C04 Attachment 3-Specifications HS Upgrades.pdf
PDF 829 KB Posted
- Solicitation number
- 1240LT26Q0103
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a specifications document for the Administrative and Recreation Facilities Rehabilitation Project at the High Sierra Ranger Station on the Sierra National Forest. The project requires construction of two new Forest Service barracks, one kitchen/laundry room, and one pit toilet at the High Sierra Ranger Station; reconstruction of one generator shed at the Wishon Work Center; and one pole barn at the Auberry Work Center on the High Sierra Ranger District. The contract type is multiple prime contracts, each based on stipulated price, with the Forest Service intending to occupy the project by the stated contract completion date. All work must comply with specified standards including ACI CODE-318 for concrete, AWC Wood Frame Construction Manual for wood framing, NFPA 70 National Electrical Code, ANSI/TPI 1 for metal plate connected wood trusses, and ASTM standards for materials including galvanized steel, fiber-cement products, and concrete reinforcing.
The specifications establish comprehensive administrative requirements including preconstruction meetings, site mobilization meetings, bi-monthly progress meetings, construction progress schedules submitted within 10 days of contract award with monthly photo documentation, and quality assurance testing by independent agencies. Contractor responsibilities include providing temporary utilities (240-volt, 100-ampere electrical service and water supply), sanitary facilities, waste removal with documented recycling/salvage reporting, and protection of installed work. Work execution requirements address concrete forming and placement per ACI standards, rough and finish carpentry with specified lumber grades and tolerances, blown insulation installation, vapor retarders, metal roof panels, fiber-cement siding, joint sealants, hollow metal and wood doors, and final cleaning and closeout procedures including correction punch lists, operation and maintenance data, and warranties. The contractor must maintain one-year minimum maintenance service following substantial completion and submit project record documents, operation manuals, and executed warranties within specified timeframes.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Administrative and Recreation Facilities Rehabilitation Project
011000 - 1 Summary
PART1 GENERAL
1.01 PROJECT
SECTION 011000
SUMMARY
A. Project Name: Administrative and Recreation Facilities Rehabilitation Project
B. The Project consists of the construction of provide the following prefab structures: Two new Forest Service Barracks, one kitchen/ laundry room, and one pit toilet at the High Sierra Ranger Station, reconstruction of one generator shed at the Wishon Work Center, and one pole barn at the Auberry Work Center on the High Sierra Ranger District.
1.02 CONTRACT DESCRIPTION
A. Contract Type: Multiple prime contracts, each based on a Stipulated Price as described in Document 005000 - Contracting Forms and Supplements.
1.03 GOVERNMENT OCCUPANCY
A. Forest Service intends to occupy the Project by the date stated in the contract as the contract completion date.
B. Cooperate with the Forest Service to minimize conflict and to facilitate Government’s operations.
C. Schedule the Work to accommodate Government occupancy.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION
013000 - 1 Administrative Requirements
SECTION 013000 ADMINISTRATIVE REQUIREMENTS
1.01 SECTION INCLUDES
A. General administrative requirements.
B. Preconstruction meeting.
C. Site mobilization meeting.
D. Progress meetings.
E. Construction progress schedule.
F. Progress photographs.
G. Submittals for review, information, and project closeout.
H. Number of copies of submittals.
I. Requests for Interpretation (RFI) procedures.
J. Submittal procedures.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 PRECONSTRUCTION MEETING
A. Attendance Required:
1. Contracting Officer Representative (COR).
2. Government Technical Monitor (If designated)
3. Contractor.
B. Agenda:
1. Discuss contract authorities.
2. Designation of personnel representing the parties to Contract, .
3. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.
4. Scheduling.
3.02 SITE MOBILIZATION MEETING
A. Attendance Required:
1. Contractor.
2. COR
3. Contractor's superintendent.
4. Major subcontractors.
B. Agenda:
1. Use of premises by the Government and Contractor.
2. Government requirements.
3. Construction facilities and controls provided by the Government.
4. Temporary utilities provided by the Government.
5. Survey and building layout.
013000 - 2 Administrative Requirements
6. Security and housekeeping procedures.
7. Schedules.
8. Application for payment procedures.
9. Procedures for testing.
10. Procedures for maintaining record documents.
11. Requirements for start-up of equipment.
12. Inspection and acceptance of equipment put into service during construction period.
C. Record minutes and distribute copies within two days after meeting to participants
3.03 PROGRESS MEETINGS
A. Schedule and administer meetings throughout progress of the work at maximum bi-monthly intervals.
B. Attendance Required:
1. Contractor.
2. COR.
3. Contractor's superintendent.
4. Major subcontractors.
C. Agenda:
1. Review minutes of previous meetings.
2. Review of work progress.
3. Field observations, problems, and decisions.
4. Identification of problems that impede, or will impede, planned progress.
5. Review of submittals schedule and status of submittals.
6. Maintenance of progress schedule.
7. Corrective measures to regain projected schedules.
8. Planned progress during succeeding work period.
9. Maintenance of quality and work standards.
10. Effect of proposed changes on progress schedule and coordination.
11. Other business relating to work.
D. Record minutes and distribute copies within two days after meeting to participants
3.04 CONSTRUCTION PROGRESS SCHEDULE
A. Within 10 days after date of the contract, submit preliminary schedule defining planned operations for the first 60 days of work, with a general outline for remainder of work.
B. If preliminary schedule requires revision after review, submit revised schedule within 10 days.
C. Within 20 days after review of preliminary schedule, submit draft of proposed complete schedule for review.
1. Include written certification that major contractors have reviewed and accepted proposed schedule.
D. Within 10 days after joint review, submit complete schedule.
E. Submit updated schedule with each Application for Payment.
3.05 PROGRESS PHOTOGRAPHS
A. Submit new photographs at least once a month, within 3 days after being taken.
B. Photography Type: Digital; electronic files.
C. Provide photographs of site and construction throughout progress of work produced by an experienced photographer, acceptable to COR.
D. In addition to periodic, recurring views, take photographs of each of the following events:
013000 - 3 Administrative Requirements
E. Views:
1. Provide non-aerial photographs from four cardinal views at each specified time, until date of Substantial Completion.
2. Consult with CORfor instructions on views required.
3. Provide factual presentation.
4. Provide correct exposure and focus, high resolution and sharpness, maximum depth of field, and minimum distortion.
F. Digital Photographs: 24 bit color, minimum resolution of 1024 by 768, in JPG format; provide files unaltered by photo editing software.
1. Delivery Medium: Via email.
2. File Naming: Include project identification, date and time of view, and view identification.
3. PDF File: Assemble all photos into printable pages in PDF format, with 2 to 3 photos per page, each photo labeled with file name; one PDF file per submittal.
3.06 REQUESTS FOR INTERPRETATION {RFI)
A. Definition: A request seeking one of the following:
1. An interpretation, amplification, or clarification of some requirement of Contract
Documents arising from inability to determine from them the exact material, process, or system to be installed; or when the elements of construction are required to occupy the same space (interference); or when an item of work is described differently at more than one place in Contract Documents.
3.07 SUBMITTALS FOR INFORMATION
A. When the following are specified in individual sections, submit them for information:
1. Design data.
2. Certificates.
3. Test reports.
4. Inspection reports.
5. Manufacturer's instructions.
6. Manufacturer's field reports.
7. Other types indicated.
B. Submit for COR's knowledge as contract administrator.
3.08 SUBMITTALS FOR PROJECT CLOSEOUT
A. Submit Correction Punch List for Substantial Completion.
B. Submit Final Correction Punch List for Substantial Completion.
C. When the following are specified in individual sections, submit them at project closeout in compliance with requirements of Section 017800 - Closeout Submittals:
1. Project record documents.
2. Operation and maintenance data.
3. Warranties.
4. Bonds.
5. Other types as indicated.
D. Submit for Government’s benefit during and after project completion.
3.09 NUMBER OF COPIES OF SUBMITTALS
A. Documents for Information: Submit two copies.
Construction Progress Schedule 013216 - 1
1.01 SECTION INCLUDES
SECTION 013216
CONSTRUCTION PROGRESS SCHEDULE
A. Preliminary schedule.
B. Construction progress schedule, bar chart type.
1.02 SUBMITTALS
A. Within 10 days after date of contract award, submit preliminary schedule.
1.03 QUALITY ASSURANCE
A. Scheduler: Contractor's personnel shall be capable of delivering a detailed graphic printout within 48 hours of request.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 PRELIMINARY SCHEDULE
A. Prepare preliminary schedule in the form of a horizontal bar chart.
3.02 BAR CHARTS
A. Include a separate bar for each major portion of Work or operation.
B. Identify the first work day of each week.
014000 - 1 Quality Requirements
A. Submittals.
B. Quality assurance.
SECTION 014000
QUALITY REQUIREMENTS
C. Testing and inspection agencies and services.
D. Control of installation.
E. Tolerances.
F. Defect Assessment.
1.02 RELATED REQUIREMENTS
A. Section 014216 - Definitions.
1.03 DEFINITIONS
A. Contractor's Quality Control Plan: Contractor's management plan for executing the Contract for Construction.
1.04 SUBMITTALS
A. See Section 013000 -Administrative Requirements, for submittal procedures.
1.05 QUALITY ASSURANCE
A. Testing Agency Qualifications:
1. Prior to start of work, submit agency name, address, and telephone number, and names of full-time registered Engineer and responsible officer.
1.06 TESTING AND INSPECTION AGENCIES AND SERVICES
A. Contractor shall employ and pay for services of an independent testing agency to perform other specified testing.
B. Employment of agency in no way relieves Contractor of obligation to perform Work in accordance with requirements of Contract Documents.
C. Contractor Employed Agency:
PART 3 EXECUTION
2.01 CONTROL OF INSTALLATION
A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce work of specified quality.
B. Comply with manufacturers' instructions, including each step in sequence.
C. Should manufacturers' instructions conflict with Contract Documents, request clarification from COR or CO before proceeding.
D. Comply with specified standards as minimum quality for the work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.
E. Have work performed by persons qualified to produce required and specified quality.
F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.
G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, and disfigurement.
014000 - 2 Quality Requirements
2.02 TOLERANCES
A. Monitor fabrication and installation tolerance control of products to produce acceptable Work.
Do not permit tolerances to accumulate.
B. Comply with manufacturers' tolerances. Should manufacturers' tolerances conflict with Contract Documents, request clarification from COR or CO before proceeding.
C. Adjust products to appropriate dimensions; position before securing products in place.
2.03 TESTING AND INSPECTION
A. Testing Agency Duties:
1. Provide qualified personnel at site. Cooperate with COR and Contractor in performance of services.
2. Perform specified sampling and testing of products in accordance with specified standards.
3. Ascertain compliance of materials and mixes with requirements of Contract Documents.
4. Promptly notify COR and Contractor of observed irregularities or non-compliance of
Work or products.
5. Perform additional tests and inspections required by COR.
6. Submit reports of all tests/inspections specified.
B. Limits on Testing/Inspection Agency Authority:
1. Agency may not release, revoke, alter, or enlarge on requirements of Contract
Documents.
2. Agency may not approve or accept any portion of the Work.
3. Agency may not assume any duties of Contractor.
4. Agency has no authority to stop the Work.
C. Contractor Responsibilities:
1. Deliver to agency at designated location, adequate samples of materials proposed to be used that require testing, along with proposed mix designs.
2. Cooperate with laboratory personnel, and provide access to the Work and to manufacturers' facilities.
3. Provide incidental labor and facilities:
a. To provide access to Work to be tested/inspected.
b. To obtain and handle samples at the site or at source of Products to be tested/inspected.
c. To facilitate tests/inspections.
d. To provide storage and curing of test samples.
4. Notify COR and laboratory 24 hours prior to expected time for operations requiring testing/inspection services.
5. Employ services of an independent qualified testing laboratory and pay for additional samples, tests, and inspections required by Contractor beyond specified requirements.
6. Arrange with the Government and pay for additional samples, tests, and inspections required by Contractor beyond specified requirements.
D. Re-testing required because of non-compliance with specified requirements shall be performed by the same agency on instructions by COR.
E. Re-testing required because of non-compliance with specified requirements shall be paid for by Contractor.
2.04 DEFECT ASSESSMENT
A. Replace Work or portions of the Work not complying with specified requirements.
014216 - 1 Definitions
1.01 SUMMARY
SECTION 014216
DEFINITIONS
A. Other definitions are included in individual specification sections.
1.02 DEFINITIONS
A. Furnish: To supply, deliver, unload, and inspect for damage.
B. Install: To unpack, assemble, erect, apply, place, finish, cure, protect, clean, start up, and make ready for use.
C. Product: Material, machinery, components, equipment, fixtures, and systems forming the work result. Not materials or equipment used for preparation, fabrication, conveying, or erection and not incorporated into the work result. Products may be new, never before used, or re-used materials or equipment.
D. Provide: To furnish and install.
E. Supply: Same as Furnish.
PART 2 PRODUCTS - NOT USED
014219 - 1 Reference Standards
1.02 QUALITY ASSURANCE
SECTION 014219
REFERENCE STANDARDS
A. For products or workmanship specified by reference to a document or documents not included in the Project Manual, also referred to as reference standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.
B. Should specified reference standards conflict with Contract Documents, request clarification from the COR before proceeding.
C. Neither the contractual relationships, duties, or responsibilities of the parties in Contract nor those of the COR shall be altered by Contract Documents by mention or inference otherwise in any reference document.
PART 2 CONSTRUCTION INDUSTRY ORGANIZATION DOCUMENTS
2.01 ASTM A SERIES -- ASTM INTERNATIONAL
A. ASTM A653/A653M - Standard Specification for Steel Sheet, Zinc-Coated {Galvanized) or Zinc- Iron Alloy-Coated {Galvannealed) by the Hot-Dip Process; 2025a.
2.02 AWC -- AMERICAN WOOD COUNCIL
A. AWC (WFCM) - Wood Frame Construction Manual for One- and Two-Family Dwellings; 2024, with Errata.
2.03 NFPA -- NATIONAL FIRE PROTECTION ASSOCIATION
A. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.
B. NFPA 780 - Standard for the Installation of Lightning Protection Systems; 2026.
2.04 TPI --TRUSS PLATE INSTITUTE
A. ANSI/TPI 1 - National Design Standard for Metal Plate Connected Wood Truss Construction;
2022.
2.05 UL -- UNDERWRITERS LABORATORIES INC.
A. UL 96 - Lightning Protection Components; Current Edition, Including All Revisions.
015000 - 1 Temporary Facilities and Controls
A. Temporary utilities.
SECTION 015000
TEMPORARY FACILITIES AND CONTROLS
B. Temporary sanitary facilities.
C. Waste removal facilities and services.
1.02 RELATED REQUIREMENTS
A. Section 015100 - Temporary Utilities.
1.03 TEMPORARY UTILITIES - SEE SECTION 015100
A. Contractor will provide the following:
1. Electrical power and metering, consisting of connection to existing facilities.
2. Water supply, consisting of connection to existing facilities.
1.04 TEMPORARY SANITARY FACILITIES
A. Provide and maintain required facilities and enclosures. Provide at time of project mobilization.
B. Maintain daily in clean and sanitary condition.
1.05 WASTE REMOVAL
A. See Section 017419 - Construction Waste Management and Disposal, for additional requirements.
B. Provide waste removal facilities and services as required to maintain the site in clean and orderly condition.
C. Provide containers with lids. Remove trash from site periodically.
D. If materials to be recycled or re-used on the project must be stored on-site, provide suitable non-combustible containers; locate containers holding flammable material outside the structure unless otherwise approved by the authorities having jurisdiction.
E. Open free-fall chutes are not permitted. Terminate closed chutes into appropriate containers with lids.
PART 2 PRODUCTS - NOT USED
015100 - 1 Temporary Utilities
SECTION 015100
TEMPORARY UTILITIES
A. Temporary Utilities: Provision of electricity, lighting, heat, ventilation, and water.
1.02 REFERENCE STANDARDS
A. 29 CFR 1926 - Safety and Health Regulations for Construction; Current Edition.
1.03 TEMPORARY ELECTRICITY
A. Cost: By Contractor.
B. Power Service Characteristics: 2 4 0 volt, 100 ampere, single phase, four wire.
C. Provide power outlets for construction operations, with branch wiring and distribution boxes located at each floor. Provide flexible power cords as required.
D. Provide main service disconnect and over-current protection at convenient location and meter.
E. Permanent convenience receptacles may be utilized during construction.
F. Provide adequate distribution equipment, wiring, and outlets to provide single phase branch circuits for power and lighting.
1.04 TEMPORARY LIGHTING FOR CONSTRUCTION PURPOSES
A. Provide and maintain LED, compact fluorescent, or high-intensity discharge lighting as suitable for the application for construction operations in accordance with requirements of 29 CFR 1926 and authorities having jurisdiction.
B. Provide branch wiring from power source to distribution boxes with lighting conductors, pigtails, and lamps as required.
C. Maintain lighting and provide routine repairs.
1.05 TEMPORARY HEATING
A. Provide heating devices and heat as needed to maintain specified conditions for construction operations.
B. Maintain minimum ambient temperature of 50 degrees F (10 degrees C) in areas where construction is in progress, unless indicated otherwise in specifications.
1.06 TEMPORARY COOLING
A. Cost of Energy: By Contractor.
B. Provide cooling devices and cooling as needed to maintain specified conditions for construction operations.
C. Maintain maximum ambient temperature of 80 degrees F (26 degrees C) in areas where construction is in progress, unless indicated otherwise in specifications.
1.07 TEMPORARY VENTILATION
A. Existing ventilation equipment may not be used.
1.08 TEMPORARY WATER SERVICE
A. Cost of Water Used: By Contractor.
PART 2 PRODUCTS - NOT USED
Execution and Closeout Requirements
017000-1
SECTION 017000
EXECUTION AND CLOSEOUT REQUIREMENTS
1.01 SECTION INCLUDES
A. Examination, preparation, and general installation procedures.
B. Cutting and patching.
C. Cleaning and protection.
D. Closeout procedures, including Contractor's Correction Punch List, except payment procedures.
E. General requirements for maintenance service.
1.02 RELATED REQUIREMENTS
A. Section 078400 - Firestopping.
1.03 SUBMITTALS
A. See Section 013000 -Administrative Requirements, for submittal procedures.
B. Cutting and Patching: Submit written request in advance of cutting or alteration that affects:
1. Structural integrity of any element of Project.
2. Integrity of weather exposed or moisture resistant element.
3. Efficiency, maintenance, or safety of any operational element.
4. Visual qualities of sight exposed elements.
5. Work of Government or separate Contractor.
PART 2 PRODUCTS
2.01 PATCHING MATERIALS
A. New Materials: As specified in product sections; match existing products and work for patching and extending work.
B. Type and Quality of Existing Products: Determine by inspecting and testing products where necessary, referring to existing work as a standard.
C. Product Substitution: For any proposed change in materials, submit request for substitution described in Section 016000 - Product Requirements.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent work.
Start of work means acceptance of existing conditions.
B. Verify that existing substrate is capable of structural support or attachment of new work being applied or attached.
C. Examine and verify specific conditions described in individual specification sections.
D. Take field measurements before confirming product orders or beginning fabrication, to minimize waste due to over-ordering or misfabrication.
E. Verify that utility services are available, of the correct characteristics, and in the correct locations.
F. Prior to Cutting: Examine existing conditions prior to commencing work, including elements subject to damage or movement during cutting and patching. After uncovering existing work, assess conditions affecting performance of work. Beginning of cutting or patching means acceptance of existing conditions.
3.02 PREPARATION
A. Clean substrate surfaces prior to applying next material or substance.
Execution and Closeout
017000-2
B. Seal cracks or openings of substrate prior to applying next material or substance.
C. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying any new material or substance in contact or bond.
3.03 GENERAL INSTALLATION REQUIREMENTS
A. Install products as specified in individual sections, in accordance with manufacturer's instructions and recommendations, and so as to avoid waste due to necessity for replacement.
B. Make vertical elements plumb and horizontal elements level, unless otherwise indicated.
C. Install equipment and fittings plumb and level, neatly aligned with adjacent vertical and horizontal lines, unless otherwise indicated.
D. Make consistent texture on surfaces, with seamless transitions, unless otherwise indicated.
E. Make neat transitions between different surfaces, maintaining texture and appearance.
3.04 CUTTING AND PATCHING
A. Whenever possible, execute the work by methods that avoid cutting or patching.
B. Perform whatever cutting and patching is necessary to:
1. Complete the work.
2. Fit products together to integrate with other work.
3. Provide openings for penetration of mechanical, electrical, and other services.
4. Match work that has been cut to adjacent work.
5. Repair areas adjacent to cuts to required condition.
6. Repair new work damaged by subsequent work.
7. Remove samples of installed work for testing when requested.
8. Remove and replace defective and non-complying work.
C. Execute work by methods that avoid damage to other work and that will provide appropriate surfaces to receive patching and finishing. In existing work, minimize damage and restore to original condition.
D. Employ original installers to perform cutting for weather exposed and moisture resistant elements, and sight exposed surfaces.
E. Cut rigid materials using masonry saw or core drill. Pneumatic tools are not allowed without prior approval.
F. Restore work with new products in accordance with requirements of Contract Documents.
G. Fit work airtight to pipes, sleeves, ducts, conduit, and other penetrations through surfaces.
H. At penetrations of fire rated walls, partitions, ceiling, or floor construction, completely seal voids with fire rated material in accordance with Section 078400, to full thickness of the penetrated element.
I. Patching:
1. Finish patched surfaces to match finish that existed prior to patching. On continuous surfaces, refinish to nearest intersection or natural break. For an assembly, refinish entire unit.
2. Match color, texture, and appearance.
3. Repair patched surfaces that are damaged, lifted, discolored, or showing other imperfections due to patching work. If defects are due to condition of substrate, repair substrate prior to repairing finish.
3.05 PROGRESS CLEANING
A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and orderly condition.
B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or remote spaces, prior to enclosing the space.
Execution and Closeout
017000-3
C. Broom and vacuum clean interior areas prior to start of surface finishing and continue cleaning to eliminate dust.
D. Collect and remove waste materials, debris, and trash/rubbish from site periodically and dispose off-site; do not burn or bury.
3.06 PROTECTION OF INSTALLED WORK
A. Protect installed work from damage by construction operations.
B. Provide special protection where specified in individual specification sections.
C. Provide temporary and removable protection for installed products. Control activity in immediate work area to prevent damage.
D. Provide protective coverings at walls, projections, jambs, sills, and soffits of openings.
E. Protect finished floors, stairs, and other surfaces from traffic, dirt, wear, damage, or movement of heavy objects, by protecting with durable sheet materials.
F. Prohibit traffic or storage upon waterproofed or roofed surfaces. If traffic or activity is necessary, obtain recommendations for protection from waterproofing or roofing material manufacturer.
G. Remove protective coverings when no longer needed; reuse or recycle coverings if possible.
3.07 ADJUSTING
A. Adjust operating products and equipment to ensure smooth and unhindered operation.
3.08 FINAL CLEANING
A. Use cleaning materials that are nonhazardous.
B. Clean interior and exterior glass, surfaces exposed to view; remove temporary labels, stains and foreign substances, polish transparent and glossy surfaces, vacuum carpeted and soft surfaces.
C. Remove all labels that are not permanent. Do not paint or otherwise cover fire test labels or nameplates on mechanical and electrical equipment.
D. Clean equipment and fixtures to a sanitary condition with cleaning materials appropriate to the surface and material being cleaned.
E. Clean filters of operating equipment.
F. Clean debris from roofs, gutters, downspouts, scuppers, overflow drains, area drains, and drainage Systems.
G. Clean site; sweep paved areas, rake clean landscaped surfaces.
H. Remove waste, surplus materials, trash/rubbish, and construction facilities from the site;
dispose of in legal manner; do not burn or bury.
3.09 CLOSEOUT PROCEDURES
A. Make submittals that are required by governing or other authorities.
B. Accompany Project Coordinator on preliminary inspection to determine items to be listed for completion or correction in the Contractor's Correction Punch List for Contractor's Notice of Substantial Completion.
C. Notify COR when work is considered ready for COR's Substantial Completion inspection.
D. Submit written certification containing Contractor's Correction Punch List, that Contract Documents have been reviewed, work has been inspected, and that work is complete in accordance with Contract Documents and ready for COR's Substantial Completion inspection.
Execution and Closeout
017000-4
E. Conduct Substantial Completion inspection and create Final Correction Punch List containing COR's and Contractor's comprehensive list of items identified to be completed or corrected and submit to COR.
F. Correct items of work listed in Final Correction Punch List and comply with requirements for access to Government-occupied areas.
G. Notify COR when work is considered finally complete and ready for COR's Substantial Completion final inspection.
H. Complete items of work determined by COR listed in executed Certificate of Substantial Completion.
3.10 MAINTENANCE
A. Provide service and maintenance of components indicated in specification sections.
B. Maintenance Period: As indicated in specification sections or, if not indicated, not less than one year from the Date of Substantial Completion or the length of the specified warranty, whichever is longer.
C. Examine system components at a frequency consistent with reliable operation. Clean, adjust, and lubricate as required.
D. Include systematic examination, adjustment, and lubrication of components. Repair or replace parts whenever required. Use parts produced by the manufacturer of the original component.
E. Maintenance service shall not be assigned or transferred to any agent or subcontractor without prior written consent of the Contracting Officer (CO).
Construction Waste Management and Disposal
017419 - 1
SECTION 017419
CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
1.01 WASTE MANAGEMENT REQUIREMENTS
A. Government requires that this project generate the least amount of trash and waste possible.
B. Employ processes that ensure the generation of as little waste as possible due to error, poor planning, breakage, mishandling, contamination, or other factors.
C. Minimize trash/waste disposal in landfills; reuse, salvage, or recycle as much waste as economically feasible.
D. Contractor Reporting Responsibilities: Submit periodic Waste Disposal Reports; report landfill disposal, incineration, recycling, salvage, and reuse regardless of to whom the cost or savings accrues; use the same units of measure on required reports.
E. Methods of trash/waste disposal that are not acceptable are:
1. Burning on the project site.
2. Burying on the project site.
3. Dumping or burying on other property, public or private.
4. Other illegal dumping or burying.
F. Regulatory Requirements: Contractor is responsible for knowing and complying with regulatory requirements, including but not limited to Federal, state and local requirements, pertaining to legal disposal of all construction and demolition waste materials.
1.02 RELATED REQUIREMENTS
A. Section 013000 - Administrative Requirements: Additional requirements for project meetings, reports, submittal procedures, and project documentation.
B. Section 015000 - Temporary Facilities and Controls: Additional requirements related to trash/waste collection and removal facilities and services.
C. Section 016000 - Product Requirements: Waste prevention requirements related to delivery, storage, and handling.
D. Section 017000 - Execution and Closeout Requirements: Trash/waste prevention procedures related to demolition, cutting and patching, installation, protection, and cleaning.
1.03 DEFINITIONS
A. Clean: Untreated and unpainted; not contaminated with oils, solvents, caulk, or the like.
B. Construction and Demolition Waste: Solid wastes typically including building materials, packaging, trash, debris, and rubble resulting from construction, remodeling, repair and demolition operations.
C. Hazardous: Exhibiting the characteristics of hazardous substances, i.e., ignitibility, corrosivity, toxicity or reactivity.
D. Nonhazardous: Exhibiting none of the characteristics of hazardous substances, i.e., ignitibility, corrosivity, toxicity, or reactivity.
E. Nontoxic: Neither immediately poisonous to humans nor poisonous after a long period of exposure.
F. Recyclable: The ability of a product or material to be recovered at the end of its life cycle and remanufactured into a new product for reuse by others.
G. Recycle: To remove a waste material from the project site to another site for remanufacture into a new product for reuse by others.
H. Recycling: The process of sorting, cleansing, treating and reconstituting solid waste and other discarded materials for the purpose of using the altered form. Recycling does not include burning, incinerating, or thermally destroying waste.
Construction Waste Management
017419 - 2
I. Return: To give back reusable items or unused products to vendors for credit.
J. Reuse: To reuse a construction waste material in some manner on the project site.
K. Salvage: To remove a waste material from the project site to another site for resale or reuse by others.
L. Sediment: Soil and other debris that has been eroded and transported by storm or well production run-off water.
M. Source Separation: The act of keeping different types of waste materials separate beginning from the first time they become waste.
N. Toxic: Poisonous to humans either immediately or after a long period of exposure.
0. Trash: Any product or material unable to be reused, returned, recycled, or salvaged.
P. Waste: Extra material or material that has reached the end of its useful life in its intended use.
Waste includes salvageable, returnable, recyclable, and reusable material.
1.04 SUBMITTALS
A. See Section 013000 -Administrative Requirements for submittal procedures.
B. Waste Disposal Reports: Submit at specified intervals, with details of quantities of trash and waste, means of disposal or reuse, and costs; show both totals to date and since last report.
1. Submit updated Report with each Application for Progress Payment; failure to submit
Report will delay payment.
2. Submit Report on a form acceptable to COR.
3. Landfill Disposal: Include the following information:
a. Identification of material.
b. Amount, in tons or cubic yards (cubic meters), of trash/waste material from the project disposed of in landfills.
c. State the identity of landfills, total amount of tipping fees paid to landfill, and total disposal cost.
d. Include manifests, weight tickets, receipts, and invoices as evidence of quantity and cost.
4. Incinerator Disposal: Include the following information:
a. Identification of material.
b. Amount, in tons or cubic yards (cubic meters), of trash/waste material from the project delivered to incinerators.
c. State the identity of incinerators, total amount of fees paid to incinerator, and total disposal cost.
d. Include manifests, weight tickets, receipts, and invoices as evidence of quantity and cost.
5. Recycled and Salvaged Materials: Include the following information for each:
a. Identification of material, including those retrieved by installer for use on other projects.
b. Amount, in tons or cubic yards (cubic meters), date removed from the project site, and receiving party.
c. Transportation cost, amount paid or received for the material, and the net total cost or savings of salvage or recycling each material.
d. Include manifests, weight tickets, receipts, and invoices as evidence of quantity and cost.
e. Certification by receiving party that materials will not be disposed of in landfills or by incineration.
6. Material Reused on Project: Include the following information for each:
a. Identification of material and how it was used in the project.
b. Amount, in tons or cubic yards (cubic meters).
c. Include weight tickets as evidence of quantity.
Construction Waste Management
017419 - 3
7. Other Disposal Methods: Include information similar to that described above, as appropriate to disposal method.
PART 3 EXECUTION
2.01 WASTE MANAGEMENT PROCEDURES
A. See Section 013000 for additional requirements for project meetings, reports, submittal procedures, and project documentation.
B. See Section 015000 for additional requirements related to trash/waste collection and removal facilities and services.
C. See Section 016000 for waste prevention requirements related to delivery, storage, and handling.
D. See Section 017000 for trash/waste prevention procedures related to demolition, cutting and patching, installation, protection, and cleaning.
2.02 WASTE MANAGEMENT PLAN IMPLEMENTATION
A. Manager: Designate an on-site person or persons responsible for instructing workers and overseeing and documenting results of the Waste Management Plan.
B. Communication: Distribute copies of the Waste Management Plan to job site foreman, each subcontractor, COR, and CO.
C. Instruction: Provide on-site instruction of appropriate separation, handling, and recycling, salvage, reuse, and return methods to be used by all parties at the appropriate stages of the project.
D. Meetings: Discuss trash/waste management goals and issues at project meetings.
1. Prebid meeting.
2. Preconstruction meeting.
3. Regular job-site meetings.
E. Facilities: Provide specific facilities for separation and storage of materials for recycling, salvage, reuse, return, and trash disposal, for use by all contractors and installers.
1. Provide containers as required.
2. Provide adequate space for pick-up and delivery and convenience to subcontractors.
3. Keep recycling and trash/waste bin areas neat and clean and clearly marked in order to avoid contamination of materials.
F. Hazardous Wastes: Separate, store, and dispose of hazardous wastes according to applicable regulations.
G. Recycling: Separate, store, protect, and handle at the site identified recyclable waste products in order to prevent contamination of materials and to maximize recyclability of identified materials. Arrange for timely pickups from the site or deliveries to recycling facility in order to prevent contamination of recyclable materials.
H. Reuse of Materials On-Site: Set aside, sort, and protect separated products in preparation for reuse.
I. Salvage: Set aside, sort, and protect products to be salvaged for reuse off-site.
017800-1 Closeout Submittals
A. Project record documents.
SECTION 017800
CLOSEOUT SUBMITTALS
B. Operation and maintenance data.
C. Warranties and bonds.
1.02 RELATED REQUIREMENTS
A. Section 013000 - Administrative Requirements: Submittals procedures, shop drawings, product data, and samples.
B. Individual Product Sections: Specific requirements for operation and maintenance data.
C. Individual Product Sections: Warranties required for specific products or Work.
1.03 SUBMITTALS
A. Project Record Documents: Submit documents to COR with claim for final Application for Payment.
B. Operation and Maintenance Data:
1. For equipment, or component parts of equipment put into service during construction and operated by the Government, submit completed documents within ten days after acceptance.
2. Submit one copy of completed documents 15 days prior to final inspection. This copy will be reviewed and returned after final inspection, with COR comments. Revise content of all document sets as required prior to final submission.
3. Submit two sets of revised final documents in final form within 10 days after final inspection.
C. Warranties and Bonds:
1. For equipment or component parts of equipment put into service during construction with
COR's permission, submit documents within 10 days after acceptance.
2. Make other submittals within 10 days after Date of Substantial Completion, prior to final
Application for Payment.
3. For items of Work for which acceptance is delayed beyond Date of Substantial
Completion, submit within 10 days after acceptance, listing the date of acceptance as the beginning of the warranty period.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 PROJECT RECORD DOCUMENTS
A. Maintain on site one set of the following record documents; record actual revisions to the Work:
1. Drawings.
2. Specifications.
3. Addenda.
4. Change Orders and other modifications to the Contract.
5. Reviewed shop drawings, product data, and samples.
6. Manufacturer's instruction for assembly, installation, and adjusting.
B. Ensure entries are complete and accurate, enabling future reference by the Government.
C. Store record documents separate from documents used for construction.
D. Record information concurrent with construction progress.
E. Specifications: Legibly mark and record at each product section description of actual products installed, including the following:
1. Manufacturer's name and product model and number.
017800-2 Closeout Submittals
2. Changes made by Addenda and modifications.
F. Record Drawings and Shop Drawings: Legibly mark each item to record actual construction including:
1. Field changes of dimension and detail.
2. Details not on original Contract drawings.
3.02 OPERATION AND MAINTENANCE DATA
A. Product Data: Mark each sheet to clearly identify specific products and component parts, and data applicable to installation. Delete inapplicable information.
B. Drawings: Supplement product data to illustrate relations of component parts of equipment and systems, to show control and flow diagrams. Do not use Project Record Documents as maintenance drawings.
C. Typed Text: As required to supplement product data. Provide logical sequence of instructions for each procedure, incorporating manufacturer's instructions.
3.03 WARRANTIES AND BONDS
A. Obtain warranties and bonds, executed in duplicate by responsible Subcontractors, suppliers, and manufacturers, within 10 days after completion of the applicable item of work. Except for items put into use with Government’s permission, leave date of beginning of time of warranty until Date of Substantial completion is determined.
B. Verify that documents are in proper form, contain full information, and are notarized.
C. Co-execute submittals when required.
D. Retain warranties and bonds until time specified for submittal.
Concrete Forming and Accessories
031000 - 1
SECTION 031000
CONCRETE FORMING AND ACCESSORIES
A. Formwork for cast-in-place concrete, with shoring, bracing and anchorage.
B. Form accessories.
C. Form stripping.
1.02 RELATED REQUIREMENTS
1.03 REFERENCE STANDARDS
A. ACI SPEC-301 - Specifications for Concrete Construction; 2020.
1.04 QUALITY ASSURANCE
A. Designer Qualifications: Design formwork under direct supervision of a Professional Structural Engineer experienced in design of concrete formwork and licensed in the State in which the Project is located.
1.05 DELIVERY, STORAGE, AND HANDLING
A. Deliver prefabricated forms and installation instructions in manufacturer's packaging.
B. Store prefabricated forms off ground in ventilated and protected manner to prevent deterioration from moisture.
C. Protect plastic foam products from damage and exposure to sunlight.
PART 2 PRODUCTS
2.01 FORMWORK - GENERAL
A. Provide concrete forms, accessories, shoring, and bracing as required to accomplish cast-in-place concrete work.
B. Design and construct concrete that complies with design with respect to shape, lines, and dimensions.
C. Comply with applicable state and local codes with respect to design, fabrication, erection, and removal of formwork.
2.02 WOOD FORM MATERIALS
A. Plywood: Douglas Fir species; solid one side grade; sound undamaged sheets with clean, true edges.
2.03 REMOVABLE PREFABRICATED FORMS
A. Void Forms: Moisture resistant treated paper faces, biodegradable, structurally sufficient to support weight of wet concrete mix until initial set; 2 inches (50 mm) thick.
2.04 FORMWORK ACCESSORIES
A. Form Ties: Removable type, galvanized metal, fixed length, with waterproofing washer, free of defects that could leave holes larger than 1 inch (25 mm) in concrete surface.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify lines, levels and centers before proceeding with formwork. Ensure that dimensions agree with drawings.
Concrete Forming and Accessories
031000 - 2
3.02 EARTH FORMS
A. Earth forms are not permitted.
3.03 ERECTION - FORMWORK
A. Erect formwork, shoring and bracing to achieve design requirements, in accordance with requirements of ACI SPEC-301.
B. Provide bracing to ensure stability of formwork. Shore or strengthen formwork subject to overstressing by construction loads.
C. Install void forms in accordance with manufacturer's recommendations. Protect forms from moisture or crushing.
3.04 FORM CLEANING
A. Clean forms as erection proceeds, to remove foreign matter within forms.
B. Clean formed cavities of debris prior to placing concrete.
3.05 FORM REMOVAL
A. Do not remove forms or bracing until concrete has gained sufficient strength to carry its own weight and imposed loads.
032000 - 1 Concrete Reinforcing
SECTION 032000
CONCRETE REINFORCING
A. Reinforcing steel for cast-in-place concrete.
B. Supports and accessories for steel reinforcement.
1.02 RELATED REQUIREMENTS
PART 2 PRODUCTS
2.01 REINFORCEMENT
A. Reinforcement Accessories:
2.02 FABRICATION
033000 - 1 Cast-in-Place Concrete
A. Concrete formwork.
SECTION 033000
CAST-IN-PLACE CONCRETE
B. Concrete building frame members.
C. Concrete for composite floor construction.
D. Joint devices associated with concrete work.
E. Concrete curing.
1.02 RELATED REQUIREMENTS
A. Section 031000 - Concrete Forming and Accessories: Forms and accessories for formwork.
1.03 REFERENCE STANDARDS
A. ACI CODE-318- Building Code Requirements for Structural Concrete and Commentary; 2019 (Reapproved 2022).
B. ACI PRC-304 - Guide for Measuring, Mixing, Transporting, and Placing Concrete; 2000 (Reapproved 2009).
C. ACI PRC-308 - Guide to External Curing of Concrete; 2016.
D. ACI SPEC-301 - Specifications for Concrete Construction; 2020.
E. ASTM C150/C150M - Standard Specification for Portland Cement; 2024.
F. ASTM C1116/C1116M - Standard Specification for Fiber-Reinforced Concrete; 2023.
G. ASTM C1602/C1602M - Standard Specification for Mixing Water Used in the Production of Hydraulic Cement Concrete; 2022.
1.04 SUBMITTALS
A. See Section 013000 -Administrative Requirements for submittal procedures.
B. Test Reports: Submit report for each test or series of tests specified.
1.05 QUALITY ASSURANCE
A. Perform work of this section in accordance with ACI SPEC-301 and ACI CODE-318.
PART 2 PRODUCTS
2.01 FORMWORK
A. Comply with requirements of Section 031000.
2.02 CONCRETE MATERIALS
A. Cement: ASTM C150/C1SOM, Type I - Normal Portland type.
1. Acquire cement for entire project from same source.
B. Water: ASTM C1602/C1602M; clean, potable, and not detrimental to concrete.
C. Structural Fiber Reinforcement: ASTM C1116/C1116M.
2.03 ACCESSORY MATERIALS
2.04 BONDING AND JOINTING PRODUCTS
2.05 CONCRETE MIX DESIGN
A. Fiber Reinforcement: Add to mix at rate of 1.5 pounds per cubic yard (0.89 kg per cu m), or as recommended by manufacturer for specific project conditions.
033000 - 2 Cast-in-Place Concrete
2.06 MIXING
A. Adding Water: If concrete arrives on-site with slump less than suitable for placement, do not add water that exceeds the maximum water-cement ratio or exceeds the maximum permissible slump.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify lines, levels, and dimensions before proceeding with work of this section.
3.02 PREPARATION
A. Verify that forms are clean and free of rust before applying release agent.
B. Coordinate placement of embedded items with erection of concrete formwork and placement of form accessories.
3.03 PLACING CONCRETE
A. Place concrete in accordance with ACI PRC-304.
3.04 CONCRETE FINISHING
A. Repair surface defects, including tie holes, immediately after removing formwork.
3.05 CURING AND PROTECTION
A. Comply with requirements of ACI PRC-308. Immediately after placement, protect concrete from premature drying, excessively hot or cold temperatures, and mechanical injury.
B. Maintain concrete with minimal moisture loss at relatively constant temperature for period necessary for hydration of cement and hardening of concrete.
3.06 FIELD QUALITY CONTROL
A. An independent testing agency will perform field quality control tests, as specified in Section 014000 - Quality Requirements.
B. Provide free access to concrete operations at project site and cooperate with appointed firm.
3.07 DEFECTIVE CONCRETE
A. Defective Concrete: Concrete not complying with required lines, details, dimensions, tolerances or specified requirements.
B. Repair or replacement of defective concrete will be determined by theCO. The cost of additional testing shall be borne by Contractor when defective concrete is identified.
3.08 PROTECTION
A. Do not permit traffic over unprotected concrete floor surface until fully cured.
061000 - 1 Rough Carpentry
SECTION 061000
ROUGH CARPENTRY
A. Structural dimension lumber framing.
B. Sheathing.
C. Subflooring.
D. Underlayment.
E. Preservative treated wood materials.
F. Miscellaneous framing and sheathing.
G. Concealed wood blocking, nailers, and supports.
H. Roof sheathing with factory applied roofing underlayment.
1.02 RELATED REQUIREMENTS
A. Section 061753 - Shop-Fabricated Wood Trusses.
1.03 REFERENCE STANDARDS
A. ASTM D3498 - Standard Specification for Adhesives for Field-Gluing Wood Structural Panels (Plywood or Oriented Strand Board) to Wood Based Floor System Framing; 2019a.
B. AWC (WFCM) - Wood Frame Construction Manual for One- and Two-Family Dwellings; 2024, with Errata.
C. PS 1 - Structural Plywood; 2023.
D. PS 2 - Performance Standard for Wood Structural Panels; 2019.
E. PS 20 - American Softwood Lumber Standard; 2025.
PART 2 PRODUCTS
2.01 GENERAL REQUIREMENTS
A. Dimension Lumber: Comply with PS 20 and requirements of specified grading agencies.
1. If no species is specified, provide species graded by the agency specified; if no grading agency is specified, provide lumber graded by grading agency meeting the specified requirements.
2. Grading Agency: Grading agency whose rules are approved by the Board of Review, American Lumber Standard Committee at www.alsc.org, and who provides grading service for the species and grade specified; provide lumber stamped with grade mark unless otherwise indicated.
2.02 DIMENSION LUMBER FOR CONCEALED APPLICATIONS
A. Sizes: Nominal sizes as indicated on drawings, S4S.
B. Moisture Content: S-dry or MC19.
C. Joist and Small Beam Framing (2 by 6 through 4 by 16 (50 by 150 mm through 100 by 400 mm)
2.03 CONSTRUCTION PANELS
A. Subfloor/Underlayment Combination: Rated single floor.
1. Plywood: PS 1.
2. Oriented Strand Board: PS 2.
3. Bond Classification: Exposure 1.
B. Subflooring: Oriented strand board wood structural panel; PS 2, rated Single Floor.
061000 - 2 Rough Carpentry
C. Underlayment: APA Underlayment; plywood, Exposure 2, 1/2 inch (12.5 mm) thick. Fully sanded faces at resilient flooring.
D. Roof Sheathing: Oriented strand board wood structural panel; PS 2.
E. Wall Sheathing: PS 2 type.
1. Bond Classification: Exterior.
2. Grade: Structural I Sheathing.
3. Span Rating: 24.
4. Performance Category: 5/16 PERF CAT.
5. Edge Profile: Square edge.
2.04 ACCESSORIES
A. Metal and Finish of Fasteners:
1. Untreated Wood: Unfinished steel.
B. Subfloor Adhesives: Gap-filling construction adhesive for bonding wood structural panels to wood-based floor system framing; complying with ASTM D3498.
PART 3 EXECUTION
3.01 PREPARATION
A. Coordinate installation of rough carpentry members specified in other sections.
3.02 INSTALLATION - GENERAL
A. Select material sizes to minimize waste.
B. Reuse scrap to the greatest extent possible; clearly separate scrap for use on site as accessory components, including: shims, bracing, and blocking.
3.03 FRAMING INSTALLATION
A. Set structural members level, plumb, and true to line. Discard pieces with defects that would lower required strength or result in unacceptable appearance of exposed members.
B. Make provisions for temporary construction loads, and provide temporary bracing sufficient to maintain structure in true alignment and safe condition until completion of erection and installation of permanent bracing.
C. Install structural members full length without splices unless otherwise specifically detailed.
D. Comply with member sizes, spacing, and configurations indicated, and fastener size and spacing indicated, but not less than required by applicable codes, AWC (WFCM) Wood Frame Construction Manual, E.