This is a Schedule of Items (SOI) pricing template for the High Sierra Ranger Station Upgrades project (Solicitation 1240LT26Q0103), a Request for Quotation issued by the Department of Agriculture Forest Service for small business concerns.

The solicitation requires contractors to provide prefabricated structures and infrastructure upgrades across three Forest Service locations. At the High Sierra Ranger Station Compound, contractors must supply two new 590 square-foot two-bedroom tinyhouses with propane heating and electrical fixtures (Items 0002-0003), one 590 square-foot multipurpose tinyhouse functioning as a kitchen, laundry facility, and restroom space with propane, plumbing, and electrical systems (Item 0004), and one concrete ADA-compliant dual pit toilet building (Item 0005). At the Wishon Work Center, contractors must rebuild an existing generator shed footprint to house a generator, install a new electrical panel, integrate solar panel systems with additional solar capacity for daytime power needs, and provide a remote shut-off switch and safety signage (Item 0006). At the Auberry Work Center, contractors must install a 30'x40'x14' pole barn with three open sides, an enclosed 10'x30'x14' storage area, and both flood and interior lighting (Item 0007). Mobilization costs are also required (Item 0001). Contractors must submit unit prices for all seven line items, with the government calculating total prices. This is a total small business set-aside under NAICS code 236220 with a $45 million size standard; a single award will be made to one contractor who must price all items. Bond premium payments may be included under mobilization costs in accordance with progress payment provisions.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOI Upgrades

SCHEDULE OF ITEMS

High Sierra Ranger Station Upgrades Sierra National Forest

1240LT26Q0103

ITEM NO. Facility Location Description of Work Pay Unit Est Qty Unit Price Total

0001 Mobilization L.S. 1 $ - 0 $ - 0

High Sierra Ranger Station Compound
FS1349 Barracks #1 (208 sq.ft.)
0002Provide new 590 sq. ft. (or equivelent) two bedroom tinyhouse. Supply propane gas heating, and electrical fixtures. No water or sewer neededL.S.1$ - 0$ - 0
FS1350 Barracks #2 (208 sq.ft.)
0003Provide new 590 sq. ft. (or equivelent) two bedroom tinyhouse. Supply propane gas heating, and electrical fixtures. No water or sewer neededL.S.1$ - 0$ - 0
FS1375 Kitchen (432 sq.ft.)
0004Provide new 590 sq. ft. (or equivelent) all purpose tinyhouse. This structure will function as a kitchen, laundry facility, and provide two restrooms with toilets, wash basins, and showers. Supply propane gas heating, plumbing, and electrical.L.S.1$ - 0$ - 0
FS1871 Toilet Building (42 sq.ft.)
0005Provide new concrete ADA compliant dual pit toilet buildingL.S.1$ - 0$ - 0
Wishon Work Center
FS1904 Generator Shed
0006Use existing footprint and rebuild generator Shed to house generator. Remove existing electrical panel and install new electrical panel. Tie in Solar's panels and add additional solar to provide day use power for filling water tank, and radio usage. Supply a remote shut off switch for generator to the barracks and kitchen. Supply required signs for safety.L.S.1$ - 0$ - 0
Auberry Work Center
Auberry Pole Barn
0007Install Pole Barn 30’x40’x14’. Open on three sides and has an enclosed storage area aproximately 10’x30’x14’.
Install flood lights and interior lights on pole barn.L.S.1$ - 0$ - 0

Total Items 0001-0007 $ - 0

NOTE 1: Contractor input Unit Prices
NOTE 2: Auto Calculated Values
NOTE 3: One award will be made from this solicitation. Contractor's must submit pricing for all items. In the event of an error in extending the proposed prices, unit prices will govern, unless otherwise determined by the Contracting Officer, in accordance with applicable regulations.
NOTE 4: Submission of the SOI represents the Contractors commitment to the data herein. It is the responsibility of the Contractor to verify that all values presented in the SOI, including auto-calculated cells, accurately represent the Contractor's intended price elements. The Government shall not be held liable for any errors in calculation or pricing data.
NOTE 5: Payment for bond premiums in accordance with AGAR Clause 452.232-71, Progress Payments for Commercial Construction Contracts, shall not be in addition to the contract price, but may be included under Mobilization.

NAME:

SAM UEI #:

DATE:

File details come from the government source that posted it. Updated .