C05 Amend 02 Attachment 2-SOI High Sierra.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
GAOA High Sierra Ranger Station Upgrades, Sierra National Forest
Solicitation number
1240LT26Q0103
Issued by

About this file

This is a Schedule of Items (SOI) attachment for Amendment 02 of a Request for Quotation for commercial construction services. The solicitation number 1240LT26Q0103 covers upgrades to the High Sierra Ranger Station and related facilities on the Sierra National Forest, managed by the Department of Agriculture Forest Service. The project requires seven line items: (1) Mobilization; (2) two new 590 sq. ft. two-bedroom tinyhouses with propane heating and electrical for Barracks #1 and #2; (3) one 590 sq. ft. multipurpose tinyhouse functioning as kitchen, laundry facility, and restroom building with propane heating, plumbing, and electrical; (4) one new ADA-compliant concrete dual pit toilet building; (5) reconstruction of an existing generator shed at Wishon Work Center to house a generator with new electrical panel, remote shut-off switch, and safety signage; and (6) installation of a 30'x40'x14' open pole barn with enclosed 10'x30'x14' storage area and interior/flood lighting at Auberry Work Center.

This small business set-aside acquisition (NAICS 236220, $45 million size standard) requires contractors to submit pricing for all seven items as lump-sum (L.S.) entries. All responsible sources may submit quotations; one award will be made from this solicitation. Contractors must input their unit prices in the SOI template, with auto-calculated totals. Per the notes, contractors are responsible for verifying all values in their submission, including auto-calculated cells, accurately represent their intended pricing. Bond premium payments may be included under Mobilization but not as an addition to the contract price. Amendment 02 includes site visit information, questions and answers, wage determination changes, and additional attachments.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOI Upgrades

AMENDMENT 02

SCHEDULE OF ITEMS

High Sierra Ranger Station Upgrades Sierra National Forest

1240LT26Q0103

ITEM NO. Facility Location Description of Work Pay Unit Est Qty Unit Price Total

0001 Mobilization L.S. 1 $ - 0 $ - 0

High Sierra Ranger Station Compound
FS1349 Barracks #1 (208 sq.ft.)
0002Provide new 590 sq. ft. (or equivelent) two bedroom tinyhouse. Supply propane gas heating, and electrical fixtures. No water or sewer neededL.S.1$ - 0$ - 0
FS1350 Barracks #2 (208 sq.ft.)
0003Provide new 590 sq. ft. (or equivelent) two bedroom tinyhouse. Supply propane gas heating, and electrical fixtures. No water or sewer neededL.S.1$ - 0$ - 0
FS1375 Kitchen (432 sq.ft.)
0004Provide new 590 sq. ft. (or equivelent) all purpose tinyhouse. This structure will function as a kitchen, laundry facility, and provide two restrooms with toilets, wash basins, and showers. Supply propane gas heating, plumbing, and electrical.L.S.1$ - 0$ - 0
FS1871 Toilet Building (42 sq.ft.)
0005Provide new concrete ADA compliant dual pit toilet buildingL.S.1$ - 0$ - 0
Wishon Work Center
FS1904 Generator Shed
0006Use existing footprint and rebuild generator Shed to house generator. Remove existing electrical panel and install new electrical panel. Supply a remote shut off switch for generator to the barracks and kitchen. Supply required signs for safety.L.S.1$ - 0$ - 0
Auberry Work Center
Auberry Pole Barn
0007Install Pole Barn 30’x40’x14’. Open on three sides and has an enclosed storage area aproximately 10’x30’x14’.
Install flood lights and interior lights on pole barn.L.S.1$ - 0$ - 0

Total Items 0001-0007 $ - 0

NOTE 1: Contractor input Unit Prices
NOTE 2: Auto Calculated Values
NOTE 3: One award will be made from this solicitation. Contractor's must submit pricing for all items. In the event of an error in extending the proposed prices, unit prices will govern, unless otherwise determined by the Contracting Officer, in accordance with applicable regulations.
NOTE 4: Submission of the SOI represents the Contractors commitment to the data herein. It is the responsibility of the Contractor to verify that all values presented in the SOI, including auto-calculated cells, accurately represent the Contractor's intended price elements. The Government shall not be held liable for any errors in calculation or pricing data.
NOTE 5: Payment for bond premiums in accordance with AGAR Clause 452.232-71, Progress Payments for Commercial Construction Contracts, shall not be in addition to the contract price, but may be included under Mobilization.

NAME:

SAM UEI #:

DATE:

File details come from the government source that posted it. Updated .