payment for nonsaw products will be in accordance with the rates listed in C4.225# ADVANCED
PAYMENT FOR NON-SAWTIMBER
If funding dictates and it is in the best interest of the government, work items may be awarded by Unit/Acre or Unit/Mile and for amounts less than the total estimated amount based on the unit prices quoted.
This solicitation contains minimum liability insurance coverage requirements. Refer to 52.228-10 for required minimums.
The following apply to Item 2 and 3 only:
A. For Items 2 and 3, the estimated price magnitude for mandatory reconstruction work is between $1,600,000 and $2,200,000.
B. A Bid Guarantee of 20% of the proposed price for mandatory reconstruction requirements is required with proposals. Failure to furnish a bid guarantee in the proper form and amount, by the stated response date and time may result in an offeror being determined unresponsive and rejection of the proposal.
C. Per FAR 28.102-3, Alternate Payment Protections are required for construction projects greater than $35,000 and shall be provided within 10 days of award.
D. Davis-Bacon wage rates.
Technical Data
Scope of Contract
(a) The purpose of the Mitchell Jackson DxP Stewardship Project IRSC is to modify the forest fuel conditions that influence fire intensity across the landscape, and reduce the potential for wildland fire to spread into Operable Unit 3 (OU3) and the corresponding exposure and migration risks in of Libby Amphibole Asbestos (LA) released from contaminated source media (e.g., soil, duff, and post-fire ash).
(b) All work described herein is split into two separate subdivisions. Subdivision #1 will be henceforth referred to as Area 56. Subdivision #2 will be henceforth referred to as Powerhouse.
(c) Resulting Contract – Any resultant contract will be a firm fixed price with economic price adjustment commercial services contract with requirements for timber removal.
Specifications
General specifications for all Contract Activities listed by item number in the Schedule of Items are provided in Appendix A. Specifications governing timber removal are contained in Appendix B, and the related road maintenance requirements for haul of products are detailed in Appendix C. Materials related to incidental construction or reconstruction, including specified road work plans, drawings, exhibits, and technical specifications, are included in Appendix D.
Technical data and supporting documentation associated with this solicitation are available through the following attachments:
Title Pages 1a. MJ IRSC Schedule of Items spreadsheet 1b. Operable Unit 3 Factsheet 1c. Biopreferred Products 1d. Powerline Right of Ways
2a Appendix A – Technical Specifications for Service Work Items 2b Tree Planting and Animal Control Device PWS 2c Mitchell Jackson IRSC Unit Summary spreadsheet
3. Appendix B – Timber Removal (Scaled) Specifications 49
4. Appendix C –Road Maintenance T-Specs & Traffic Safety Requirements 17 5a Powerhouse Area Appendix D- Road Reconstruction Plans 5b Powerhouse Area Forest Service FP-14 Supplemental Specifications 5c Area 56 Appendix D- Road Reconstruction Plans 5d Area 56 Forest Service FP-14 Supplemental Specifications
6a. Area 56 Subdivision 1 CAM 6b. Powerhouse Subdivision 2 CAM 6c. MJ IRSC Service Work CAM
7a. Area 56 Timber Cruise 7b. Powerhouse Timber Cruise
8. Service Contract Act Wage Determination #1976-1342, Revision #83 dated 05/13/2026 3
9. Davis-Bacon Wage Rates MT20260080 6
Project Location
i. Area 56 Subdivision: Includes portions of Sections 8, 17, 18, 20, 21, 28, 29, and 30, T31N, R30W;
Sections 24 and 25, T31N, R31W, Lincoln County, State of Montana, PMM
ii. Powerhouse Subdivision: Includes portions of Sections 18, 19, 20, 28, 29, 30, 31, 32, 33 T31N, R29W, Section 5, T30N, R29W, Sections 25, 26, 35, 36, T31N, R30W, Lincoln County, State of Montana, PMM
Federal Acquisition Regulation (FAR) and United States Department of Agriculture Acquisition Regulation (AGAR) Clauses and Provisions
The clauses and provisions contained herein are applicable to any order awarded as a result of this solicitation. The terms and conditions set forth herein supersede all other terms and conditions. Acceptance of the order in accordance with (IAW) FAR 12.201-1(b)(2) constitutes acceptance of all terms and conditions contained herein.
As part of the Revolutionary FAR Overhaul (RFO), system updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in this solicitation. Contracting officers will rely on representations from offers based on provisions in the solicitation. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
52.252-2 Clauses Incorporated by Reference Feb 1998
This solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also the full text of the clause may be accessed electronically at Internet address https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
52.212-4 Terms and Conditions—Commercial Products and Commercial Services (Nov 2025)
This is a commercial construction acquisition. FAR 52.212-4 is amended as follows:
(b) Inspection/Acceptance. Inspection and Acceptance will be conducted in accordance with FAR 52.246-12, Inspection of Construction (Aug 1996).
(d) Changes. Changes will be handled in accordance with the following FAR clause(s):
☒ FAR 52.243-4, Changes (Nov 2025) ☐ FAR 52.243-5, Changes and Changed Conditions (Nov 2025)
52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 52.222-50 Combating Trafficking in Persons (Nov 2025) 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) 52.233-3 Protest After Award (Sep 2025) 52.233-4 Applicable Law for Breach of Contract Claim (Sep 2025) 52.240-91 Security Prohibitions and Exclusions (Nov 2025) 52.244-6 Subcontracts for Commercial Products and Commercial Services (Nov 2025)
The following clauses are applicable if checked:
☒ 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) with Alternate I (Nov 2021) of 52.203-6 ☒ 52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions (Jun 2020) https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
☒ 52.203-13 Contractor Code of Business Ethics and Conduct (Nov 2021) ☒ 52.204-9 Personal Identity Verification of Contractor Personnel Jan 2011 ☒ 52.204-13 System for Award Management—Maintenance (Nov 2025) ☒ 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Sep 2025) ☒ 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Sep 2025) ☒ 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Sep 2025) ☒ 52.219-6 Notice of Total Small Business Aside (Nov 2025) ☒ 52.219-8 Utilization of Small Business Concerns (Nov 2025) ☒ 52.219-14 Limitations on Subcontracting (Nov 2025) ☒ 52.222-3 Convict Labor (June 2003) ☒ 52.222-35 Equal Opportunity for Veterans (Nov 2025) ☒ 52.222-36 Equal Opportunity for Workers with Disabilities (Nov 2025) ☒ 52.222-37 Employment Reports on Veterans (Nov 2025) ☒ 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) ☒ 52.222-41 Service Contract Labor Standards (Aug 2018) ☒ 52.222-42 Statement of Equivalent Rates for Federal Hires (May 2014)
This Statement is for Information Only:
It is not a Wage Determination
Employee Class Monetary Wage -- Fringe Benefits* Heavy Equipment Operator WG-8 $32.33/hr.
Crew Leader GS-5 $18.96/hr.
Forestry Tech GS-5 $18.96/hr.
Laborer GS-3 or GS-4 $15.10 or $16.95/hr.
*FRINGE BENEFITS: Life, Accident and Health Insurance and Sick Leave Programs - 5.1 percent of basic hourly rate.
☒ 52.222-43 Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (Multiple Year and Option Contracts) (Aug 2018) ☒ 52.222-54 Employment Eligibility Verification (Nov 2025) ☒ 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) ☒ 52.222-90 Addressing DEI Discrimination by Federal Contractors (Apr 2026) ☒ 52.223-23 Sustainable Products and Services ☒ 52.224-3 Privacy Training (Jan 2017) ☒ 52.232-33 Payment by Electronic Funds Transfer— System for Award Management (Oct 2018)
The Contractor shall comply with the following FAR Clauses for Commercial Construction.
52.222-6 Construction Wage Rate Requirements 52.222-7 Withholding of Funds 52.222-8 Payrolls and Basic Records 52.222-9 Apprentices and Trainees 52.222-10 Compliance with Copeland Act Requirements 52.222-11 Subcontracts (Labor Standards) 52.222-12 Contract Termination-Debarment
52.222-14 Disputes Concerning Labor Standards 52.222-15 Certificate of Eligibility 52.236-5 Material and Workmanship
The following clauses are applicable when checked:
☒ 52.222-32 Construction Wage Rate Requirements-Price Adjustment (Actual Method) (Nov 2025) ☒ 52.225-9 Buy American-Construction Materials (Nov 2025) ☒ 52.228-1 Bid Guarantee (Sep 1996) ☒ 52.228-2 Additional Bond Security (Oct 1997) ☒52.228-5 Insurance-Work on Government Installation (Jan 1997) ☒ 52.228-11 Individual Surety-Pledge of Assets (Feb 2021) ☒ 52.228-13 Alternative Payment Protections (Jul 2020) ☒ 52.228-14 Irrevocable Letter of Credit (Nov 2014) ☒ 52.228-15 Performance and Payment Bonds-Construction (Jun 2020) ☒ 52.228-17 Individual Surety-Pledge of Assets (Bid Guarantee) (Feb 2021) ☒ 52.236-2 Differing Site Conditions (Jul 2025) ☒ 52.236-3 Site Investigation and Conditions Affecting the Work (Jul 2025) ☒ 52.236-6 Superintendent by the Contractor (Jul 2025) ☒ 52.236-7 Permits and Responsibilities (Jul 2025) ☒ 52.236-8 Other Contracts (Jul 2025) ☒ 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Jul 2025) ☒ 52.336-10 Operations and Storage Areas (Jul 2025) ☒ 52.236-11 Use and Possession Prior to Completion (Jul 2025) ☒ 52.236-12 Cleaning Up (Jul 2025) ☒ 52.236-13 Accident Prevention (Jul 2025) ☒ 52.236-15 Schedules for Construction Contracts (Jul 2025) ☒ 52.236-17 Layout of Work (Jul 2025) ☒ 52.236-21 Specifications and Drawings for Construction (Jul 2025) ☒ 52.242-14 Suspension of Work (Apr 1984) ☒ 52.246.12 Inspection of Construction (Aug 1996) ☒ 52.248-3 Value Engineering (Oct 2025)
Other Applicable Clauses
52.204-13 System for Award Management—Maintenance (Aug 2025) 52.203-17 Contractor Employee Whistleblower Rights (Jun 2020) 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation (Nov 2021) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 52.222-44 Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (May 2014) 52.222-50 Combating Trafficking in Persons (Nov 2021) 52.232-90 Fast Payment Procedures (Nov 2025) 52.240-90 Security Prohibitions and Exclusions Representations and Certifications (Nov 2025) 52.240-91 Security Prohibitions and Exclusions (Nov 2025) 52.240-93 Basic Safeguarding of Covered Contractor Information Systems (Nov 2025)
52.242-13 Bankruptcy (July 1995) 52.242-14 Suspension of Work (Apr 1984) 52.244-6 Subcontracts for Commercial Products and Commercial Services (Jan 2025) 52.245-1 Government Property (Sep 2021) ☒ Alternate I (Sep 2021) of 52.245-1 52.245-2 Government Property Installation Operation Services (Apr 2012) 52.245-9 Use and Charges (Apr 2012) 52.246-21 Warranty of Construction (Mar 1994)
52.222-43 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT LABOR STANDARDS-PRICE
ADJUSTMENT (MULTIPLE YEAR AND OPTION CONTRACTS).(NOV 2025)
(a) This clause applies to both contracts subject to area prevailing wage determinations and contracts subject to collective bargaining agreements.
(b) The Contractor warrants that the prices in this contract do not include any allowance for any contingency to cover increased costs for which adjustment is provided under this clause.
(c) The wage determination, issued under the Service Contract Labor Standards statute, ( 41 U.S.C. chapter 67), by the Administrator, Wage and Hour Division, U.S. Department of Labor, current on the anniversary date of a multiple year contract or the beginning of each renewal option period, must apply to this contract. If no such determination has been made applicable to this contract, then the Federal minimum wage as established by section 6(a)(1) of the Fair Labor Standards Act of1938, as amended, ( 29 U.S.C. 206) current on the anniversary date of a multiple year contract or the beginning of each renewal option period, must apply to this contract.
(d) The contract price, contract unit price labor rates, or fixed hourly labor rates will be adjusted to reflect the Contractor’s actual increase or decrease in applicable wages and fringe benefits to the extent that the increase is made to comply with or the decrease is voluntarily made by the Contractor as a result of:
(1) The Department of Labor wage determination applicable on the anniversary date of the multiple year contract, or at the beginning of the renewal option period. For example, the prior year wage determination required a minimum wage rate of $4.00 per hour. The Contractor chose to pay $4.10. The new wage determination increases the minimum rate to $4.50 per hour. Even if the Contractor voluntarily increases the rate to $4.75 per hour, the allowable price adjustment is $.40 per hour;
(2) An increased or decreased wage determination otherwise applied to the contract by operation of law; or
(3) An amendment to the Fair Labor Standards Act of1938 that is enacted after award of this contract, affects the minimum wage, and becomes applicable to this contract under law.
(e) Any adjustment will be limited to increases or decreases in wages and fringe benefits as described in paragraph
(d) of this clause, and the accompanying increases or decreases in social security and unemployment taxes and workers’ compensation insurance, but must not otherwise include any amount for general and administrative costs, overhead, or profit.
(f) The Contractor must notify the Contracting Officer of any increase claimed under this clause within 30 days after receiving a new wage determination unless this notification period is extended in writing by the Contracting Officer.
The Contractor must promptly notify the Contracting Officer of any decrease under this clause, but nothing in the clause shall preclude the Government from asserting a claim within the period permitted by law. The notice must contain a statement of the amount claimed and the change in fixed hourly rates (if this is a time-and-materials or labor-hour contract), and any relevant supporting data, including payroll records, that the Contracting Officer may reasonably require. Upon agreement of the parties, the contract price, contract unit price labor rates, or fixed hourly rates must be modified in writing. The Contractor must continue performance pending agreement on or determination of any such adjustment and its effective date.
(g) The Contracting Officer or an authorized representative must have access to and the right to examine any directly pertinent books, documents, papers and records of the Contractor until the expiration of 3 years after final payment under the contract.
52.228-10 Vehicular and General Public Liability Insurance.
(a) The Contractor, at the Contractor’s expense, agrees to maintain, during the continuance of this contract, vehicular liability and general public liability insurance with limits of liability for-
(1) Bodily injury of not less than $500,000 for each person and $1,000,000 for each occurrence; and
(2) Property damage of not less than $500,000 for each accident and $1,000,000 in the aggregate.
(b) The Contractor also agrees to maintain workers’ compensation and other legally required insurance with respect to the Contractor’s own employees and agents.
AGAR Clauses
452.203-71 Anti-Discrimination and Diversity, Equity, and Inclusion (DEI) Compliance (Dec 2025)
(a) By entering into this contract, the Contractor certifies that:
1. It is compliant with all applicable Federal anti-discrimination laws and the Equal Protection principles of the U.S. Constitution, and it will remain compliant for the duration of the contract.
2. Neither it nor any subcontractor or teaming partner operates or funds any program, policy, or initiative that promotes DEI in a manner that violates any applicable Federal anti-discrimination laws, including but not limited to Title VI and VII of the Civil Rights Act of 1964, or the Equal Protection principles of the U.S.
Constitution, and the Contractor and any subcontractor or teaming partner will not do so for the duration of the contract.
(b) If the Contractor participates in, facilitates, or funds programs that implicate Title VI of the Civil Rights Act of 1964 or Title IX of the Education Amendments of 1972, as amended, including but not limited to grants to or for schools, colleges, universities, 4-H programs, non-governmental organization (NGO) programs, sports programs, and education-related grants to prisons or other detention facilities, the Contractor certifies that it will remain compliant with those laws, including the requirements set forth in Executive Order 14168, Defending Women from Gender Ideology Extremism and Restoring Biological Truth to the Federal Government, and Executive Order 14173, Ending Illegal Discrimination and Restoring Merit- Based Opportunity.
(c) The Contractor affirms that the above requirements are conditions of payment that go to the essence of the contract and are therefore material terms of the contract. Payments under the contract are predicated on compliance with the above requirements, and therefore the Contractor is not eligible for funding under the contract or to retain any funding under the contract absent compliance with the above requirements.
(d) This certification reflects a change in the Government’s position regarding the materiality of the foregoing requirements and therefore any prior payment of similar claims does not reflect the materiality of the foregoing requirements to this contract.
(e) Submission of a knowing false statement relating to Contractor’s compliance with the above requirements and/or eligibility for the contract may subject the Contractor to liability under the False Claims Act, 31 U.S.C. § 3729, and/or criminal liability, including under 18 U.S.C. §§ 287 and 1001.
(f) The Contractor must include the provisions of this clause in all subcontract solicitations.
(g) Failure on the part of the Contractor or its subcontractors to comply with the terms of this clause may be grounds for the Contracting Officer to terminate this contract for default.
(End of Clause)
452.204–70 Modification for Contract Closeout (Nov 2025)
(a) If unliquidated funds in the amount of $1000 or less remain on the contract, the Contracting Officer (Contracting Officer) shall issue a unilateral modification for deobligation. The contractor will receive a copy of the modification but will not be required to provide a signature. The Contracting Officer shall immediately proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.
(b) Upon contract closeout for contracts utilizing SAP: if unliquidated funds of more than $1000 remain on the contract, the Contracting Officer shall issue a bilateral modification for deobligation. The contractor will receive a copy of the modification and will be required to provide a signature. (The Contracting Officer may also request a “Contractor Release of Claims” be completed by the contractor, although not required for contracts and orders using SAP.) If the bilateral modification and Release of Claims are not returned to the Contracting Officer within 60 days, the Contracting Officer shall release the modification as unilateral and proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.
(c) Upon contract closeout for contracts utilizing anything other than cost reimbursement, if unliquidated funds of more than $1000 remain on the contract, the Contracting Officer shall issue a bilateral modification for deobligation.
The contractor will receive a copy of the modification and a ‘‘Contractor Release of Claims’’ and will be required to provide a signature on both forms. If the bilateral modification and Release of Claims are not returned to the Contracting Officer within 120 days, the Contracting Officer shall release the modification as unilateral and proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.
(End of Clause)
452.204-71 Personal Identity Verification of Contractor Employees (Nov 2025)
(a) The contractor shall comply with the personal identity verification (PIV) policies and procedures established by the United States Department of Agriculture (USDA) Directives 4620-002 series.
(b) Should the USDA Directives 4620-002 require the exclusion of a contractor's employee, the contracting officer will notify the contractor in writing. The contractor must appoint a representative to manage compliance with the PIV policies established by the USDA Directives 4620-002 and to maintain a list of employees eligible for a USDA LincPass required for performance of the work.
(c) The responsibility of maintaining a sufficient workforce remains with the contractor. Contractor employees may be barred by the Government from performance of work should they be found ineligible or to have lost eligibility for a USDA LincPass. Failure to maintain a sufficient workforce of employees eligible for a USDA LincPass may be grounds for termination of the contract.
(d) The contractor shall insert this clause in all subcontracts when the subcontractor is required to have routine unaccompanied physical access to a Federally controlled facility and/or routine unaccompanied access to a Federally controlled information system.
(e) The PIV Sponsor for this contract is a designated program point of contact, which in most cases is the COR, unless otherwise specified in this contract. The PIV Sponsor will be available to receive contractor identity information from [hours and days to be added by CO] to [hours and days to be added by CO] at [office address for registration to be added by CO]. The Government will notify the contractor if there is a change in the PIV Sponsor, the office address, or the office hours for registration; however, it is the contractor's responsibility to meet all aspects of paragraphs (c), (d), and (e).
(End of Clause)
452.211-73 Variation in Estimated Quantity (SEP 2025)
If the actual quantity of a unit-priced item varies by more than 15% from the estimated quantity, either party may request an equitable adjustment in the contract price. The adjustment will be based on cost changes due to variations above 115% or below 85% of the estimated quantity. If this variation delays completion, the Contractor may request a time extension in writing. The request must be received by the Contracting Officer within 10 days of the delay's start or within such further period granted by the Contracting Officer before the final contract settlement. The Contracting Officer will review the request and, if justified, extend the completion date.
452.232-71 Progress Payments for Commercial Construction Contracts (Dec 2025)
(a) Contractor entitlement to progress payments. The Contractor may request progress payments monthly as the work proceeds, or at more frequent intervals as determined by the Contracting Officer, on estimates of work accomplished that meets the standards of quality established under the contract, as approved by the Contracting Officer.
(b) Computation of amounts. Progress payments will be authorized when the payment requested is properly due in accordance with this contract; the work will be performed in accordance with the contract; and there has been no impairment or diminution of the Government’s security under this contract. The Contracting Officer may authorize consideration of:
3. Materials delivered on site and preparatory work;
4. Materials delivered to the Contractor at locations other than the site, if:
i. Specifically authorized by the contract; and
ii. The Contractor provides satisfactory evidence of title and intended use in the contract.
(c) Contractor request for progress payments. The Contractor’s request for progress payments shall include the following:
1. An itemization of the amounts requested, related to the various elements of work required by the contract;
2. A listing of the amount included for work performed by each subcontractor;
3. A listing of the total amount of each subcontract;
4. A listing of the amounts previously paid to each subcontractor; and
5. Additional supporting data in a form and detail required by the Contracting Officer.
(d) Contractor Certification. Each request for progress payment shall be accompanied by the following certification:
I hereby certify, to the best of my knowledge and belief, that—
1. The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
2. All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
3. This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and
4. This certification is not to be construed as final acceptance of a subcontractor’s performance.
________________________________________________(name) ________________________________________________(title) ________________________________________________(date)
(e) Access for verification of payment entitlement. To verify the Contractor’s entitlement to progress payments under this contract, the Contractor shall provide the Government, upon request and during normal business hours, access to the following:
1. Records and Documentation:
(i) Certified progress payment requests and supporting documentation;
(ii) Subcontractor and supplier invoices, payment records, and lien waivers;
(iii) Updated schedule of values and progress schedules;
(iv) Quality assurance and inspection reports;
(v) Payroll records, if applicable under labor provisions.
2. Facilities and Worksite Access:
(i) Physical access to the construction site for inspection of work progress;
(ii) Access to off-site storage locations for materials billed but not yet incorporated into the work; or
(iii) Access to any fabrication facilities where contract-related work is being performed.
3. Access to electronic invoicing or project management systems used to track progress and payments, if such systems are used in contract performance.
(f) Dates for payment. A progress payment under this clause is a contract progress payment under the Prompt Payment clause of this contract, and except as provided in paragraph (g) of this clause, approved requests shall be paid within 30 days of submittal of a proper request for payment.
(g) Liquidation of progress payments. Progress payments shall be liquidated by deducting from the payment of each item the total unliquidated amount of progress payments made for that separately priced unit of that line item. The liquidation amounts for each line item shall be clearly delineated in each request for progress payment submitted by the Contractor.
(h) Security for progress payments. In the event the Contractor fails to provide adequate security as required in this contract, no progress payment shall be made under this contract. Upon receipt of adequate security, progress payments shall be made, including all previous payments to which the Contractor is entitled, in accordance with the terms of the contract. If at any time the Contracting Officer determines that the security provided by the Contractor is insufficient, the Contractor shall promptly provide such additional security as the Contracting Officer determines necessary. In the event the Contractor fails to provide such additional security, the Contracting Officer may collect or liquidate such security that has been provided, and suspend further payments to the Contractor; the Contractor shall repay to the Government the amount of unliquidated progress payments as the Contracting Officer at his sole discretion deems repayable.
(i) Special terms regarding termination for cause. If this contract is terminated for cause, the Contractor shall, on demand, repay to the Government the amount of unliquidated progress payments. The Government shall be liable for no payment except as provided by the Termination for Cause paragraph of the clause at Federal Acquisition Regulation 52.212-4, Contract Terms and Conditions—Commercial Products and Commercial Services.
(j) Reservation of rights.
1. No payment, vesting of title under this clause, or other action taken by the Government under this clause shall-
(i) Excuse the Contractor from performance of obligations under this contract; or
(ii) Constitute a waiver of any of the rights or remedies of the parties under the contract.
2. The Government’s rights and remedies under this clause-
(i) Shall not be exclusive, but rather shall be in addition to any other rights and remedies provided by law or this contract; and
(ii) Shall not be affected by delayed, partial, or omitted exercise of any right, remedy, power, or privilege, nor shall such exercise or any single exercise preclude or impair any further exercise under this clause or the exercise of any other right, power, or privilege of the Government.
(k) Refund of unearned amounts. If the Contractor, after making a certified request for progress payments, discovers that a portion or all of such request constitutes a payment for performance by the Contractor that fails to conform to the specifications, terms, and conditions of this contract (hereinafter referred to as the "unearned amount"), the Contractor shall-
1. Notify the Contracting Officer of such performance deficiency; and
2. Be obligated to pay the Government an amount (computed by the Contracting Officer in the manner provided in paragraph (j) of this clause) equal to interest on the unearned amount from the 8th day after the date of receipt of the unearned amount until-
(i) The date the Contractor notifies the Contracting Officer that the performance deficiency has been corrected; or
(ii) The date the Contractor reduces the amount of any subsequent certified request for progress payments by an amount equal to the unearned amount.
(l) Retainage. If the Contracting Officer finds that satisfactory progress was achieved during any period for which a progress payment is to be made, the Contracting Officer shall authorize payment to be made in full. However, if satisfactory progress has not been made, the Contracting Officer may retain a maximum of 10 percent of the amount of the payment until satisfactory progress is achieved. When the work is substantially complete, the Contracting Officer may retain from previously withheld funds and future progress payments that amount the Contracting Officer considers adequate for protection of the Government and shall release to the Contractor all the remaining withheld funds. Also, on completion and acceptance of each separate building, public work, or other division of the contract, for which the price is stated separately in the contract, payment shall be made for the completed work without retention of a percentage.
(m) Title, liability, and reservation of rights. All material and work covered by progress payments made shall, at the time of payment, become the sole property of the Government, but this shall not be construed as-
1. Relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration of any damaged work; or
2. Waiving the right of the Government to require the fulfillment of all the terms of the contract.
3. The Government’s rights and remedies under this clause-
(i) Shall not be exclusive, but rather shall be in addition to any other rights and remedies provided by law or this contract; and
(ii) Shall not be affected by delayed, partial, or omitted exercise of any right, remedy, power, or privilege, nor shall such exercise or any single exercise preclude or impair any further exercise under this clause or the exercise of any other right, power, or privilege of the Government.
(n) Reimbursement for bond premiums. In making these progress payments, the Government shall, upon request, reimburse the Contractor for the amount of premiums paid for performance and payment bonds (including coinsurance and reinsurance agreements, when applicable) after the Contractor has furnished evidence of full payment to the surety. The retainage provisions in paragraph (l) of this clause shall not apply to that portion of progress payments attributable to bond premiums.
(o) Final payment. The Government shall pay the amount due the Contractor under this contract after-
1. Completion and acceptance of all work;
2. Presentation of a properly executed voucher; and
3. Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release. A release may also be required of the assignee if the Contractor’s claim to amounts payable under this contract has been assigned under the Assignment of Claims Act of1940 ( 31 U.S.C.3727 and 41 U.S.C. 6305).
http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3727&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section6305&num=0&edition=prelim
(p) Limitation because of undefinitized work. Notwithstanding any provision of this contract, progress payments shall not exceed 80 percent on work accomplished on undefinitized contract actions. A "contract action" is any action resulting in a contract, as defined in FAR subpart 2.1, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the Changes clause, or funding and other administrative changes.
(End of clause)
452.236-70 Emergency Response, Fire Suppression, and Liability.
(a) Contractor's Responsibility for Responding to Emergencies. When directed by the contracting officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to firefighting). This is considered to be within the general scope of the contract. An equitable adjustment for the temporary use of employees and equipment will be made under the Contract Terms and Conditions—Commercial Products and Commercial Services Changes clause, FAR 52.212-4 (d).
(b) Contractor's Responsibility for Fire Fighting. The Contractor, under the provisions of FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents, subcontractors, or employees subject to the fire classifications listed in subsection (c).
(c) Fire Suppression Costs. The Contractor's obligations for cost of fire suppression vary according to three classifications of fires as follows:
(1) Operations Fire. An “operations fire” is a fire caused by the Contractor's operations other than a negligent fire. The Contractor agrees to reimburse the Forest Service for such cost for each operations fire, subject to a maximum dollar amount of $52,300. The cost of the Contractor's actions, supplies, and equipment expended or used on suppressing any such fire, or otherwise provided at the request of Forest Service, shall be credited toward such maximum. If the Contractor's actual cost exceeds the contractor's maximum obligation stated above, the Forest Service shall reimburse the contractor for the excess.
(2) Negligent Fire. A “negligent fire” is a fire caused by the negligence or fault of the Contractor's operations including, but not limited to, one caused by smoking by persons engaged in the Contractor's operations during the course of their employment, or during rest or lunch periods; or if the Contractor's failure to comply with requirements under this contract results in a fire starting or permits a fire to spread. Damages and the cost of suppressing negligent fires shall be borne by the Contractor.
(3) Other Fires on Contract Area. The Forest Service shall pay the Contractor, at firefighting rates common in the area or at prior agreed rates, for equipment or personnel furnished by the Contractor at the request of the Forest Service, on any fire on the contract area other than an operations fire or a negligent fire.
(d) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
(e) Performance by the Contractor. Where the Contractor's employees, agents, contractors, subcontractors, or their employees or agents perform the Contractor's operations in connection with fire responsibilities, the Contractor's obligations shall be the same as if performance was by the Contractor.
(f) State Law. The Contractor shall not be relieved by the terms of this contract of any liability to the United States for fire suppression costs recovered in an action based on State law, except for such costs resulting from operations fires.
Amounts due to the Contractor for firefighting expenditures on operations fires shall not be withheld pending settlement of any such claim or action based on State law.
52.212-4 IRSC Addenda
CONTRACTOR QUALITY CONTROL INSPECTION SYSTEM
The Contractor shall identify the quality control inspection system it will use to ensure that contract specifications will be achieved. At no time shall the contractor rely upon Government inspections to provide notification of unsatisfactory performance. The Contractor shall produce written inspection records in a format and at times and places satisfactory to the Contracting Officer. Inspection records shall be made available upon request of the Contracting Officer and be maintained until the date of contract closure. The Contracting Officer may observe the Contractor's inspection at any time and shall otherwise have unlimited access to the inspection data.
GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN
Quality assurance plans specific to individual items will be found in Appendix A.
POST AWARD CONFERENCE
A post award conference with the successful offeror is required. It will be scheduled within 30 days after the date of contract award. The conference will be held at Kootenai National Forest Supervisor’s Office, 31374 U.S. Hwy 2, Libby Montana.
PREWORK CONFERENCES
Annually, prior to commencement of work, a prework conference will be held to discuss contract terms and work performance requirements. Also at this meeting such things as responsibility under OSHA, and procedures for how undesignated timber that may have to be added to the contract (including danger trees) shall be discussed and documented.
CONTRACT OPERATIONS SCHEDULE
Under this contract, “Contractor’s Operations” shall include activities of or use of equipment of Contractor, Contractor’s employees, agents, Subcontractors, or their employees or agents, acting in the course of their employment in operations hereunder on National Forest lands or within Forest Service protection boundary (unless acting under the immediate supervision of Forest Service).
Contractor’s Operations shall be conducted in a workmanlike and orderly manner. The timing of required Forest Service designation of work on the ground and the performance of other Forest Service work shall not be such as to cause unnecessary delay to Contractor.
Contractor shall, before commencing operations, provide in writing an annual operating schedule of anticipated major activities and needs for removal of Included Timber and completing stewardship projects, such as logging, road maintenance, stand improvement, and construction. Upon reasonable notice to Forest Service, such a schedule shall be subject to amendments necessitated by weather, markets, or other unpredictable circumstances.
Contractor’s Operations may be conducted outside Normal Operating Season. “Normal Operating Season” is the period(s) beginning and ending on the dates stated below.
Restriction Description Timeframe
Normal Operating Season June 15 through October 15
Road Completion Date Road work identified in Appendix D must be completed no later than June 30, 2030.
Work may be done any time during the term of the contract, except under the following conditions:
1. When conditions are such that operations shall be restricted or ceased due to increased fire risk.
2. When soil moisture and ground conditions create excessive risk of damage and/or excessive disturbance to soils, as determined by the COR.
3. When snow depth creates a situation where requirements cannot be met and/or work cannot be inspected, as determined by the COR.
4. The government reserves the right to prioritize the order in which Units are treated.
5. If any cultural or archeological sites are discovered during operations of this contract, work will be suspended in the immediate vicinity of the site until a reconnaissance survey is completed by the Forest Archeologist.
Areas excluded from treatment shall be deleted from the contract.
SCHEDULES AND REPORTS
Contractor shall provide the following submittals as stated below unless otherwise mutually agreed upon. The Contractor shall update all submittals as needed, or as required by the CO, but in no case less than once per calendar year on a date specified by the Contracting Officer:
ITEM DESCRIPTION Submittal Due
Proposed Operation Plan (Overall Schedule): The Contractor shall prepare and submit one electronic copy of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the estimated starting and completion dates of various phases of the work. The schedule shall comply with the contract time requirements in the contract.
With proposal for mandatory items and within 30 days of exercising optional items
Schedule for Construction Items: The Contractor shall comply with the requirements of FAR 52.236-15 – Schedules for Construction Contracts.
At prework meetings
Subcontractors: List of proposed subcontractors and their intended work. Sub-contractors must have Contracting Officer’s written approval prior to starting work on the project.
Subcontractor information shall be submitted to the CO on Standard Form 1413 prior to the start of work.
With proposal and updated annually by
October 31
Traffic Control Plan. The Contractor shall prepare and submit a Traffic Control Plan detailing conformance with OSHA requirements, MUTCD requirements, and all other contract requirements, including, but not limited to the requirements included in the Appendices, if any.
At prework meetings
Safety Plan. The Contractor shall comply with the requirements of the solicitation’s safety clause for all activities under this contract.
At prework meetings
Quality Control Plan. Submit original with proposal. Any updates need to be provided for approval to the CO.
With proposal
Soil Erosion and Water Pollution Control Plan. The Contractor shall prepare and submit an Erosion Control Plan detailing permanent and temporary control measures to minimize erosion and sedimentation during and after contract performance. Plan shall conform to all contract requirements and the requirements in the Appendices.
At prework meetings
Designation of Contractor personnel describing responsibilities and authorities At prework meetings
Annual Operating Plan. Contractor shall submit an annual plan listing units, roads and other information required in the Appendices.
Beginning of every operating season annually Proof of Vehicular and General Liability Insurance: The Contractor shall submit a copy of its insurance policy annually prior to hauling.
Annually prior to the start of haul
Fire Control Plan. Contractor shall submit plan in accordance with requirements in the Appendices.
At prework meetings
Aggregate Gradation and Quality. Test results certifying material meet specifications.
Shall be turned in to COR a minimum of 7 days before placement for review and approval. Before Placement
Culvert Certifications. Certification of gauge. Shall be turned in to COR a minimum of 7 days before placement for review and approval. Before Installation
Weed Free Material Source. As applicable for reconstruction materials. Shall be turned in to COR a minimum of 7 days before placement for review and approval. Before placement
Proof of possession of ADC material: Visual inspection of product being in possession of the contractor. See work item 6d, Appendix A and Attachment 3 for full description.
Annually, prior to planting season
Proof of Possession of Material for Covering Hand Piles: Visual inspection of product being in possession of the contractor.
At prework meeting for slashing and piling
BioBased Report. Submit annually via SAM.gov and provide a copy to the CO. October 31 Annually
All schedules and reports shall be submitted to the Contracting Officer and COR.
PAYMENT
It is anticipated that funds will be exchanged in the performance of this contract because the value of the timber will not completely offset the value of the work to be performed. When payment is made to the contractor for work performed, it will be made in accordance with the specifications set forth under the payment methods provisions in Appendix A. When harvesting operations are underway, the value of work completed and timber removed will be documented monthly in the Forest Products Financial System which will produce a Statement of Accounts.
STEWARDSHIP CREDITS
Stewardship Credits are credits that are earned and established when work listed in the Schedule of Items has been performed and accepted. Stewardship credits may be cash or non-monetary (product value) and shall be earned at the rate as shown in award documents. Earned non-monetary credits may be used to satisfy payment for timber value included in the Schedule of Items. Unless otherwise indicated in the Schedules, credits will be earned based upon actual quantities accomplished and accepted.
ESTABLISHMENT OF STEWARDSHIP CREDITS
Notwithstanding references to payments in “Payment” clauses or provisions of this contract, payment for Stewardship Activities will be made with Stewardship Credits as indicated in the award document.
Stewardship Credits will be established on a…